About this file

36C78619B0007 A0001 36C78619B0007 A0001.docx

View the file

Other files

File Type Posted
36C78619C0085-000.docx DOCX document
36C78619B0007-A0006000.docx DOCX document
36C78619B0007-A0006001.pdf PDF
36C78619B0007-A0006002.pdf PDF
36C78619B0007-A0005000.docx DOCX document
36C78619B0007-A0004003.pdf PDF
36C78619B0007-A0004002.pdf PDF
36C78619B0007-A0004001.pdf PDF
36C78619B0007-A0004000.docx DOCX document
36C78619B0007-A0003001.pdf PDF
36C78619B0007-A0003000.docx DOCX document
36C78619B0007-A0002000.docx DOCX document
36C78619B0007-009.pdf PDF
36C78619B0007-007.docx DOCX document
36C78619B0007-010.pdf PDF
36C78619B0007-011.pdf PDF
36C78619B0007-008.pdf PDF
36C78619B0007-000.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A0001 05-04-2018

860IC3027

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford

VA

22556 43C1 Department of Veterans Affairs NCA Contracting Service 75 Barrett Heights Rd. Suite 309 Stafford

VA

22556 To all Offerors/Bidders

36C78619B0007 05-04-2018 A0001

X X X

X Memphis National Cemetery | 36C78619B0007 | Renovate Site and Buildings to Correct FCA Deficiencies

1. The attached questions from prospective bidders and government responses are attached.

**Please see the Continuation Page**

**ALL TERM AND CONDITIONS OF THE SPECIFICATIONS REMAIN THE SAME**

Sheryl Palacio-Davis Contracting Officer

CONTINUATION PAGE

Respond to RFI for IFB 36C78619B0007 Memphis National Cemetery FCA Deficiencies Corrections

1. Drawing D1.02: Can clarification be provided on the limits of demolition around the Administration/Maintenance Area?

· The limits of demolition around the Administration/Maintenance Area as shown on the drawing(s) is outside of red square. Anything inside the red square is not in this contract, as shown on the drawing(s).

2. Drawing C1.02: Can clarification be provided on the areas that will have new work around the Administration/Maintenance Area?

· The limits of new work around the Administration/Maintenance Area as shown on the drawing(s) is outside of red square. Anything inside the red square is not in this contract, as shown on the drawing(s).

3. Drawing L3.02: Can clarification be provided on the areas that will have new landscaping around the Administration/Maintenance Area?

· The limits of new landscaping around the Administration/Maintenance Area as shown on the drawing(s) is outside of red square. Anything inside the red square is not in this contract, as shown on the drawing(s).

4. Drawing ES1.01 shows no work around the Administration/Maintenance Area but drawing ES5.01 and ES 8.01 shows work to be completed in this area. Can clarification be provided on what electrical work will be required? If work is to be done in the existing buildings can an electrical floor plan be provided showing the extent of the new work?

· Drawing ES1.01 shows electric work around for flag lights and other sheet shows more information about wiring and panelboard. All the work related to the buildings have been completed under different contracts.

5. Drawing PL 5.01 shows work in several buildings. Can clarification be provided on what new work will be required for each building? If work is to be done in the existing buildings can an plumbing floor plan be provided showing the extent of the new work.

· All the work related to the buildings have been completed under different contracts. Work for the building is not part of this contract.

6. If new Electrical or Plumbing work is required in the interior of the existing building can as-builts pe provided of the existing work?

· All the work related to the buildings have been completed under different contracts. Work for the building is not part of this contract.

7. If new work is required in the interior of the existing building can an Architectural drawing be provided show the extent of the new/repair work of existing will be required?

· All the work related to the buildings have been completed under different contracts. Work for the building is not part of this contract.

[END OF Q&A]