About this file

36C78619B0015 S01_912CM3013 WVNC Basis of Design Bk 01.pdf

View the file

Other files

File Type Posted
36C78619C0149-000.docx DOCX document
36C78619C0149-001.pdf PDF
36C78619B0015-0005000.docx DOCX document
36C78619B0015-0005000.docx DOCX document
36C78619B0015-0004001.pdf PDF
36C78619B0015-0004000.docx DOCX document
36C78619B0015-0004000.docx DOCX document
36C78619B0015-0004001.pdf PDF
36C78619B0015-0003000.docx DOCX document
36C78619B0015-0003000.docx DOCX document
36C78619B0015-0002001.docx DOCX document
36C78619B0015-0002002.pdf PDF
36C78619B0015-0002000.docx DOCX document
36C78619B0015-0002002.pdf PDF
36C78619B0015-0002001.docx DOCX document
36C78619B0015-0002000.docx DOCX document
36C78619B0015-0001003.pdf PDF
36C78619B0015-0001000.docx DOCX document
36C78619B0015-0001004.pdf PDF
36C78619B0015-0001002.pdf PDF
36C78619B0015-0001001.pdf PDF
36C78619B0015-0001003.pdf PDF
36C78619B0015-0001001.pdf PDF
36C78619B0015-0001000.docx DOCX document
36C78619B0015-0001002.pdf PDF
36C78619B0015-0001004.pdf PDF
36C78619B0015-004.pdf PDF
36C78619B0015-003.pdf PDF
36C78619B0015-002.xlsx XLSX spreadsheet
36C78619B0015-011.pdf PDF
36C78619B0015-001.docx DOCX document
36C78619B0015-008.pdf PDF
36C78619B0015-009.pdf PDF
36C78619B0015-005.pdf PDF
36C78619B0015-006.docx DOCX document
36C78619B0015-010.pdf PDF
36C78619B0015-008.pdf PDF
36C78619B0015-001.docx DOCX document
36C78619B0015-006.docx DOCX document
36C78619B0015-007.pdf PDF
36C78619B0015-009.pdf PDF
36C78619B0015-010.pdf PDF
36C78619B0015-005.pdf PDF
36C78619B0015-002.xlsx XLSX spreadsheet
36C78619B0015-003.pdf PDF
36C78619B0015-011.pdf PDF
36C78619B0015-004.pdf PDF
36C78619B0015-000.docx DOCX document
36C78619B0015-000.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUNE 3, 2019

West Virginia National Cemetery Basis of Design Report

VA PROJECT NUMBER 912CM3013

Columbarium/Administration/PIC/Maintenance/Parking Taylor County, West Virginia

Basis of Design Report Project Number: 912CM3013

Prepared for:

United States Department of Veterans Affairs NCA Contracting Service 425 I Street, NW Washington DC, 20001

June 3, 2019

Prepared by

THIS PAGE INTENTIONALLY LEFT BLANK FOR DOUBLE SIDED PRINTING

Basis of Design Report (Bid Documents) June 3, 2019

TABLE OF CONTENTS

1. Project Need

2. Review Meetings

3. Proposed Improvements

4. Design Criteria

5. Site Design

6. Architectural Design

7. Mechanical Design

8. Electrical Design

9. Plumbing Design

10. Structural Design

11. Appendices

· Appendix A – Review Meetings o Kick-Off Meeting Minutes o Schematic Design Meeting Minutes o Construction Documents – 50% Meeting Minutes o Construction Documents – 95% Meeting Minutes o Revised Construction Documents – 95% Meeting Minutes

· Appendix B – Phase I Environmental Site Assessment

· Appendix C – Waters of the U.S. Delineation Report

· Appendix D – Asbestos Containing Materials Sampling & Lead-Based Paint

Screening

Basis of Design Report (Bid Documents) June 3, 2019

Basis of Design Report (Bid Documents) June 3, 2019

Basis of Design Report (Bid Documents)

1. Project Need The West Virginia National Cemetery (WVNC) continues to expand and provide services for a growing number of visitors. Existing facilities are not adequate to accommodate future demands.

The existing Administration Building lacks storage space, employee amenities, ADA compliant parking, Honor Guard facilities and proper visitor restrooms. The entry drive currently serves as a cortege lane, Committal Shelter A is deteriorating, and Shelter B contains drainage induced issues. The proposed improvements will expand the Administration/Maintenance Building to provide proper service to both employees and visitors. The mission of WVNC will be supported through the construction of additional parking, dedicated cortege lanes and Committal Shelter construction and maintenance.

2. Review Meetings

2.1. Kick-Off Meeting

On October 13th, 2017, the Kick-Off Meeting was held at the West Virginia National Cemetery, 42 Veterans Memorial Lane, Grafton, WV. Refer to Appendix A for an attendee list and meeting notes. Included in this meeting were site visits by team members from Gordon to assess and document site conditions. Additional site visits were conducted independently by the Architect and the Mechanical/Electrical/Plumbing Engineer. At the meeting, representatives from the U.S Department of Veterans Affairs (VA), West Virginia National Cemetery (WVNC) and the Design Team reviewed and discussed the program objectives.

Refer to Appendix A for an attendee list and meeting notes.

2.2. Schematic Design (SD) Meeting

On January 25, 2018, the Schematic Design Review Meeting was held at 425 I Street NW, Washington, DC in Suite 5E. The architect, Gordon and VA PM/COR Michael Borgman were present at this review meeting. Other team members, U.S Department of Veterans Affairs (VA) staff, the Cemetery Director and Cemetery Caretaker Supervisor participated via teleconference.

At the meeting, representatives from the U.S Department of Veterans Affairs (VA), West Virginia National Cemetery (WVNC) and the Design Team reviewed the SD drawings, reports/studies and discussed the program objectives.

