36C78619Q0351-005.docx

DOCX document 1 MB Posted

Attached to
Pacific District - District Wide Tree Maintenance Services Federal contract opportunity
Solicitation number
36C78619Q0351
Issued by
Department of Veterans Affairs National Cemetery Administration

About this file

36C78619Q0351 Price Cost Schedule.docx

View the file

Other files for this federal contract opportunity

Other files attached to Pacific District - District Wide Tree Maintenance Services, newest first.
File Type Posted
36C78619Q0351-0002001.pdf PDF
36C78619Q0351-0002000.docx DOCX document
36C78619Q0351-0001001.pdf PDF
36C78619Q0351-0001000.docx DOCX document
36C78619Q0351-004.docx DOCX document
36C78619Q0351-001.docx DOCX document
36C78619Q0351-002.docx DOCX document
36C78619Q0351-003.docx DOCX document
36C78619Q0351-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

?.## PRICE/COST SCHEDULE

PRICE/COST SCHEDULE

TREEWORK DIFFICULTY FACTORS

Pricing: Pricing for treework is dependent upon factors which influence the ease of access and surrounding features which may add difficulty to accomplishing the work. The main factors that influence difficulty of tree work within cemeteries are:

1.Proximity to stable surfaces on which equipment can be driven and set up (e.g., paved and unpaved roads, open ground).
2.Presence of burial plots.
3.Vertical obstructions (e.g., upright headstones, walls, fences, monuments, buildings, poles, utility lines, shrub beds). Other trees are not considered vertical obstructions.
4.Percent slope of the terrain.

For obtaining fair and accurate pricing, requests for pricing at 4 levels of treework difficulty are included in the pricing schedule. To qualify for a category the tree must contain three of the four descriptors listed. The categories are: A=Easy; B=Moderately Easy; C=Moderately Difficult; and D=Difficult. Pricing for “B”, “C”, and “D” levels of difficulty will be arrived at by multiplying the “A” price provided in the price/cost schedule by a difficulty factor multiplier also provided in the price/cost schedule.

A=Easy:

1. The tree is within 50 feet of a stable surface.

2. There are no burial plots underneath the tree.

3. There are no vertical obstructions.

4. There terrain is relatively flat from 0 to 5% slope.

B=Moderately Easy

1. The tree is within 100 feet of a stable surface.

2. There are burial plots underneath the tree.

3. There are no vertical obstructions.

4. The terrain is moderately sloped up to 10%.

C=Moderately Difficult

1. The tree is within 150 feet of a stable surface.

2. There are burial plots underneath the tree.

3. There are vertical obstructions.

4. The terrain is moderately sloped up to 10%.

D=Difficult

1. The tree is further than 150 feet of a stable surface.

2. There are burial plots underneath the tree.

3. There are vertical obstructions.

4. The terrain is steeply sloped greater than 10%.

The determination of the treework difficulty factor will be made in one of two ways: First the difficulty factor listed in the tree assessment and inventory provided by the Pacific District tree expert company for the specific tree will be used. In the absence of this listing in the tree assessment and inventory, the COR will determine the difficulty factor based on the factors listed above. All determinations will be final. Distance of tree from a stable surface is measured from the center of the tree trunk to the edge of the stable surface.

Bakersfield National Cemetery PRICE/COST SCHEDULE – BASE YEAR (August 1, 2019 to July 31, 2020)

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
01
0-5 DBH
2
Each
$
$
02
6-11 DBH
1
Each
$
$
03
12-17 DBH
1
Each
$
$
04
18-23 DBH
1
Each
$
$
05
24-29 DBH
1
Each
$
$
06
30-35 DBH
1
Each
$
$
07
36-41 DBH
1
Each
$
$
08
42-47 DBH
1
Each
$
$
09
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
010
0-5 DBH
1
Each
$
$
011
6-11 DBH
1
Each
$
$
012
12-17 DBH
1
Each
$
$
013
18-23 DBH
2
Each
$
$
014
24-29 DBH
2
Each
$
$
015
30-35 DBH
1
Each
$
$
016
36-41 DBH
5
Each
$
$
017
42-47 DBH
1
Each
$
$
018
48+ DBH
2
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
019
0-5 DBH
1
Each
$
$
020
6-11 DBH
1
Each
$
$
021
12-17 DBH
1
Each
$
$
022
18-23 DBH
1
Each
$
$
023
24-29 DBH
2
Each
$
$
024
30-35 DBH
1
Each
$
$
025
36-41 DBH
2
Each
$
$
026
42-47 DBH
1
Each
$
$
027
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
028
0-5 DBH
1
Each
$
$
029
6-11 DBH
1
Each
$
$
030
12-17 DBH
1
Each
$
$
031
18-23 DBH
1
Each
$
$
032
24-29 DBH
2
Each
$
$
033
30-35 DBH
1
Each
$
$
034
36-41 DBH
2
Each
$
$
035
42-47 DBH
1
Each
$
$
036
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
037
0-5 DBH
53
Each
$
$
038
6-11 DBH
2
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
039
0-5 DBH
1
Each
$
$
040
6-11 DBH
1
Each
$
$
041
12-17 DBH
1
Each
$
$
042
18-23 DBH
1
Each
$
$
043
24-29 DBH
1
Each
$
$
044
30-35 DBH
1
Each
$
$
045
36-41 DBH
1
Each
$
$
046
42-47 DBH
1
Each
$
$
047
48+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
048
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
049
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
050
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
051
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST BASE YEAR:
$

PRICE/COST SCHEDULE – OPTION YEAR 1 (August 1, 2020 to July 31, 2021)

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
11
0-5 DBH
1
Each
$
$
12
6-11 DBH
1
Each
$
$
13
12-17 DBH
1
Each
$
$
14
18-23 DBH
1
Each
$
$
15
24-29 DBH
1
Each
$
$
16
30-35 DBH
1
Each
$
$
17
36-41 DBH
1
Each
$
$
18
42-47 DBH
1
Each
$
$
19
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
110
0-5 DBH
1
Each
$
$
111
6-11 DBH
1
Each
$
$
112
12-17 DBH
1
Each
$
$
113
18-23 DBH
1
Each
$
$
114
24-29 DBH
1
Each
$
$
115
30-35 DBH
1
Each
$
$
116
36-41 DBH
1
Each
$
$
117
42-47 DBH
1
Each
$
$
118
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
119
0-5 DBH
1
Each
$
$
120
6-11 DBH
1
Each
$
$
121
12-17 DBH
1
Each
$
$
122
18-23 DBH
1
Each
$
$
123
24-29 DBH
1
Each
$
$
124
30-35 DBH
1
Each
$
$
125
36-41 DBH
1
Each
$
$
126
42-47 DBH
1
Each
$
$
127
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
128
0-5 DBH
1
Each
$
$
129
6-11 DBH
1
Each
$
$
130
12-17 DBH
1
Each
$
$
131
18-23 DBH
1
Each
$
$
132
24-29 DBH
1
Each
$
$
133
30-35 DBH
1
Each
$
$
134
36-41 DBH
1
Each
$
$
135
42-47 DBH
1
Each
$
$
136
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
137
0-5 DBH
1
Each
$
$
138
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
139
0-5 DBH
1
Each
$
$
140
6-11 DBH
1
Each
$
$
141
12-17 DBH
1
Each
$
$
142
18-23 DBH
1
Each
$
$
143
24-29 DBH
1
Each
$
$
144
30-35 DBH
1
Each
$
$
145
36-41 DBH
1
Each
$
$
146
42-47 DBH
1
Each
$
$
147
48+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
148
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
149
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
150
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
151
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 1:
$

PRICE/COST SCHEDULE – OPTION YEAR 2 (August 1, 2021 to July 31, 2022)

