36C78619R0052 802-MM19-02 - Shelter Landscaping.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78619C0097-000.docx | DOCX document | |
| 36C78619R0052-A0004000.docx | DOCX document | |
| 36C78619R0052-A0003000.docx | DOCX document | |
| 36C78619R0052-A0003001.pdf | ||
| 36C78619R0052-A0002000.docx | DOCX document | |
| 36C78619R0052-A0001000.docx | DOCX document | |
| 36C78619R0052-004.pdf | ||
| 36C78619R0052-001.docx | DOCX document | |
| 36C78619R0052-008.pdf | ||
| 36C78619R0052-007.pdf | ||
| 36C78619R0052-003.pdf | ||
| 36C78619R0052-002.pdf | ||
| 36C78619R0052-005.pdf | ||
| 36C78619R0052-009.pdf | ||
| 36C78619R0052-010.pdf | ||
| 36C78619R0052-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12" CMP OUTFALL PIPE
INV=350.85
6" HDPE IN
INV=356.16
12" HDPE OUT
INV=354.74
12" HDPE IN
INV=354.58
HC PARKING
SIGN
HC PARKING
SIGN
POEM
PLAQUE SIGN
TRASH CAN
LANDSCAPE
AREA
LANDSCAPE
AREA
CONCRETE
SIDEWALK
CONCRETE
MACADAM
MACADAM
MACADAM
MACADAM
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
MARBLE
BENCH
MARBLE
TABLE
CATCH BASIN
GRATE=357.08
CATCH BASIN
GRATE=357.66
ROOF DRAIN
ROOF DRAIN
12" CMP OUT
INV=353.93
.6
.1
19.63
E: 1395435.2974
F
L
O
W
F
L
O
W
F
L
O
W
14'x20'± STEEL FRAME CANOPY
TREE
TRUNK
UPRIGHT CURB (TYP)
x x x x x x
40"
352.3
355.3
356.0
349.4
361.8
20"
SECTION O
RIP
RAP
SECTION O MARKER
PROTECT EXISTING
TREE TO REMAIN
CONTRACTOR PERSONAL VEHICLE
PARKING - (110'X9')
- COORDINATE LOCATION SO AS NOT
TO INTERFERE WITH CEMETERY
OPERATIONS
CONTRACTOR CONSTRUCTION ACCESS
ROUTE IS VIA MAIN CEMETERY ENTRANCE
FROM FREDERICK RD.
- COORDINATE SO AS NOT TO INTERFERE
WITH CEMETERY OPERATIONS
AT LEAST ONE LANE (12' WIDE) TO
REMAIN OPEN THROUGHOUT
CONSTRUCTION
AT LEAST ONE LANE (12' WIDE) TO
REMAIN OPEN THROUGHOUT
CONSTRUCTION
AT LEAST ONE LANE (12' WIDE) TO
REMAIN OPEN THROUGHOUT
CONSTRUCTION
CONTRACTOR
STAGING AREA
TREE PROTECTION
FENCE
L-202
Project Number
Building Number
Drawing Number
Project Title
Location: Baltimore National Cemetery 5501 Frederick Ave., Catonsville, Baltimore County, MD 21228
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
100% CONSTRUCTION DOCUMENTS
FINAL
MARCH 25, 2019
NOT SUPPRESSED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
321 4 5 6 7 8 9 10
802-MM18-05
Committal Shelter Project Director
Revisions: Date:
BALTIMORE NATIONAL CEMETERY
Design Services for Committal Service Shelter Improvements
Office of Construction and Facilities Management
Civil/ Structural/ Electrical Engineer:
KCI Technologies, Inc.
1352 Marrows Road, Suite 100 Newark, Delaware 19711
PH: 302.731.9176
POC: Tom deLorimier
Landscape Architect:
Pashek+MTR, Ltd.
619 E. Ohio St.
Pittsburgh, PA 15212
PH: 412-321-6362
POC: Kara Roggenkamp
D-101
03.25.2019 KR MAS
SITE DEMOLITION AND CONSTRUCTION
ACCESS PLAN
y V
A
I D
I Q b a l t i m o r e c o m m i t t a l s h e l t e r s h e e t s x D
S i t e
D e m o l i t i o n
P l a n d w g
DEMOLITION KEYED NOTES
REMOVE EXISTING SIGNS AND REINSTALL AS INDICATED ON SITE PLAN.
DEMOLISH EXISTING 14' X 20' STEEL FRAME CANOPY.
REMOVE EXISTING FURNISHINGS AND TURN OVER TO CEMETERY.
PROTECT EXISTING CATCH BASIN AND STORM DRAIN TO REMAIN.
DEMOLITION LEGEND
DEMOLISH EXISTING CONCRETE
PAVEMENT
DEMOLISH EXISTING CONCRETE
CURB AND GUTTER
SAW CUT AND REMOVE EXISTING BITUMINOUS
PAVING AS NEEDED TO INSTALL CURB
REMOVE EXISTING LANDSCAPING
TREE PROTECTION FENCE
CONSTRUCTION FENCE (CHAIN
LINK - 8' HT)
1. CONTRACTOR IS RESPONSIBLE FOR ALL WORK SHOWN UNLESS SPECIFICALLY
INDICATED OTHERWISE.
2. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE LAWS,
ORDINANCES, AND CODES. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
APPLICABLE PERMITS.
3. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE INDIVIDUAL
CONTRACT DOCUMENTS AND REPORT AT ONCE IN WRITING TO THE COR ANY
DEFICIENCIES. THE CONTRACTOR SHALL REQUIRE EACH SUBCONTRACTOR TO
LIKEWISE STUDY THE DOCUMENTS AND IMMEDIATELY REPORT ANY
DEFICIENCIES. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND
PROPOSED POINT OF CONNECTION (P.O.C.) LOCATIONS AND REPORT ANY
DISCREPANCY TO THE COR IMMEDIATELY.
4. NOTIFY UTILITY LOCATOR SERVICE AT LEAST 3 WORKING DAYS PRIOR TO ANY
DIGGING OR EXCAVATION.
5. CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS OF
CONSTRUCTION AND SHALL COORDINATE ALL CONSTRUCTION EFFORTS WITH
COR'S REQUIREMENTS.
6. MATERIALS INDICATED TO BE DEMOLISHED AND WASTE MATERIALS
ENCOUNTERED IN THE WORK SHALL BE LEGALLY DISPOSED OF OFF SITE BY
CONTRACTOR.
7. PROTECT EXISTING WALLS, PLAQUES, SIGNS, HISTORIC ELEMENTS, FENCING,
GATES, LANDSCAPING, IRRIGATION, BENCH MARKS, UTILITIES, SIDEWALKS,
PAVING AND CURBS FROM EQUIPMENT, VEHICULAR TRAFFIC AND GENERAL
CONSTRUCTION ACTIVITIES. DAMAGED ITEMS INTENDED TO REMAIN SHALL BE
REPLACED OR REPAIRED AT NO EXPENSE TO THE GOVERNMENT. DISTURBED
AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. ANY EXISTING LAWN
AREAS DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED WITH
SOD (NOT SEED).
8. PROTECT ALL EXISTING TREES.
9. PROTECT GRAVESITES AND MONUMENTS.
10. MAINTAIN PUBLIC ACCESS TO GRAVESITES AT ALL TIMES DURING
CONSTRUCTION. OBTAIN COR APPROVAL IF RESTRICTING ACCESS IS
NECESSARY FOR PUBLIC SAFETY DURING DEMOLITION OR CONSTRUCTION.
PROVIDE TEMPORARY BARRICADES, FENCING, TRAFFIC CONTROL AND
SIGNAGE AS NEEDED TO MAINTAIN PUBLIC SAFETY DURING CONSTRUCTION.
11. CONSTRUCTION NOTES AND TYPICALS MAY APPEAR ONLY ONCE ON DRAWINGS,
BUT APPLY TO ALL SIMILAR CONDITIONS WHERE NEW CONSTRUCTION OCCURS
TO FULFILL THE INTENT OF THE DRAWINGS.
12. THE BURIAL ACTIVITIES AT THE NATIONAL CEMETERY SHALL TAKE
PRECEDENCE OVER CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST
COOPERATE AND COORDINATE WITH THE CEMETERY DIRECTOR, THROUGH THE
COR, IN ARRANGING THE CONSTRUCTION SCHEDULE TO CAUSE THE LEAST
POSSIBLE INTERFERENCE WITH CEMETERY ACTIVITIES. CONSTRUCTION NOISE
DURING COMMITTAL SERVICES SHALL NOT DISTURB THE SERVICE. TRUCKS AND
WORKMEN SHALL NOT PASS THROUGH THE SERVICE AREA DURING THIS
PERIOD.
13. THE CONTRACTOR IS REQUIRED TO DISCONTINUE HIS WORK SUFFICIENTLY IN
ADVANCE OF EASTER SUNDAY, MOTHER'S DAY, FATHER'S DAY, MEMORIAL DAY,
VETERAN'S DAY AND/OR FEDERAL HOLIDAYS, TO PERMIT HIM TO CLEAN UP ALL
AREAS OF OPERATION ADJACENT TO EXISTING BURIAL PLOTS BEFORE THESE
DATES.