Refer to Appendix A for an attendee list and meeting notes.

2.3. Construction Documents-50% (CD-50%) Meeting

On April 5, 2018 a conference call to review the CD-50% was held. The architect, MEP, Cost Estimator, Gordon and VA PM/COR Michael Borgman phoned into the conference call.

Comments from the U.S Department of Veterans Affairs (VA) and West Virginia National Cemetery (WVNC) were reviewed as well as the overall project design and cost implications.

Refer to Appendix A for an attendee list and meeting notes.

Basis of Design Report (Bid Documents) June 3, 2019

2.4. Construction Documents-95% (CD-95%) Meeting

On June 19, 2018 a conference call to review the CD-95% was held. The architect, MEP, structural, Gordon and VA representatives phoned into the conference call. Comments from the U.S Department of Veterans Affairs (VA) and West Virginia National Cemetery (WVNC) were reviewed, line by line.

Refer to Appendix A for an attendee list and meeting notes.

2.5. Revised Construction Documents-95% (CD-95R%) Meeting

On July 31, 2018 a meeting was held at Gordon’s Martinsburg office to review the plans and comments. Attendees included representatives from Gordon and VA PM/COR Michael Borgman.

Refer to Appendix A for an attendee list and meeting notes.

2.6. Construction Documents-100% (CD-100%) Meeting

On December 13, 2018 a meeting was held at Gordon’s Chantilly office to review the plans and comments. Attendees included representatives from disciplines of the design team and VA PM/COR Michael Borgman.

3. Proposed Improvements The Bid Documents incorporate proposed improvements defined in the scope of work, subsequent discussions, request for information and comments received through previous submissions. The WVNC project consists of the following components.

3.1. Temporary Facilities

· Staff offices and parking

· Restrooms, gravesite locator, 16 parking spaces, 3 utility vehicle spaces and signage

3.2. Columbarium

· 800 niches located within two, double loaded niche walls.

· Master Plan layout for future expansion to 5,000 niches.

3.3. New Committal Shelter A

· Demolition of existing Committal Shelter

· Parking for a minimum of 30 cars

3.4. Add Public Information Center (PIC)

· Parking for 6 + 1 ADA

· Cortege lanes for 30 cars

3.5. Administration and Maintenance Complex

· Renovation and expand

· Visitor parking for 2 + 1 ADA

· Staff parking at 12 + 1 ADA

3.6. Existing Flag Pole Repair

· Replace flag halyard cleat

· Replace lighting with high efficiency LED

Basis of Design Report (Bid Documents) June 3, 2019

3.7. Expand Existing Maintenance Bays – Optional Construction Contract Line Item 002

· New enclosed wash bay

· Replace concrete paving in maintenance yard

· New flammable storage building

3.8. Cold Storage Building Improvements – Optional Construction Contract Line Item 003

· Add 2,000 sf sheltered storage

· Automatic garage door openers

· Video surveillance in lieu of lockable gate and fence listed in Scope of Work (SOW)

3.9. Committal Shelter B Improvements – Optional Construction Contract Line Item 004

· Add ventilation

· Fix lights

· Honor guard parking (10)

· New roofing

· Repair back wall

4. Design Criteria The SOW provides a list of general guidance documents to be followed in the design of the proposed improvements. The steeper slopes and the state of existing infrastructure at WVNC required flexibility in the design guidelines to achieve the proposed improvements. The general guidance documents include:

· VA Program Guide PG-18-3, Topic 1

· VA Program Guide PG-18-3, Topic 4

· VA Program Guide PG-18-3, Topic 16

· VA Sustainable Design Manual (May 2014)

· Green Globes – New Construction

· VA Design and Construction Criteria, NCA Specific Criteria and Specifications

· VA Program Guide 18-10 Physical Security

· VA Signage Design Guide Section 12 (December 2012)

5. Site Design Existing features such as the stream and steeper slopes provided distinct boundaries for development. Consideration of these features required the installation of retaining walls, ADA ramps and alternative design solutions to embrace the existing character of the Cemetery. It is accepted that portions of the design contain slopes representative of existing conditions with design standards adjusted accordingly. ADA access is provided to all proposed structures.

The Bid Documents reflect previous design submission with additional detail to incorporate comments from the VA. The overall site layout and amenities did not change from the 95% submission.

Basis of Design Report (Bid Documents) June 3, 2019

5.1. Temporary Facilities

5.1.1. PIC / Administration and Maintenance Complex

Facilities for administrative services, maintenance offices, public restrooms, and the PIC are located north of the existing stream and will have direct access from Route 50. This area shall be restored to existing conditions upon construction completion.

Proposed/existing slopes and space requirements limited opportunities to provide an ADA compliant facility south of the existing stream.

To reduce cost, only entrance aprons and ADA parking will be paved, and remaining parking will be gravel. Parking is to be provided adjacent to the temporary facilities and will be reserved visitors and select cemetery staff. It was determined through an RFI that a total of 16 vehicle spaces and 3 utility vehicle spaces will be required. A gravel path connecting the entry road to the temporary structures will be provided to allow utility vehicle access which does not require access to Route 50.

Temporary cortege will be managed on the existing entry drive and/or within existing cemetery roadways prior to Committal Shelter B.

5.1.2. New Committal Shelter A

Committal Shelter B will be utilized during the demolition of the existing committal shelter and construction of new Committal Shelter A.

5.2. PIC / Administration and Maintenance Complex

The PIC will be integrated into the Administration and Maintenance Complex to provide a single comprehensive facility. A single facility will allow shared use of parking, reduce construction costs and limit the impact of proposed improvements on the site. The site design is influenced by the existing 10.2 percent grade of the entry road and the impact of this slope on ADA access, circulation and overall functional expectations.

