This document is an Asbestos Reinspection Report for the Montgomery Veterans Affairs Medical Center (VAMC) in Montgomery, Alabama, conducted under federal contract VA247-14-F-3623. The inspection was performed by USFin Development, LLC between February 2-3, 2015, and covers 14 buildings across the facility totaling approximately 360,000 square feet. The report comprehensively documents asbestos-containing materials (ACM) identified during the survey, including their locations, quantities, condition, friability status, and risk assessments in accordance with the Asbestos Hazard Emergency Response Act (AHERA) and EPA protocols.

The survey identified friable thermal system insulation (TSI) on pipes in multiple buildings (notably Building 1 with unknown quantity behind plaster walls and above ceilings across multiple floors, and Building 1 penthouse with 55 linear feet of steam pipe insulation showing minor damage), inaccessible underground steam pipe insulation in clay tile in Buildings 6, 7, and 8, and non-friable vinyl floor tile with mastic in Buildings 6, 13, and 14. Removal cost estimates range from $1,400 to $525,000 depending on material type and quantity. All identified ACM received priority rankings from 7 (highest priority for immediate action) to 1 (lowest priority), with recommended responses including operations and maintenance (O&M), repair, encapsulation, or removal at renovation/demolition. Two EPA-trained inspectors certified in asbestos inspection and management planning conducted the work, with samples analyzed by EMSL Analytical, an NVLAP-accredited laboratory. Floor plans and detailed photographs documenting each homogeneous area of ACM are included as appendices.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS REINSPECTION REPORT

for the

DEPARTMENT OF VETERANS AFFAIRS

MONTGOMERY VAMC

MONTGOMERY, AL

STATION NUMBER: 619

ORDER #:

VA247-14-F-3623

INSPECTION DATES:

FEBRUARY 2-3, 2015

CONTRACTOR:

USFIN DEVELOPMENT, LLC

EDWARDSVILLE, IL – MONCLOVA, OH

MONTGOMERY VAMC – MONTGOMERY, AL

FEBRUARY 2015

TABLE OF CONTENTS

1.0 BUILDING IDENTITIES AND PROJECT DESCRIPTION

2.0 INSPECTOR NAMES AND CONTACT INFORMATION

3.0 INSPECTOR CERTIFICATIONS AND LICENSES

4.0 ASBESTOS SAMPLING FORMS

5.0 LABORATORY IDENTITY, INFORMATION, AND RESULTS

6.0 ACM DESCRIPTIONS AND INFORMATION (QUANTITY, LOCATION, CONDITION,

FRIABILITY, AND PHOTOS)

7.0 ACM RISK ASSESSMENTS, COST ESTIMATES & PRIORITY FOR ABATEMENT

8.0 FLOOR PLANS - ASBESTOS SAMPLES AND ACM LOCATIONS

1.0 BUILDING IDENTITY

Building Number: 1

Building Name: Main Hospital Building

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: 1993 (most recent)

Number of Floors: 8

Total GSF: 272,873 sf

Inspection Date: February 2, 2015

Previous Inspection Date: 2002, 2007, and 2010

Building Number: 4

Building Name: Dining Hall Administration

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: 1993

Number of Floors: 3

Total GSF: 38,160 sf

Inspection Date: February 3, 2015

Building Number: 6

Building Name: A&MM, EMS, Administration

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: n/a

Number of Floors: 3

Total GSF: 5,773 sf

Building Number: 7

Building Name: Engineering, MCFF, Safety, Administration

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: n/a

Number of Floors: 3

Total GSF: 11,534 sf

Building Number: 8

Building Name: Fiscal, DSS, HBPC, Administration

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: n/a

Number of Floors: 3

Total GSF: 5,433 sf

Building Number: 12

Building Name: A&MM Warehouse

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: n/a

Number of Floors: 1

Total GSF: 4,695 sf

Building Number: 13

Building Name: Engineering Shops

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: n/a

Number of Floors: 1

Total GSF: 4,916 sf

Building Number: 14

Building Name: Boiler Plant

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: Several boiler renovation projects

Number of Floors: 3

Total GSF: 4,882 sf

Building Number: 20

Building Name: Eng. Locksmith Shop

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: 1990’s

Number of Floors: 1

Total GSF: 174 sf

Building Number: 21

Building Name: Engineering Storage (Flammables)

Station Name: Montgomery VAMC

Year Built: 1940

Year Renovated: n/a

Number of Floors: 1

Total GSF: 101 sf

Building Number: T-25

Building Name: Storage, Smoking Shelter

Station Name: Montgomery VAMC

Year Built: 1956

Year Renovated: n/a

Number of Floors: 1

Total GSF: 3,900 sf

Building Number: T-27

Building Name: Paint Shop

Station Name: Montgomery VAMC

Year Built: 1956

Year Renovated: n/a

Number of Floors: 1

Total GSF: 1,099 sf

Building Number: T-28

Building Name: Engineering Storage

Station Name: Montgomery VAMC

Year Built: 1956

Year Renovated: n/a

Number of Floors: 1

Total GSF: 1,098 sf

Building Number: T-39

Building Name: Grounds Storage

Station Name: Montgomery VAMC

Year Built: 1956

Year Renovated: n/a

Number of Floors: 1

Total GSF: 1,610 sf

PROJECT DESCRIPTION

USFin Development, LLC (USFIN) completed the asbestos re-inspection conducted at the Montgomery Veterans Affairs Medical Center (VAMC) located at in Montgomery, AL. These activities were provided at the request of the Department of Veterans Affairs Solicitation Number VA247-14-F-3623. The project description required that the Contractor conduct a comprehensive survey for the presence of asbestos containing materials (ACM) and conduct a determination inspection in accordance with the contract Statement of Work.

Scope of Work

The scope of work consisted of the performance of an asbestos survey with the following components to be including in the final report:

1.0 Building Identity and Project Description

2.0 Inspector Names and Contact Information

3.0 Inspector Certifications and Licenses

4.0 Asbestos Sampling Forms

5.0 Laboratory Identity, Information, and Results

6.0 ACM Descriptions and Information (Quantity, Location, Condition, Friability, And Photos)

7.0 ACM Risk Assessments, Cost Estimates & Priority For Abatement

8.0 Floor Plans - Asbestos Samples and ACM Locations (Attached CD in Revit)

The asbestos re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700.