GENERAL NOTES
1. CONTRACTOR SHALL NOT WORK UPON OR STORE ANY MATERIALS ON
OCCUPIED GRAVE PLOTS. DESIGNATED LIMITED ACCESS ROUTES ARE
INDICATED ON THE PLANS.
2. PROTECT ALL EXISTING GRAVESITES, HEADSTONES, AND FLAT MARKERS FROM
DAMAGE DUE TO CONSTRUCTION OPERATIONS.
3. MONUMENT PROTECTION SHALL BE INSTALLED IMMEDIATELY PRIOR TO
DEMOLITION OR CONSTRUCTION ACTIVITIES OCCURING WITHIN 10' OF EXISTING
MONUMENTS AND SHALL BE REMOVED IMMEDIATELY AFTER DEMOLITION OR
CONSTRUCTION NEAR THE MONUMENT IS COMPLETE.
4. HEADSTONE COVERS SHALL BE CONSTRUCTED OF ½-INCH THICK PLYWOOD
AND SHALL COMPLETELY ENCASE HEADSTONES ADJACENT TO THE WORK AREA
WITHOUT DAMAGING THEM.
GRAVESITE PROTECTION NOTES
1. ALL TREES NOT INDICATED TO BE REMOVED ARE TO BE PROTECTED FROM
DAMAGE DUE TO CONSTRUCTION OPERATIONS.
2. PROTECTION ZONE: THE AREA DEFINED BY THE DRIP LINE OF THE OUTER
EXTENT OF THE CANOPY OF A TREE, OR WITHIN THE TREE PROTECTION FENCE
AREA AS SHOWN ON PLANS, WHICHEVER IS LARGER.
3. ACTIVITIES PROHIBITED WITHIN PROTECTION ZONES:
3.1. STORAGE OF ANY CONSTRUCTION MATERIALS, EQUIPMENT, STOCKPILING,
EXCAVATION OR FILL, SOIL, GRAVEL, TRASH, TOOLS, STONES, FENCING
ETC., EXCEPT IN DESIGNATED AREAS AS APPROVED BY THE GOVERNMENT.
3.2. EQUIPMENT OR VEHICLE PARKING, EXCEPT IN DESIGNATED AREAS AS
APPROVED BY THE GOVERNMENT.
3.3. VEHICULAR TRAFFIC WITHOUT PROPER CONSTRUCTION MATTING.
3.4. MASONRY SET UP, CLEAN UP OR WASHOUT.
3.5. DUMPING OF ANY CHEMICALS, (I.E. PAINT THINNER FROM CLEANING
BRUSHES), WASH-OUT MATERIALS FROM CLEANING EQUIPMENT,
CONCRETE OR MORTAR REMAINDER, TRASH, GARBAGE, OR DEBRIS OF ANY
KIND.
4. ROOT ZONE PROTECTION:
4.1. IN GENERAL, VEHICLE TRAFFIC IS PROHIBITED IN PROTECTION ZONES,
EXCEPT IN EXISTING PAVED AREAS AS APPROVED BY OWNER. IF
EQUIPMENT ACCESS IS REQUIRED THROUGH PROTECTION ZONES
(OUTSIDE OF EXISTING PAVED AREAS), PROVIDE THE FOLLOWING:
4.2. VEHICLES AND EQUIPMENT CONSTRUCTION MATTING: GEOTEXTILE FABRIC
WITH 8-INCH THICKNESS OF COARSELY SHREDDED WOOD CHIPS ON TOP.
RESPREAD OR ADD MULCH AS NEEDED TO MAINTAIN THE SPECIFIED
THICKNESS.
4.3. PEDESTRIAN TRAFFIC AND SHORT TERM (ONE DAY) MATERIAL STAGING:
DURING MASONRY AND FENCE INSTALLATION, PROTECT SOIL AND LAWN
AREAS WITHIN PROTECTION ZONES WITH 1-INCH THICK PLYWOOD.
4.4. COMPLETELY REMOVE ALL CONSTRUCTION MAT MATERIALS AS SOON AS
POSSIBLE.
5. TRUNK PROTECTION: PROTECT TRUNKS OF TREES ADJACENT TO WORKING
AREAS FROM ACCIDENTAL MECHANICAL DAMAGE BY ATTACHING LUMBER TO
THE TRUNK WITH NYLON WEBBING STRAPS. DO NOT USE NAILS OR BOLTS.
6. GRADING: IN GENERAL, GRADING, FILLING, AND EXCAVATION IS PROHIBITED
WITHIN PROTECTION ZONES, EXCEPT IN EXISTING PAVED AREAS. IF
UNAVOIDABLE, EXCAVATION SHALL BE CONDUCTED USING DIRECTIONAL
BORING OR PNEUMATIC EXCAVATION (AIR SPADE) IN ORDER TO LOCATE ROOTS
PRIOR TO DAMAGING THEM.
6.1. IF ROOTS OVER 2” DIAMETER ARE ENCOUNTERED:
6.2. PROTECT EXPOSED ROOTS BY IMMEDIATELY WRAPPING WITH WET BURLAP
AND KEEP MOIST. DO NOT LEAVE THE TRENCH OPEN FOR LONGER THAN 4
HOURS, QUICKLY REPLACE THE SOIL AND SOAK WITH WATER TO PACK.
6.3. IF POSSIBLE, LEAVE ROOTS IN PLACE.
6.4. IF UNAVOIDABLE, A LICENSED ARBORIST SHALL CONDUCT ROOT PRUNING
BY CUTTING EXPOSED ROOTS CLEANLY WITH A WHEEL SAW,
RECIPROCATING SAW OR SMALL PRUNING SAW. CONTRACTOR SHALL NOT
RIP, CHOP, OR TEAR ROOTS.
7. ALL PRUNING, TREE REMOVALS, ROOT PRUNING, AND FERTILIZATION REQUIRED
SHALL BE PERFORMED BY AN ISA-LICENSED ARBORIST.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COSTS OF A CONSULTING
ARBORIST AND REMEDIAL MEASURES FOR TREES DAMAGED BY CONSTRUCTION
ACTIVITIES, INCLUDING BUT NOT LIMITED TO PRUNING, TREATMENTS, VERTICAL
MULCHING, TREE REMOVAL, AND PROVIDING REPLACEMENT TREE(S) WHOSE
TOTAL CALIPER EQUALS THE DBH OF THE DAMAGED TREE (E.G. IF A 24" DBH
TREE IS DAMAGED, PROVIDE (8) 3" CALIPER TREES), AT NO ADDITIONAL COST
TO THE GOVERNMENT.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND
MAINTENANCE OF ALL TREE PROTECTION FENCING. PROTECTIVE FENCING
SHALL REMAIN UNDISTURBED UNTIL ALL CONSTRUCTION ACTIVITIES HAVE BEEN
COMPLETED. IF PROTECTIVE FENCING IS DAMAGED, THE CONTRACTOR SHALL
IMMEDIATELY EXECUTE THE NECESSARY REPAIRS TO RE-ESTABLISH THE
PROTECTIVE FENCING TO ORIGINAL CONFIGURATIONS. THE CONTRACTOR
SHALL REMOVE FENCING UPON COMPLETION OF CONSTRUCTION.
10. CONTRACTOR IS RESPONSIBLE FOR KEEPING LAWN MOWED INSIDE TREE
PROTECTION FENCE IF LEFT IN PLACE FOR MORE THAN ONE WEEK.
TREE PROTECTION NOTES
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text Scale: 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text North
40"
352.3
355.3
356.0
349.4
361.8
20"
SECTION O
RIP
RAP
SECTION O MARKER
BENCH (TYP.) - SEE SPECIFICATIONS
COMMITTAL SHELTER
COLUMN - SEE A -
DRAWINGS
SODDED
LAWN
CONCRETE PAVEMENT
L-201
BITUMINOUS PAVEMENT
RESTORATION
L-201
SODDED
LAWN
LINE STRIPING (TYP.)
BOLLARD, TYP.
L-201
CONCRETE CURB AND
GUTTER (STANDARD)
L-201
CONCRETE CURB AND
GUTTER (FLUSH)
L-201
CONCRETE CURB AND
GUTTER (FLUSH)
L-201
CONCRETE CURB AND
GUTTER (MOUNTABLE)
L-201
CONCRETE CURB AND
GUTTER (MOUNTABLE)
L-201
EXPANSION JOINT (TYP.)
EXPANSION JOINT
(TYP.)
BOLLARD, TYP.
L-201
CONTROL JOINT
(TYP.)
BIVOUAC OF THE DEAD
MONUMENT
L-201
(1) CARPINUS CAROLINIANA
TRASH RECEPTACLE
L-201
DOWNSPOUT -
SEE CIVIL DRAWINGS (TYP.)
POST AND PANEL
DIRECTIONAL SIGN -
NC-04.01
L-201
CONCRETE CURB AND
GUTTER (STANDARD)
L-201
CONCRETE CURB AND
GUTTER (STANDARD)
L-201
Project Number
Building Number
Drawing Number
Project Title
Location: Baltimore National Cemetery 5501 Frederick Ave., Catonsville, Baltimore County, MD 21228
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
100% CONSTRUCTION DOCUMENTS
FINAL
MARCH 25, 2019
NOT SUPPRESSED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
321 4 5 6 7 8 9 10
802-MM18-05
Committal Shelter Project Director
Revisions: Date:
BALTIMORE NATIONAL CEMETERY
Design Services for Committal Service Shelter Improvements
Office of Construction and Facilities Management
Civil/ Structural/ Electrical Engineer:
KCI Technologies, Inc.