5.2.1. Vehicular Improvements

Vehicles will enter the property from the existing entrance from Route 50 and continue to the cortege lanes, parking areas or the gravesites. The existing entry road will maintain its current alignment and grade. New curb and gutter will be provided adjacent to the cortege lanes and areas between and including the proposed parking areas to the west.

Basis of Design Report (Bid Documents) June 3, 2019

5.2.2. Parking

Existing parking consists of two (2) parallel spaces at the entrance to the Administration Building, nine (9) spaces opposite the entry drive, the maintenance yard and a gravel overflow lot accessed from Route 50. The current facilities do not meet cemetery needs and are not ADA compliant. The nine (9) spaces opposite the entry drive will be eliminated and the two (2) existing parallel spaces along the entry drive will remain for visitor use.

The SD review meeting determined that the 24 + 5 ADA (29 total) spaces specified in the Scope of Work may be reduced by six (6) spaces to a total of 23. ADA spaces listed in the Scope of Work exceed ADA requirements and were also reduced to recognized standards for specific uses. A total of one (1) ADA space will be provided for cemetery staff, one (1) for the PIC/Honor Guard and one (1) for visitors. A total of 20 + 3 ADA spaces are provided for the PIC / Administration and Maintenance Complex.

Parking is provided in two (2) separate lots. The division of parking into separate lots is driven by the existing terrain, space limitations and construction costs. The lots include a “Lower” and “Upper” parking area.

· The Lower lot is located north of the Administration and Maintenance Complex and will primarily serve cemetery staff and the Honor Guard. No ADA parking will be provided in this lot due to the limitations imposed by the existing terrain, finished floor elevation and entry road slope.

· The Upper lot is located south of the Administration and Maintenance Complex and will be will be reserved for visitor and ADA parking. This location will provide visitors direct access to the PIC and is the preferred ADA access point due to the existing finished floor elevation. Existing slopes and associated construction costs limit the ability to locate all parking in the Upper parking area.

5.2.3. Cortege Lanes

Pursuant to the Scope of Work, the cortege lanes will provide capacity for up to 30 vehicles.

Locating the lanes east of northbound traffic will preserve the existing entry road alignment and will provide cemetery access during the construction process. Circulation patterns, functional requirements, construction cost and existing surface elevations limited opportunities to locate the cortege west incoming traffic.

Cortege lanes will be located on slopes of 10.2% due to the existing entry road design. It was determined during the SD review meeting this is an acceptable slope due to the area’s topography and the existing site conditions. Additional pavement and turfed area is provided to protect visitors from the proposed 3:1 slopes. Parallel double stripes will be provided to assist in car queuing.

Basis of Design Report (Bid Documents) June 3, 2019

5.2.4. Pedestrian Improvements

Sidewalks will be provided from the parallel spaces along the entry drive and from the Lower & Upper parking areas. An ADA accessible route will be provided from the Upper parking area to the main entrance of the Administration and Maintenance Complex. The existing parallel parking spaces will be expanded to allow for the crosswalk connecting the Administration and Maintenance Complex to the cortege lanes.

5.2.5. Landscape Improvements

Plant material is of native species and is designed to be simple and contained to reduce maintenance requirements. Landscaping includes foundation plantings to accent the building, to soften parking areas and to provide separation between the cortege lanes and the entry drive. A combination of rock and shredded hardwood bark mulch is used based on specific application and slope conditions.

5.3. Columbarium

Occupying the space of existing Committal Shelter A, the Columbarium is centrally located in the Cemetery and utilizes existing infrastructure. This location provides a level grade, existing parking, direct views from the main cemetery road and adequate space.

5.3.1. Niche Walls

Freestanding walls will be utilized to integrate the columbarium into the existing environment. There will be a total of four (4) wall faces within two (2) walls. Walls will be constructed of prefabricated concrete niches in accordance with NCA guidelines.

Walls are five (5) niches high and contain 200 niches per wall face. A total of 800 niches will be provided to allow for a symmetrical design. The 800 niches are 50 units greater than the minimum 750 niches identified in the Scope of Work.

Pillars will be faced with stone veneer similar in appearance to the existing sandstone finishes found throughout the cemetery (Committal Shelter B and Administration Building entrance). Engraved lettering will be 1.5” deep to be clearly visible and minimize future maintenance requirements.

Niche covers will be provided pursuant to NCA specifications and will be Government-furnished-Contractor-Installed. Torx head rosettes will be used to secure the niche covers.

5.3.2. Vehicular Improvements

The design will utilize the existing loop road (cul-de-sac) for circulation. No vehicular improvements are proposed.

Basis of Design Report (Bid Documents) June 3, 2019

5.3.3. Parking

It was determined in the SD review meeting that existing parking adjacent to Burial Section 2 along the loop road is adequate for the new Columbarium. Parking requirements within the Scope of Work were eliminated and no new parking areas will be provided.

5.3.4. Pedestrian Improvements

Access will be provided through existing sidewalks adjacent to the loop road and parallel parking area. Existing sidewalks are in poor condition and the flagstone pavers will be replaced with conventional concrete.

5.3.5. Landscape Improvements

The Scope of Work states that Columbarium landscaping shall be limited to trees and turf.

Turf, benches and a watering station are the only landscape improvements provided for the Columbarium.

5.3.6. Additional Improvements

The proposed Columbarium will be inserted into an existing environment containing a loop road, retaining walls and flag stone pavers. The addition of new stone veneer to the existing wall and the replacement of adjacent flag stone walkways with conventional concrete will be provided. It was determined that the removal and reuse of existing walls stone veneer is not advised. Quality control and potential costs impacted the decision not to reuse the existing stone veneer.