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
2001
0-5 DBH
1
Each
$
$
2002
6-11 DBH
1
Each
$
$
2003
12-17 DBH
1
Each
$
$
2004
18-23 DBH
1
Each
$
$
2005
24-29 DBH
1
Each
$
$
2006
30-35 DBH
1
Each
$
$
2007
36-41 DBH
1
Each
$
$
2008
42-47 DBH
1
Each
$
$
2009
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
2010
0-5 DBH
1
Each
$
$
2011
6-11 DBH
1
Each
$
$
2012
12-17 DBH
1
Each
$
$
2013
18-23 DBH
1
Each
$
$
2014
24-29 DBH
1
Each
$
$
2015
30-35 DBH
1
Each
$
$
2016
36-41 DBH
1
Each
$
$
2017
42-47 DBH
1
Each
$
$
2018
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
2019
0-5 DBH
1
Each
$
$
2020
6-11 DBH
1
Each
$
$
2021
12-17 DBH
1
Each
$
$
2022
18-23 DBH
1
Each
$
$
2023
24-29 DBH
1
Each
$
$
2024
30-35 DBH
1
Each
$
$
2025
36-41 DBH
1
Each
$
$
2026
42-47 DBH
1
Each
$
$
2027
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
2028
0-5 DBH
1
Each
$
$
2029
6-11 DBH
1
Each
$
$
2030
12-17 DBH
1
Each
$
$
2031
18-23 DBH
1
Each
$
$
2032
24-29 DBH
1
Each
$
$
2033
30-35 DBH
1
Each
$
$
2034
36-41 DBH
1
Each
$
$
2035
42-47 DBH
1
Each
$
$
2036
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
2037
0-5 DBH
1
Each
$
$
2038
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
2039
0-5 DBH
1
Each
$
$
2040
6-11 DBH
1
Each
$
$
2041
12-17 DBH
1
Each
$
$
2042
18-23 DBH
1
Each
$
$
2043
24-29 DBH
1
Each
$
$
2044
30-35 DBH
1
Each
$
$
2045
36-41 DBH
1
Each
$
$
2046
42-47 DBH
1
Each
$
$
2047
48+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
2048
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
2049
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
2050
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
2051
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 2:
$

PRICE/COST SCHEDULE – OPTION YEAR 3 (August 1, 2022 to July 31, 2023)

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
3001
0-5 DBH
1
Each
$
$
3002
6-11 DBH
1
Each
$
$
3003
12-17 DBH
1
Each
$
$
3004
18-23 DBH
1
Each
$
$
3005
24-29 DBH
1
Each
$
$
3006
30-35 DBH
1
Each
$
$
3007
36-41 DBH
1
Each
$
$
3008
42-47 DBH
1
Each
$
$
3009
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
3010
0-5 DBH
1
Each
$
$
3011
6-11 DBH
1
Each
$
$
3012
12-17 DBH
1
Each
$
$
3013
18-23 DBH
1
Each
$
$
3014
24-29 DBH
1
Each
$
$
3015
30-35 DBH
1
Each
$
$
3016
36-41 DBH
1
Each
$
$
3017
42-47 DBH
1
Each
$
$
3018
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
3019
0-5 DBH
1
Each
$
$
3020
6-11 DBH
1
Each
$
$
3021
12-17 DBH
1
Each
$
$
3022
18-23 DBH
1
Each
$
$
3023
24-29 DBH
1
Each
$
$
3024
30-35 DBH
1
Each
$
$
3025
36-41 DBH
1
Each
$
$
3026
42-47 DBH
1
Each
$
$
3027
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
3028
0-5 DBH
1
Each
$
$
3029
6-11 DBH
1
Each
$
$
3030
12-17 DBH
1
Each
$
$
3031
18-23 DBH
1
Each
$
$
3032
24-29 DBH
1
Each
$
$
3033
30-35 DBH
1
Each
$
$
3034
36-41 DBH
1
Each
$
$
3035
42-47 DBH
1
Each
$
$
3036
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
3037
0-5 DBH
1
Each
$
$
3038
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
3039
0-5 DBH
1
Each
$
$
3040
6-11 DBH
1
Each
$
$
3041
12-17 DBH
1
Each
$
$
3042
18-23 DBH
1
Each
$
$
3043
24-29 DBH
1
Each
$
$
3044
30-35 DBH
1
Each
$
$
3045
36-41 DBH
1
Each
$
$
3046
42-47 DBH
1
Each
$
$
3047
48+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
3048
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
3049
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
3050
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
3051
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 3:
$

PRICE/COST SCHEDULE – OPTION YEAR 4 (August 1, 2023 to July 31, 2024)

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
4001
0-5 DBH
1
Each
$
$
4002
6-11 DBH
1
Each
$
$
4003
12-17 DBH
1
Each
$
$
4004
18-23 DBH
1
Each
$
$
4005
24-29 DBH
1
Each
$
$
4006
30-35 DBH
1
Each
$
$
4007
36-41 DBH
1
Each
$
$
4008
42-47 DBH
1
Each
$
$
4009
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
4010
0-5 DBH
1
Each
$
$
4011
6-11 DBH
1
Each
$
$
4012
12-17 DBH
1
Each
$
$
4013
18-23 DBH
1
Each
$
$
4014
24-29 DBH
1
Each
$
$
4015
30-35 DBH
1
Each
$
$
4016
36-41 DBH
1
Each
$
$
4017
42-47 DBH
1
Each
$
$
4018
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
4019
0-5 DBH
1
Each
$
$
4020
6-11 DBH
1
Each
$
$
4021
12-17 DBH
1
Each
$
$
4022
18-23 DBH
1
Each
$
$
4023
24-29 DBH
1
Each
$
$
4024
30-35 DBH
1
Each
$
$
4025
36-41 DBH
1
Each
$
$
4026
42-47 DBH
1
Each
$
$
4027
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
4028
0-5 DBH
1
Each
$
$
4029
6-11 DBH
1
Each
$
$
4030
12-17 DBH
1
Each
$
$
4031
18-23 DBH
1
Each
$
$
4032
24-29 DBH
1
Each
$
$
4033
30-35 DBH
1
Each
$
$
4034
36-41 DBH
1
Each
$
$
4035
42-47 DBH
1
Each
$
$
4036
48+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
4037
0-5 DBH
1
Each
$
$
4038
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
4039
0-5 DBH
1
Each
$
$
4040
6-11 DBH
1
Each
$
$
4041
12-17 DBH
1
Each
$
$
4042
18-23 DBH
1
Each
$
$
4043
24-29 DBH
1
Each
$
$
4044
30-35 DBH
1
Each
$
$
4045
36-41 DBH
1
Each
$
$
4046
42-47 DBH
1
Each
$
$
4047
48+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
4048
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
4049
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
4050
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
4051
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 4:
$
ESTIMATED TOTAL COST BASE+4 OPTION YEARS:
$

Fort Rosecrans National Cemetery

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
01
0-5 DBH
1
Each
$
$
02
6-11 DBH
1
Each
$
$
03
12-17 DBH
1
Each
$
$
04 0
18-23 DBH
1
Each
$
$
05 0
24-29 DBH
1
Each
$
$
06 0
30-35 DBH
1
Each
$
$
07 0
36-41 DBH
1
Each
$
$
08 0
42-47 DBH
1
Each
$
$
09 0
48-53 DBH
1
Each
$
$
010 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
011
0-5 DBH
1
Each
$
$
012
6-11 DBH
1
Each
$
$
013
12-17 DBH
1
Each
$
$
014
18-23 DBH
1
Each
$
$
015
24-29 DBH
1
Each
$
$
016
30-35 DBH
1
Each
$
$
017
36-41 DBH
1
Each
$
$
018
42-47 DBH
1
Each
$
$
019
48-53 DBH
1
Each
$
$
020
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
021
0-5 DBH
1
Each
$
$
022 0
6-11 DBH
1
Each
$
$
023 0
12-17 DBH
1
Each
$
$
024 0
18-23 DBH
1
Each
$
$
025 0
24-29 DBH
1
Each
$
$
026 0
30-35 DBH
1
Each
$
$
027 0
36-41 DBH
1
Each
$
$
028 0
42-47 DBH
1
Each
$
$
029 0
48-53 DBH
1
Each
$
$
030 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)
1

