36C78619B0004-0005001.pdf

PDF 75 KB Posted

Attached to
(MM) 835CM3035 | 36C786-19-AP- 0145 Gravesite Expansion PPC & IGB Chattanooga National Cemetery
Solicitation number
36C78619B0004
Issued by

About this file

36C78619B0004 0005 Remaining RFI's CNC.pdf

View the file

Other files

File Type Posted
36C78619C0102-000.docx DOCX document
36C78619B0004-0006001.pdf PDF
36C78619B0004-0006000.docx DOCX document
36C78619B0004-0005000.docx DOCX document
36C78619B0004-0005002.pdf PDF
36C78619B0004-0004018.pdf PDF
36C78619B0004-0004019.pdf PDF
36C78619B0004-0004016.docx DOCX document
36C78619B0004-0004017.pdf PDF
36C78619B0004-0003000.docx DOCX document
36C78619B0004-0002000.docx DOCX document
36C78619B0004-0001000.docx DOCX document
36C78619B0004-014.pdf PDF
36C78619B0004-018.pdf PDF
36C78619B0004-016.pdf PDF
36C78619B0004-013.docx DOCX document
36C78619B0004-015.pdf PDF
36C78619B0004-019.pdf PDF
36C78619B0004-017.pdf PDF
36C78619B0004-000.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Per the RFP documents, Phase I (new road and committal shelter) has to be complete and approved prior to any work starting on Phase II (Demo of existing shelter and installation of new crypt fields). Additionally, through conversations with the precast crypt manufacturers, based on the quantity of crypts (6,068), it will take nearly the entirety of the total contract duration (240 calendar days) just to manufacture that many crypts, of which that timeframe does not include the submittal/review period for the crypts. Given this information, can the contract duration be extended? VA Response: contract duration extended to 330 calendar days.

2. Will the contractor be allowed to work on Saturdays and Sundays (weekends)? VA response: no work on Saturdays, Sundays

36C78619B004 Chattanooga National Cemetery 835- 035