5.3.7. Future Expansion

Space limitations require future expansion of up to 5,000 niches to occur at a separate location from the 800 niche Columbarium. It is proposed that future expansion occur southwest of Burial Section 5. This area contains gentler slopes and direct access to an internal roadway. Landscape screening of adjacent properties will be required.

5.4. Existing Committal Shelter A

This Shelter is to be demolished and replaced in an alternate location within the cemetery (see Section 5.5).

5.5. New Committal Shelter A

Located near the top of the Cemetery in the vicinity of the existing flag pole, this location provides a large area of gentler slopes with broad views of the Cemetery.

5.5.1. Vehicular Improvements

A dedicated drive is provided to allow for separation of service attendees and general cemetery traffic.

Basis of Design Report (Bid Documents) June 3, 2019

5.5.2. Parking

Parking spaces for 30 vehicles are provided as outlined in the Scope of Work. Parallel double stripes will be provided to assist in car queuing.

5.5.3. Pedestrian Improvements

Sidewalks will be located along the northeastern edge of the parallel parking and will lead to the Committal Shelter. All sidewalks shall be ADA accessible and consist of conventional concrete.

5.5.4. Prevailing Winter Winds

Prevailing winds were described as a critical element of design in the Scope of Work. The shelter is oriented with a solid wall facing northwest to block winds. Existing vegetation will help protect visitors from prevailing winds.

5.5.5. Landscape Improvements

Plant material is of native species and is designed to be simple and contained to reduce maintenance requirements. Landscaping includes foundation plantings to accent the buildings, to soften parking areas and to provide separation between the pull-off area and the cemetery road.

5.6. Expand Existing Maintenance Bays (Optional Construction Contract Line Item 002)

5.6.1. Wash Bay

A wash bay is to be provided through the expansion of the existing Administration and Maintenance Complex west into the existing slope. This location will symmetrically align with the existing retaining wall and maintenance bays.

5.6.2. Flammable Storage

The expansion of the wash bay will require the existing flammable storage be relocated.

Extension of the existing structure further westward is not an economically viable option due to the existing slopes and retaining wall. Therefore, the flammable storage will be relocated to the southern perimeter of the maintenance yard, east of the existing gate.

5.7. Cold Storage Building Improvements (Optional Construction Contract Line Item 003) Fine grading and the installation of a concrete apron leading to the building expansion will be provided. The two (2) existing pole barns will be relocated east of the existing Cold Storage Building.

5.8. Committal Shelter B Improvements (Optional Construction Contract Line Item 004) The existing Shelter’s parallel parking spaces and adjacent sidewalk is expanded south by ten (10) spaces.

Basis of Design Report (Bid Documents) June 3, 2019

5.9. Signage Improvements

An inventory of existing signage was compiled during a site visit on February 15, 2018. Existing signage impacted by the proposed improvements will be replaced or eliminated. New signs will match existing style of WVNC signage. Signage is based on VA Signage Design Guide, National Cemetery Signs, MUCTD guidelines and existing WVNC signage.

5.9.1. Directional Signage

Directional signs are provided at decision points throughout the cemetery. The road system of WVNC naturally guides visitors through the cemetery while limiting decision points. This reduces the number of required signs to successfully guide visitors through the cemetery.

Signs will be standard two (2) post and panel signs, brown in color and contain one (1), two

(2) or three (3) lines of text. Standard letter dimensions for text reading “Public Information Center” has been modified to fit within the standard sign message area. Since the lower parking lot is not ADA compliant, the signage specific to for Visitor Parking will include an ADA symbol.

Directional signs are utilized to direct visitors to:

· The Public Information Center

· Visitor / ADA Parking

· Administration

· Columbarium

· Committal Shelter A

· Committal Shelter B

· Exit

5.9.2. Informational Signage

Includes a Visitor Information sign (NC-01.01A-M1) to replace the existing cemetery sign just south of the Administration Building. The sign will be located adjacent to the visitor parking lot and will identify cemetery regulations and hours of operation.

Sign will be standard two (2) post and panel signs, brown in color and comply with standard NCA dimensions and specifications.

5.9.3.Regulatory Signage Will be provided to designate ADA parking, restricted areas and for traffic regulations.

Signs will be standard two (2) post and panel signs, brown in color and comply with NCA requirements for low profile traffic signs. The “All Funeral Wait Here” sign was modified to include a directional arrow. This will help direct funeral attendees to the opposite side of the road where the cortege lane is located. This standard NCA sign was modified to include “Do Not Enter Sign” text to resemble existing cemetery signage.

Basis of Design Report (Bid Documents) June 3, 2019

ADA and stop signs associate with the temporary facilities will comply with NCA requirements for tall traffic regulatory signs.

5.9.4. Map “You Are Here” Signage

These signs are tasked with helping visitors familiar with the cemetery grounds and help to locate burial sections or niches.

Signs will be standard two (2) post sign with aluminum sign cabinet assembly containing a fiber reinforced sign panel. Details for NCA sign NC-02.or “Horizontal You Are Here” map shall be followed.

A total of two (2) of this sign type will be provided within the cemetery as follows:

1) Administration Building sign will include a map of the entire cemetery and shall include current location, administration building, cortege lanes, committal shelters, columbarium, roads with names and burial sections.

2) Columbarium Site Plan sign will include current location, columbarium section, wall numbers, niche locations and overall layout. Map shall provide information to allow visitor to locate a specific niche.

5.9.5. Construction Signage

A standard NCA construction safety sign (SP-24.04) shall be erected near the Administration Building. Exact location to be determined by Contractor and shall be in location visible to both visitors visitors and contractors. The days without accident shall be updated on a daily basis.