A

B
C
D
031
0-5 DBH
1
Each
$
$
032
6-11 DBH
1
Each
$
$
033
12-17 DBH
1
Each
$
$
034
18-23 DBH
1
Each
$
$
035
24-29 DBH
1
Each
$
$
036
30-35 DBH
1
Each
$
$
037
36-41 DBH
1
Each
$
$
038
42-47 DBH
1
Each
$
$
039
48-53 DBH
1
Each
$
$
040
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)
1

A

B
C
D
041
0-5 DBH
1
Each
$
$
042
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
043
0-5 DBH
1
Each
$
$
044
6-11 DBH
1
Each
$
$
045
12-17 DBH
1
Each
$
$
046
18-23 DBH
1
Each
$
$
047
24-29 DBH
1
Each
$
$
048
30-35 DBH
1
Each
$
$
049
36-41 DBH
1
Each
$
$
050
42-47 DBH
1
Each
$
$
051
48-53 DBH
1
Each
$
$
052
54 + DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)

A

B
C
D
053
0-5 DBH
1
Each
$
$
054
6-11 DBH
1
Each
$
$
055
12-17 DBH
1
Each
$
$
056
18-23 DBH
1
Each
$
$
057
24-29 DBH
1
Each
$
$
058
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
059 0
LINEAL FOOT

14-INCH DEPTH

10
Each
$
$
060 0
LINEAL FOOT

18-INCH DEPTH

10
Each
$
$
061 0
LINEAL FOOT

24-INCH DEPTH

10
Each
$
$
CLIN NO.
EMERGENCY WORK
062 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST BASE YEAR:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
11 0
0-5 DBH
1
Each
$
$
12 0
6-11 DBH
1
Each
$
$
13
12-17 DBH
1
Each
$
$
14 0
18-23 DBH
1
Each
$
$
15 0
24-29 DBH
1
Each
$
$
16 0
30-35 DBH
1
Each
$
$
17 0
36-41 DBH
1
Each
$
$
18 0
42-47 DBH
1
Each
$
$
19 0
48-53 DBH
1
Each
$
$
110 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
111
0-5 DBH
1
Each
$
$
112
6-11 DBH
1
Each
$
$
113
12-17 DBH
1
Each
$
$
114
18-23 DBH
1
Each
$
$
115
24-29 DBH
1
Each
$
$
116
30-35 DBH
1
Each
$
$
117
36-41 DBH
1
Each
$
$
118
42-47 DBH
1
Each
$
$
119
48-53 DBH
1
Each
$
$
120
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)
1

A

B
C
D
121
0-5 DBH
1
Each
$
$
122 0
6-11 DBH
1
Each
$
$
123 0
12-17 DBH
1
Each
$
$
124 0
18-23 DBH
1
Each
$
$
125 0
24-29 DBH
1
Each
$
$
126 0
30-35 DBH
1
Each
$
$
127 0
36-41 DBH
1
Each
$
$
128 0
42-47 DBH
1
Each
$
$
129 0
48-53 DBH
1
Each
$
$
130 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)
1

A

B
C
D
131
0-5 DBH
1
Each
$
$
132
6-11 DBH
1
Each
$
$
133
12-17 DBH
1
Each
$
$
134
18-23 DBH
1
Each
$
$
135
24-29 DBH
1
Each
$
$
136
30-35 DBH
1
Each
$
$
137
36-41 DBH
1
Each
$
$
138
42-47 DBH
1
Each
$
$
139
48-53 DBH
1
Each
$
$
140
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)
1

A

B
C
D
141
0-5 DBH
1
Each
$
$
142
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
143
0-5 DBH
1
Each
$
$
144
6-11 DBH
1
Each
$
$
145
12-17 DBH
1
Each
$
$
146
18-23 DBH
1
Each
$
$
147
24-29 DBH
1
Each
$
$
148
30-35 DBH
1
Each
$
$
149
36-41 DBH
1
Each
$
$
150
42-47 DBH
1
Each
$
$
151
48-53 DBH
1
Each
$
$
152
54 + DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)

A

B
C
D
153
0-5 DBH
1
Each
$
$
154
6-11 DBH
1
Each
$
$
155
12-17 DBH
1
Each
$
$
156
18-23 DBH
1
Each
$
$
157
24-29 DBH
1
Each
$
$
158
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
159 0
LINEAL FOOT

14-INCH DEPTH

10
Each
$
$
160 0
LINEAL FOOT

18-INCH DEPTH

10
Each
$
$
161 0
LINEAL FOOT

24-INCH DEPTH

10
Each
$
$
CLIN NO.
EMERGENCY WORK
162 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 1:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
2001 0
0-5 DBH
1
Each
$
$
2002 0
6-11 DBH
1
Each
$
$
2003
12-17 DBH
1
Each
$
$
2004 0
18-23 DBH
1
Each
$
$
2005 0
24-29 DBH
1
Each
$
$
2006 0
30-35 DBH
1
Each
$
$
2007 0
36-41 DBH
1
Each
$
$
2008 0
42-47 DBH
1
Each
$
$
2009 0
48-53 DBH
1
Each
$
$
2010 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
2011
0-5 DBH
1
Each
$
$
2012
6-11 DBH
1
Each
$
$
2013
12-17 DBH
1
Each
$
$
2014
18-23 DBH
1
Each
$
$
2015
24-29 DBH
1
Each
$
$
2016
30-35 DBH
1
Each
$
$
2017
36-41 DBH
1
Each
$
$
2018
42-47 DBH
1
Each
$
$
2019
48-53 DBH
1
Each
$
$
2020
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
2021
0-5 DBH
1
Each
$
$
2022 0
6-11 DBH
1
Each
$
$
2023 0
12-17 DBH
1
Each
$
$
2024 0
18-23 DBH
1
Each
$
$
2025 0
24-29 DBH
1
Each
$
$
2026 0
30-35 DBH
1
Each
$
$
2027 0
36-41 DBH
1
Each
$
$
2028 0
42-47 DBH
1
Each
$
$
2029 0
48-53 DBH
1
Each
$
$
2030 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)
1

A

B
C
D
2031
0-5 DBH
1
Each
$
$
2032
6-11 DBH
1
Each
$
$
2033
12-17 DBH
1
Each
$
$
2034
18-23 DBH
1
Each
$
$
2035
24-29 DBH
1
Each
$
$
2036
30-35 DBH
1
Each
$
$
2037
36-41 DBH
1
Each
$
$
2038
42-47 DBH
1
Each
$
$
2039
48-53 DBH
1
Each
$
$
2040
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)
1

A

B
C
D
2041
0-5 DBH
1
Each
$
$
2042
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING
1

A

B
C
D
2043
0-5 DBH
1
Each
$
$
2044
6-11 DBH
1
Each
$
$
2045
12-17 DBH
1
Each
$
$
2046
18-23 DBH
1
Each
$
$
2047
24-29 DBH
1
Each
$
$
2048
30-35 DBH
1
Each
$
$
2049
36-41 DBH
1
Each
$
$
2050
42-47 DBH
1
Each
$
$
2051
48-53 DBH
1
Each
$
$
2052
54 + DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)
1

A

B
C
D
2053
0-5 DBH
1
Each
$
$
2054
6-11 DBH
1
Each
$
$
2055
12-17 DBH
1
Each
$
$
2056
18-23 DBH
1
Each
$
$
2057
24-29 DBH
1
Each
$
$
2058
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
2059 0
LINEAL FOOT