The scope of work for the survey required the following activities:

• AHERA-type re-inspection. The survey was to include accessible areas of all site buildings and, if present, suspect materials on the exterior of buildings and in tunnels and crawl spaces. Each structure was to be categorized according to the AHERA risk rating system and AHERA abatement categories. Previous data and assessments were to be utilized to reduce survey time and effort.

• Provide a complete update to prior Baseline Asbestos Assessment Surveys to ensure compliance with EPA AHERA and OSHA asbestos notification requirements to building occupants are met.

• Bulk samples were to be collected of suspect materials for confirmatory laboratory analysis (samples will be collected and analyzed in accordance with the recommended EPA protocol) when necessary to confirm or clarify existing asbestos surveys. The contractor was to collect all samples of suspected ACM in accordance with EPA and OSHA regulations preventing airborne fiber exposure to the inspectors and facility personnel.

Explanation of Summary Table for Re-inspection and Assessment of ACM’s

Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.

The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:

• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)

• Material Type - Friable (F); Non-Fable (NF)

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

• Recommended Response Action - 1 through 7

Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)

• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.

• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.

Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.

1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints.

Asbestos debris originating from the ACBM in question may also indicate damage.

2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.

3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.

4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers;

separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage;

significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM.

Asbestos debris originating from the ACBM in question may also indicate damage.

5. ACBM with Potential for Damage - Potential damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

7. Any remaining friable ACBM or Friable Suspected ACBM

INSPECTION LIMITATIONS

This report is intended for the VAMC. This report is not intended to serve as a bidding document or as a project specification document. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document or the findings, conclusions, or recommendations is at the risk of said user. Additionally, the passage of time may result in a change in the environmental characteristics at this site. This report does not warrant against future operations or conditions that could affect the recommendations made. The results, findings, conclusions and recommendations expressed in this report are based only on conditions that were observed during the inspection of the site. There may be additional suspect asbestos containing materials in inaccessible or concealed spaces that are revealed during demolition activities. All such unidentified materials should be treated as Presumed Asbestos Containing Material (PACM) in accordance with 29 CFR 1926.71 and

1910.1001. The PACM’s should be sampled to confirm the presence of asbestos prior continuation of the demolition activities. Subcontractors and employees working within the structures at the site should be made aware of the locations of the ACMs and the possibility of concealed suspect ACMs that could be found during demolition activities. They should be advised not to disturb the ACM’s or PACM’s.

2.0 INSPECTOR NAMES AND CONTACT INFORMATION

Company: USFin Development, LLC 5993 Staunton Rd.

Edwardsville, IL 62025

(618) 789-0449

Inspector 1: Brett Brumbaugh USFin Development, LLC 7920 N. Woodbridge Rd.

Monclova, OH 43542 419-382-9574 brett@usfingroup.com

Inspector 2: Grant Dick USFin Development, LLC 5993 Staunton Rd.

Edwardsville, IL 62025

(618) 789-0449 grant@usfingroup.com

3.0 INSPECTOR TRAINING CERTIFICATES AND LICENSES

Inspector 1: Brett Brumbaugh

US EPA Trained Asbestos Inspector 1987 Original Training 1988-2014 Annual Refreshers

US EPA Trained Asbestos Management Planner 1987 Original Training 1988-2014 Annual Refreshers

State Certified: GA, OH, MI, IN, PA, KY, VA

Inspector 2: Grant Dick

US EPA Trained Asbestos Inspector 2011 Original Training 2012-2014 Annual Refreshers

US EPA Trained Asbestos Management Planner

2011 Original Training 2012-2014 Annual Refreshers

State Certified: AL, GA, IL, MO

A S

B E

S T

O S

R E

IN

S

P E

C T

IO

N

R E

P O

R T

M

O N

T G

O M

E R

Y V

A M

C

M O

N T

G O

M E

R Y

, A L

F

E B

R U

A R

Y

B E

S T

O S

R E

IN

S

P E

C T

IO

N

R E

P O

N

T G

O M

E R

Y V

A M

C

M O

N T

G O

M E

R Y

B

R U

A R

Y

B E

S T

O S

R E

IN

S

P E

C T

IO

N

R E

P O

N

T G

O M

E R

Y V

A M

C

M O

N T

G O

M E

R Y

B

R U

A R

Y

4.0 ASBESTOS SAMPLING DATA AND FORMS

4.1 Bulk Sampling Protocol

EPA and OSHA define an ACBM as any material which contains greater than 1percent asbestos.

For the purposes of this inspection, any sample containing more than “trace” or less than 1% asbestos is considered to be an ACBM. The ACBM inspection and bulk sampling were performed in accordance with AHERA (40 CFR Part 763). AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).

The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect ACBM, as follows:

• Surfacing Material

a) Three samples from homogeneous areas up to 1,000 square feet

b) Five samples from homogeneous areas between 1,000 and 5,000 square feet

c) Seven samples from homogeneous areas over 5,000 square feet

• Thermal System Insulation

a) Minimum of three samples per homogeneous sampling area

• Miscellaneous Material

a) Per the discretion of the inspector in a manner sufficient to determine asbestos content (usually 2 or more samples per homogeneous sampling area)

4.2 Sample Collection/Analytical Procedures

Samples for asbestos analysis were collected by EPA-trained inspectors. Proper safety measures such as wetting the material before sampling, cleaning up the area by wet-wiping any resulting residual debris, and wearing proper personal protective equipment, were employed. Coring tools and knives were utilized to be certain of sampling the entire thickness of a material. All samples were placed in appropriately labeled airtight containers for shipment to the laboratory.

4.3 Survey Access Limitations

All accessible areas within the facility were inspected for ACBM, including access panels to chases, areas above suspended ceilings, and crawl spaces. Any areas not inspected included non-accessible pipe chases, areas above plaster ceilings, areas above patient-care operations, secured areas, and areas occupied by patients where access could not be gained.

The areas not inspected, or where access could not be obtained, must be assumed to contain asbestos and be inspected prior to any renovation or maintenance activities.