5.10.Drainage Improvements The West Virginia Department of Environmental Protection National Pollutant Discharge Elimination System Water Pollution Control General Permit provides guidelines to protect water quality and reduce flooding potential for stormwater discharges associated with development projects. The General Permit indicates that a completed project shall convey stormwater runoff in a manner that shall protect both the site and the receiving stream from post-construction erosion. Structural practices are to be employed to encourage infiltration and flow attenuation.

Velocity dissipation devices shall be placed at all stormwater outlets to provide a non-erosive velocity flow from the structure to a water course.

For the proposed cemetery improvements, all stormwater flows are conveyed through adequately stabilized channels and appropriately sized storm drain piping. Storm drain and channel outlets are stabilized with rock riprap or turf reinforcement matting to protect against erosive velocities. Vegetated swales, level spreader devices, and plunge pools are employed to provide flow attenuation and velocity dissipation.

Basis of Design Report (Bid Documents) June 3, 2019

5.11. Water Service Improvements

Pursuant to Scope of Work section 7.7.3.10., the existing waterline from the Administration and Maintenance Complex to the public water distribution line adjacent to Route 50 will be demolished and then replaced. The new water line will require a stream crossing and will be constructed by either open trench or boring methods. Open trench construction will require coverage under US Army Corps of Engineers Nationwide Permit 12 (NWP-12) and a 401 water quality certification from the WV Department of Environmental Protection.

5.12. Irrigation Improvements

As is typical throughout the existing Cemetery grounds, no irrigation will be provided.

6. Architectural Design The existing Administration/Maintenance Complex exhibits the architectural qualities of the region. In keeping with the design theme, new structures and modifications to existing structures seen by the public will carry on the current design language of the Administration/Maintenance Building. The design includes wood shake siding, gable roof configurations and punched window openings.

6.1. Temporary Facilities

Temporary facilities for staff and visitors will be ADA compliant and will include parking, lighting, power, telecom, heat, air conditioning, gravesite locator and restrooms. Temporary facilities shall be phased to allow cemetery operations to continue without interruption during all phases of construction.

During the CD-50% design review it was determined that the maintenance trailer should be combined with the temporary administration facility proposed along Route 50. A subsequent RFI determined the spatial requirements for this facility, which included 6 offices, 4 open office work stations, 2 public restrooms, 3 staff restrooms, break/lunch area, data room and storage. The temporary facilities will utilize existing furniture which will be relocated by the contractor.

In keeping with existing conditions, it was determined during the design review meeting that a standalone trailer not be provided for the Honor Guard.

6.2. PIC / Administration and Maintenance Complex

The improvements to the existing Administration / Maintenance Building include the addition of new spaces, as well as the renovation of existing spaces. Renovations to the Administration / Maintenance Building include new partition walls, new ceilings, floor finishes, doors, as well as new lighting and plumbing fixtures throughout the complex.

Current operations require the addition of a Public Information Center (PIC). The PIC will have a lobby, men’s and women’s restrooms, and family restroom. It will house the Gravesite Locator.

It will also house space for the Honor Guard. The renovation of the spaces on the east side of

Basis of Design Report (Bid Documents) June 3, 2019 the building will include the Cemetery Director’s office, open office, supply room, and the new PIC lobby and reception area.

The center of the building will be rebuilt to house the PIC restrooms and Honor Guard space adjacent to the PIC lobby. The PIC lobby, gravesite locator, and restrooms will be separated from the staff by lockable doors.

A door separates the newly rebuilt Maintenance spaces of the building, which include a maintenance foreman’s office; men’s locker room with shower; women’s locker room with shower; multipurpose room for operations, lunch area, kitchenette, and storage; storage closet for cemetery staff uniforms; janitor room with mop basin; and boot and raincoat area, with boot wash station on the exterior of the building.

An RFI for data room area requirements to be 10’x10’ or a little smaller considering space limitations. A data room measuring 10.5’x7.5’ has been provided as part of the design.

6.3. Existing Committal Shelter A

This Shelter is to be demolished and replaced in an alternate location within the cemetery (see Section 6.4).

6.4. New Committal Shelter A

A new Committal Shelter is to be constructed to replace existing Committal Shelter A, which is slated to be demolished. The new Committal Shelter A is 24 feet by 24 feet as identified during the Schematic Review. It is to accommodate funeral attendees and 1 casket; and have space for seven (7) Honor Guard personnel to stand. A 79 SF storage room is included on the west side of the building, which will also serve to protect the occupants from the strong westerly winds.

6.5. Expand Existing Maintenance Bays (Optional Construction Contract Line Item 002) A new Vehicle Wash Bay is to be constructed to the west of the Existing Maintenance Bay. The Wash Bay is longer than the existing maintenance bay to accommodate a truck with plow and spreader. Electric overhead door, pedestrian door, and an oil/water separator will also be part of the new wash bay. The oil and water separator is located in the lower parking lot to provide easy access for maintenance.

With the addition of the new Vehicle Wash Bay, the existing Flammable Storage and Pesticide/Herbicide Storage space will be relocated. The new location will be across the maintenance yard, so that the existing retaining wall remains, as well as allows for vehicle clearances in front of the vehicle bay doors.

6.6. Cold Storage Building Improvements (Optional Construction Contract Line Item 003) The existing Cold Storage Building will be renovated to include electric operated overhead doors throughout the building.

Basis of Design Report (Bid Documents) June 3, 2019

A new sheltered vehicle storage area of approximately 2,000 sf will be constructed on the back side of the building. The vehicle storage building will consist of a concrete slab with structural posts supporting a metal roof, sloped to one side with gutters and downspouts.

