36C78619R0052-009.pdf
PDF 104 KB Posted
- Solicitation number
- 36C78619R0052
About this file
36C78619R0052 SOW- Baltimore NC (802-MM19-02) STATEMENT OF WORK (SOW) .pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78619C0097-000.docx | DOCX document | |
| 36C78619R0052-A0004000.docx | DOCX document | |
| 36C78619R0052-A0003000.docx | DOCX document | |
| 36C78619R0052-A0003001.pdf | ||
| 36C78619R0052-A0002000.docx | DOCX document | |
| 36C78619R0052-A0001000.docx | DOCX document | |
| 36C78619R0052-004.pdf | ||
| 36C78619R0052-001.docx | DOCX document | |
| 36C78619R0052-006.pdf | ||
| 36C78619R0052-008.pdf | ||
| 36C78619R0052-007.pdf | ||
| 36C78619R0052-003.pdf | ||
| 36C78619R0052-002.pdf | ||
| 36C78619R0052-005.pdf | ||
| 36C78619R0052-010.pdf | ||
| 36C78619R0052-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Location: BALTIMORE NATIONAL CEMETERY
Project Title: Construct Committal Service Shelter
Project Control #: 802-MM19-02
Statement of Work Summary:
Contractor shall furnish all tools, labor, materials, equipment, and services to perform work described below, in the specification sections, and on the drawings at the Baltimore
National Cemetery.
A. General
1. Contractor is strongly encouraged to survey the project area prior to bidding to adequately understand the full scope of work and all requirements. Contractor is required to submit any questions or clarifications prior to bid. A bid submitted will be taken as agreement that the work shall be performed to meet the requirements herein based on the existing conditions in the field.
2. The specifications and drawings have the following project number on them which corresponds to the design project number: 802-MM18-05. Contractor shall note that this differs from the scope of work project control number listed above which is being used for this construction project: 802-MM19-02.
3. The contractor shall submit submittals including shop drawings and any other specification requirements to the COR for review and approval prior to fabrication/installation. Submittals approved by the owner (VA/NCA) are required prior to starting on the corresponding work.
4. The contractor shall submit a draft invoice/payment request concurrently to the field COR and the Project Engineer for dual approval. Only when the field COR and the Project Engineer approve of the draft invoice may it then be submitted for formal payment.
B. Specific work items:
1. Perform all work in accordance with the contract drawings and specifications below and attached.
SPECIFICATION SECTIONS:
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 TITLE SHEET
00 01 07 CERTIFICATION PAGE
00 01 10 TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 00 02 GENERAL REQUIREMENTS
01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 42 19 REFERENCE STANDARDS
01 45 29 TESTING LABORTORY SERVICES
01 74 19 CONSTRUCTION WASTE MANAGEMENT
DIVISION 02 – EXISTING CONDITIONS
02 21 00 SITE SURVEYS
02 41 10 DEMOLITION AND SITE CLEARING
DIVISION 03 – CONCRETE
03 30 53 CAST-IN-PLACE CONCRETE (SHORT FORM)
03 48 26 PRECAST CONCRETE MEMORIAL WALL UNITS
DIVISION 04 – MASONRY
04 05 13 MASONRY MORTARING
04 05 16 MASONRY GROUTING
04 43 00 NATURAL STONE VENEER
DIVISION 05 – METALS
05 50 00 METAL FABRICATIONS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 13 52 MODIFIED BITUMEN SHEET WATERPROOFING
07 25 13.13 ACRYLIC PLASTER FINISH
07 31 29 SYNTHETIC SLATE SHINGLES
07 60 00 FLASHING AND SHEET METAL
07 71 00 ROOF SPECIALITIES
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 90 00 LOUVERS AND VENTS
DIVISION 09 – FINISHES
09 91 00 PAINTING
DIVISION 10 – SPECIALTIES
10 14 00 EXTERIOR SIGNAGE
DIVISION 11 – EQUIPMENT (Not Used)
DIVISION 12 – FURNISHINGS (Not Used)
DIVISION 13 – SPECIAL CONSTRUCTION (Not Used)
DIVISION 14 – CONVEYING EQUIPMENT (Not Used)
DIVISION 15-21 (Not Used)
DIVISION 22 - PLUMBING
22 05 11 COMMON WORK RESULTS FOR PLUMBING
22 14 00 FACILITY STORM DRAINAGE
DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING (Not Used)
DIVISION 24-25 (Not used)
DIVISION 26 – ELECTRICAL
26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION
26 27 26 WIRING DEVICES
26 29 21 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
DIVISION 27-30 (Not Used)
DIVISION 31 – EARTHWORK
31 20 11 EARTH MOVING (SHORT FORM)
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS
32 12 16 ASPHALT PAVING
32 17 23 PAVEMENT MARKINGS
32 33 00 SITE FURNISHINGS
32 90 00 PLANTING
DIVISION 33 – UTILITIES (Not Used)
DIVISION 34 – 49 (Not Used
DRAWINGS:
G-100 – Title Sheet
C-101 – Erosion & Sediment Control Details
C-102 - Erosion & Sediment Control Details
D-101 – Site Demolition Plan
L-101 – Site Plan
L-102 – Site Grading Plan
L-103 – Layout Plan
L-201 – Site Details
L-202 – Site Details
S-001 – Notes, Legends, & Abbreviations
S-100 – Plans
S-101 – Sections
S-102 – Details
S-103 – Details
AG-101 – Achitectural Abbreviations & Symbols
A-101 – Plans & Details
A-201 – Elevations & Details
A-301 – Sections & Details
A-501 – Details
E-1 - Electrical Symbols & General Notes
E-2 - Site Plan & Details
E-3 - Lightning Protection Plan & Details
Pre-Bid Site Visit: Bidders are strongly urged to inspect, site investigate by observation, and Request for Information (RFI) and responses through the Contracting Office to satisfy their understanding of the work to be done, all general, local and technical conditions that may affect the cost and the feasibility of their proposal. In no event shall failure to inspect the site constitute grounds for a claim after award. Visitors planning to conduct a site visit shall contact the Cemetery Director to make arrangements.
PRICE SCHEDULE
DESCRIPTION QTY UNIT TOTAL PRICE
Contractor shall provide all labor, tools, materials, equipment, and supervision necessary to perform all work detailed in the contract specifications and drawings at the Baltimore National Cemetery.
1 JOB $ _____________
Duration: Term of the contract shall be one hundred and eighty days (180 days) from date of award. The Contractor shall complete all work within 180 calendar days after receipt of
Notice of Award, subject to all terms, conditions, provisions and schedules of the contract.
(END OF PRICE SCHEDULE)
File details come from the government source that posted it.