4.4 Non-Asbestos-Containing Building Materials

The following materials were not sampled (per EPA) because they are not considered suspect asbestos-containing materials:

• Slate roofing shingles

• Brick materials

• Ceramic tiles

• Cinderblock and concrete

• Marble, travertine, and terrazzo

• Fiberglass insulating materials (yellow, white, and pink colored)

• Glass materials

• Rubber and synthetic materials including Styrofoam and isocyanates

• Wood materials

• Metal materials

4.5 List of Acronyms Used in Report

ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act EPA United States Environmental Protection Agency HazCom Hazard Communication MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NVLAP National Voluntary Laboratory Accreditation Program PLM Polarized Light Microscopy TSI Thermal Systems Insulation USFin USFin Development, LLC (Prime Contractor) VA United States Department of Veterans Affairs VAMC VA Medical Center

ASBESTOS BULK SAMPLING INFORMATION

Facility: MONTGOMERY VAMC Location: MONTGOMERY, AL Inspection Dates: FEBRUARY 2-3, 2015 Laboratory: EMSL ANALYTICAL - ANN ARBOR, MI Inspector: GRANT DICK Page 1 of 1

BUILDING SAMPLE

NUMBER

HOMOG.

AREA

SAMPLE LOCATION MATERIAL DESCRIPTION LABORATORY ANALYSIS

RESULT

8 8-1 H-5 1 st floor hallway/entry – Radiator Brown board behind radiator No Asbestos Detected

T-27 T27-1 H-6 South side of hut – window Window glazing No Asbestos Detected

T-27 T27-2 H-6 West side of hut – window Window glazing No Asbestos Detected

T-28 T28-1 H-6 South side of hut – window Window glazing No Asbestos Detected

T-28 T28-2 H-6 East side of hut – window Window glazing No Asbestos Detected

5.0 LABORATORY IDENTITY, CONTACT INFORMATION, AND LAB REPORTS

Laboratory: EMSL Analytical, Inc.

212 S. Wagner Road Ann Arbor, MI 48103 734-668-6810 www.EMSL.com

Accreditation: NVLAP Asbestos Bulk Accredited Laboratory

Accreditation Number: 101048-4

Expires: 6-30-15 http://www.emsl.com/

LABORATORY ANALYSIS REPORT

6.0 ACM DESCRIPTIONS AND INFORMATION

BUILDING SUMMARY: Building 1

Homog.

Area Asbestos Material Locations Quantity Condition Friability

H-1

Inaccessible pipe insulation

(steam & domestic water) behind plaster walls and above plaster ceilings

Ground through 6th Floor of Block A & B Unknown Good Friable

H-2 Pipe insulation (steam) 6A103 Penthouse Attic 55 lf

Good with minor damage

(open ends & seams)

Friable

6.0 Photographs of ACM Materials - Building 1

H-1 Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings

H-2 Pipe insulation (steam)

BUILDING SUMMARY: Building 4

Area Asbestos Material Locations Quantity Condition Friability

H-1

Inaccessible pipe insulation

(steam & domestic water) behind plaster walls and above plaster ceilings

Ground Floor Unknown Good Friable

6.0 Photographs of ACM Materials - Building 4

Inaccessible behind walls and above ceilings

BUILDING SUMMARY: Building 6

Area Asbestos Material Locations Quantity Condition Friability

H-1

Inaccessible pipe insulation

(steam & domestic water) behind plaster walls and above plaster ceilings

Basement and 1st Floors ~400 lf Good Friable

H-3

Steam pipe insulation underground in clay tile

(inaccessible)

Underground between buildings & in crawl space Unknown Good Friable

H-4 9" Vinyl floor tile and mastic 103 and 203 28 sf Good Non-Friable

6.0 Photographs of ACM Materials - Building 6

H-3 Steam pipe insulation underground in clay tile (inaccessible)

H-4 9" Vinyl floor tile and mastic

BUILDING SUMMARY: Building 7

Area Asbestos Material Locations Quantity Condition Friability

H-1

Inaccessible pipe insulation

(steam & domestic water) behind plaster walls and above plaster ceilings

Basement and 1st Floors ~400 lf Good Friable

H-3

Steam pipe insulation underground in clay tile

(inaccessible)

Underground between buildings & in crawl space

6.0 Photographs of ACM Materials - Building 7

BUILDING SUMMARY: Building 8

Area Asbestos Material Locations Quantity Condition Friability

H-1

Inaccessible pipe insulation

(steam & domestic water) behind plaster walls and above plaster ceilings

Basement and 1st Floors ~400 lf Good Friable

H-3

Steam pipe insulation underground in clay tile

(inaccessible)

Underground between buildings & in crawl space

6.0 Photographs of ACM Materials - Building 8

BUILDING SUMMARY: Building 13

Area Asbestos Material Locations Quantity Condition Friability

H-4 9" vinyl floor tile and mastic

(under newer 12" floor tile) 006A storage 160 sf Good Non-Friable

H-4 9" vinyl floor tile and mastic (under newer 12" floor tile)

BUILDING SUMMARY: Building 14

Area Asbestos Material Locations Quantity Condition Friability

H-4 9" vinyl floor tile and mastic Parts storage off W.

Mezzanine area 144 sf Good Non-Friable

H-4 9" vinyl floor tile and mastic

7.0 ACM RISK ASSESSMENT FORMS

AHERA RESPONSE ACTIONS BASED ON HAZARD RANKING

HAZARD

RANK

REMOVAL

PRIORITY

AHERA CATEGORY RESPONSE ACTION REQUIRED BY

AHERA

7 1 Significantly Damaged Evacuate or isolate the area if needed. Remove the ACBM (or enclose or encapsulate if sufficient to contain fibers).

Repair of TSI is allowed if feasible and safe. O&M required for all friable ACBM.

6 2 Damaged with Potential for Significant Damage

Evacuate or isolate the area if needed. Remove, enclose, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required for all friable ACBM.

5 3 Damaged with Potential for Damage

Remove, enclose, encapsulate, or repair to correct damage.

O&M required for all friable

ACBM.

4 4 Damaged Remove, enclose, encapsulate, or repair to correct damage.

O&M required for all friable

ACBM.

3 5 Potential for Significant Damage

Evacuate or isolate the area if needed. Remove, enclose, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required for all friable ACBM.

2 6 Potential for Damage O&M required for all friable

ACBM.

1 7 No Damage O&M required for all friable

ACBM.

Montgomery VAMC

Building 1

Asbestos Assessments and Cost Estimates

Homog.

Area Asbestos Material Locations

Sample

Number(s) Quantity AHERA Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

H-1

Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings

Ground through 6th

Floor of Block A & B HL943, 944, 946 Unknown 1

O&M; Remove at renovation or demolition 7 n/a $525,000

H-2 Pipe insulation (steam) 6A103 Penthouse Attic 55 lf 4 Repair damage; Continue O&M.