1352 Marrows Road, Suite 100 Newark, Delaware 19711
PH: 302.731.9176
POC: Tom deLorimier
Landscape Architect:
Pashek+MTR, Ltd.
619 E. Ohio St.
Pittsburgh, PA 15212
PH: 412-321-6362
POC: Kara Roggenkamp
LEGEND
SYMBOL
DETAIL
REFERENCE
CONCRETE PAVEMENT
L-201
BITUMINOUS PAVEMENT RESTORATION
L-201
CONCRETE CURB AND GUTTER (FLUSH)
L-201
CONCRETE CURB AND GUTTER (MOUNTABLE)
L-201
CONCRETE CURB AND GUTTER (STANDARD)
L-201
L-101
03.25.2019 KR MAS
SITE PLAN
y V
A
I D
I Q b a l t i m o r c o m m i t t a l s h e l t e r s h e e t s x
L
S i t a n d w g
1. CONTRACTOR IS RESPONSIBLE FOR ALL WORK SHOWN UNLESS SPECIFICALLY
INDICATED OTHERWISE.
2. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE LAWS,
ORDINANCES, AND CODES. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
APPLICABLE PERMITS.
3. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE INDIVIDUAL
CONTRACT DOCUMENTS AND REPORT AT ONCE IN WRITING TO THE COR ANY
DEFICIENCIES. THE CONTRACTOR SHALL REQUIRE EACH SUBCONTRACTOR TO
LIKEWISE STUDY THE DOCUMENTS AND IMMEDIATELY REPORT ANY
DEFICIENCIES. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND
PROPOSED POINT OF CONNECTION (P.O.C.) LOCATIONS AND REPORT ANY
DISCREPANCY TO THE COR IMMEDIATELY.
4. NOTIFY UTILITY LOCATOR SERVICE AT LEAST 3 WORKING DAYS PRIOR TO ANY
DIGGING OR EXCAVATION.
5. CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS OF
CONSTRUCTION AND SHALL COORDINATE ALL CONSTRUCTION EFFORTS WITH
COR'S REQUIREMENTS.
6. MATERIALS INDICATED TO BE DEMOLISHED AND WASTE MATERIALS
ENCOUNTERED IN THE WORK SHALL BE LEGALLY DISPOSED OF OFF SITE BY
CONTRACTOR.
7. PROTECT EXISTING WALLS, PLAQUES, SIGNS, HISTORIC ELEMENTS, FENCING,
GATES, LANDSCAPING, IRRIGATION, BENCH MARKS, UTILITIES, SIDEWALKS,
PAVING AND CURBS FROM EQUIPMENT, VEHICULAR TRAFFIC AND GENERAL
CONSTRUCTION ACTIVITIES. DAMAGED ITEMS INTENDED TO REMAIN SHALL BE
REPLACED OR REPAIRED AT NO EXPENSE TO THE GOVERNMENT. DISTURBED
AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. ANY EXISTING LAWN
AREAS DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED WITH
SOD (NOT SEED).
8. PROTECT ALL EXISTING TREES.
9. PROTECT GRAVESITES AND MONUMENTS.
10. MAINTAIN PUBLIC ACCESS TO GRAVESITES AT ALL TIMES DURING
CONSTRUCTION. OBTAIN COR APPROVAL IF RESTRICTING ACCESS IS
NECESSARY FOR PUBLIC SAFETY DURING DEMOLITION OR CONSTRUCTION.
PROVIDE TEMPORARY BARRICADES, FENCING, TRAFFIC CONTROL AND
SIGNAGE AS NEEDED TO MAINTAIN PUBLIC SAFETY DURING CONSTRUCTION.
11. CONSTRUCTION NOTES AND TYPICALS MAY APPEAR ONLY ONCE ON DRAWINGS,
BUT APPLY TO ALL SIMILAR CONDITIONS WHERE NEW CONSTRUCTION OCCURS
TO FULFILL THE INTENT OF THE DRAWINGS.
12. THE BURIAL ACTIVITIES AT THE NATIONAL CEMETERY SHALL TAKE
PRECEDENCE OVER CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST
COOPERATE AND COORDINATE WITH THE CEMETERY DIRECTOR, THROUGH THE
COR, IN ARRANGING THE CONSTRUCTION SCHEDULE TO CAUSE THE LEAST
POSSIBLE INTERFERENCE WITH CEMETERY ACTIVITIES. CONSTRUCTION NOISE
DURING COMMITTAL SERVICES SHALL NOT DISTURB THE SERVICE. TRUCKS AND
WORKMEN SHALL NOT PASS THROUGH THE SERVICE AREA DURING THIS
PERIOD.
13. THE CONTRACTOR IS REQUIRED TO DISCONTINUE HIS WORK SUFFICIENTLY IN
ADVANCE OF EASTER SUNDAY, MOTHER'S DAY, FATHER'S DAY, MEMORIAL DAY,
VETERAN'S DAY AND/OR FEDERAL HOLIDAYS, TO PERMIT HIM TO CLEAN UP ALL
AREAS OF OPERATION ADJACENT TO EXISTING BURIAL PLOTS BEFORE THESE
DATES.
GENERAL NOTES
KEYED NOTES
REINSTALL EXISTING ADA PARKING SIGN
1. CONTRACTOR SHALL NOT WORK UPON OR STORE ANY MATERIALS ON
OCCUPIED GRAVE PLOTS. DESIGNATED LIMITED ACCESS ROUTES ARE
INDICATED ON THE PLANS.
2. PROTECT ALL EXISTING GRAVESITES, HEADSTONES, AND FLAT MARKERS FROM
DAMAGE DUE TO CONSTRUCTION OPERATIONS.
3. MONUMENT PROTECTION SHALL BE INSTALLED IMMEDIATELY PRIOR TO
DEMOLITION OR CONSTRUCTION ACTIVITIES OCCURING WITHIN 10' OF EXISTING
MONUMENTS AND SHALL BE REMOVED IMMEDIATELY AFTER DEMOLITION OR
CONSTRUCTION NEAR THE MONUMENT IS COMPLETE.
4. HEADSTONE COVERS SHALL BE CONSTRUCTED OF ½-INCH THICK PLYWOOD
AND SHALL COMPLETELY ENCASE HEADSTONES ADJACENT TO THE WORK AREA
WITHOUT DAMAGING THEM.
GRAVESITE PROTECTION NOTES
1. ALL TREES NOT INDICATED TO BE REMOVED ARE TO BE PROTECTED FROM
DAMAGE DUE TO CONSTRUCTION OPERATIONS.
2. PROTECTION ZONE: THE AREA DEFINED BY THE DRIP LINE OF THE OUTER
EXTENT OF THE CANOPY OF A TREE, OR WITHIN THE TREE PROTECTION FENCE
AREA AS SHOWN ON PLANS, WHICHEVER IS LARGER.
3. ACTIVITIES PROHIBITED WITHIN PROTECTION ZONES:
3.1. STORAGE OF ANY CONSTRUCTION MATERIALS, EQUIPMENT, STOCKPILING,
EXCAVATION OR FILL, SOIL, GRAVEL, TRASH, TOOLS, STONES, FENCING
ETC., EXCEPT IN DESIGNATED AREAS AS APPROVED BY THE GOVERNMENT.
3.2. EQUIPMENT OR VEHICLE PARKING, EXCEPT IN DESIGNATED AREAS AS
APPROVED BY THE GOVERNMENT.
3.3. VEHICULAR TRAFFIC WITHOUT PROPER CONSTRUCTION MATTING.
3.4. MASONRY SET UP, CLEAN UP OR WASHOUT.
3.5. DUMPING OF ANY CHEMICALS, (I.E. PAINT THINNER FROM CLEANING
BRUSHES), WASH-OUT MATERIALS FROM CLEANING EQUIPMENT,
CONCRETE OR MORTAR REMAINDER, TRASH, GARBAGE, OR DEBRIS OF ANY
KIND.
4. ROOT ZONE PROTECTION:
4.1. IN GENERAL, VEHICLE TRAFFIC IS PROHIBITED IN PROTECTION ZONES,
EXCEPT IN EXISTING PAVED AREAS AS APPROVED BY OWNER. IF
EQUIPMENT ACCESS IS REQUIRED THROUGH PROTECTION ZONES
(OUTSIDE OF EXISTING PAVED AREAS), PROVIDE THE FOLLOWING:
4.2. VEHICLES AND EQUIPMENT CONSTRUCTION MATTING: GEOTEXTILE FABRIC
WITH 8-INCH THICKNESS OF COARSELY SHREDDED WOOD CHIPS ON TOP.
RESPREAD OR ADD MULCH AS NEEDED TO MAINTAIN THE SPECIFIED
THICKNESS.
4.3. PEDESTRIAN TRAFFIC AND SHORT TERM (ONE DAY) MATERIAL STAGING:
DURING MASONRY AND FENCE INSTALLATION, PROTECT SOIL AND LAWN
AREAS WITHIN PROTECTION ZONES WITH 1-INCH THICK PLYWOOD.