6.7. Committal Shelter B Improvements (Optional Construction Contract Line Item 004) Existing Committal Shelter B is slated to be repaired. The repairs include a new replacement roof, repairs to the cracks in the back wall, replacement of lighting, and the addition of ventilation. The cracks in the rear wall are in the stucco-style finish. The reason for the cracks will not be evident until the stucco is removed, and the interior of the wall is investigated. Once the reason for the cracks is determined, the repairs to the wall may be to remove and replace the finish in kind or with another finish.

7. Mechanical Design Provide all required heating, ventilation, and air conditioning systems for the renovation / modification of the assigned spaces of the West Virginia National Cemetery in accordance with the NCA Guidelines, and national and local codes.

7.1. Temporary Facilities

7.1.1. Ventilation

Ventilation air shall be provided with a new unit for staff and visitors’ temporary building(s) and shall be in compliance with ASHRAE, IMC, NCA guidelines, and applicable national and local codes and standards for outdoor air requirement.

7.1.2. Temperature Control

Staff and visitors’ temporary building(s) shall be conditioned to 70-75°F & 30-60% relative humidity with new unit(s). The outdoor design condition for summer shall be 90.5°F DB – 73.8°F and for winter 8.6°F as per ASHRAE.

7.1.3. Operation

The HVAC system shall comply with VA design manual and OSHA for noise level. The HVAC system shall be in compliance with IMC, ASHRAE, NFPA, and all applicable national and international codes and guidelines. All high voltage HVAC equipment shall be provided with a local disconnect switch to allow for safe maintenance and servicing of the unit. The HVAC system shall be capable of managing condensate. The HVAC system shall be in compliance with NFPA 90A requirement. The HVAC system shall be operated through a DDC automatic controller. The temporary building(s) shall be provided with appropriate relief / transfer air to manage building(s) pressurization. If necessary, a return or an exhaust fan shall be added.

7.1.4. HVAC Unit

New packaged unit(s) shall be provided to provide ventilation air and temperature control.

The unit shall be gas heating and direct expansion cooling. The unit(s) will be controlled

Basis of Design Report (Bid Documents) June 3, 2019 through zone thermostat tied into a facility management DDC system. The unit(s) shall be provided with a minimum MERV 8 filter as per NCA facility design guide.

7.1.2. Exhaust

The mechanical / electrical room, janitor closet, water closets, and locker rooms in the new building(s) shall be provided with appropriate exhaust as per ASHRAE, IMC, and NCA guideline; in addition to implementing the best practice for staff’s health and safety.

7.2. Administrative Building

7.2.1. Ventilation

Ventilation air shall be provided with a new air handling unit; a mixed air unit, partly outside air and partly return air. The new air handler will utilize gas heating and direct expansion cooling, with MERV 8 filter, a supply fan, an exhaust fan, isolation damper on outside air. The AHU will reside outside the building adjacent to the mechanical room. The new AHU will be a constant volume system, with the branches connecting to the rooms, hard balanced through volume dampers. The new AHU shall be in compliance with ASHRAE, IMC, NCA guideline, and applicable national and local codes and standards for outdoor air requirement. In addition to the AHU, the facility will be equipped with a exhaust fan to provide appropriate exhaust for restrooms, locker rooms, storage rooms, janitor closet, data, and mechanical and electrical room, in compliance with NCA standard, IMC, ASHRAE, and applicable local and nation codes and guidelines.

7.2.2. Temperature Control

The temperature control will be accomplished through a combination of air side DX cooling and hydronic heating. The new AHU shall be sized to condition the supply air to saturated air at 55°F for humidity management and to provide the cooling load required for each room / zone. The individual branches to rooms, offices, reception area, pic lobby, honor guard, multipurpose room, corridor, restrooms, and M&F locker rooms will be hard balanced and provided with a room / zone hydronic (hot water) reheat coil and a dedicated thermostat in each one of these rooms to control the reheat coil. Therefore, the AHU shall be sized to provide cooling and dehumidification, and a 400 MBH water heater and two (2) redundant pump will be parts of the hot water hydronic system that serves the room / zones reheat coils, and to provide perimeter heating. The facility shall be conditioned to 70-75°F & 30-60% RH as described in NCA facility design guide. The outdoor design condition for summer to be 90.5°F DB – 73.8°F and for winter 8.6°F as per ASHRAE.

7.2.3. Operation

The HVAC system shall comply with VA design manual and OSHA for noise level. The HVAC system shall be in compliance with IMC, ASHRAE, NFPA, and all applicable national and international codes and guidelines. All high voltage HVAC equipment shall be provided with a local disconnect switch to allow for safe maintenance and servicing of the unit. The HVAC system shall be capable to manage condensate. The HVAC system shall be in compliance with NFPA 90A requirement. The HVAC system shall be operated through a

Basis of Design Report (Bid Documents) June 3, 2019

DDC automatic controller. The facility shall be provided with appropriate relief / transfer air to manage room(s) pressurization. If necessary, a return or an exhaust fan shall be added.

7.2.4. HVAC Unit(s)

New packaged unit shall be provided for ventilation air and cooling. The unit shall be gas heating and direct expansion cooling. The unit supply air temperature will be controlled through room / zone thermostats tied into a facility management DDC system. The unit shall be provided with a minimum MERV 8 pre-filter and MERV 14 Final filter.

7.2.5. Exhaust

Exhaust shall be provided for locker rooms, water closets, data, mechanical / electrical room, and janitor closet in compliance with ASHRAE, IMC, NCA guidelines, and applicable national and international codes and standards. Flammable storage shall be provided with a dedicated exhaust rated for Class I Div. 2 environment, in compliance with NFPA, ASHRAE, IMC, NCA guidelines, and applicable national and international codes and standards. The flammable storage will NOT be provided with temperature control.

