36C78619R0052 SOW- Baltimore NC (802-MM19-02) STATEMENT OF WORK (SOW) .pdf

View the file

Other files

File Type Posted
36C78619C0097-000.docx DOCX document
36C78619R0052-A0004000.docx DOCX document
36C78619R0052-A0003000.docx DOCX document
36C78619R0052-A0003001.pdf PDF
36C78619R0052-A0002000.docx DOCX document
36C78619R0052-A0001000.docx DOCX document
36C78619R0052-004.pdf PDF
36C78619R0052-001.docx DOCX document
36C78619R0052-006.pdf PDF
36C78619R0052-008.pdf PDF
36C78619R0052-007.pdf PDF
36C78619R0052-003.pdf PDF
36C78619R0052-002.pdf PDF
36C78619R0052-005.pdf PDF
36C78619R0052-010.pdf PDF
36C78619R0052-000.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Location: BALTIMORE NATIONAL CEMETERY

Project Title: Construct Committal Service Shelter

Project Control #: 802-MM19-02

Statement of Work Summary:

Contractor shall furnish all tools, labor, materials, equipment, and services to perform work described below, in the specification sections, and on the drawings at the Baltimore

National Cemetery.

A. General

1. Contractor is strongly encouraged to survey the project area prior to bidding to adequately understand the full scope of work and all requirements. Contractor is required to submit any questions or clarifications prior to bid. A bid submitted will be taken as agreement that the work shall be performed to meet the requirements herein based on the existing conditions in the field.

2. The specifications and drawings have the following project number on them which corresponds to the design project number: 802-MM18-05. Contractor shall note that this differs from the scope of work project control number listed above which is being used for this construction project: 802-MM19-02.

3. The contractor shall submit submittals including shop drawings and any other specification requirements to the COR for review and approval prior to fabrication/installation. Submittals approved by the owner (VA/NCA) are required prior to starting on the corresponding work.

4. The contractor shall submit a draft invoice/payment request concurrently to the field COR and the Project Engineer for dual approval. Only when the field COR and the Project Engineer approve of the draft invoice may it then be submitted for formal payment.

B. Specific work items:

1. Perform all work in accordance with the contract drawings and specifications below and attached.

SPECIFICATION SECTIONS:

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 01 TITLE SHEET

00 01 07 CERTIFICATION PAGE

00 01 10 TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

01 00 02 GENERAL REQUIREMENTS

01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

01 42 19 REFERENCE STANDARDS

01 45 29 TESTING LABORTORY SERVICES

01 74 19 CONSTRUCTION WASTE MANAGEMENT

DIVISION 02 – EXISTING CONDITIONS

02 21 00 SITE SURVEYS

02 41 10 DEMOLITION AND SITE CLEARING

DIVISION 03 – CONCRETE

03 30 53 CAST-IN-PLACE CONCRETE (SHORT FORM)

03 48 26 PRECAST CONCRETE MEMORIAL WALL UNITS

DIVISION 04 – MASONRY

04 05 13 MASONRY MORTARING

04 05 16 MASONRY GROUTING

04 43 00 NATURAL STONE VENEER

DIVISION 05 – METALS

05 50 00 METAL FABRICATIONS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 13 52 MODIFIED BITUMEN SHEET WATERPROOFING

07 25 13.13 ACRYLIC PLASTER FINISH

07 31 29 SYNTHETIC SLATE SHINGLES

07 60 00 FLASHING AND SHEET METAL

07 71 00 ROOF SPECIALITIES

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS

08 90 00 LOUVERS AND VENTS

DIVISION 09 – FINISHES

09 91 00 PAINTING

DIVISION 10 – SPECIALTIES

10 14 00 EXTERIOR SIGNAGE

DIVISION 11 – EQUIPMENT (Not Used)

DIVISION 12 – FURNISHINGS (Not Used)

DIVISION 13 – SPECIAL CONSTRUCTION (Not Used)

DIVISION 14 – CONVEYING EQUIPMENT (Not Used)

DIVISION 15-21 (Not Used)

DIVISION 22 - PLUMBING

22 05 11 COMMON WORK RESULTS FOR PLUMBING

22 14 00 FACILITY STORM DRAINAGE

DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING (Not Used)

DIVISION 24-25 (Not used)

DIVISION 26 – ELECTRICAL

26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION

26 27 26 WIRING DEVICES

26 29 21 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

DIVISION 27-30 (Not Used)

DIVISION 31 – EARTHWORK

31 20 11 EARTH MOVING (SHORT FORM)

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

32 12 16 ASPHALT PAVING

32 17 23 PAVEMENT MARKINGS

32 33 00 SITE FURNISHINGS

32 90 00 PLANTING

DIVISION 33 – UTILITIES (Not Used)

DIVISION 34 – 49 (Not Used

DRAWINGS:

G-100 – Title Sheet

C-101 – Erosion & Sediment Control Details

C-102 - Erosion & Sediment Control Details

D-101 – Site Demolition Plan

L-101 – Site Plan

L-102 – Site Grading Plan

L-103 – Layout Plan

L-201 – Site Details

L-202 – Site Details

S-001 – Notes, Legends, & Abbreviations

S-100 – Plans

S-101 – Sections

S-102 – Details

S-103 – Details

AG-101 – Achitectural Abbreviations & Symbols

A-101 – Plans & Details

A-201 – Elevations & Details

A-301 – Sections & Details

A-501 – Details

E-1 - Electrical Symbols & General Notes

E-2 - Site Plan & Details

E-3 - Lightning Protection Plan & Details

Pre-Bid Site Visit: Bidders are strongly urged to inspect, site investigate by observation, and Request for Information (RFI) and responses through the Contracting Office to satisfy their understanding of the work to be done, all general, local and technical conditions that may affect the cost and the feasibility of their proposal. In no event shall failure to inspect the site constitute grounds for a claim after award. Visitors planning to conduct a site visit shall contact the Cemetery Director to make arrangements.

PRICE SCHEDULE

DESCRIPTION QTY UNIT TOTAL PRICE

Contractor shall provide all labor, tools, materials, equipment, and supervision necessary to perform all work detailed in the contract specifications and drawings at the Baltimore National Cemetery.

1 JOB $ _____________

Duration: Term of the contract shall be one hundred and eighty days (180 days) from date of award. The Contractor shall complete all work within 180 calendar days after receipt of

Notice of Award, subject to all terms, conditions, provisions and schedules of the contract.

(END OF PRICE SCHEDULE)