Remove at renovation or demolition 4 $1,000 $3,000

Asbestos Assessments and Cost Estimates

Homogeneous Area H-1 Homogeneous Area H-2

Asbestos Assessments and Cost Estimates

Homogeneous Area H-2 Homogeneous Area H-2

Building 4

Asbestos Assessments and Cost Estimates

Homog.

Area Asbestos Material Locations

Sample

Number(s) Quantity AHERA Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

H-1

Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings

Ground Floor Unknown 1 O&M; Remove at renovation or demolition 7 n/a $110,000

Building 6

Asbestos Assessments and Cost Estimates

Homog.

Area Asbestos Material Locations

Sample

Number(s) Quantity AHERA Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

H-1

Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings

Basement and 1st

Floors ~400 lf 1

O&M; Remove at renovation or demolition 7 n/a $8,000

H-3 Steam pipe insulation underground in clay tile

(inaccessible)

Underground between buildings & in crawl space

Unknown 1 O&M; Remove at renovation 7 n/a $15,000

H-4 9" Vinyl floor tile and mastic 103 and 203 28 sf 1 O&M; Remove at renovation 7 n/a $1,500

Building 6

Asbestos Assessments and Cost Estimates

Homogeneous Area H-3 Homogeneous Area H-4

Building 7

Asbestos Assessments and Cost Estimates

Homog.

Area Asbestos Material Locations

Sample

Number(s) Quantity AHERA Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

H-1

Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings

Basement and 1st

Floors ~400 lf 1

O&M; Remove at renovation or demolition 7 n/a $8,000

H-3 Steam pipe insulation underground in clay tile

(inaccessible)

Underground between buildings & in crawl space

Building 7

Asbestos Assessments and Cost Estimates

Homogeneous Area H-3

Building 8

Asbestos Assessments and Cost Estimates

Homog.

Area Asbestos Material Locations

Sample

Number(s) Quantity AHERA Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

H-1

Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings

Basement and 1st

Floors ~400 lf 1

O&M; Remove at renovation or demolition 7 n/a $8,000

H-3 Steam pipe insulation underground in clay tile

(inaccessible)

Underground between buildings & in crawl space

Building 8

Asbestos Assessments and Cost Estimates

Homogeneous Area H-3

Building 13

Asbestos Assessments and Cost Estimates

Homog.

Area Asbestos Material Locations

Sample

Number(s) Quantity AHERA Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

H-4 9" vinyl floor tile and mastic (under newer 12" floor tile) 006A storage HL925 160 sf 1 O&M; Remove at renovation 7 n/a $1,500

Building 13

Asbestos Assessments and Cost Estimates

Homogeneous Area H-4

Building 14

Asbestos Assessments and Cost Estimates

Homog.

Area Asbestos Material Locations

Sample

Number(s) Quantity AHERA Assessment Recommendation Removal Priority

Repair Cost

Estimate

Removal

Cost

Estimate

H-4 9" vinyl floor tile and mastic Parts storage off W.

Mezzanine area HL991 144 sf 1 O&M; Remove at renovation 7 n/a $1,400

Building 14

Asbestos Assessments and Cost Estimates

Homogeneous Area H-4

XXXXX

xxxxx hl949 hl950

KEY PLAN

N

O R

T H

CA

B

BLDG. 4

D

DENOTES LOCATION OF ROY F. WESTON SAMPLE

DENOTES NEGATIVE ASBESTOS SAMPLE

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES LOCATION OF BEM SAMPLE

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 1

SECOND FLOOR BLOCK "A"

2B-100

2B-102

2B-101

2A-107A

2A-132

2A-131A

2A-132A

2A-128

2A-130

2A-131

2A-131B

2A-128A

A

2A-133A

2A-133

2A-134A

2A-134

A A

2A-137

2A-136

2A-139

2A-127

2A-135

2A-138

2A-126

2A-125

2A-124

2A-126A

2A-124A

2A-122A

2A-122

2A-123

2A-121

2A-121B

2A-115A

2A-140

2A-141

2A-1422A-143

C2-4

C2-9

2A-112

S2-3 2A-109

2A-110

2A-111

2A-108

2A-115

2A-114

2A-113

2A-116

2A-117

S2-5

2A-115B

2A-120A

2A-120

2A-121A

2A-119A

2A-119 2A-118

2A-118A

E2-P2

2A-100B

2A-100A

C2-4

2A-100

S2-1

2A-100C

2A-100D

2A-100E

E2-P3

2A-101

2A-104

2A-103A

2A-107

C2-3

2A-104A

2A-105

2A-106

2A-102A

2A-103

2A-103B

2A-102

2A-106A

C2-1

E2-P1

2A-100F

E2-S2E2-S1

A A

2B-101A

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D4

BLDG 1

2ND FL

BLOCK A

1" = 40'-0" 1 D4

KEY PLAN

N O

R T

H

CA

B

BLDG. 4

D

DENOTES POSITIVE ASBESTOS SAMPLE BY ROY F. WESTON

DENOTES NEGATIVE ASBESTOS SAMPLE BY ROY F. WESTON

HL939

HL940

HL941

HL936

HL937

HL938

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 1

GROUND FLOOR BLOCK "A"

GA-128C

G A B

GA-128F

GA-128G

GA-128E

GA-130

GA-103

GA-104A

GA-111

GA-107GA-109

GA-131

STAIR

N0. 3

GA-124

GA-123

GA-125 GA-127

NO. 5

STAIR

GA-113

GA-118

CG-3

CG-6

CG-8

CG-4

GA-102

GA-100

EG-P3

EG-P1

EG-P2

GA-104

GA-101

GA-100A

GA-112

CG-1

GA-108

GA-111A

GA-110

GA-121

GA-115

GA-128

GA-128A

CG-5

GA-129

GA-117

GA-120

GA-122

GA-130A

GA-116

GA-119

GA-108A

CG-8A

CG-7

GA-114

GA-125A

CG-6A

CG-55

EG-S1 EG-S2

GA-106

N0. 1

STAIR

H-1

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D1

BLDG 1

GRND FL

BLOCK A

hl951

KEY PLAN

N O

R T

H

CA

B

BLDG. 4

D

DENOTES LOCATION OF ROY F. WESTON SAMPLE

DENOTES NEGATIVE ASBESTOS SAMPLE

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES LOCATION OF BEM SAMPLE

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 1

SECOND FLOOR BLOCK "B"

