36C78619B0015-0003000.docx

DOCX document 22 KB Posted

Attached to
Invitation for Bid West Virginia National Cemetery Columbarium/Administration/PIC/Maintenance/Parking (Construction)
Solicitation number
36C78619B0015
Issued by

About this file

36C78619B0015 0003 36C78619B0015 0003.docx

View the file

Other files

File Type Posted
36C78619C0149-000.docx DOCX document
36C78619C0149-001.pdf PDF
36C78619B0015-0005000.docx DOCX document
36C78619B0015-0005000.docx DOCX document
36C78619B0015-0004001.pdf PDF
36C78619B0015-0004000.docx DOCX document
36C78619B0015-0004000.docx DOCX document
36C78619B0015-0004001.pdf PDF
36C78619B0015-0003000.docx DOCX document
36C78619B0015-0002001.docx DOCX document
36C78619B0015-0002002.pdf PDF
36C78619B0015-0002000.docx DOCX document
36C78619B0015-0002002.pdf PDF
36C78619B0015-0002001.docx DOCX document
36C78619B0015-0002000.docx DOCX document
36C78619B0015-0001003.pdf PDF
36C78619B0015-0001000.docx DOCX document
36C78619B0015-0001004.pdf PDF
36C78619B0015-0001002.pdf PDF
36C78619B0015-0001001.pdf PDF
36C78619B0015-0001003.pdf PDF
36C78619B0015-0001001.pdf PDF
36C78619B0015-0001000.docx DOCX document
36C78619B0015-0001002.pdf PDF
36C78619B0015-0001004.pdf PDF
36C78619B0015-004.pdf PDF
36C78619B0015-003.pdf PDF
36C78619B0015-002.xlsx XLSX spreadsheet
36C78619B0015-011.pdf PDF
36C78619B0015-001.docx DOCX document
36C78619B0015-008.pdf PDF
36C78619B0015-009.pdf PDF
36C78619B0015-005.pdf PDF
36C78619B0015-006.docx DOCX document
36C78619B0015-007.pdf PDF
36C78619B0015-010.pdf PDF
36C78619B0015-008.pdf PDF
36C78619B0015-001.docx DOCX document
36C78619B0015-006.docx DOCX document
36C78619B0015-007.pdf PDF
36C78619B0015-009.pdf PDF
36C78619B0015-010.pdf PDF
36C78619B0015-005.pdf PDF
36C78619B0015-002.xlsx XLSX spreadsheet
36C78619B0015-003.pdf PDF
36C78619B0015-011.pdf PDF
36C78619B0015-004.pdf PDF
36C78619B0015-000.docx DOCX document
36C78619B0015-000.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C78619B0015 West Virginia Amendment #3 8/27/2019

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-20-2019

912CM3013

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 To all Offerors/Bidders

36C78619B0015 08-02-2019

X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

X Amendment #3 is being issued to answer Request for Informaiton

Bid Opening Date of 12 September, 2019 @ 1300

Responses to the RFI are on attached page

Kellyann Bruno Contracting Officer #1 - In specification 230923-10 under 2.4A:1a Temperature sensors it indicates that these shall be thermistor type, but with no indication noted for the cosmetic features. In 2.6A:1 it indicates that thermostats shall have a polished or aluminum finish with setpoint range, temperature adjustment and external adjustment. Question is, are these features directed for the space temp sensors indicated under 230923-10(2.4A:1a)? Second part to the question is if so, does the temperature display need to be digital or analog? Personally never seen a polished or stainless finished sensor with digital display. Please provide model or part# if you have as reference.

Answer to question 1:

Specification 230923-10 under 2.4A:1a says:

“Thermistor type for terminal units and Resistance Temperature Device (RTD) with an integral transmitter type for all other sensors” In this mechanical design no terminal units were used, therefore the first part of the statement is obsolete. All wall temperature sensors shall be RTD type (wired, no wireless sensor is allowed).

The scope of mechanical package shall cover the performance. The room thermostat cover and color shall match the receptacles and light switches. These room thermostats are analog, and do not require stainless steel cover plate, since it is not in security rooms.

#2 - On drawing M-503 under detail #6, the BACnet Architecture is indicated which brings up the next question. There is a Portable Laptop shown which connects to what I assume is a Ethernet Hub. If this is an Ethernet Hub, is it connected to the owners LAN and would they want the BACnet Control System to be remotely accessed? Also, does the owner have any existing WiFi Router connections that are communicated back thru this Ethernet Hub?, and lastly, below the BACnet Network there is an indication of a Engineering/desktop workstation. Is this workstation to be provided for the project in addition to the Laptop?

Answer to question 2:

The detail is a standard VA detail and represents a high-level overview.

During the design the client was asking for a system resembling residential controls. Per the contract specifications, currently there is no requirement for either a portable operator terminal, or Bacnet engineering control center.

This facility does not contain a control room and the mechanical room is too small to carve an office out of it and to the projects understanding, there is no WiFi capability for the building controls to be integrated into, due to VA IT security protocols.

#3 - Drawing M-601 under Note 5 indicates a flow meter. Does this meter tie into the BAS? Same drawing note 6 indicates a temp sensor in the Buffer Tank. Is this sensor a stand alone temp sensor provide by the Buffer Tank manufacturer? Note 7 indicates a temp sensor shown in pipe. Is this just a temp sensor with thermometer guage to be viewed from floor or does this need to tie into the BAS?

Answer to question 3:

Sensors shown by keynote 5 & 6 shall be tied into the BAS system for controls. Sensor shown by keynote 7 is for operators’ information and verification and it can be a gauge that is easily readable for someone standing on the floor inside the mechanical room.

#4 - Does UH-1 need to be provided with a 2-way control valve like the ones indicated for the RHC units?

Answer to question 4:

Yes!

Reviewing this question, it was noticed that the UH-1 is missing from the flow diagram M-601; UH-1 shall be added to the flow diagram and the unit heater shall be provided with 2-way control valve as shown on detail 3 sheet M-502.

#5 - Drawing M-802 indicates three exhaust fans. Do they tie into the BAS? Same question for the Radian Gas Heaters on same drawing.

Answer to question 5:

Currently the Radiant Gas Heaters have integral controls, that are not connected to the building BMS system.

As for the exhaust fans and associated dampers, they are not connected to the building BMS system.

Both systems can operate as stand alone without connection to the BMS, however NCA can identify if they want alarm and/or control communication with the BMS.

#6 - Drawing M-803 Same question regard CF-2 & 3.

Answer to question 6:

Currently the Ceiling Fans are not connected to the building BMS system. Due to the committal shelter distance from the Admin Building, connection to the BMS system is not recommended.

#7 - Under specification section 230923 this is no indication of a specific control system being asked for. Does this mean the controls portion of the project is open to anyone who has BACnet?

Answer to question 7:

Yes! BACnet is the acceptable protocol for communication and all equipment installed shall be capable to communicate through this protocol. Controls contractor to perform all controls wiring inside conduit and program the system as specified in project document.

Given that the NCA specifications do not allow for identification of manufacturers, just performance requirements, and that the site currently does not have a controls provider, any manufacturer and installer who meets the project specifications is acceptable.