14-INCH DEPTH

10
Each
$
$
2060 0
LINEAL FOOT

18-INCH DEPTH

10
Each
$
$
2061 0
LINEAL FOOT

24-INCH DEPTH

10
Each
$
$
CLIN NO.
EMERGENCY WORK
2062 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 2:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
3001 0
0-5 DBH
1
Each
$
$
3002 0
6-11 DBH
1
Each
$
$
3003
12-17 DBH
1
Each
$
$
3004 0
18-23 DBH
1
Each
$
$
3005 0
24-29 DBH
1
Each
$
$
3006 0
30-35 DBH
1
Each
$
$
3007 0
36-41 DBH
1
Each
$
$
3008 0
42-47 DBH
1
Each
$
$
3009 0
48-53 DBH
1
Each
$
$
3010 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
3011
0-5 DBH
1
Each
$
$
3012
6-11 DBH
1
Each
$
$
3013
12-17 DBH
1
Each
$
$
3014
18-23 DBH
1
Each
$
$
3015
24-29 DBH
1
Each
$
$
3016
30-35 DBH
1
Each
$
$
3017
36-41 DBH
1
Each
$
$
3018
42-47 DBH
1
Each
$
$
3019
48-53 DBH
1
Each
$
$
3020
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)
1

A

B
C
D
3021
0-5 DBH
1
Each
$
$
3022 0
6-11 DBH
1
Each
$
$
3023 0
12-17 DBH
1
Each
$
$
3024 0
18-23 DBH
1
Each
$
$
3025 0
24-29 DBH
1
Each
$
$
3026 0
30-35 DBH
1
Each
$
$
3027 0
36-41 DBH
1
Each
$
$
3028 0
42-47 DBH
1
Each
$
$
3029 0
48-53 DBH
1
Each
$
$
3030 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)
1

A

B
C
D
3031
0-5 DBH
1
Each
$
$
3032
6-11 DBH
1
Each
$
$
3033
12-17 DBH
1
Each
$
$
3034
18-23 DBH
1
Each
$
$
3035
24-29 DBH
1
Each
$
$
3036
30-35 DBH
1
Each
$
$
3037
36-41 DBH
1
Each
$
$
3038
42-47 DBH
1
Each
$
$
3039
48-53 DBH
1
Each
$
$
3040
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)
1

A

B
C
D
3041
0-5 DBH
1
Each
$
$
3042
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING
1

A

B
C
D
3043
0-5 DBH
1
Each
$
$
3044
6-11 DBH
1
Each
$
$
3045
12-17 DBH
1
Each
$
$
3046
18-23 DBH
1
Each
$
$
3047
24-29 DBH
1
Each
$
$
3048
30-35 DBH
1
Each
$
$
3049
36-41 DBH
1
Each
$
$
3050
42-47 DBH
1
Each
$
$
3051
48-53 DBH
1
Each
$
$
3052
54 + DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)
1

A

B
C
D
3053
0-5 DBH
1
Each
$
$
3054
6-11 DBH
1
Each
$
$
3055
12-17 DBH
1
Each
$
$
3056
18-23 DBH
1
Each
$
$
3057
24-29 DBH
1
Each
$
$
3058
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
3059 0
LINEAL FOOT

14-INCH DEPTH

10
Each
$
$
3060 0
LINEAL FOOT

18-INCH DEPTH

10
Each
$
$
3061 0
LINEAL FOOT

24-INCH DEPTH

10
Each
$
$
CLIN NO.
EMERGENCY WORK
3062 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 3:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
4001 0
0-5 DBH
1
Each
$
$
4002 0
6-11 DBH
1
Each
$
$
4003
12-17 DBH
1
Each
$
$
4004 0
18-23 DBH
1
Each
$
$
4005 0
24-29 DBH
1
Each
$
$
4006 0
30-35 DBH
1
Each
$
$
4007 0
36-41 DBH
1
Each
$
$
4008 0
42-47 DBH
1
Each
$
$
4009 0
48-53 DBH
1
Each
$
$
4010 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)
1

A

B
C
D
4011
0-5 DBH
1
Each
$
$
4012
6-11 DBH
1
Each
$
$
4013
12-17 DBH
1
Each
$
$
4014
18-23 DBH
1
Each
$
$
4015
24-29 DBH
1
Each
$
$
4016
30-35 DBH
1
Each
$
$
4017
36-41 DBH
1
Each
$
$
4018
42-47 DBH
1
Each
$
$
4019
48-53 DBH
1
Each
$
$
4020
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)
1

A

B
C
D
4021
0-5 DBH
1
Each
$
$
4022 0
6-11 DBH
1
Each
$
$
4023 0
12-17 DBH
1
Each
$
$
4024 0
18-23 DBH
1
Each
$
$
4025 0
24-29 DBH
1
Each
$
$
4026 0
30-35 DBH
1
Each
$
$
4027 0
36-41 DBH
1
Each
$
$
4028 0
42-47 DBH
1
Each
$
$
4029 0
48-53 DBH
1
Each
$
$
4030 0
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)
1

A

B
C
D
4031
0-5 DBH
1
Each
$
$
4032
6-11 DBH
1
Each
$
$
4033
12-17 DBH
1
Each
$
$
4034
18-23 DBH
1
Each
$
$
4035
24-29 DBH
1
Each
$
$
4036
30-35 DBH
1
Each
$
$
4037
36-41 DBH
1
Each
$
$
4038
42-47 DBH
1
Each
$
$
4039
48-53 DBH
1
Each
$
$
4040
54+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)
1

A

B
C
D
4041
0-5 DBH
1
Each
$
$
4042
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING
1

A

B
C
D
4043
0-5 DBH
1
Each
$
$
4044
6-11 DBH
1
Each
$
$
4045
12-17 DBH
1
Each
$
$
4046
18-23 DBH
1
Each
$
$
4047
24-29 DBH
1
Each
$
$
4048
30-35 DBH
1
Each
$
$
4049
36-41 DBH
1
Each
$
$
4050
42-47 DBH
1
Each
$
$
4051
48-53 DBH
1
Each
$
$
4052
54 + DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)

A

B
C
D
4053
0-5 DBH
1
Each
$
$
4054
6-11 DBH
1
Each
$
$
4055
12-17 DBH
1
Each
$
$
4056
18-23 DBH
1
Each
$
$
4057
24-29 DBH
1
Each
$
$
4058
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
4059 0
LINEAL FOOT

14-INCH DEPTH

10
Each
$
$
4060 0
LINEAL FOOT

18-INCH DEPTH

10
Each
$
$
4061 0
LINEAL FOOT

24-INCH DEPTH

10
Each
$
$
CLIN NO.
EMERGENCY WORK
4062 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 4:
$
ESTIMATED TOTAL COST BASE+4 OPTION YEARS:
$

Golden Gate National Cemetery

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
01
0-5 DBH
1
Each
$
$
02
6-11 DBH
1
Each
$
$
03
12-17 DBH
1
Each
$
$
04
18-23 DBH
1
Each
$
$
05
24-29 DBH
1
Each
$
$
06
30-35 DBH
1
Each
$
$
07
36-41 DBH
1
Each
$
$
08
42-47 DBH
1
Each
$
$
09
48-53 DBH
1
Each
$
$
010
54-60 DBH
1
Each
$
$
011
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
012
0-5 DBH
1
Each
$
$
013
6-11 DBH
8
Each
$
$
014
12-17 DBH
13
Each
$
$
015
18-23 DBH
13
Each
$
$
016
24-29 DBH
14
Each
$
$
017
30-35 DBH
14
Each
$
$
018
36-41 DBH
9
Each
$
$
019
42-47 DBH
5
Each
$
$
020
48-53 DBH
3
Each
$
$
021
54-60 DBH
2
Each
$
$
022
61+ DBH
2
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
023
0-5 DBH
1
Each
$
$
024
6-11 DBH
1
Each
$
$
025
12-17 DBH
6
Each
$
$
026
18-23 DBH
8
Each
$
$
027
24-29 DBH
8
Each
$
$
028
30-35 DBH
8
Each
$
$
029
36-41 DBH
7
Each
$
$
030
42-47 DBH
5
Each
$
$
031
48-53 DBH
3
Each
$
$
032
54-60 DBH
2
Each
$
$
033
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
034
0-5 DBH
1
Each
$
$
035
6-11 DBH
1
Each
$
$
036
12-17 DBH
1
Each
$
$
037
18-23 DBH
1
Each
$
$
038
24-29 DBH
1
Each
$
$
039
30-35 DBH
1
Each
$
$
040
36-41 DBH
1
Each
$
$
041
42-47 DBH
1
Each
$
$
042
48-53 DBH
1
Each
$
$
043
54-60 DBH
1
Each
$
$
044
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
045
0-5 DBH
1
Each
$
$
046
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
047
0-5 DBH
1
Each
$
$
048
6-11 DBH
1
Each
$
$
049
12-17 DBH
1
Each
$
$
050
18-23 DBH
1
Each
$
$
051
24-29 DBH
1
Each
$
$
052
30-35 DBH
1
Each
$
$
053
36-41 DBH
1
Each
$
$
054
42-47 DBH
1
Each
$
$
055
48-53 DBH
1
Each
$
$
056
54-60 DBH
1
Each
$
$
057
61+ DBH
1
Each
$
$
CLIN No.
PALM / CABBAGE TREE PRUNING (ROUTINE)