2B-102A

2B-142

2B-141

2B-140

2B-109

2B-104A

2B-104 2B-106

2B-138

C2-19

2B-138A 2B-136

2B-102B

2B-100

2B-102

2B-101A

2B-101

2B-103

2B-103A

2B-108

2B-107A

2B-104B

C2-10

2B-105 2B-107

S2-2

2B-111

2B-110

2B-115

2B-113

C2-13

2B-114A

2B-116

2B-117

2B-118

2B-145

2B-143 2B-144

2B-139

2B-146

2B-150

2B-137 2B-148

2B-135

2B-134

2B-152

2B-153

2B-147

2B-149

2B-151

2B-154

2B-1272B-131

C2-22

C2-11

2B-133

2B-112

2B-132 2B-130

2B-129

2B-114

S2-4 2B-120

2B-128

C2-14 2B-121

2B-126

2B-125

2B-123

2B-119

2B-122 2B-124

E2-P2

E2-P1

2A-100F

2C-103

2C-102

2C-100

2C-101

2B-109A

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D5

BLDG 1

2ND FL

BLOCK B

1 D5

GB-113A

N0. 2

CG-16

CG-15

GB-127

NO. 4

GB-106

CG-2

CG-13

GB-116A

CG-10

GB-110

GB-115

CG-9

GB-101GB-100

GB-126

GB-103

GB-116

GB-102 GB-104 GB-105

GB-118

GB-120

GB-121

GB-119

CG-11

GB-138

CG-18

GB-139

GB-117A

GB-133

GB-137

GB-117

GB-135

CG-20

CG-23

CG-22

GB-109

GB-114

GB-114A GB-111

GB-112

GB-113

CG-14

GB-107

GB-131

GB-128

GB-126A GB-126B

GB-127A

GB-127B

GB-128A

GB-130

GB-134

GB-136

GB-129

STAIR

STAIR

GB-122

GB-104A

GB-108

GB-126C

GB-140

KEY PLAN

N O

R T

H

CA

B

BLDG. 4

D

DENOTES POSITIVE ASBESTOS SAMPLE BY ROY F. WESTON

DENOTES NEGATIVE ASBESTOS SAMPLE BY ROY F. WESTON

HL931

HL935

HL934

HL933

HL932

HL942

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 1

GROUND FLOOR BLOCK "B"

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D2

BLDG 1

BLOCK B

hl947 hl943 hl944 hl946 hl948

TSI

KEY PLAN

N

O R

T H

CA

B

BLDG. 4

D

DENOTES LOCATION OF ROY F. WESTON SAMPLE

DENOTES NEGATIVE ASBESTOS SAMPLE

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES LOCATION OF BEM SAMPLE

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 1

FIRST FLOOR BLOCK "A"

