36C78619Q0272-008.pdf

PDF 5 MB Posted

Attached to
NRM 890-19-110 Maintenance Building & Committal Shelter Repairs Fort McPherson NC
Solicitation number
36C78619Q0272
Issued by

About this file

36C78619Q0272 S02 Maps.pdf

View the file

Other files

File Type Posted
36C78619Q0272-0002000.docx DOCX document
36C78619Q0272-0001000.docx DOCX document
36C78619Q0272-006.pdf PDF
36C78619Q0272-002.pdf PDF
36C78619Q0272-007.pdf PDF
36C78619Q0272-003.pdf PDF
36C78619Q0272-001.docx DOCX document
36C78619Q0272-011.pdf PDF
36C78619Q0272-005.pdf PDF
36C78619Q0272-004.pdf PDF
36C78619Q0272-009.pdf PDF
36C78619Q0272-010.pdf PDF
36C78619Q0272-000.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

d) The skylight currently leaks and needs to be reset. The contractor shall remove and replace (re-use existing) the existing skylight and provide the required flashing, caulking, roofing cement, shingles (if needed), etc. required to properly seal the skylight back to a watertight condition in its designated location. All work related to this i.e., removing the skylight, cleaning the areas around the skylight for a clean seal, resetting the skylight, providing new metal flashing, providing new shingles, caulking, etc. is considered incidental to the project.

4) The route of construction traffic to and from the project site shall be clear of debris at all times as well as the required safety signage and barricades for the safe passage of visitors. Thoroughly clean up the work area at the end of each day’s work and at the completion of the project. Leave the premises clean and free of waste, scrap, used equipment or other material intentionally delivered to the site by the contractor or contractor’s personnel.

5) Map and site information follows:

Location Map

Paint Historic Bldgs

Misc.

Repairs

Insulate Break Rm & Office

DETAILS OF BREAK ROOM AND OFFICE AREA TO BE INSULATED

AS-BUILT DETAILS OF COMMITTAL SHELTER

APPROX. 3’-4”x 9’-10”x 2” APPROX. 3’-0”x 6’-0”x 1 3/4” APPROX. 10’-0”x 6’-8”x 1”

Photos

South Side of Building

North Side of Building

West Side of Building East Side of Building

Example of Brick to be Removed and Replaced

Example of Wood Elements to be Repainted

SMALL HISTORIC MAINTENANCE BUILDING

North Side of Building South Side of Building

West Side of Building Example of Wood Elements to be Painted

LARGE HISTORIC MAINTENANCE BUILDING (OLDER HALF SECTION)

Older Section Only (Typ.)

North Side of Building West Side of Building

West Side of Building South Side of Building

BREAK ROOM AND OFFICE AREA IN LARGE STORAGE BUILDING

Roll Up Door in Back Storage

Metal Door in Back Storage

COMMITTAL SHELTER BUILDING

North Side of Building

DOOR WARPED NEEDS

STRAIGHTENING

DOOR WARPED NEEDS

STRAIGHTENING

South Side of Building

LATCHES AND LOCK TO

BE REPLACED (TYP.)

Typical Latch and Lock Replacement

Typical Flush Bolt Replacement (Top and Bottom)

Doors Swung Open (Typ.)

West Side of Building East Side of Building Skylight from Inside Building

SKYLIGHT

COMMITTAL SHELTER BUILDING

COMMITTAL SHELTER EXTERIOR CEDAR DECKING

WIDTH OF EXTERIOR

CEDAR DECKING TO BE

RESTORED ALONG

PERIMETER OF BUILDING

(TYP.)

East Side of Building Looking along North Side of Building

Looking along South Side of Building

Looking along West Side of Building West Side of Building

APPROX. 4.5’

File details come from the government source that posted it.