A

B
C
D
058
0-5 DBH
1
Each
$
$
059
6-11 DBH
6
Each
$
$
060
12-17 DBH
11
Each
$
$
061
18-23 DBH
5
Each
$
$
062
24-29 DBH
1
Each
$
$
063
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
064
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
065
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
066
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
067 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST BASE YEAR:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
11
0-5 DBH
1
Each
$
$
12
6-11 DBH
1
Each
$
$
13
12-17 DBH
1
Each
$
$
14
18-23 DBH
1
Each
$
$
15
24-29 DBH
1
Each
$
$
16
30-35 DBH
1
Each
$
$
17
36-41 DBH
1
Each
$
$
18
42-47 DBH
1
Each
$
$
19
48-53 DBH
1
Each
$
$
110
54-60 DBH
1
Each
$
$
111
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
112
0-5 DBH
1
Each
$
$
113
6-11 DBH
1
Each
$
$
114
12-17 DBH
1
Each
$
$
115
18-23 DBH
1
Each
$
$
116
24-29 DBH
1
Each
$
$
117
30-35 DBH
1
Each
$
$
118
36-41 DBH
1
Each
$
$
119
42-47 DBH
1
Each
$
$
120
48-53 DBH
1
Each
$
$
121
54-60 DBH
1
Each
$
$
122
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
123
0-5 DBH
1
Each
$
$
124
6-11 DBH
1
Each
$
$
125
12-17 DBH
1
Each
$
$
126
18-23 DBH
1
Each
$
$
127
24-29 DBH
1
Each
$
$
128
30-35 DBH
1
Each
$
$
129
36-41 DBH
1
Each
$
$
130
42-47 DBH
1
Each
$
$
131
48-53 DBH
1
Each
$
$
132
54-60 DBH
1
Each
$
$
133
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
134
0-5 DBH
1
Each
$
$
135
6-11 DBH
1
Each
$
$
136
12-17 DBH
1
Each
$
$
137
18-23 DBH
1
Each
$
$
138
24-29 DBH
1
Each
$
$
139
30-35 DBH
1
Each
$
$
140
36-41 DBH
1
Each
$
$
141
42-47 DBH
1
Each
$
$
142
48-53 DBH
1
Each
$
$
143
54-60 DBH
1
Each
$
$
144
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
145
0-5 DBH
1
Each
$
$
146
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
147
0-5 DBH
1
Each
$
$
148
6-11 DBH
1
Each
$
$
149
12-17 DBH
1
Each
$
$
150
18-23 DBH
1
Each
$
$
151
24-29 DBH
1
Each
$
$
152
30-35 DBH
1
Each
$
$
153
36-41 DBH
1
Each
$
$
154
42-47 DBH
1
Each
$
$
155
48-53 DBH
1
Each
$
$
156
54-60 DBH
1
Each
$
$
157
61+ DBH
1
Each
$
$
CLIN No.
PALM / CABBAGE TREE PRUNING (ROUTINE)

A

B
C
D
158
0-5 DBH
1
Each
$
$
159
6-11 DBH
1
Each
$
$
160
12-17 DBH
1
Each
$
$
161
18-23 DBH
1
Each
$
$
162
24-29 DBH
1
Each
$
$
163
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
164
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
165
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
166
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
167 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 1:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
2001
0-5 DBH
1
Each
$
$
2002
6-11 DBH
1
Each
$
$
2003
12-17 DBH
1
Each
$
$
2004
18-23 DBH
1
Each
$
$
2005
24-29 DBH
1
Each
$
$
2006
30-35 DBH
1
Each
$
$
2007
36-41 DBH
1
Each
$
$
2008
42-47 DBH
1
Each
$
$
2009
48-53 DBH
1
Each
$
$
2010
54-60 DBH
1
Each
$
$
2011
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
2012
0-5 DBH
1
Each
$
$
2013
6-11 DBH
1
Each
$
$
2014
12-17 DBH
1
Each
$
$
2015
18-23 DBH
1
Each
$
$
2016
24-29 DBH
1
Each
$
$
2017
30-35 DBH
1
Each
$
$
2018
36-41 DBH
1
Each
$
$
2019
42-47 DBH
1
Each
$
$
2020
48-53 DBH
1
Each
$
$
2021
54-60 DBH
1
Each
$
$
2022
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
2023
0-5 DBH
1
Each
$
$
2024
6-11 DBH
1
Each
$
$
2025
12-17 DBH
1
Each
$
$
2026
18-23 DBH
1
Each
$
$
2027
24-29 DBH
1
Each
$
$
2028
30-35 DBH
1
Each
$
$
2029
36-41 DBH
1
Each
$
$
2030
42-47 DBH
1
Each
$
$
2031
48-53 DBH
1
Each
$
$
2032
54-60 DBH
1
Each
$
$
2033
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
2034
0-5 DBH
1
Each
$
$
2035
6-11 DBH
1
Each
$
$
2036
12-17 DBH
1
Each
$
$
2037
18-23 DBH
1
Each
$
$
2038
24-29 DBH
1
Each
$
$
2039
30-35 DBH
1
Each
$
$
2040
36-41 DBH
1
Each
$
$
2041
42-47 DBH
1
Each
$
$
2042
48-53 DBH
1
Each
$
$
2043
54-60 DBH
1
Each
$
$
2044
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
2045
0-5 DBH
1
Each
$
$
2046
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
2047
0-5 DBH
1
Each
$
$
2048
6-11 DBH
1
Each
$
$
2049
12-17 DBH
1
Each
$
$
2050
18-23 DBH
1
Each
$
$
2051
24-29 DBH
1
Each
$
$
2052
30-35 DBH
1
Each
$
$
2053
36-41 DBH
1
Each
$
$
2054
42-47 DBH
1
Each
$
$
2055
48-53 DBH
1
Each
$
$
2056
54-60 DBH
1
Each
$
$
2057
61+ DBH
1
Each
$
$
CLIN No.
PALM / CABBAGE TREE PRUNING (ROUTINE)