1A-124F

1A-132A

1A-132

1A-130

1A-124E

1A-127

1A-127A

1A-127B

1A-124B

1A-124C

1A-124G

1A-124D

1A-124A

1A-124

1A-136A

1A-136

1A-134

1A-129

1A-131

1A-133A

1A-133

C

1A-135

1A-135A

1A-102

E1-S2E1-S1

C1-30

1A-101

1A-100

1A-118

1A-116

1A-126

1A-128

1A-125

C

S1-5

C1-6A

S1-3

1A-117

1A-115

C

1A-120

1A-119

1A-121

1A-119A

1A-122

1A-122A

1A-122B

1A-122C

1A-109

1A-110

1A-111

1A-1121A-114

1A-113

C1-4

1A-107

1A-108

S1-1

1A-108A

1A-103

1A-103A

E1-P3

1A-104

1B-100

1B-101

C

1A-105 1A-106

E1-P1

E1-P2

C1-1

C1-7

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D3

BLDG 1

1ST FL

BLOCK A

SMOKE WALL

FIRE WALL

CONCRETE PLATFORM

FIRE AND SMOKE WALL LEGEND

6A-103

6A-101

6A-102

S6-1

6A-100

E6-S1

C6-1

ATTIC SPACE

MECH SPACE

ATTIC

SPACE

STAIR

MECH SPACE

ELEVATOR

ELECTRICAL RM

ROOF

DN

H-2

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D9

BLDG 1

FL 6

FD

SMOKE WALL

FI RE WALL-2HR

FI RE WALL-1HR

FI RE AND SMOKE WALL LEG END

TOILET

TOILET

MALE

FEMALE

TOILET

MEDICATION

NOURISHMENT KITCHEN

STORAGE

TOILET

TOILET

TOILET

PIPE

CHASE

MALE /

FEMALE TOILET

MALE / FEMALE TOILET PIPE

CHASE

TOILETCHAPLAIN STORAGETOILETTOILET

EQUIP

CLOSET

TOILET

NURSING EQUIP

TOILET

NURSING SUPPLY

NURSING SUPPLY

MALE

FEMALE

TOILET

TOILET

NOURISHMENT STATION

EMS EQUIP

SUPPLIES

STORAGE

CORRIDOR CORRIDORCORRIDOR

ELEVATOR LOBBY

CORRIDOR

ELECTRICAL CLOSET

TOILET

TOILET

UPPER MECH AREA

TOILET

NURSING

CLASS

RM

2-BED

RM

SOILED UTILITYPHYSICIAN OFFICE

TOILET

4-BED

RM

2-BED

RM

2-BED

RM

1-BED

RM

NURSE MGR

NURSE STATION

ELEVATOR

CHAPEL

STORAGE

EXAM

HAC

NURSE MGR

MED RM

SOCIAL WORKER

STAIR

4-BED

RM

2-BED

RM

1-BED

RM

1-BED

RM

TOILET

CLEAN LINEN

ELECTRICAL CLOSET

OFFICE

STAIR

PASTORAL CARE

ELEVATOR

1-BED

RM

SOILED UTILITY

STAIR

CLEAN EQUIP

EQUIP

STORAGE

DAY RM

NURSING EQUIP

UTILITY

OFFICE

EXAM RM

ELEVATOR STAIR

EYE

CLINIC

EYE

CLINIC

TRIAGE

ELECTRICAL CLOSET

PHYSICIAN ASST

EXAM RM

TRIAGE

EXAM RM

PHYSICIAN OFFICE

ELEVATOR

CPE

SUPV

CHAPLAIN

EXAM RM

TOILET

EXAM RM

EXAM RM

EYE

CLINIC

WAITING RM

WAITING RM

TOILET

TOILET

EXAM RM

EXAM RM

EXAM RM

PHYSICIAN

OFFICE

EXAM RM

TOILET

WAITING RM

CPAP

CLINIC

TOILET

TOILET

TRIAGE

STAIR

EXAM RM

EXAM RM

EXAM RM

TOILET

SPD

STORAGE

ELECTRICAL CLOSET

ASST

CHIEF

PROTECTIVE

SVC

TRIAGE

TRIAGE

ELEVATOR

TOILET

NURSING EQUIP STORAGE

PYXIS

CLEAN UTILITY

TOILET

4-BED

RM

TOILET

4-BED

RM

TOILET

TOILET

1-BED

RM

TOILET

TOILET

2-BED

RM

2-BED

RM

1-BED

RM

1-BED

RM

2-BED

RM

TOILET

TOILET

CORRIDOR

CORRIDOR

HAC

STORAGE

IRM

TOILET

TOILETTOILET

3B-126A

3B-129

3B-101A

3A-129

3B-136A

3B-137

3B-112

3B-113

3B-117

3B-119A 3B-118A

3B-133A

3A-109A

3A-103A

3B-103 3B-109A

3B-104A3A-1013A-102A3A-104A

3A-136A

3A-114

3A-117

3A-118A

3B-131B

3B-121B

3B-114

3A-119A

3A-113

3A-141

3A-131B

3A-121B

C3-4 C3-10C3-3

C3-17

C3-1

3A-127

3A-126A

3A-121A

3C-100

3B-128A

C3-16

3A-139

3A-133

3B-1093B-105

3B-105A

3B-115

3A-120

3A-126

3A-131

3A-128

3B-102

C3-9

E3-P2

3A-100

3A-138

3A-136

3A-140

3A-108

3A-112

3A-116

S3-5

3A-118 3A-119

3A-115B

3A-115

3A-115A

3A-115C

3A-111

3A-110

3A-106

S3-1

3A-100A

E3-S2

3A-105 3A-109

S3-3

3A-135

3A-104

3A-102

3A-100C

3B-100

3B-101

3B-104

E3-P1 S3-2

3B-138

3B-135

3B-143

3B-127

3B-136

3B-139

3B-142

3B-141

3B-140

3B-133

3B-134

E3-P3

3A-100B

3B-125

3B-124A

3B-126

3B-128

3B-132

3B-131

3B-131A

3B-132A

3B-130

3B-124

3B-123

3B-121

3B-122

3B-122A

3B-119 3B-120

3B-121A

3B-120A

3B-116

S3-4

3B-118

3B-115B

3B-115A

3B-115C

3B-111

3B-110

3B-108 3B-106

3B-107

E3-S1

3A-105A

3A-107

3A-142 3A-143

3A-137

3A-134

3A-133A

3A-132

3A-132A

3A-131A

3A-130

3A-128A

3A-124A

3A-125

3A-124

3A-123

3A-122

3A-121

3A-122A

3A-120A

C3-11

3B-134A3A-134A

ROOF

FP

DESK

DN

DN

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D6

BLDG 1

3RD FL

D6

NOTE: H1 IN A & B BLOCKS IN WALLS & CEILING CHASES

SM OKE W ALL

FI R E W ALL-2HR

FI R E W ALL-1HR

FI R E AND SM OKE W ALL LEG END

MEDICATION

TOILET

STORAGE

TOILET

NOURISHMENT KITCHEN

TOILET

MEDICATION

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

EXIT NURSE

SOILED

LINEN

HAC

M/F

STAFF

TOILET

STAFF TOILET

TOILET

TOILET

M/F TOILETCLOSET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

NURSING

SUPPLY

NURSING

SUPPLY

PIPE CHASE

IRM

STORAGE

STORAGE

PHYSICIAN

OFFICE

OFFICE

PHYSICIAN

OFFICE

WAITING RM

CORRIDOR CORRIDOR

BREAK RM

ELECTRIC

