36C78619Q0272-009.pdf

PDF 76 KB Posted

Attached to
NRM 890-19-110 Maintenance Building & Committal Shelter Repairs Fort McPherson NC
Solicitation number
36C78619Q0272
Issued by

About this file

36C78619Q0272 S02 Fort McPherson NC additional requirements.pdf

View the file

Other files

File Type Posted
36C78619Q0272-0002000.docx DOCX document
36C78619Q0272-0001000.docx DOCX document
36C78619Q0272-006.pdf PDF
36C78619Q0272-002.pdf PDF
36C78619Q0272-007.pdf PDF
36C78619Q0272-003.pdf PDF
36C78619Q0272-008.pdf PDF
36C78619Q0272-001.docx DOCX document
36C78619Q0272-011.pdf PDF
36C78619Q0272-005.pdf PDF
36C78619Q0272-004.pdf PDF
36C78619Q0272-010.pdf PDF
36C78619Q0272-000.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDITIONAL FORT MCPHERSON NATIONAL CEMETERY

PROJECT INFORMATION AND REQUIREMENTS

A. CEMETERY LOCATION: The work will be performed at one (1) location:

Fort McPherson National Cemetery 12004 S. Spur 56A Maxwell, NE 69151

Phone (308) 582-4433 Ryan Hannon, Foreman

B. GENERAL INFO:

Job Foreman: A job foreman shall be provided whenever work is being performed to ensure employees are adequately supervised and proper conduct is maintained.

Period of Performance: The Contractor shall complete this work within 75 calendar days from start to finish after Notice To Proceed has been issued.

Work Hours: All work shall be performed between the normal business hours (8:00 a.m.

to 4:30 p.m.), Monday through Friday.

Pre-bid Site Visit: Bidders are required to make a pre-bid site visit. Such visits must be pre-scheduled and arranged by contacting the Fort McPherson National Cemetery office.

1. The National Cemetery Administration honors veterans with a final resting place and lasting memorials that commemorate their service to our Nation. National Cemeteries are national shrines. The standards of work, appearance, and procedures performed by the contractor at this cemetery shall reflect this nations concern for those interred there.

Due to the sensitive mission of the cemetery, contractor personnel must exercise and exhibit absolute decorum, composure, and stability at all times.

2. The Contractor is responsible to ensure that all work shall be done in a manner that safeguards all NCA visitors, employees, and public. A competent crew leader shall be provided by the Contractor for whenever work is being performed to ensure employees are adequately supervised and proper conduct is maintained.

3. Be required to be fully clothed at all times, to include upper garment to cover body from the waist to the neck and long pants or slacks.

4. The Contractor/personnel shall not engage in loud or boisterous behavior, angry outbursts or use profane or abusive language at anytime on Government property.

Playing radios and/or electronic games/devices, is not permitted.

END

File details come from the government source that posted it.