4.4. COMPLETELY REMOVE ALL CONSTRUCTION MAT MATERIALS AS SOON AS
POSSIBLE.
5. TRUNK PROTECTION: PROTECT TRUNKS OF TREES ADJACENT TO WORKING
AREAS FROM ACCIDENTAL MECHANICAL DAMAGE BY ATTACHING LUMBER TO
THE TRUNK WITH NYLON WEBBING STRAPS. DO NOT USE NAILS OR BOLTS.
6. GRADING: IN GENERAL, GRADING, FILLING, AND EXCAVATION IS PROHIBITED
WITHIN PROTECTION ZONES, EXCEPT IN EXISTING PAVED AREAS. IF
UNAVOIDABLE, EXCAVATION SHALL BE CONDUCTED USING DIRECTIONAL
BORING OR PNEUMATIC EXCAVATION (AIR SPADE) IN ORDER TO LOCATE ROOTS
PRIOR TO DAMAGING THEM.
6.1. IF ROOTS OVER 2” DIAMETER ARE ENCOUNTERED:
6.2. PROTECT EXPOSED ROOTS BY IMMEDIATELY WRAPPING WITH WET BURLAP
AND KEEP MOIST. DO NOT LEAVE THE TRENCH OPEN FOR LONGER THAN 4
HOURS, QUICKLY REPLACE THE SOIL AND SOAK WITH WATER TO PACK.
6.3. IF POSSIBLE, LEAVE ROOTS IN PLACE.
6.4. IF UNAVOIDABLE, A LICENSED ARBORIST SHALL CONDUCT ROOT PRUNING
BY CUTTING EXPOSED ROOTS CLEANLY WITH A WHEEL SAW,
RECIPROCATING SAW OR SMALL PRUNING SAW. CONTRACTOR SHALL NOT
RIP, CHOP, OR TEAR ROOTS.
7. ALL PRUNING, TREE REMOVALS, ROOT PRUNING, AND FERTILIZATION REQUIRED
SHALL BE PERFORMED BY AN ISA-LICENSED ARBORIST.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COSTS OF A CONSULTING
ARBORIST AND REMEDIAL MEASURES FOR TREES DAMAGED BY CONSTRUCTION
ACTIVITIES, INCLUDING BUT NOT LIMITED TO PRUNING, TREATMENTS, VERTICAL
MULCHING, TREE REMOVAL, AND PROVIDING REPLACEMENT TREE(S) WHOSE
TOTAL CALIPER EQUALS THE DBH OF THE DAMAGED TREE (E.G. IF A 24" DBH
TREE IS DAMAGED, PROVIDE (8) 3" CALIPER TREES), AT NO ADDITIONAL COST
TO THE GOVERNMENT.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND
MAINTENANCE OF ALL TREE PROTECTION FENCING. PROTECTIVE FENCING
SHALL REMAIN UNDISTURBED UNTIL ALL CONSTRUCTION ACTIVITIES HAVE BEEN
COMPLETED. IF PROTECTIVE FENCING IS DAMAGED, THE CONTRACTOR SHALL
IMMEDIATELY EXECUTE THE NECESSARY REPAIRS TO RE-ESTABLISH THE
PROTECTIVE FENCING TO ORIGINAL CONFIGURATIONS. THE CONTRACTOR
SHALL REMOVE FENCING UPON COMPLETION OF CONSTRUCTION.
10. CONTRACTOR IS RESPONSIBLE FOR KEEPING LAWN MOWED INSIDE TREE
PROTECTION FENCE IF LEFT IN PLACE FOR MORE THAN ONE WEEK.
TREE PROTECTION NOTES
1. COMPLY WITH REQUIREMENTS OF SPECIFICATION SECTION 32 90 00 AND THE
STANDARDS OF THE AMERICAN ASSOCIATION OF NURSERYMEN "AMERICAN
STANDARDS FOR NURSERY STOCK" FOR PLANT MATERIAL SPECIFICATIONS.
2. EXCAVATE PLANT PITS TO DEPTH AND DIMENSION SHOWN ON THE DETAILS,
AND PREPARE PLANTED AREAS AND LAWN AREAS AS SPECIFIED.
3. OBTAIN PLANTS FIELD GROWN IN LOCAL NURSERIES, OR IN CLIMATES
(HARDINESS ZONE) SIMILAR TO THE PROJECT SITE'S LOCATION. NO PLANTS
GROWN OR OBTAINED IN AREAS OUTSIDE THIS HARDINESS ZONE ARE
ACCEPTABLE.
4. TEST, PLACE, AND AMEND TOPSOIL (EXISTING AND/OR IMPORTED SOIL) IN
ACCORDANCE WITH SPECIFICATIONS.
5. COORDINATE LANDSCAPING WITH EXISTING AND PROPOSED UTILITY
LOCATIONS. NOTIFY COR OF ANY CONFLICTS.
6. PROVIDE TREE STAKING PER THE DETAILS AND SPECIFICATIONS.
7. MAKE NO PLANT SUBSTITUTIONS WITHOUT PRIOR APPROVAL BY THE OWNER'S
REPRESENTATIVE.
8. ALL LAWN AND LANDSCAPED AREAS SHALL RECEIVE A MINIMUM 6 INCH DEPTH
TOPSOIL.
9. PROVIDE TURFGRASS SOD (NOT SEED) FOR ALL PROPOSED LAWN AREAS AND
FOR REPAIRS TO EXISTING LAWN AREAS DISTURBED BY CONSTRUCTION
OPERATIONS.
10. PROVIDE MULCH RING AROUND INDIVIDUAL TREES.
11. COMPLY WITH SPECIFIED LANDSCAPE PLANT AND TURFGRASS ESTABLISHMENT
PERIOD.
12. PROVIDE ONE-YEAR PLANT AND TURFGRASS WARRANTY AS SPECIFIED.
PLANTING NOTES
TREES
PLANT LIST
1 CARPINUS CAROLINIANA
AMERICAN HORNBEAM
2" CAL. B&B
COND.SIZEQTY.
BOTANICAL NAME
COMMON NAME
1. VERIFY LAYOUT WITH OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION
AND ADJUST AS REQUIRED.
2. REPAIR AND/OR REPLACE BITUMINOUS PAVING DAMAGED OR REMOVED DUE TO
CONSTRUCTION OPERATIONS, INCLUDING ADJACENT ROADS AND SITES.
3. DETERMINE THAT LOCATION OF UNDERGROUND UTILITIES OR FEATURES TO
REMAIN DO NOT INTERFERE WITH PROPOSED IMPROVEMENTS. CONTACT COR
FOR ALTERNATE LOCATIONS IF REQUIRED.
4. PLACE EXPANSION JOINTS AT ALL AREAS WHERE CONCRETE MEETS THE
BUILDING, BASE OF COLUMNS OR ADJOINING VERTICAL SURFACES.REVIEW
LAYOUT OF EXPANSION AND CONTROL JOINTS WITH OWNER'S
REPRESENTATIVE PRIOR TO PLACEMENT OF CONCRETE.
5. CONSTRUCTION NOTES AND TYPICALS MAY APPEAR ONLY ONCE ON DRAWINGS,
BUT APPLY TO ALL SIMILAR CONDITIONS WHERE NEW CONSTRUCTION OCCURS
TO FULFILL THE INTENT OF THE DRAWINGS.
LAYOUT NOTES
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text Scale: 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
40"
351.36
352.3
355.3
356.0
349.4
361.8
24"
20"
SECTION O
RIP
RAP
SECTION C MARKER
TC 355.71
BC 355.55
356.50
356.66
356.43
356.15
356.60
356.59
355.43
356.85
356.31
356.11
356.00
355.49
355.91
355.82
355.96
356.27
356.00
356.17
356.37
356.11
355.91
355.98
TC 356.17
BC 356.01
TC 356.56
BC 356.40
TC 355.93
BC 355.77
TC 357.59
BC 357.09
357.51
TC 357.64
BC 357.14
357.59
TC 355.91
BC 355.75
355.95
356.22
355.30
355.38
355.44
355.36
356.06
356.08
355.90
TC 355.70
BC 355.20
355.60
TC 355.51
BC 355.01
355.41
355.35
355.73
355.82
355.94
356.48
Project Number
Building Number
Drawing Number
Project Title
Location: Baltimore National Cemetery 5501 Frederick Ave., Catonsville, Baltimore County, MD 21228
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
100% CONSTRUCTION DOCUMENTS
FINAL
MARCH 25, 2019
NOT SUPPRESSED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
321 4 5 6 7 8 9 10
802-MM18-05
Committal Shelter Project Director
Revisions: Date:
BALTIMORE NATIONAL CEMETERY
Design Services for Committal Service Shelter Improvements
Office of Construction and Facilities Management
Civil/ Structural/ Electrical Engineer:
KCI Technologies, Inc.
1352 Marrows Road, Suite 100 Newark, Delaware 19711
PH: 302.731.9176
POC: Tom deLorimier
Landscape Architect:
Pashek+MTR, Ltd.