A

B
C
D
2058
0-5 DBH
1
Each
$
$
2059
6-11 DBH
1
Each
$
$
2060
12-17 DBH
1
Each
$
$
2061
18-23 DBH
1
Each
$
$
2062
24-29 DBH
1
Each
$
$
2063
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
2064
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
2065
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
2066
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
2067 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 2:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
3001 1
0-5 DBH
1
Each
$
$
3002
6-11 DBH
1
Each
$
$
3003
12-17 DBH
1
Each
$
$
3004
18-23 DBH
1
Each
$
$
3005
24-29 DBH
1
Each
$
$
3006
30-35 DBH
1
Each
$
$
3007
36-41 DBH
1
Each
$
$
3008
42-47 DBH
1
Each
$
$
3009
48-53 DBH
1
Each
$
$
3010
54-60 DBH
1
Each
$
$
3011
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
3012
0-5 DBH
1
Each
$
$
3013
6-11 DBH
1
Each
$
$
3014
12-17 DBH
1
Each
$
$
3015
18-23 DBH
1
Each
$
$
3016
24-29 DBH
1
Each
$
$
3017
30-35 DBH
1
Each
$
$
3018
36-41 DBH
1
Each
$
$
3019
42-47 DBH
1
Each
$
$
3020
48-53 DBH
1
Each
$
$
3021
54-60 DBH
1
Each
$
$
3022
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
3023
0-5 DBH
1
Each
$
$
3024
6-11 DBH
1
Each
$
$
3025
12-17 DBH
1
Each
$
$
3026
18-23 DBH
1
Each
$
$
3027
24-29 DBH
1
Each
$
$
3028
30-35 DBH
1
Each
$
$
3029
36-41 DBH
1
Each
$
$
3030
42-47 DBH
1
Each
$
$
3031
48-53 DBH
1
Each
$
$
3032
54-60 DBH
1
Each
$
$
3033
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
3034
0-5 DBH
1
Each
$
$
3035
6-11 DBH
1
Each
$
$
3036
12-17 DBH
1
Each
$
$
3037
18-23 DBH
1
Each
$
$
3038
24-29 DBH
1
Each
$
$
3039
30-35 DBH
1
Each
$
$
3040
36-41 DBH
1
Each
$
$
3041
42-47 DBH
1
Each
$
$
3042
48-53 DBH
1
Each
$
$
3043
54-60 DBH
1
Each
$
$
3044
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
3045
0-5 DBH
1
Each
$
$
3046
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
3047
0-5 DBH
1
Each
$
$
3048
6-11 DBH
1
Each
$
$
3049
12-17 DBH
1
Each
$
$
3050
18-23 DBH
1
Each
$
$
3051
24-29 DBH
1
Each
$
$
3052
30-35 DBH
1
Each
$
$
3053
36-41 DBH
1
Each
$
$
3054
42-47 DBH
1
Each
$
$
3055
48-53 DBH
1
Each
$
$
3056
54-60 DBH
1
Each
$
$
3057
61+ DBH
1
Each
$
$
CLIN No.
PALM / CABBAGE TREE PRUNING (ROUTINE)

A

B
C
D
3058
0-5 DBH
1
Each
$
$
3059
6-11 DBH
1
Each
$
$
3060
12-17 DBH
1
Each
$
$
3061
18-23 DBH
1
Each
$
$
3062
24-29 DBH
1
Each
$
$
3063
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
3064
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
3065
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
3066
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
3067 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 3:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
4001
0-5 DBH
1
Each
$
$
4002
6-11 DBH
1
Each
$
$
4003
12-17 DBH
1
Each
$
$
4004
18-23 DBH
1
Each
$
$
4005
24-29 DBH
1
Each
$
$
4006
30-35 DBH
1
Each
$
$
4007
36-41 DBH
1
Each
$
$
4008
42-47 DBH
1
Each
$
$
4009
48-53 DBH
1
Each
$
$
4010
54-60 DBH
1
Each
$
$
4011
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
4012
0-5 DBH
1
Each
$
$
4013
6-11 DBH
1
Each
$
$
4014
12-17 DBH
1
Each
$
$
4015
18-23 DBH
1
Each
$
$
4016
24-29 DBH
1
Each
$
$
4017
30-35 DBH
1
Each
$
$
4018
36-41 DBH
1
Each
$
$
4019
42-47 DBH
1
Each
$
$
4020
48-53 DBH
1
Each
$
$
4021
54-60 DBH
1
Each
$
$
4022
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
4023
0-5 DBH
1
Each
$
$
4024
6-11 DBH
1
Each
$
$
4025
12-17 DBH
1
Each
$
$
4026
18-23 DBH
1
Each
$
$
4027
24-29 DBH
1
Each
$
$
4028
30-35 DBH
1
Each
$
$
4029
36-41 DBH
1
Each
$
$
4030
42-47 DBH
1
Each
$
$
4031
48-53 DBH
1
Each
$
$
4032
54-60 DBH
1
Each
$
$
4033
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
4034
0-5 DBH
1
Each
$
$
4035
6-11 DBH
1
Each
$
$
4036
12-17 DBH
1
Each
$
$
4037
18-23 DBH
1
Each
$
$
4038
24-29 DBH
1
Each
$
$
4039
30-35 DBH
1
Each
$
$
4040
36-41 DBH
1
Each
$
$
4041
42-47 DBH
1
Each
$
$
4042
48-53 DBH
1
Each
$
$
4043
54-60 DBH
1
Each
$
$
4044
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
4045
0-5 DBH
1
Each
$
$
4046
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
4047
0-5 DBH
1
Each
$
$
4048
6-11 DBH
1
Each
$
$
4049
12-17 DBH
1
Each
$
$
4050
18-23 DBH
1
Each
$
$
4051
24-29 DBH
1
Each
$
$
4052
30-35 DBH
1
Each
$
$
4053
36-41 DBH
1
Each
$
$
4054
42-47 DBH
1
Each
$
$
4055
48-53 DBH
1
Each
$
$
4056
54-60 DBH
1
Each
$
$
4057
61+ DBH
1
Each
$
$
CLIN No.
PALM / CABBAGE TREE PRUNING (ROUTINE)

A

B
C
D
4058
0-5 DBH
1
Each
$
$
4059
6-11 DBH
1
Each
$
$
4060
12-17 DBH
1
Each
$
$
4061
18-23 DBH
1
Each
$
$
4062
24-29 DBH
1
Each
$
$
4063
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
4064
LINEAL FOOT

14-INCH DEPTH

10
Each
$
$
4065
LINEAL FOOT

18-INCH DEPTH

10
Each
$
$
4066
LINEAL FOOT

24-INCH DEPTH

10
Each
$
$
CLIN NO.
EMERGENCY WORK
4067 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 4:
$
ESTIMATED TOTAL COST BASE+4 OPTION YEARS:
$

Los Angeles National Cemetery

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
01
0-5 DBH
1
Each
$
$
02
6-11 DBH
1
Each
$
$
03
12-17 DBH
1
Each
$
$
04
18-23 DBH
1
Each
$
$
05
24-29 DBH
1
Each
$
$
06
30-35 DBH
1
Each
$
$
07
36-41 DBH
1
Each
$
$
08
42-47 DBH
1
Each
$
$
09
48-53 DBH
1
Each
$
$
010
54-60 DBH
1
Each
$
$
011
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
012
0-5 DBH
6
Each
$
$
013
6-11 DBH
32
Each
$
$
014
12-17 DBH
49
Each
$
$
015
18-23 DBH
33
Each
$
$
016
24-29 DBH
18
Each
$
$
017
30-35 DBH
12
Each
$
$
018
36-41 DBH
14
Each
$
$
019
42-47 DBH
9
Each
$
$
020
48-53 DBH
7
Each
$
$
021
54-60 DBH
4
Each
$
$
022
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
023
0-5 DBH
1
Each
$
$
024
6-11 DBH
1
Each
$
$
025
12-17 DBH
1
Each
$
$
026
18-23 DBH
2
Each
$
$
027
24-29 DBH
2
Each
$
$
028
30-35 DBH
2
Each
$
$
029
36-41 DBH
2
Each
$
$
030
42-47 DBH
1
Each
$
$
031
48-53 DBH
1
Each
$
$
032
54-60 DBH
1
Each
$
$
033
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
034
0-5 DBH
1
Each
$
$
035
6-11 DBH
1
Each
$
$
036
12-17 DBH
2
Each
$
$
037
18-23 DBH
3
Each
$
$
038
24-29 DBH
2
Each
$
$
039
30-35 DBH
1
Each
$
$
040
36-41 DBH
2
Each
$
$
041
42-47 DBH
1
Each
$
$
042
48-53 DBH
1
Each
$
$
043
54-60 DBH
1
Each
$
$
044
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
045
0-5 DBH
1
Each
$
$
046
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
047
0-5 DBH
1
Each
$
$
048
6-11 DBH
1
Each
$
$
049
12-17 DBH
1
Each
$
$
050
18-23 DBH
1
Each
$
$
051
24-29 DBH
1
Each
$
$
052
30-35 DBH
1
Each
$
$
053
36-41 DBH
1
Each
$
$
054
42-47 DBH
1
Each
$
$
055
48-53 DBH
1
Each
$
$
056
54-60 DBH
1
Each
$
$
057
61+ DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)