CLOSET

EXIT

NURSE

CORRIDORCORRIDOR

CORRIDOR

R.O. / C&P

TEAM

ELEVATOR

LOBBY

STAIR

R.O. / C&P

TEAM

EXAM RM

STORAGE

OFFICE

EXAM RM

EXAM RM

TOILET

PHYSICIAN/EXAM

RM

SOCIAL

WORKER

TOILET

WOMEN'S VET

CO-ORDR

STORAGE

STAIR

C&P MGR

NURSE

STAFF

TOILET

SOCIAL

WORKER

STORAGE

ELECTRICAL

CLOSET

HAC

DIETICIAN

SUPPLY

RMSTAIR

EXAM RM

TOILET

EXAM RM

EXAM RM

EXAM RM

PHYSICIAN

OFFICE

WAITING RM

TOILET

GREEN TEAM

PHARMACY

TOILET

DIETICIAN

STORAGE

ELECTRICAL CLOSET

EXAM RMEXAM RM

IRM

AFGE

STORAGE

AFGE

LOCAL 503

EXAM RM

SOCIAL

WORKER

PHYSICIAN

OFFICE

ELECTRICAL

CLOSET

EMPLOYEE

KITCHEN

OFFICE

TOILET

GROUP RM GROUP RM

TOILET

PA/NURSE

PRACTITIONER

EXAM RM

EXAM RM

STAIR

EXAM RM

SOCIAL

WORKER

TOILET

ELEVATOR

ELEVATOR

ELEVATOR

C&P CHECK-IN

ELEVATORELEVATOR

PHYSICIAN

OFFICE

EEO MGRSOILED

UTILITY

STAIR

EXAM RM

TRIAGE

WAITING

RM

PHYSICIAN

EXAM RM

I.T. TRAINING

RM

TOILET

NURSE

PRACTITIONER

STAFF

PSYCHOLOGIST

TRIAGE

STAFF

PSYCHIATRIST

TOILET

STAFF

PSYCHOLOGIST

STAFF

PSYCHIATRIST

TOILET

NURSE

TOILET

NURSE

SOCIAL

WORKER

PATIENT

WAITING AREA

TOILET

TOILET

TOILET

NURSE PSTATION

OFFICE

ANTE

RM

TOILET

TOILET

TOILET

TOILET

4A-112

4A-104A

4A-101

4B-114

4B-113

4A-102A

4B-112

4B-119A

4B-120A

4B-121A

4B-122A

4B-126A

4B-131A

4B-142 4B-141

4B-140

4B-137

4B-136A

4B-134A

4B-133A

4B-1034A-141

4A-103A

4A-134A

4A-133A

4A-131A

4A-128A

4A-114

4B-131B

4A-113

4B-109A

4B-129

4B-121B

4B-104A

4A-109A

4A-129

4A-131B

4A-121B

4B-120

4B-136

4B-133

4B-119

C4-4 C4-11

4B-139

4B-127

4B-143

C4-10C4-3

C4-1

4A-100B

4A-103

C4-17

S4-1

4A-100A

4B-126

4B-109

4B-107A

4B-107

4B-128

4B-130

4B-128A

4B-131

4B-132

4B-132A

4B-116

4B-117

S4-4

4B-101

4B-101A

4A-136

4A-137

4A-139

4A-143

4A-127

4A-142

4A-140

4A-116

4A-117S4-5

4B-125

4B-124A

4B-124

4B-123

4B-122

4B-121

4B-118

4B-118A

4B-115B

4B-1154B-115C

4B-115A

4B-111

4B-110

4B-108

4B-1064B-104

4B-100

4A-100C

4A-102

4A-1044A-1064A-108

4A-110

4A-111

4A-115B

4A-115

4A-115A

4A-115C

4A-119 4A-118

4A-118A

4A-119A

4B-134

4B-135

4B-138

S4-2

4B-105 4B-102

4B-105A

E4-P1

E4-P2

E4-P3

4A-100

E4-S2E4-S1

4A-105

4A-105A

4A-107 4A-109

4A-107A

S4-3

4A-138

4A-135

4A-134

4A-133 4A-132

4A-132A

4A-131

4A-130

4A-128

4A-126

4A-126A

4A-125

4A-124

4A-124A

4A-123

4A-122A

4A-122

4A-121

4A-120

4A-121A

4A-120A

4A-136A

C4-9 C4-16

FP

FP

UP DN UP DN

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D7

BLDG 1

4TH FL

NOTE: H1 IN A & B BLOCKS IN WALL AND CEILING CHASES

SM OKE W ALL

FI R E W ALL

FI R E AND SM OKE W ALL LEG END

HR RESTROOM

HR

RESTROOM

HR RESTROOM

UTILITY

HR

STORAGE

STAIR

UTILITY

ATTIC

CORRIDOR

UTILITY

HR

OFFICE

HR

OFFICE

HR

OFFICE

HR

OFFICE

CORRIDOR

ELEVATOR

ELEVATOR

ELEVATOR

HR OFFICE

HR OFFICEHR OFFICE

HR OFFICE

ELEVATORELEVATOR

ELEVATOR LOBBY

STAIR

EQUIP RM

ATTIC

ATTIC

ATTIC

CORRIDOR

STAIR

HR

OFFICEHR OFFICE

FP

ROOF

ROOF

ROOF

ROOF

ROOF

ROOFROOF

ROOF

UP DN

5A-102

5A-101A

5A-110 5A-112

5A-106A

5A-117

5A-118

5B-101

5B-102

S5-2

5B-103

5B-100

C5-2

5A-111

5A-108

5A-107

5A-107A

5A-106

5A-105

C5-1

E5-P2

E5-P1

E5-P3

5A-104

5A-1035A-101

5A-100

E5-S2E5-S1

C5-5

S5-1

5A-109

5A-114

5A-115

5A-113

5A-116

C5-3

S5-3

5A-106B

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D8

BLDG 1

5TH FL

NOTE: H1 IN B BLOCK WALL AND CEILING CHASES

CROSSWALK

OPEN AREA FOR STAIRS

RETAINING WALL

UP

UP

RETAINING WALL

UP

CART WASH

LIFT

UP

UP

UP

UP

U P

EG-S4

RAMP

CHILLER PLANT

LOADING DOCK

OVER DOOR

STAIR NO. 2

CANOPY

EXTERIOR

CANOPY

GE-104

GE-104A

GE-104B

GE-117 GE-105A

GE-106

GE-107

SG-8

SG-9

GE-116

GE-101

GE-111 GE-115

GE-109

GE-113D

GE-102

GE-107A

GE-107B

GE-105

GE-103

GE-112

GE-114B

GE-120

GE-110B

GE-110AGE-110GE-108

GE-100

GE-119B

GE-119

GE-118

CG-59

GE-109A

GE-109B

CG-59A

GE-100A

CG-55

GE-119A

CG-56

CG-57A

CG-57

GE-103A

CG-58

GE-101A

GE-113

GE-113A GE-113B

GE-113E

CG-60

GE-114A

GE-114

24,878 SQUARE FEET

VCT MASTIC

15 LINEAR FEET

ASBESTOS PIPE

INSULATION

KEY PLAN

N O

R T

H

BLDG. 4

A B

D

C

DENOTES POSITIVE ASBESTOS SAMPLE BY ROY F. WESTON

DENOTES NEGATIVE ASBESTOS SAMPLE BY ROY F. WESTON

HL954

HL955

HL957

HL958

HL956

HL945

HL952

HL953

HL959

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 4

GROUND FLOOR

H-1

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D10

BLDG 4

SCALE: 1/4"=1'-0"

FIRST FLOOR PLAN - BLDG #8

SECOND FLOOR PLAN - BLDG #8

SCALE: 1/4"=1'-0"