619 E. Ohio St.
Pittsburgh, PA 15212
PH: 412-321-6362
POC: Kara Roggenkamp
L-102
03.25.2019 KR MAS
SITE GRADING PLAN
y V
A
I D
I Q b a l t i m o r e c o m m i t t a l s h e l t e r s h e e t s x L
S i t e
G r a d i n g
P l a n d w g
1. CONTRACTOR IS RESPONSIBLE FOR ALL WORK SHOWN UNLESS SPECIFICALLY
INDICATED OTHERWISE.
2. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE LAWS,
ORDINANCES, AND CODES. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
APPLICABLE PERMITS.
3. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE INDIVIDUAL
CONTRACT DOCUMENTS AND REPORT AT ONCE IN WRITING TO THE COR ANY
DEFICIENCIES. THE CONTRACTOR SHALL REQUIRE EACH SUBCONTRACTOR TO
LIKEWISE STUDY THE DOCUMENTS AND IMMEDIATELY REPORT ANY
DEFICIENCIES. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND
PROPOSED POINT OF CONNECTION (P.O.C.) LOCATIONS AND REPORT ANY
DISCREPANCY TO THE COR IMMEDIATELY.
4. NOTIFY UTILITY LOCATOR SERVICE AT LEAST 3 WORKING DAYS PRIOR TO ANY
DIGGING OR EXCAVATION.
5. CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS OF
CONSTRUCTION AND SHALL COORDINATE ALL CONSTRUCTION EFFORTS WITH
COR'S REQUIREMENTS.
6. MATERIALS INDICATED TO BE DEMOLISHED AND WASTE MATERIALS
ENCOUNTERED IN THE WORK SHALL BE LEGALLY DISPOSED OF OFF SITE BY
CONTRACTOR.
7. PROTECT EXISTING WALLS, PLAQUES, SIGNS, HISTORIC ELEMENTS, FENCING,
GATES, LANDSCAPING, IRRIGATION, BENCH MARKS, UTILITIES, SIDEWALKS,
PAVING AND CURBS FROM EQUIPMENT, VEHICULAR TRAFFIC AND GENERAL
CONSTRUCTION ACTIVITIES. DAMAGED ITEMS INTENDED TO REMAIN SHALL BE
REPLACED OR REPAIRED AT NO EXPENSE TO THE GOVERNMENT. DISTURBED
AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. ANY EXISTING LAWN
AREAS DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED WITH
SOD (NOT SEED).
8. PROTECT ALL EXISTING TREES.
9. PROTECT GRAVESITES AND MONUMENTS.
10. MAINTAIN PUBLIC ACCESS TO GRAVESITES AT ALL TIMES DURING
CONSTRUCTION. OBTAIN COR APPROVAL IF RESTRICTING ACCESS IS
NECESSARY FOR PUBLIC SAFETY DURING DEMOLITION OR CONSTRUCTION.
PROVIDE TEMPORARY BARRICADES, FENCING, TRAFFIC CONTROL AND
SIGNAGE AS NEEDED TO MAINTAIN PUBLIC SAFETY DURING CONSTRUCTION.
11. CONSTRUCTION NOTES AND TYPICALS MAY APPEAR ONLY ONCE ON DRAWINGS,
BUT APPLY TO ALL SIMILAR CONDITIONS WHERE NEW CONSTRUCTION OCCURS
TO FULFILL THE INTENT OF THE DRAWINGS.
12. THE BURIAL ACTIVITIES AT THE NATIONAL CEMETERY SHALL TAKE
PRECEDENCE OVER CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST
COOPERATE AND COORDINATE WITH THE CEMETERY DIRECTOR, THROUGH THE
COR, IN ARRANGING THE CONSTRUCTION SCHEDULE TO CAUSE THE LEAST
POSSIBLE INTERFERENCE WITH CEMETERY ACTIVITIES. CONSTRUCTION NOISE
DURING COMMITTAL SERVICES SHALL NOT DISTURB THE SERVICE. TRUCKS AND
WORKMEN SHALL NOT PASS THROUGH THE SERVICE AREA DURING THIS
PERIOD.
13. THE CONTRACTOR IS REQUIRED TO DISCONTINUE HIS WORK SUFFICIENTLY IN
ADVANCE OF EASTER SUNDAY, MOTHER'S DAY, FATHER'S DAY, MEMORIAL DAY,
VETERAN'S DAY AND/OR FEDERAL HOLIDAYS, TO PERMIT HIM TO CLEAN UP ALL
AREAS OF OPERATION ADJACENT TO EXISTING BURIAL PLOTS BEFORE THESE
DATES.
GENERAL NOTES
1. COMPLY WITH APPLICABLE REGULATIONS FOR EROSION AND SEDIMENTATION
MEASURES. REFER TO C-DRAWINGS FOR REQUIREMENTS.
2. FIELD VERIFY FIELD STAKE-OUT AND GRADES PRIOR TO CONSTRUCTION AND
NOTIFY COR OF ANY DISCREPANCY.
3. PROVIDE POSITIVE DRAINAGE IN EXISTING AND PROPOSED PAVED AND
PLANTED AREAS DURING EACH PHASE OF CONSTRUCTION, AND FOR FINISHED
GRADES. AVOID FORMING FALSE GUTTERS AND/OR PONDING. REMOVE AND
RECONSTRUCT PAVEMENT DICTATED BY FIELD CONDITIONS TO PROVIDE
POSITIVE DRAINAGE AT TIE-IN POINTS.
4. ELIMINATE RUTS, DEPRESSIONS, AND REPAIR ERODED AREAS UPON FINAL
GRADING.
5. FOR ADA ACCESSIBILITY; CONSTRUCT RAMPS TO A MAXIMUM 8.3%; CONSTRUCT
WALKS TO A MAXIMUM 4.9%; CONSTRUCT PARKING SPACES TO A MAXIMUM 2%
(BOTH DIRECTIONS). FIELD VERIFY SUBGRADE ELEVATIONS AND SLOPES PRIOR TO
PAVING.
6. SPOTS AND CONTOURS ARE SHOWN AT FINISH GRADE ELEVATIONS. REFER TO
CONSTRUCTION DETAILS FOR PAVEMENT THICKNESS.
7. ADJUST TOP ELEVATIONS OF EXISTING (SURFACE) GAS VALVES, WATER
VALVES, BOXES, VAULTS, AND OTHER ELEMENTS TO REMAIN, TO MEET
PROPOSED GRADES FLUSH.
GRADING NOTES
1. CONTRACTOR SHALL NOT WORK UPON OR STORE ANY MATERIALS ON
OCCUPIED GRAVE PLOTS. DESIGNATED LIMITED ACCESS ROUTES ARE
INDICATED ON THE PLANS.
2. PROTECT ALL EXISTING GRAVESITES, HEADSTONES, AND FLAT MARKERS FROM
DAMAGE DUE TO CONSTRUCTION OPERATIONS.
3. MONUMENT PROTECTION SHALL BE INSTALLED IMMEDIATELY PRIOR TO
DEMOLITION OR CONSTRUCTION ACTIVITIES OCCURING WITHIN 10' OF EXISTING
MONUMENTS AND SHALL BE REMOVED IMMEDIATELY AFTER DEMOLITION OR
CONSTRUCTION NEAR THE MONUMENT IS COMPLETE.
4. HEADSTONE COVERS SHALL BE CONSTRUCTED OF ½-INCH THICK PLYWOOD
AND SHALL COMPLETELY ENCASE HEADSTONES ADJACENT TO THE WORK AREA
WITHOUT DAMAGING THEM.
GRAVESITE PROTECTION NOTES
1. ALL TREES NOT INDICATED TO BE REMOVED ARE TO BE PROTECTED FROM
DAMAGE DUE TO CONSTRUCTION OPERATIONS.
2. PROTECTION ZONE: THE AREA DEFINED BY THE DRIP LINE OF THE OUTER
EXTENT OF THE CANOPY OF A TREE, OR WITHIN THE TREE PROTECTION FENCE
AREA AS SHOWN ON PLANS, WHICHEVER IS LARGER.
3. ACTIVITIES PROHIBITED WITHIN PROTECTION ZONES:
3.1. STORAGE OF ANY CONSTRUCTION MATERIALS, EQUIPMENT, STOCKPILING,
EXCAVATION OR FILL, SOIL, GRAVEL, TRASH, TOOLS, STONES, FENCING
ETC., EXCEPT IN DESIGNATED AREAS AS APPROVED BY THE GOVERNMENT.
3.2. EQUIPMENT OR VEHICLE PARKING, EXCEPT IN DESIGNATED AREAS AS
APPROVED BY THE GOVERNMENT.
3.3. VEHICULAR TRAFFIC WITHOUT PROPER CONSTRUCTION MATTING.
3.4. MASONRY SET UP, CLEAN UP OR WASHOUT.
3.5. DUMPING OF ANY CHEMICALS, (I.E. PAINT THINNER FROM CLEANING
BRUSHES), WASH-OUT MATERIALS FROM CLEANING EQUIPMENT,
CONCRETE OR MORTAR REMAINDER, TRASH, GARBAGE, OR DEBRIS OF ANY
KIND.