A

B
C
D
058
0-5 DBH
1
Each
$
$
059
6-11 DBH
1
Each
$
$
060
12-17 DBH
1
Each
$
$
061
18-23 DBH
1
Each
$
$
062
24-29 DBH
1
Each
$
$
063
30+ DBH
2
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
064
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
065
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
066
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
067 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST BASE YEAR:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
11
0-5 DBH
1
Each
$
$
12
6-11 DBH
1
Each
$
$
13
12-17 DBH
1
Each
$
$
14
18-23 DBH
1
Each
$
$
15
24-29 DBH
1
Each
$
$
16
30-35 DBH
1
Each
$
$
17
36-41 DBH
1
Each
$
$
18
42-47 DBH
1
Each
$
$
19
48-53 DBH
1
Each
$
$
110
54-60 DBH
1
Each
$
$
111
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
112
0-5 DBH
5
Each
$
$
113
6-11 DBH
31
Each
$
$
114
12-17 DBH
48
Each
$
$
115
18-23 DBH
34
Each
$
$
116
24-29 DBH
19
Each
$
$
117
30-35 DBH
12
Each
$
$
118
36-41 DBH
14
Each
$
$
119
42-47 DBH
9
Each
$
$
120
48-53 DBH
7
Each
$
$
121
54-60 DBH
4
Each
$
$
122
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
123
0-5 DBH
1
Each
$
$
124
6-11 DBH
1
Each
$
$
125
12-17 DBH
1
Each
$
$
126
18-23 DBH
2
Each
$
$
127
24-29 DBH
2
Each
$
$
128
30-35 DBH
2
Each
$
$
129
36-41 DBH
2
Each
$
$
130
42-47 DBH
1
Each
$
$
131
48-53 DBH
1
Each
$
$
132
54-60 DBH
1
Each
$
$
133
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
134
0-5 DBH
1
Each
$
$
135
6-11 DBH
1
Each
$
$
136
12-17 DBH
2
Each
$
$
137
18-23 DBH
3
Each
$
$
138
24-29 DBH
2
Each
$
$
139
30-35 DBH
1
Each
$
$
140
36-41 DBH
2
Each
$
$
141
42-47 DBH
1
Each
$
$
142
48-53 DBH
1
Each
$
$
143
54-60 DBH
1
Each
$
$
144
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
145
0-5 DBH
1
Each
$
$
146
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
147
0-5 DBH
1
Each
$
$
148
6-11 DBH
1
Each
$
$
149
12-17 DBH
1
Each
$
$
150
18-23 DBH
1
Each
$
$
151
24-29 DBH
1
Each
$
$
152
30-35 DBH
1
Each
$
$
153
36-41 DBH
1
Each
$
$
154
42-47 DBH
1
Each
$
$
155
48-53 DBH
1
Each
$
$
156
54-60 DBH
1
Each
$
$
157
61+ DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)

A

B
C
D
158
0-5 DBH
1
Each
$
$
159
6-11 DBH
1
Each
$
$
160
12-17 DBH
1
Each
$
$
161
18-23 DBH
1
Each
$
$
162
24-29 DBH
1
Each
$
$
163
30+ DBH
2
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
164
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
165
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
166
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
167 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 1:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
2001
0-5 DBH
1
Each
$
$
2002
6-11 DBH
1
Each
$
$
2003
12-17 DBH
1
Each
$
$
2004
18-23 DBH
1
Each
$
$
2005
24-29 DBH
1
Each
$
$
2006
30-35 DBH
1
Each
$
$
2007
36-41 DBH
1
Each
$
$
2008
42-47 DBH
1
Each
$
$
2009
48-53 DBH
1
Each
$
$
2010
54-60 DBH
1
Each
$
$
2011
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
2012
0-5 DBH
1
Each
$
$
2013
6-11 DBH
1
Each
$
$
2014
12-17 DBH
1
Each
$
$
2015
18-23 DBH
1
Each
$
$
2016
24-29 DBH
1
Each
$
$
2017
30-35 DBH
1
Each
$
$
2018
36-41 DBH
1
Each
$
$
2019
42-47 DBH
1
Each
$
$
2020
48-53 DBH
1
Each
$
$
2021
54-60 DBH
1
Each
$
$
2022
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
2023
0-5 DBH
1
Each
$
$
2024
6-11 DBH
1
Each
$
$
2025
12-17 DBH
1
Each
$
$
2026
18-23 DBH
1
Each
$
$
2027
24-29 DBH
1
Each
$
$
2028
30-35 DBH
1
Each
$
$
2029
36-41 DBH
1
Each
$
$
2030
42-47 DBH
1
Each
$
$
2031
48-53 DBH
1
Each
$
$
2032
54-60 DBH
1
Each
$
$
2033
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
2034
0-5 DBH
1
Each
$
$
2035
6-11 DBH
1
Each
$
$
2036
12-17 DBH
1
Each
$
$
2037
18-23 DBH
1
Each
$
$
2038
24-29 DBH
1
Each
$
$
2039
30-35 DBH
1
Each
$
$
2040
36-41 DBH
1
Each
$
$
2041
42-47 DBH
1
Each
$
$
2042
48-53 DBH
1
Each
$
$
2043
54-60 DBH
1
Each
$
$
2044
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
2045
0-5 DBH
1
Each
$
$
2046
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
2047
0-5 DBH
1
Each
$
$
2048
6-11 DBH
1
Each
$
$
2049
12-17 DBH
1
Each
$
$
2050
18-23 DBH
1
Each
$
$
2051
24-29 DBH
1
Each
$
$
2052
30-35 DBH
1
Each
$
$
2053
36-41 DBH
1
Each
$
$
2054
42-47 DBH
1
Each
$
$
2055
48-53 DBH
1
Each
$
$
2056
54-60 DBH
1
Each
$
$
2057
61+ DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)

A

B
C
D
2058
0-5 DBH
1
Each
$
$
2059
6-11 DBH
1
Each
$
$
2060
12-17 DBH
1
Each
$
$
2061
18-23 DBH
1
Each
$
$
2062
24-29 DBH
1
Each
$
$
2063
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
2064
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
2065
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
2066
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
2067 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 2:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
3001
0-5 DBH
1
Each
$
$
3002
6-11 DBH
1
Each
$
$
3003
12-17 DBH
1
Each
$
$
3004
18-23 DBH
1
Each
$
$
3005
24-29 DBH
1
Each
$
$
3006
30-35 DBH
1
Each
$
$
3007
36-41 DBH
1
Each
$
$
3008
42-47 DBH
1
Each
$
$
3009
48-53 DBH
1
Each
$
$
3010
54-60 DBH
1
Each
$
$
3011
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
3012
0-5 DBH
1
Each
$
$
3013
6-11 DBH
1
Each
$
$
3014
12-17 DBH
1
Each
$
$
3015
18-23 DBH
1
Each
$
$
3016
24-29 DBH
1
Each
$
$
3017
30-35 DBH
1
Each
$
$
3018
36-41 DBH
1
Each
$
$
3019
42-47 DBH
1
Each
$
$
3020
48-53 DBH
1
Each
$
$
3021
54-60 DBH
1
Each
$
$
3022
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
3023
0-5 DBH
1
Each
$
$
3024
6-11 DBH
1
Each
$
$
3025
12-17 DBH
1
Each
$
$
3026
18-23 DBH
1
Each
$
$
3027
24-29 DBH
1
Each
$
$
3028
30-35 DBH
1
Each
$
$
3029
36-41 DBH
1
Each
$
$
3030
42-47 DBH
1
Each
$
$
3031
48-53 DBH
1
Each
$
$
3032
54-60 DBH
1
Each
$
$
3033
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
3034
0-5 DBH
1
Each
$
$
3035
6-11 DBH
1
Each
$
$
3036
12-17 DBH
1
Each
$
$
3037
18-23 DBH
1
Each
$
$
3038
24-29 DBH
1
Each
$
$
3039
30-35 DBH
1
Each
$
$
3040
36-41 DBH
1
Each
$
$
3041
42-47 DBH
1
Each
$
$
3042
48-53 DBH
1
Each
$
$
3043
54-60 DBH
1
Each
$
$
3044
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
3045
0-5 DBH
1
Each
$
$
3046
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
3047
0-5 DBH
1
Each
$
$
3048
6-11 DBH
1
Each
$
$
3049
12-17 DBH
1
Each
$
$
3050
18-23 DBH
1
Each
$
$
3051
24-29 DBH
1
Each
$
$
3052
30-35 DBH
1
Each
$
$
3053
36-41 DBH
1
Each
$
$
3054
42-47 DBH
1
Each
$
$
3055
48-53 DBH
1
Each
$
$
3056
54-60 DBH
1
Each
$
$
3057
61+ DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)

