36C78618Q0273-002.pdf
PDF 13 KB Posted
- Solicitation number
- 36C78618Q0273
About this file
36C78618Q0273 36C78618Q0273 - Barrancas Site Visit Instrcutions 04-03-2018.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78618Q0273-00005001.docx | DOCX document | |
| 36C78618Q0273-00005002.docx | DOCX document | |
| 36C78618Q0273-00005000.docx | DOCX document | |
| 36C78618Q0273-00004000.docx | DOCX document | |
| 36C78618Q0273-00004001.pdf | ||
| 36C78618Q0273-00003003.docx | DOCX document | |
| 36C78618Q0273-00003002.pdf | ||
| 36C78618Q0273-00003000.docx | DOCX document | |
| 36C78618Q0273-00003001.pdf | ||
| 36C78618Q0273-00002000.docx | DOCX document | |
| 36C78618Q0273-00002001.pdf | ||
| 36C78618Q0273-00001000.docx | DOCX document | |
| 36C78618Q0273-00001001.pdf | ||
| 36C78618Q0273-006.pdf | ||
| 36C78618Q0273-004.pdf | ||
| 36C78618Q0273-003.pdf | ||
| 36C78618Q0273-001.docx | DOCX document | |
| 36C78618Q0273-005.pdf | ||
| 36C78618Q0273-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Barrancas National Cemetery
Shrine Project 36C78618Q0273
An organized site visit has been scheduled for— 12 April 10:00AM -Until Complete
Allow time for access to the Naval Air Station, Pensacola
This will be the only organized site visit a reschedule will only be made by the Government.
Participants will meet at Barrancas National Cemetery (Administration Building), Naval Air Station, 1 Cemetery Road, Pensacola, FL 32508
Sign In Sheet
The expectation of this site visit is to prepare a proposal in accordance with I. Technical Rating Sub- Factor I: Evaluation Factor Period of Performance / Schedule of Proposed Work so this factor can be submitted when the solicitation closes.
This project’s success depends on the schedule of work the efficiency and capability of the awarded company.
Be prepared to take notes, measurements, pictures (upon approval) and ask questions that are relevant to the Scope of Work. Bring any copies of the solicitation, specification and drawing. Copies will not be provided the day of the site visit.
The following items in the scope of work will be highlighted during the site visit, however the Government will entertain any additional requests from any contractors or sub-contractors as it is related solely to the scope of work. It is the contractors responsibly to understand how the highlighted items will apply to your schedule and meet or exceed the project completion date.
a) A tour of Barrancas Drawings Section 50, 51, 52
b) An explanation of how the bean system operates
c) A tour of the current Shire completed projects
d) C.3.7 Utility Location
e) C.3.9 Contractor Equipment
f) C.4 Work Scheduling
g) C.5.1 Phasing and Work Sequencing
Note: This is not an inclusive list it is the responsibility of the contractor to create a complete proposal.
Note: All questions will be considered RFI’s and you be asked to submit the question in writing.