4. ROOT ZONE PROTECTION:
4.1. IN GENERAL, VEHICLE TRAFFIC IS PROHIBITED IN PROTECTION ZONES,
EXCEPT IN EXISTING PAVED AREAS AS APPROVED BY OWNER. IF
EQUIPMENT ACCESS IS REQUIRED THROUGH PROTECTION ZONES
(OUTSIDE OF EXISTING PAVED AREAS), PROVIDE THE FOLLOWING:
4.2. VEHICLES AND EQUIPMENT CONSTRUCTION MATTING: GEOTEXTILE FABRIC
WITH 8-INCH THICKNESS OF COARSELY SHREDDED WOOD CHIPS ON TOP.
RESPREAD OR ADD MULCH AS NEEDED TO MAINTAIN THE SPECIFIED
THICKNESS.
4.3. PEDESTRIAN TRAFFIC AND SHORT TERM (ONE DAY) MATERIAL STAGING:
DURING MASONRY AND FENCE INSTALLATION, PROTECT SOIL AND LAWN
AREAS WITHIN PROTECTION ZONES WITH 1-INCH THICK PLYWOOD.
4.4. COMPLETELY REMOVE ALL CONSTRUCTION MAT MATERIALS AS SOON AS
POSSIBLE.
5. TRUNK PROTECTION: PROTECT TRUNKS OF TREES ADJACENT TO WORKING
AREAS FROM ACCIDENTAL MECHANICAL DAMAGE BY ATTACHING LUMBER TO
THE TRUNK WITH NYLON WEBBING STRAPS. DO NOT USE NAILS OR BOLTS.
6. GRADING: IN GENERAL, GRADING, FILLING, AND EXCAVATION IS PROHIBITED
WITHIN PROTECTION ZONES, EXCEPT IN EXISTING PAVED AREAS. IF
UNAVOIDABLE, EXCAVATION SHALL BE CONDUCTED USING DIRECTIONAL
BORING OR PNEUMATIC EXCAVATION (AIR SPADE) IN ORDER TO LOCATE ROOTS
PRIOR TO DAMAGING THEM.
6.1. IF ROOTS OVER 2” DIAMETER ARE ENCOUNTERED:
6.2. PROTECT EXPOSED ROOTS BY IMMEDIATELY WRAPPING WITH WET BURLAP
AND KEEP MOIST. DO NOT LEAVE THE TRENCH OPEN FOR LONGER THAN 4
HOURS, QUICKLY REPLACE THE SOIL AND SOAK WITH WATER TO PACK.
6.3. IF POSSIBLE, LEAVE ROOTS IN PLACE.
6.4. IF UNAVOIDABLE, A LICENSED ARBORIST SHALL CONDUCT ROOT PRUNING
BY CUTTING EXPOSED ROOTS CLEANLY WITH A WHEEL SAW,
RECIPROCATING SAW OR SMALL PRUNING SAW. CONTRACTOR SHALL NOT
RIP, CHOP, OR TEAR ROOTS.
7. ALL PRUNING, TREE REMOVALS, ROOT PRUNING, AND FERTILIZATION REQUIRED
SHALL BE PERFORMED BY AN ISA-LICENSED ARBORIST.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COSTS OF A CONSULTING
ARBORIST AND REMEDIAL MEASURES FOR TREES DAMAGED BY CONSTRUCTION
ACTIVITIES, INCLUDING BUT NOT LIMITED TO PRUNING, TREATMENTS, VERTICAL
MULCHING, TREE REMOVAL, AND PROVIDING REPLACEMENT TREE(S) WHOSE
TOTAL CALIPER EQUALS THE DBH OF THE DAMAGED TREE (E.G. IF A 24" DBH
TREE IS DAMAGED, PROVIDE (8) 3" CALIPER TREES), AT NO ADDITIONAL COST
TO THE GOVERNMENT.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND
MAINTENANCE OF ALL TREE PROTECTION FENCING. PROTECTIVE FENCING
SHALL REMAIN UNDISTURBED UNTIL ALL CONSTRUCTION ACTIVITIES HAVE BEEN
COMPLETED. IF PROTECTIVE FENCING IS DAMAGED, THE CONTRACTOR SHALL
IMMEDIATELY EXECUTE THE NECESSARY REPAIRS TO RE-ESTABLISH THE
PROTECTIVE FENCING TO ORIGINAL CONFIGURATIONS. THE CONTRACTOR
SHALL REMOVE FENCING UPON COMPLETION OF CONSTRUCTION.
10. CONTRACTOR IS RESPONSIBLE FOR KEEPING LAWN MOWED INSIDE TREE
PROTECTION FENCE IF LEFT IN PLACE FOR MORE THAN ONE WEEK.
TREE PROTECTION NOTES
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text Scale: 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
27"
40"
20"
R11.00
R7 .75
R10.50
R65.00
R15.00
R15.00
BENCH MARK
(MAG NAIL SET)
EL=358.09
N: 586635.6990
E: 1395566.1226
Project Number
Building Number
Drawing Number
Project Title
Location: Baltimore National Cemetery 5501 Frederick Ave., Catonsville, Baltimore County, MD 21228
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i t h
P
M
100% CONSTRUCTION DOCUMENTS
FINAL
MARCH 25, 2019
NOT SUPPRESSED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
321 4 5 6 7 8 9 10
802-MM18-05
Committal Shelter Project Director
Revisions: Date:
BALTIMORE NATIONAL CEMETERY
Design Services for Committal Service Shelter Improvements
Office of Construction and Facilities Management
Civil/ Structural/ Electrical Engineer:
KCI Technologies, Inc.
1352 Marrows Road, Suite 100 Newark, Delaware 19711
PH: 302.731.9176
POC: Tom deLorimier
Landscape Architect:
Pashek+MTR, Ltd.
619 E. Ohio St.
Pittsburgh, PA 15212
PH: 412-321-6362
POC: Kara Roggenkamp
L-103
03.25.2019 KR MAS
LAYOUT PLAN
y V
A
I D
I Q b a l t i m o r c o m m i t t a l s h e l t e r s h e e t s x
L
L y o u t
P l a n d w g
1. CONTRACTOR IS RESPONSIBLE FOR ALL WORK SHOWN UNLESS SPECIFICALLY
INDICATED OTHERWISE.
2. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE LAWS,
ORDINANCES, AND CODES. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
APPLICABLE PERMITS.
3. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE INDIVIDUAL
CONTRACT DOCUMENTS AND REPORT AT ONCE IN WRITING TO THE COR ANY
DEFICIENCIES. THE CONTRACTOR SHALL REQUIRE EACH SUBCONTRACTOR TO
LIKEWISE STUDY THE DOCUMENTS AND IMMEDIATELY REPORT ANY
DEFICIENCIES. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND
PROPOSED POINT OF CONNECTION (P.O.C.) LOCATIONS AND REPORT ANY
DISCREPANCY TO THE COR IMMEDIATELY.
4. NOTIFY UTILITY LOCATOR SERVICE AT LEAST 3 WORKING DAYS PRIOR TO ANY
DIGGING OR EXCAVATION.
5. CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS OF
CONSTRUCTION AND SHALL COORDINATE ALL CONSTRUCTION EFFORTS WITH
COR'S REQUIREMENTS.
6. MATERIALS INDICATED TO BE DEMOLISHED AND WASTE MATERIALS
ENCOUNTERED IN THE WORK SHALL BE LEGALLY DISPOSED OF OFF SITE BY
CONTRACTOR.
7. PROTECT EXISTING WALLS, PLAQUES, SIGNS, HISTORIC ELEMENTS, FENCING,
GATES, LANDSCAPING, IRRIGATION, BENCH MARKS, UTILITIES, SIDEWALKS,
PAVING AND CURBS FROM EQUIPMENT, VEHICULAR TRAFFIC AND GENERAL
CONSTRUCTION ACTIVITIES. DAMAGED ITEMS INTENDED TO REMAIN SHALL BE
REPLACED OR REPAIRED AT NO EXPENSE TO THE GOVERNMENT. DISTURBED
AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. ANY EXISTING LAWN
AREAS DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED WITH
SOD (NOT SEED).
8. PROTECT ALL EXISTING TREES.
9. PROTECT GRAVESITES AND MONUMENTS.
10. MAINTAIN PUBLIC ACCESS TO GRAVESITES AT ALL TIMES DURING
CONSTRUCTION. OBTAIN COR APPROVAL IF RESTRICTING ACCESS IS
NECESSARY FOR PUBLIC SAFETY DURING DEMOLITION OR CONSTRUCTION.
PROVIDE TEMPORARY BARRICADES, FENCING, TRAFFIC CONTROL AND
SIGNAGE AS NEEDED TO MAINTAIN PUBLIC SAFETY DURING CONSTRUCTION.
11. CONSTRUCTION NOTES AND TYPICALS MAY APPEAR ONLY ONCE ON DRAWINGS,
BUT APPLY TO ALL SIMILAR CONDITIONS WHERE NEW CONSTRUCTION OCCURS
TO FULFILL THE INTENT OF THE DRAWINGS.
12. THE BURIAL ACTIVITIES AT THE NATIONAL CEMETERY SHALL TAKE
PRECEDENCE OVER CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST
COOPERATE AND COORDINATE WITH THE CEMETERY DIRECTOR, THROUGH THE
COR, IN ARRANGING THE CONSTRUCTION SCHEDULE TO CAUSE THE LEAST
POSSIBLE INTERFERENCE WITH CEMETERY ACTIVITIES. CONSTRUCTION NOISE
DURING COMMITTAL SERVICES SHALL NOT DISTURB THE SERVICE. TRUCKS AND
WORKMEN SHALL NOT PASS THROUGH THE SERVICE AREA DURING THIS
PERIOD.