A

B
C
D
3058
0-5 DBH
1
Each
$
$
3059
6-11 DBH
1
Each
$
$
3060
12-17 DBH
1
Each
$
$
3061
18-23 DBH
1
Each
$
$
3062
24-29 DBH
1
Each
$
$
3063
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
3064
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
3065
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
3066
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
3067 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 3:
$
DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
4001
0-5 DBH
1
Each
$
$
4002
6-11 DBH
1
Each
$
$
4003
12-17 DBH
1
Each
$
$
4004
18-23 DBH
1
Each
$
$
4005
24-29 DBH
1
Each
$
$
4006
30-35 DBH
1
Each
$
$
4007
36-41 DBH
1
Each
$
$
4008
42-47 DBH
1
Each
$
$
4009
48-53 DBH
1
Each
$
$
4010
54-60 DBH
1
Each
$
$
4011
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
4012
0-5 DBH
1
Each
$
$
4013
6-11 DBH
1
Each
$
$
4014
12-17 DBH
1
Each
$
$
4015
18-23 DBH
1
Each
$
$
4016
24-29 DBH
1
Each
$
$
4017
30-35 DBH
1
Each
$
$
4018
36-41 DBH
1
Each
$
$
4019
42-47 DBH
1
Each
$
$
4020
48-53 DBH
1
Each
$
$
4021
54-60 DBH
1
Each
$
$
4022
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
4023
0-5 DBH
1
Each
$
$
4024
6-11 DBH
1
Each
$
$
4025
12-17 DBH
1
Each
$
$
4026
18-23 DBH
1
Each
$
$
4027
24-29 DBH
1
Each
$
$
4028
30-35 DBH
1
Each
$
$
4029
36-41 DBH
1
Each
$
$
4030
42-47 DBH
1
Each
$
$
4031
48-53 DBH
1
Each
$
$
4032
54-60 DBH
1
Each
$
$
4033
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
4034
0-5 DBH
1
Each
$
$
4035
6-11 DBH
1
Each
$
$
4036
12-17 DBH
1
Each
$
$
4037
18-23 DBH
1
Each
$
$
4038
24-29 DBH
1
Each
$
$
4039
30-35 DBH
1
Each
$
$
4040
36-41 DBH
1
Each
$
$
4041
42-47 DBH
1
Each
$
$
4042
48-53 DBH
1
Each
$
$
4043
54-60 DBH
1
Each
$
$
4044
61+ DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
4045
0-5 DBH
1
Each
$
$
4046
6-11 DBH
1
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
4047
0-5 DBH
1
Each
$
$
4048
6-11 DBH
1
Each
$
$
4049
12-17 DBH
1
Each
$
$
4050
18-23 DBH
1
Each
$
$
4051
24-29 DBH
1
Each
$
$
4052
30-35 DBH
1
Each
$
$
4053
36-41 DBH
1
Each
$
$
4054
42-47 DBH
1
Each
$
$
4055
48-53 DBH
1
Each
$
$
4056
54-60 DBH
1
Each
$
$
4057
61+ DBH
1
Each
$
$
CLIN No.
PALM TREE PRUNING (ROUTINE)

A

B
C
D
4058
0-5 DBH
1
Each
$
$
4059
6-11 DBH
1
Each
$
$
4060
12-17 DBH
1
Each
$
$
4061
18-23 DBH
1
Each
$
$
4062
24-29 DBH
1
Each
$
$
4063
30+ DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
4064
LINEAL FOOT

14-INCH DEPTH

3
Each
$
$
4065
LINEAL FOOT

18-INCH DEPTH

3
Each
$
$
4066
LINEAL FOOT

24-INCH DEPTH

3
Each
$
$
CLIN NO.
EMERGENCY WORK
4067 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST OPTION YEAR 4:
$
ESTIMATED TOTAL COST BASE+4 OPTION YEARS:
$

Miramar National Cemetery

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
01
0-5 DBH
1
Each
$
$
02
6-11 DBH
1
Each
$
$
03
12-17 DBH
1
Each
$
$
04
18 + DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
05
0-5 DBH
1
Each
$
$
06
6-11 DBH
1
Each
$
$
07
12-17 DBH
1
Each
$
$
08
18 + DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
09
0-5 DBH
1
Each
$
$
010
6-11 DBH
1
Each
$
$
011
12-17 DBH
1
Each
$
$
012
18 + DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
013
0-5 DBH
1
Each
$
$
014
6-11 DBH
1
Each
$
$
015
12-17 DBH
1
Each
$
$
016
18 + DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
017
0-5 DBH
200
Each
$
$
018
6-11 DBH
100
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
019
0-5 DBH
1
Each
$
$
020
6-11 DBH
1
Each
$
$
021
12-17 DBH
1
Each
$
$
022
18 + DBH
1
Each
$
$
CLIN No.
DRAGON TREE PRUNING (ROUTINE)

A

B
C
D
023
0-5 DBH
1
Each
$
$
024
6-11 DBH
1
Each
$
$
025
12-17 DBH
1
Each
$
$
026
18 + DBH
1
Each
$
$
CLIN No.
ROOT PRUNING

A

B
C
D
027
LINEAL FOOT

14-INCH DEPTH

10
Each
$
$
028
LINEAL FOOT

18-INCH DEPTH

10
Each
$
$
029
LINEAL FOOT

24-INCH DEPTH

10
Each
$
$
CLIN NO.
EMERGENCY WORK
030 0
One-Time Emergency Response Upcharge
1
Each
$
$
ESTIMATED COST BASE YEAR:
$

Miramar National Cemetery

DESCRIPTION
ESTIMATED QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
DIFFICULTY FACTOR MULTIPLIER
CLIN No.
TREE AND STUMP REMOVAL

A

B
C
D
11
0-5 DBH
1
Each
$
$
12
6-11 DBH
1
Each
$
$
13
12-17 DBH
1
Each
$
$
14
18 + DBH
1
Each
$
$
CLIN No.
TREE PRUNING (ROUTINE)

A

B
C
D
15
0-5 DBH
1
Each
$
$
16
6-11 DBH
1
Each
$
$
17
12-17 DBH
1
Each
$
$
18
18 + DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 1)

A

B
C
D
19
0-5 DBH
1
Each
$
$
110
6-11 DBH
1
Each
$
$
111
12-17 DBH
1
Each
$
$
112
18 + DBH
1
Each
$
$
CLIN No.
TREE PRUNING (DEADWOOD 2)

A

B
C
D
113
0-5 DBH
1
Each
$
$
114
6-11 DBH
1
Each
$
$
115
12-17 DBH
1
Each
$
$
116
18 + DBH
1
Each
$
$
CLIN No.
TREE PRUNING (TRAINING)

A

B
C
D
117
0-5 DBH
75
Each
$
$
118
6-11 DBH
50
Each
$
$
CLIN No.
STUMP GRINDING

A

B
C
D
119
0-5 DBH
1
Each
$
$
120
6-11 DBH
1
Each