7.3. Maintenance Complex (Includes Wash Bay – Optional Construction Line Item 002)

7.3.1. Ventilation

The maintenance bay and wash bay will be provided with a separate exhaust from the system that serves the administration building to provide 8 exhaust air change hours. The makeup air for this will be provided through a combination louver with backdraft protection.

7.3.2. Temperature Control Assist

The maintenance bay and wash bay will be provided with waterproof gas infrared radiant heater(s) to provide 60°F heating as per NCA design guide.

7.4. Committal Shelter B Improvements (Optional Construction Contract Line Item 004) 7.4.1.The design shall include provisions to manage condensate formation inside the structure.

This may include the addition of an exhaust fan to provide airflow through structure. This item shall be studied in more depth and additional information provided in the final design.

8. Electrical Design Provide all the necessary electrical facilities for the modification / renovation of the assigned spaces of the West Virginia National Cemetery (WVNC). The work will include, but is not limited to, relocated service entrance power source connection, primary and secondary power distribution, emergency lighting, normal LED lighting systems, receptacles and power connections for all equipment, fire alarm, telephone and other required signal systems. Final design is subject to change based on Cemetery Director and United States Department of Veterans Affairs (VA) facility layout selection.

Basis of Design Report (Bid Documents) June 3, 2019

8.1. Applicable Codes and Standards

Unless otherwise indicated by the National Cemetery Administration (NCA) Facilities Design Guide, NCA Program Guide PG-18-15, Volume D, VA and all other applicable NCA codes use the latest edition of all federal, state and local regulatory agencies having jurisdiction codes. The codes will include, but is not limited to the sub codes, regulations and standards, including amendments, of the following organizations:

· American National Standards Institute (ANSI).

· American Society for Testing Materials (ASTM).

· Building Industry Consulting Service International (BICSI).

· Illuminating Engineering Society (IES).

· Institute of Electrical and Electronic Engineers (IEEE).

· International Building Code (IBC).

· International Energy Conservation Code (IECC).

· National Electrical Manufacturers Association (NEMA).

· National Fire Protection Association (NFPA). Particular attention to:

· NFPA 20, 70, 72, 78, 101, 110 and 780

· Occupational Safety and Health Administration (OSHA).

· Underwriters Laboratories, Inc. (UL).

· Uniform Construction Code (UCC).

8.2. Equipment Grounding and Wiring Devices

Design shall be in accordance with the Electrical Design Manual for VA Life-Safety Protected Facilities. All wiring shall be contained in raceways and metal clad cable (MC) is not acceptable for use. Heavy-duty safety switches (ratings as required) will be provided for hard-wired equipment where a local disconnecting means is required. Disconnects will be fused or unfused as required. Stainless steel enclosures will be specified for interior wet locations. All non-current carrying metallic parts of the electrical distribution system will be bonded to the existing grounding electrode system or building steel. An insulated grounding conductor will be run with all power feeder and branch circuits to supplement the conduit ground. All branch circuits shall be solid #10 & #12. Nonflexible metallic conduit will be provided for all emergency circuits due to the need to provide redundant grounding and protection of the branch circuit. Wherever possible all electrical outdoor conduits shall be underground. Contractor shall not attempt to fish new conductors through an existing conduit with existing conductors. Replace all conductors.

Generally, encase underground ducts and conduits in concrete. Under building and roads, direct burial conduit may be used for feeder and branch circuits where not exposed to risks of damage or difficult replacement.

Basis of Design Report (Bid Documents) June 3, 2019

8.3. Fire Alarm

Design shall be in accordance with the Fire Protection Design Manual for VA Life-Safety Protected Facilities. All fire alarm devices shall be connected to a central control/monitoring station located in the administration building. Design system to protect against transient damage and malfunction surge protection on the AC power line and data/communications lines for the system interior and exterior of the building.

8.4. Lighting

Design shall be in accordance with the Lighting Design Manual for VA Life-Safety Protected Facilities. The lighting will be designed to provide task and ambient light to support the visual needs, comfort and security requirements of staff and visitors. The design will include accent and effect lighting to reinforce the architectural design. Lighting equipment will be selected for energy efficiency and simplified lighting maintenance to minimize operating costs. The selection of light sources will be in accordance with IECC-2015, the Energy Policy Act of 1992, Environmental Protection Agency and the recommendations from the Architects. The source for interior lighting will generally be LED.

8.4.1. Offices

Recessed LED troffer.

8.4.2. Existing Open Offices

Uplight cove LED fixture.

8.4.3. Corridor

Recessed LED indirect/direct luminaire with sealed lens.

8.4.4. Locker Room

Recessed LED down light with sealed lens.

8.4.5. Exterior Building

Surface mount weatherproof LED wall pack with daylight sensor.

8.4.6. Flag Pole

Exterior LED tight spot light weatherproof NEMA 3R with daylight sensor with surface mount tenon.

8.4.7. Back of House Areas

Lighting for back of house areas such as, storage, utility and service areas: lensed LED troffer will provide lighting in spaces with finished ceilings, pendant or chain hung industrial LED strip fixtures will be used in areas with exposed structure.

Basis of Design Report (Bid Documents) June 3, 2019

8.4.8. Flammable Storage

Lighting, lighting switch and raceways for the Flammable Storage building shall be rated explosion proof (XP). Installation, cable and seals shall meet the requirements of NEC for hazardous area locations.

8.4.9. Recommended Illumination Levels

To find the recommended illumination levels for additional areas refer to the lighting design manual, below is a general illumination chart:

8.5. Power

Design shall be in accordance with the Electrical Design Manual for VA Life-Safety Protected Facilities. Contractor to perform appropriate short circuit studies, and coordinate AIC ratings to comply with latest NEC code requirements.