13. THE CONTRACTOR IS REQUIRED TO DISCONTINUE HIS WORK SUFFICIENTLY IN
ADVANCE OF EASTER SUNDAY, MOTHER'S DAY, FATHER'S DAY, MEMORIAL DAY,
VETERAN'S DAY AND/OR FEDERAL HOLIDAYS, TO PERMIT HIM TO CLEAN UP ALL
AREAS OF OPERATION ADJACENT TO EXISTING BURIAL PLOTS BEFORE THESE
DATES.
GENERAL NOTES
1. VERIFY LAYOUT WITH OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION
AND ADJUST AS REQUIRED.
2. REPAIR AND/OR REPLACE BITUMINOUS PAVING DAMAGED OR REMOVED DUE TO
CONSTRUCTION OPERATIONS, INCLUDING ADJACENT ROADS AND SITES.
3. DETERMINE THAT LOCATION OF UNDERGROUND UTILITIES OR FEATURES TO
REMAIN DO NOT INTERFERE WITH PROPOSED IMPROVEMENTS. CONTACT COR
FOR ALTERNATE LOCATIONS IF REQUIRED.
4. PLACE EXPANSION JOINTS AT ALL AREAS WHERE CONCRETE MEETS THE
BUILDING, BASE OF COLUMNS OR ADJOINING VERTICAL SURFACES.REVIEW
LAYOUT OF EXPANSION AND CONTROL JOINTS WITH OWNER'S
REPRESENTATIVE PRIOR TO PLACEMENT OF CONCRETE.
5. CONSTRUCTION NOTES AND TYPICALS MAY APPEAR ONLY ONCE ON DRAWINGS,
BUT APPLY TO ALL SIMILAR CONDITIONS WHERE NEW CONSTRUCTION OCCURS
TO FULFILL THE INTENT OF THE DRAWINGS.
LAYOUT NOTES
1. TOPOGRAPHIC INFORMATION BASED UPON SURVEY CONDUCTED BY KCI
TECHNOLOGIES,INC.
ADDRESS: 1352 MARROWS ROAD, SUITE 100
NEWARK, DELAWARE 19711
PHONE: 302-731-9176
DATE: SEPTEMBER 2018
2. SURVEYOR NOTES:
a. CONTROL POINTS SET USING LEICA SMART NET RTN GPS
b. HORIZONTAL DATUM - MD SPC NAD83 (2011)
c. VERTICAL DATUM - NAVD88 (GEOID 12B)
d. SUBSURFACE UTILITY MARKINGS WERE NOT PRESENT AT THE TIME OF FIELD WORK.
EXISTENCE AND LOCATION UNKNOWN.
SURVEY NOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text Scale: 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SECTION
M
I N
NOTES:
1. PROVIDE
" RADIUS, ALL SLAB EDGES
2. REFER TO SITE PLAN FOR JOINT LAYOUT. CONTROL JOINTS SHALL BE 10' O.C. MAX;
EXPANSION JOINTS SHALL BE 30' O.C. MAX.
3. PLACE EXPANSION JOINTS BETWEEN PAVING AND ALL FIXED OBJECTS SUCH AS CURBS,
COLUMNS, INLETS, WALLS, ETC. (OMIT DOWEL)
COMPACTED SUBGRADE
COMPACTED AGGREGATE
SUBBASE - CRUSHER RUN (CR-6)
4,000 PSI CONCRETE PAVING
WWF- 6 X 6 - W 2.9 X W 2.9
MEDIUM BROOM FINISH - PERPENDICULAR
TO DIRECTION OF TRAVEL
#4 X 18" STEEL EPOXY-COATED SLIP DOWEL;
18" O.C. GREASE AND CAP ONE END
EXPANSION JOINT FILLER, BACKER ROD AND
SEALANT
CONTROL JOINT - 1/2" DEEP, 3/8" WIDE, 3/16"
RADIUS EDGES
2'-0"
NEW PAVEMENT
CONCRETE CURB AND GUTTER
EXISTING AGGREGATE SUBBASE
COURSE - RECOMPACT UNDER
NEW PAVEMENT
ASPHALT BASE COURSE
ASPHALT WEARING COURSE
SEAL JOINT
NEATLY SAW CUT
EXISTING ASPHALT
PAVEMENT TO FULL
DEPTH
SECTION
EXISTING PAVEMENT
PROVIDE 3/8" DIA. STAINLESS STEEL
ANCHOR BOLTS (NOT PROVIDED BY MNFR)
PROVIDE GROUT FOR LEVELING
STEEL BOLLARD SURFACE MOUNT
-4-1/2" DIA.
COLOR: TO MATCH BENCHES
9"
1'-4"
THICKEN PAVEMENT AT BOLLARD
SECTION
NOTES:
1. PROVIDE CONTROL JOINTS @5'-0",
" WIDE X 2" DEEP; PROVIDE
EXPANSION JOINTS @20' O.C. MAX.
2. PROVIDE 5' LONG TRANSITION BETWEEN CURB TYPES
(STANDARD, MOUNTABLE, FLUSH)
3. WHERE PAVEMENT SLOPES AWAY FROM CURB, GUTTER SLOPE
SHALL MATCH
1'-4"
10"
2'-2"
P
E R
4"
(1) #4 EPOXY COATED BAR
FLUSH CURB PROFILE WHERE
INDICATED ON PLANS - 5% SLOPE MAX.
COMPACTED AGGREGATE SUBBASE
-EXTEND UNDER CURB
ADJACENT PAVING
- MEET FLUSH
4,000 PSI CAST IN
PLACE CONCRETE
SECTION
NOTES:
1. PROVIDE CONTROL JOINTS @5'-0",
" WIDE X 2" DEEP; PROVIDE
EXPANSION JOINTS @20' O.C. MAX.
2. PROVIDE 5' LONG TRANSITION BETWEEN CURB TYPES
(STANDARD, MOUNTABLE, FLUSH)
3. WHERE PAVEMENT SLOPES AWAY FROM CURB, GUTTER SLOPE
SHALL MATCH
1'-4"
10"
2'-2"
P
4"
(1) #4 EPOXY COATED BAR
COMPACTED AGGREGATE SUBBASE
-EXTEND UNDER CURB
ADJACENT PAVING
- MEET FLUSH
4,000 PSI CAST IN
PLACE CONCRETE
2" MOUNTABLE CURB PROFILE
GRANITE BASE
FINISH
GRADE
NOTES:
1. STONE BASE: MEDIUM GREY GRANITE
TO MATCH EXISTING SECTION
MARKERS, SUBMIT SAMPLE FOR
APPROVAL
2. STONE FINISH:
2.1. FACE (PLAQUE MOUNT LOCATION):
HONED SMOOTH FINISH
2.2. ALL OTHER SURFACES TO HAVE A
SMOOTH SAWN FINISH TO 6"
BELOW GRADE.
2.3. ALL EDGES TO HAVE A
" RADIUS
3. ATTACH EXISTING PLAQUE TO NEW
GRANITE MARKER WITH CONCEALED
STAINLESS STEEL STUDS. MODIFY
BACK OF PLAQUE IF NEEDED TO
FACILITATE ATTACHMENT TO STONE
4. VERIFY EXISTING PLAQUE
DIMENSIONS PRIOR TO STONE
FABRICATION
COMPACTED SUBGRADE
AND BACKFILL - 95%
MODIFIED PROCTOR
EXISTING PLAQUE
SECTION
FACE
ELEVATION
DRAINAGE AGGREGATE
(AASHTO #57)
EXISTING
BRONZE PLAQUE
EXISTING
BRONZE
PLAQUE
GRANITE
BASE
1'-6"
4"
2'-2"
1'-6 13/16"
SET POST IN CONCRETE
ALUMINUM POST, 2" SQ. X .080"
THICK; FINISH COLOR BLACK
NOTES:
1. SUBMIT SEPARATE SHOP DRAWINGS
FOR EACH SIGN TYPE.
2. SUBMIT SAMPLES FOR ALL SIGN
MATERIALS AND COMPONENTS
3. SEE PLANS FOR SIGN LOCATIONS.
4. REFLECTIVE FILM TO BE ENGINEER
GRADE, MEETING ASTM D4956 TYPE 1.
63 MIL ALUMINUM SIGN WITH REFLECTIVE
FILM GRAPHICS. BACKGROUND COLOR: B2
HANDICAPPED BLUE MATTHEWS # MP15085.
TEXT AND SYMBOL: REFELCTIVE WHITE,
EQUAL TO ENGINEERING GRADE 3M
SCOTCHLITE. BOLT TO POST.
1'-0"
12"
SQUARE OR ROUND
MOUNT TO POST WITH (2) TAMPER
PROOF MECHANICAL FASTENERS
APPLY PROTECTIVE COATING TO
ALUMINUM POST IN CONCRETE TO
PREVENT CORROSION
CONCRETE FOOTING - FORM TOP 6" NEAT, SMOOTH
RUBBED FINISH
ALUM. CHANNEL, 1/2" REVEAL BETWEEN POST AND
PANEL
FINISHED GRADE MAY VARY
3'-0"
ALUMINUM POST EXTRUSION - 2" x 4" X 1/8" THICK;
PROVIDE TOP CAP SECURED W/ TAMPERPROOF SS
SCREWS. COLOR TO MATCH SIGN PANEL
BACKGROUND.