B A S E M E N T

F L O O R

P L A N

B L D G

S C A L E

HAS

DSS

OFFICE

DSS

OFFICE

DSS

OFFICE

DSS

OFFICE

Office Police Security

TOILET

TOILET

HBPC OFFICE

108-A

HBPC OFFICE

HBPC OFFICE

Financial Management

PAYROLL

101-A

PAYROLL

104105

TOILET

TOILET

ROOF

ROOF

B-05

HRMS Storage

B-03B

Bathroom

B-05B

Bathroom

B-03

DSS Storage

B-01

Storage

B-04

Storage

B-06

Payroll

B-03A

B-05A

AHU

AHU

201-A 201-B208-A208-B

H-3

8-1

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D18

BLDG 8

hl961 hl960 hl962

XXXXX

KEY PLAN

N

O R

T H

BLDG. 4

A

D

B C

DENOTES LOCATION OF ROY F. WESTON SAMPLE

DENOTES LOCATION OF BEM SAMPLE

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES NEGATIVE ASBESTOS SAMPLE

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 4

FIRST FLOOR

BEM_NT_FS/CAD/DGN/ACTIVE/01-GSA-18-CSEF/WEST CAMPUS

1E-114D

1E-117C1E-115 EXTERIOR

STAIR NO. 2

1E-117A

1E-117B

1E-117

1E-118

CANOPY

CANOPY

OVER DOOR

1E-116

1E-114C

1E-114B

1E-114A

1E-114

1E-108I

1E-108J

1E-108G

1E-108H

1E-108E

1E-111 1E-112

1E-108D

C1-35

1E-108F

1E-108

S1-4

1E-108C1E-105

1E-104C

1E-104B

1E-104A

C1-34

1E-108A

1E-108B

S1-8

S1-9

1E-107

1E-104

E N

C

LO

S E

D W

A

LK

W A

Y

1E-103A

1E-103

E B

1E-101A

1E-101

1E-102

1E-109C

1E-113 1E-114E

CHILLER PLANT ROOF

1E-110D

CHILLER PLANT ROOF

1E-110

1E-110C

1E-110B

1E-110A

1E-109

1E-109D

1E-109B

1E-109A

EXTERIOR

STAIR NO. 1

C1-31

1E-106

OVER

CANOPY

WALKWAY

1E-106B

1E-106A

1E-100D

1E-100C

1E-100A1E-100B

1E-100

COVERED

WALKWAY

C1-33

C

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D11

BLDG 4

hl992 hl993 hl978 hl977 hl982 hl981 hl979 hl980 hl986 hl987 hl985 hl984 hl996 hl995 hl994 hl990 hl983 hl989 hl988 hl998 hl997 hl991

XXXXX

DENOTES NEGATIVE ASBESTOS SAMPLE

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES LOCATION OF BEM SAMPLE

DENOTES LOCATION OF ROY F. WESTON SAMPLE

GROUND FLOOR PLAN - BUILDING #14

EAST MEZZANINE

WEST MEZZANINE

EMERGENCY GENERATOR ROOM

SHOP AREA

BOILER #1 BOILER #2

B O

IL

E

R

OFFICE

LOCKER ROOM

GEAR ROOM

TRANSFORMER/SWITCH

PUMP ROOM

FEED WATER AREA

STORAGETOILET

PARTS

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 14

BEM_NT_FS/CAD/DGN/ACTIVE/01-GSA-18-CSEF/WEST CAMPUS

= Floor Tile

H-4

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D20

BLDG 14

D20

DENOTES LOCATION OF ROY F. WESTON SAMPLE

DENOTES LOCATION OF BEM SAMPLE

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES NEGATIVE ASBESTOS SAMPLE

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 6

BASEMENT

LEGEND

U P

B01 B02

SB-1

CRAWL SPACE

H-3

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D12

BLDG 6

BASEMENT

hl913 hl918 hl919 hl915

XXXXX

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES NEGATIVE ASBESTOS SAMPLE

DENOTES LOCATION OF BEM SAMPLE

DENOTES LOCATION OF ROY F. WESTON SAMPLE

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 6

FIRST FLOOR

LEGEND

D O W N

U P

106-C106-B104B

104A 106

106-A

D O W N

DOWN

DOWN

E1-P6

S1-1

D O

WN

D O

WN

H-4

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D13 hl914 hl912

XXXXX

DENOTES LOCATION OF ROY F. WESTON SAMPLE

DENOTES LOCATION OF BEM SAMPLE

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES NEGATIVE ASBESTOS SAMPLE

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 6

SECOND FLOOR

LEGEND

DOWN

204B

209 208B

206 207

204C

208A204A

S2-1

E2-P6

209A 209B

D O

WN

D O

WN

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D14

2ND FL

N

EW

B05

B06 B07B04

B04A

B03

B02

B08B09

B11 B10

B01

EB1

SCALE: 1/4"=1'-0"

BASEMENT FLOOR PLAN - BLDG #7

H-3

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D15

BLDG 7

BASEMENT

112A

100 101

103 104

110 111

E1P7

S11

SCALE: 1/4"=1'-0"

FIRST FLOOR PLAN - BLDG #7

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D16

SECOND FLOOR PLAN

215A

202 216

216A

206 205

209A

208210

210A

S2-1

E2-P7

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D17

2ND FL

hl927 hl930 hl928 hl926 hl929 hl925

XXXXX

DENOTES NEGATIVE ASBESTOS SAMPLE

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES LOCATION OF BEM SAMPLE

DENOTES LOCATION OF ROY F. WESTON SAMPLE

AIR CONDITIONING

SHOP REFRIGERATION AND

002B

CLOSET

LOCKER ROOM

002A

TOILET

003B

SMALL PARTS

003C

HAV

003A

STOCK ROOM

CARPENTRY

PLUMBING

005A

TRANSFORMER ROOM

006A

POWER ROOM

007A

TOILET

OFFICE

ELECTRIC SHOP

GARAGE

STORAGE

OFFICE

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 13

= Floor Tile

H-4

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D19

BLDG 13

hl992 hl993 hl978 hl977 hl982 hl981 hl979 hl980 hl986 hl987 hl985 hl984 hl996 hl995 hl994 hl990 hl983 hl989 hl988 hl998 hl997 hl991

XXXXX

DENOTES NEGATIVE ASBESTOS SAMPLE

DENOTES POSITIVE ASBESTOS SAMPLE

DENOTES LOCATION OF BEM SAMPLE

DENOTES LOCATION OF ROY F. WESTON SAMPLE

GROUND FLOOR PLAN - BUILDING #14

EAST MEZZANINE

WEST MEZZANINE

EMERGENCY GENERATOR ROOM

SHOP AREA

BOILER #1 BOILER #2

B O

IL

E

R

OFFICE

LOCKER ROOM

GEAR ROOM

TRANSFORMER/SWITCH

PUMP ROOM

FEED WATER AREA

STORAGETOILET

PARTS

LEGEND

CENTRAL ALABAMA VETERANS

HEALTH CARE SYSTEM

WEST CAMPUS, MONTGOMERY, AL

BUILDING 14

BEM_NT_FS/CAD/DGN/ACTIVE/01-GSA-18-CSEF/WEST CAMPUS

= Floor Tile

H-4

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

D20

BLDG 14

D20

Scale

Date

Drawn By

Checked By

Project Number

MONTGOMERY

VAMC

MONTGOMERY, AL

US DEPARTMENT OF

VETERANS AFFAIRS

2015 ASBESTOS

REINSPECTION

USFIN

DEVELOPMENT,

LLC

FEBRUARY 2015

NOT TO SCALE

photos photos

File details come from the government source that posted it. Updated .