Feeders will consist of copper conductors installed in raceways. Conduit fill will not exceed 40% based on the dimension of THW insulated conductors. Raceway systems will generally consist of metal boxes interconnected with electric metallic tubing (EMT). Schedule 40 PVC will only be used for underground installation. Rigid galvanize steel (RCS) conduit or intermediate metal conduit (IMC) will be used for exposed exterior work where subject to damage. The minimum conduit size for power wiring will be 3/4 inches. An insulated equipment ground conductor will be installed in all raceways along with phase conductors. Metal raceways boxes equipment, receptacles, and light fixture. Underground feeders shall be concrete encased. Conductors for feeders, as defined in Article 100 of NFPA 72, sized to prevent a voltage drop exceeding 2 percent and branch circuits exceeding 3 percent at the farthest outlet of power, heating, and lighting loads, or combinations of such loads, and where the maximum total voltage drop on both feeders and branch circuits to the farthest outlet does not exceed 5 percent, will provide reasonable

Basis of Design Report (Bid Documents) June 3, 2019 efficiency of operation. Increase wire size in runs over 50’ if voltages drop below the required value.

Contractor to provide for a complete lightning protection system in accordance with NEC, NFPA 780 and master UL96A standards. Contractor shall ground and bond all new electrical equipment in accordance with NFPA 70 Section 250.

Power to all new, relocated, renovated area required electrical equipment, powered doors, HVAC equipment, lighting, security and fire alarm systems shall be provided.

Contractor responsible for relocating the existing service feeder to new exterior Southeast wall and provide new ground rod. Contractor shall coordinate all required work with local electric utility. The new power distribution panels and transformer shall be located in the new MECH/ELEC room. Contractor shall rewire all existing branch circuits for non-renovated areas in the Admin Building to new distribution panels. Contractor responsible for providing temporary power as needed to contractor staging area. Contractor responsible for updates to electrical design as required to meet current codes and regulations.

Power requirements for the new design are dependent on the facility design layout selected by the VA. Verify that the existing power source to the renovation, modification, addition and new construction is adequate for existing and anticipated loads where applicable.

8.6. Security

Design shall be in accordance with the Physical Security Design Manual for VA Life-Safety Protected Facilities.

Provide all electrical for security upgrades to the building entries including cameras and card access and communication infrastructure. Provide required video surveillance, card access, and any other equipment per the cemetery’s requirements.

All security devices shall be connected to a central control/monitoring station located in the administration building. Coordinate equipment location with the IT and facility directors.

Contractor is responsible for coordinating final security device and equipment quantity and locations with the facility directors and the VA.

Provide dielectric break insulation for conduit entering building. Dielectric insulation shall be manufactured by Sanchem Inc. No-ox-id-"a special" or approved equal non-silicone insulation.

Interface for all equipment requiring communication/signal wiring shall be per manufacturer's recommendations and requirements. Spare communications and security conduit shall be installed in conjunction with the communications/security conduit in a 2x2 configured duct bank.

Basis of Design Report (Bid Documents) June 3, 2019

Where means of egress do not also function as access points for the building, provide card reader for authorized users and delayed action, alarmed egress hardware to indicate unauthorized use.

Install door status monitors at doors intended to be used only for emergency egress.

8.7. Telecommunications

Design shall be in accordance with the Telecommunications and Special Telecommunications Systems Design Manual for VA Life-Safety Protected Facilities. All telecommunication installations must comply with BICSI telecommunications distribution methods manual and NCA standards.

Interface for all equipment requiring communication/signal wiring shall be per manufacturer's recommendations and requirements. Spare communications and security conduit shall be installed in conjunction with the communications/security conduit in appropriately configured duct bank.

Coordinate all telephone/data installations and requirements with communications vendor and the VA.

8.8. Temporary Facilities

Provide all the electrical power, lighting, fire alarm, communications, and security to temporary facilities. Design shall be based on location and requirements needed to keep the facility fully functional. Base design is for temporary utility service pole transformer and feeder. Trailer power service minimum requirements are 75 KVA, 3-phase, 208/120V (To be confirmed by trailer provider).

Temporary facility will obtain power from the utility service from the existing overhead lines along Route 50 and from Administration Building for any construction trailers.

Provide all electrical for the ventilation, HVAC, exhaust, pressurization equipment and controls for all mechanical equipment. Provide all electrical for the instantaneous water heater(s) or with a recirculation system if required by the new fixture layout and all plumbing equipment.

8.9. PIC / Administration and Maintenance Complex

The existing administration building is served by a 45KVA, 12.47KV-480/277V, 3Ø, pole mounted utility transformer, which then feeds a 200AF disconnect switches and meter and 80A main power distribution panel breaker. This service distribution provides power to the Administration/Maintenance building, Committal shelter A and Committal Shelter B.

Power requirements for new design are dependent on facility design layout selected by the VA.

Based on present design, a new 75 KVA 12.47KV-480/277V, 3Ø, pole mounted utility transformer, fused disconnect, meter and service feeder to the ADMIN Building will be required.

Basis of Design Report (Bid Documents) June 3, 2019

Contractor responsible for relocating the new service feeder to new exterior Southeast wall and provide new ground rod. Contractor shall coordinate all required work with local electric utility.

The new power distribution panels and transformer shall be located in the new MECH/ELEC room.

Complete lightning protection system shall be installed in accordance with NEC, NFPA 780 and master UL96A standards. Ground and bond all new electrical equipment in accordance to NFPA 70 Section 250. Lightning and surge protection shall be installed at main power distribution panel.

Provide all electrical for the ventilation, HVAC, exhaust and controls for all mechanical equipment.