ALUMINUM SIGN CABINET (PANEL), FULLY ENCLOSED
ON ALL SIDES. SIGN CABINET EXTRUSION SHALL
ALLOW REMOVAL AND REPLACEMENT OF FACES
WITHOUT REMOVAL OF THE POSTS
1'-0"
PLAN
CONCRETE FOOTING
POST
2'-0"
CURB
SIGN PANEL
CABINET
M
I N
APPLY PROTECTIVE COATING TO ALUMINUM POST IN
CONCRETE TO PREVENT CORROSION
NOTES:
1. SUBMIT SHOP DRAWING AND FULL SIZE PROOFS FOR EACH
SIGN TYPE AND MESSAGE.
2. SUBMIT SAMPLES FOR ALL SIGN MATERIALS AND COMPONENTS.
3. SEE PLANS FOR SIGN LOCATIONS.
4. REFER TO SECTION 10 14 00 EXTERIOR SIGNAGE FOR FULL
REQUIREMENTS.
3'-0"
DIRECTIONAL SIGN
NC-04.02 m2 - MESSAGE LAYOUT B2 - Single Sided
E Q
Committal Shelter
4"
E Q
2'-4"
1'-9 5/8"
CONTINUOUS 2-1/2" STEEL BAND AROUND
RECEPTACLES W/"TRASH OR "FLOWER
VASES" LABELS APPLIED; TYPEFACE FOR
LABELS TO BE HELVETICA MEDIUM, UPPER
AND LOWER CASE; 2-1/4" HT LETTERS
WELD STEEL BRACKET TO INNER SIDE OF LID
FOR MOUNTING TO RECEPTACLE
STAINLESS STEEL DOME LID
1'-7"
1'-11 3/4"
AIRCRAFT
STEEL CABLE
LOOPED
THROUGH
BRACKET ON
LID AND
ATTACHED TO
LITTER
RECEPTACLE
NOTES:
1. DRILL (4) 3/8" DIAMETER HOLES IN
BOTTOM OF PLASTIC RECEPTACLES FOR
WATER DRAINAGE
FINISH GRADE
CONCRETE SLAB
ANCHOR RECEPTACLES WITH STAINLESS
STEEL EXPANSION SHIELDS AND BOLTS PER
MANUFACTURER'S SPECIFICATIONS
ELEVATION
ROUND
ROUND
SECTION
NOTES:
1. PROVIDE CONTROL JOINTS @5'-0",
" WIDE X 2" DEEP; PROVIDE
EXPANSION JOINTS @20' O.C. MAX.
2. PROVIDE 5' LONG TRANSITION BETWEEN CURB TYPES
(STANDARD, MOUNTABLE, FLUSH)
3. WHERE PAVEMENT SLOPES AWAY FROM CURB, GUTTER SLOPE
SHALL MATCH
1'-4"
10"
2'-2"
P
4"
(1) #4 EPOXY COATED BAR
COMPACTED AGGREGATE SUBBASE
-EXTEND UNDER CURB
ADJACENT PAVING
- MEET FLUSH
4,000 PSI CAST IN
PLACE CONCRETE
STANDARD CURB PROFILE
Project Number
Building Number
Drawing Number
Project Title
Location: Baltimore National Cemetery 5501 Frederick Ave., Catonsville, Baltimore County, MD 21228
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
100% CONSTRUCTION DOCUMENTS
FINAL
MARCH 25, 2019
NOT SUPPRESSED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
CONSULTANTS
321 4 5 6 7 8 9 10
802-MM18-05
Committal Shelter Project Director
Revisions: Date:
BALTIMORE NATIONAL CEMETERY
Design Services for Committal Service Shelter Improvements
Office of Construction and Facilities Management
Civil/ Structural/ Electrical Engineer:
KCI Technologies, Inc.
1352 Marrows Road, Suite 100 Newark, Delaware 19711
PH: 302.731.9176
POC: Tom deLorimier
Landscape Architect:
Pashek+MTR, Ltd.
619 E. Ohio St.
Pittsburgh, PA 15212
PH: 412-321-6362
POC: Kara Roggenkamp
L-201
03.25.2019 MG MAS
SITE DETAILS
y V
A
I D
I Q b a l t i m o r e c o m m i t t a l s h e l t e r s h e e t s x L
S i t e
D e t a i l s d w g
SCALE:
CONCRETE PAVEMENT
1" = 1'-0"
SCALE:
BITUMINOUS PAVEMENT RESTORATION
1" = 1'-0"
SCALE:
BOLLARD
1" = 1'-0"
SCALE:
CONCRETE CURB AND GUTTER (FLUSH)
1" = 1'-0"
SCALE:
CONCRETE CURB AND GUTTER (MOUNTABLE)
1" = 1'-0"
SCALE:
BIVOUAC OF THE DEAD MONUMENT
3/4" = 1'-0"
SCALE:
TRAFFIC REGULATORY SIGN TALL NC-03.09
3/4" = 1'-0"
SCALE:
POST AND PANEL DIRECTIONAL SIGN - NC-04.01
3/4" = 1'-0"
SCALE:
TRASH RECEPTACLE
3/4" = 1'-0"
SCALE:
CONCRETE CURB AND GUTTER (STANDARD)
1" = 1'-0"
AutoCAD SHX Text
SECTION
AutoCAD SHX Text Trash
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
CROWN DRIP LINE OR OTHER LIMIT OF TREE PROTECTION AREA. SEE
PLANS FOR FENCE ALIGNMENT.
MAINTAIN EXISTING
GRADE WITH THE TREE
PROTECTION FENCE
UNLESS OTHERWISE
INDICATED ON THE
PLANS.
2" X 6' STEEL POSTS
TREE PROTECTION
FENCE: HIGH DENSITY
POLYETHYLENE FENCING
WITH 3.5" X 1.5"
OPENINGS; COLOR-
ORANGE. STEEL POSTS
INSTALLED AT 8' O.C.
SECTION VIEW
KEEP OUT
TREE PROTECTION
AREA
24" X 18"
SIGN
LAMINATED IN
PLASTIC SPACED
EVERY 50'
ALONG THE
FENCE.
NOTES:
1. SEE SPECIFICATIONS AND NOTES ON PLANS
FOR ADDITIONAL TREE PROTECTION
REQUIREMENTS.
2. NO PRUNING SHALL BE PERFORMED
EXCEPT BY APPROVED ARBORIST.
3. NO EQUIPMENT SHALL OPERATE INSIDE
THE PROTECTIVE FENCING INCLUDING
DURING FENCE INSTALLATION AND
REMOVAL.
4. CONTRACTOR TO MAINTAIN FENCING.
ACCEPTABLE REJECTABLE
ROOT COLLAR.
ROOTS RADIATE FROM TRUNK AND REACH SIDE OF ROOT
BALL WITHOUT DEFECTING DOWN OR AROUND.
ROOT BALL
PERIPHERY.
ABSORBING
ROOTS.
STRUCTURAL
ROOTS.
STRUCTURAL
ROOTS
STRUCTURAL ROOTS PRIMARILY GROW TO
ONE SIDE.
STRUCTURAL ROOTS MISSING FROM ONE
SIDE, AND/OR GROW TANGENT TO TRUNK.
STRUCTURAL ROOTS CIRCLE INTERIOR OF
ROOT BALL. NO STRUCTURAL ROOTS ARE
HORIZONTAL AND REACH THE ROOT BALL
PERIPHERY NEAR THE TOP OF THE ROOT
BALL.
STRUCTURAL ROOTS DESCEND INTO ROOT
BALL INTERIOR OR ARE DEEPER THAN 2"
FROM TOP OF BALL. NO STRUCTURAL
ROOTS ARE HORIZONTAL AND REACH THE
ROOT BALL PERIPHERY NEAR THE TOP OF
THE ROOT BALL.
ONLY ABSORBING ROOTS REACH THE
PERIPHERY NEAR THE TOP OF THE ROOT BALL.
STRUCTURAL ROOTS MOSTLY WRAP OR ARE
DEFLECTED ON THE ROOT BALL INTERIOR.
Notes:
1. Observations of roots shall occur prior to acceptance. Roots and soil may be removed during the observation process; substrate/soil shall be replaced after the observations have been completed.
2. See specifications for observation process and requirements.
STRUCTURAL
ROOT
CIRCLING.
TOP OF
ROOT
BALL.
POINT
WHERE TOP-
MOST ROOT
EMERGES
FROM TRUNK.
THE POINT WHERE THE TOP-MOST ROOT(S) EMERGES FROM
THE TRUNK (ROOT COLLAR) SHOULD BE WITHIN THE TOP 2"
OF SUBSTRATE. THE ROOT COLLAR AND THE ROOT BALL
INTERIOR SHOULD BE FREE OF DEFECTS INCLUDING
CIRCLING, KINKED, ASCENDING, AND STEM GIRDLING ROOTS.
STRUCTURAL ROOTS SHALL REACH THE PERIPHERY NEAR
THE TOP OF THE ROOT BALL.
ABSORBING ROOTS