This document is an Asbestos Reinspection Report for the Montgomery Veterans Affairs Medical Center (VAMC) in Montgomery, Alabama, conducted under federal contract VA247-14-F-3623. The inspection was performed by USFin Development, LLC between February 2-3, 2015, and covers 14 buildings across the facility totaling approximately 360,000 square feet. The report comprehensively documents asbestos-containing materials (ACM) identified during the survey, including their locations, quantities, condition, friability status, and risk assessments in accordance with the Asbestos Hazard Emergency Response Act (AHERA) and EPA protocols.
The survey identified friable thermal system insulation (TSI) on pipes in multiple buildings (notably Building 1 with unknown quantity behind plaster walls and above ceilings across multiple floors, and Building 1 penthouse with 55 linear feet of steam pipe insulation showing minor damage), inaccessible underground steam pipe insulation in clay tile in Buildings 6, 7, and 8, and non-friable vinyl floor tile with mastic in Buildings 6, 13, and 14. Removal cost estimates range from $1,400 to $525,000 depending on material type and quantity. All identified ACM received priority rankings from 7 (highest priority for immediate action) to 1 (lowest priority), with recommended responses including operations and maintenance (O&M), repair, encapsulation, or removal at renovation/demolition. Two EPA-trained inspectors certified in asbestos inspection and management planning conducted the work, with samples analyzed by EMSL Analytical, an NVLAP-accredited laboratory. Floor plans and detailed photographs documenting each homogeneous area of ACM are included as appendices.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS REINSPECTION REPORT
for the
DEPARTMENT OF VETERANS AFFAIRS
MONTGOMERY VAMC
MONTGOMERY, AL
STATION NUMBER: 619
ORDER #:
VA247-14-F-3623
INSPECTION DATES:
FEBRUARY 2-3, 2015
CONTRACTOR:
USFIN DEVELOPMENT, LLC
EDWARDSVILLE, IL – MONCLOVA, OH
MONTGOMERY VAMC – MONTGOMERY, AL
FEBRUARY 2015
TABLE OF CONTENTS
1.0 BUILDING IDENTITIES AND PROJECT DESCRIPTION
2.0 INSPECTOR NAMES AND CONTACT INFORMATION
3.0 INSPECTOR CERTIFICATIONS AND LICENSES
4.0 ASBESTOS SAMPLING FORMS
5.0 LABORATORY IDENTITY, INFORMATION, AND RESULTS
6.0 ACM DESCRIPTIONS AND INFORMATION (QUANTITY, LOCATION, CONDITION,
FRIABILITY, AND PHOTOS)
7.0 ACM RISK ASSESSMENTS, COST ESTIMATES & PRIORITY FOR ABATEMENT
8.0 FLOOR PLANS - ASBESTOS SAMPLES AND ACM LOCATIONS
1.0 BUILDING IDENTITY
Building Number: 1
Building Name: Main Hospital Building
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: 1993 (most recent)
Number of Floors: 8
Total GSF: 272,873 sf
Inspection Date: February 2, 2015
Previous Inspection Date: 2002, 2007, and 2010
Building Number: 4
Building Name: Dining Hall Administration
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: 1993
Number of Floors: 3
Total GSF: 38,160 sf
Inspection Date: February 3, 2015
Building Number: 6
Building Name: A&MM, EMS, Administration
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: n/a
Number of Floors: 3
Total GSF: 5,773 sf
Building Number: 7
Building Name: Engineering, MCFF, Safety, Administration
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: n/a
Number of Floors: 3
Total GSF: 11,534 sf
Building Number: 8
Building Name: Fiscal, DSS, HBPC, Administration
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: n/a
Number of Floors: 3
Total GSF: 5,433 sf
Building Number: 12
Building Name: A&MM Warehouse
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: n/a
Number of Floors: 1
Total GSF: 4,695 sf
Building Number: 13
Building Name: Engineering Shops
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: n/a
Number of Floors: 1
Total GSF: 4,916 sf
Building Number: 14
Building Name: Boiler Plant
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: Several boiler renovation projects
Number of Floors: 3
Total GSF: 4,882 sf
Building Number: 20
Building Name: Eng. Locksmith Shop
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: 1990’s
Number of Floors: 1
Total GSF: 174 sf
Building Number: 21
Building Name: Engineering Storage (Flammables)
Station Name: Montgomery VAMC
Year Built: 1940
Year Renovated: n/a
Number of Floors: 1
Total GSF: 101 sf
Building Number: T-25
Building Name: Storage, Smoking Shelter
Station Name: Montgomery VAMC
Year Built: 1956
Year Renovated: n/a
Number of Floors: 1
Total GSF: 3,900 sf
Building Number: T-27
Building Name: Paint Shop
Station Name: Montgomery VAMC
Year Built: 1956
Year Renovated: n/a
Number of Floors: 1
Total GSF: 1,099 sf
Building Number: T-28
Building Name: Engineering Storage
Station Name: Montgomery VAMC
Year Built: 1956
Year Renovated: n/a
Number of Floors: 1
Total GSF: 1,098 sf
Building Number: T-39
Building Name: Grounds Storage
Station Name: Montgomery VAMC
Year Built: 1956
Year Renovated: n/a
Number of Floors: 1
Total GSF: 1,610 sf
PROJECT DESCRIPTION
USFin Development, LLC (USFIN) completed the asbestos re-inspection conducted at the Montgomery Veterans Affairs Medical Center (VAMC) located at in Montgomery, AL. These activities were provided at the request of the Department of Veterans Affairs Solicitation Number VA247-14-F-3623. The project description required that the Contractor conduct a comprehensive survey for the presence of asbestos containing materials (ACM) and conduct a determination inspection in accordance with the contract Statement of Work.
Scope of Work
The scope of work consisted of the performance of an asbestos survey with the following components to be including in the final report:
1.0 Building Identity and Project Description
2.0 Inspector Names and Contact Information
3.0 Inspector Certifications and Licenses
4.0 Asbestos Sampling Forms
5.0 Laboratory Identity, Information, and Results
6.0 ACM Descriptions and Information (Quantity, Location, Condition, Friability, And Photos)
7.0 ACM Risk Assessments, Cost Estimates & Priority For Abatement
8.0 Floor Plans - Asbestos Samples and ACM Locations (Attached CD in Revit)
The asbestos re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700.
The scope of work for the survey required the following activities:
• AHERA-type re-inspection. The survey was to include accessible areas of all site buildings and, if present, suspect materials on the exterior of buildings and in tunnels and crawl spaces. Each structure was to be categorized according to the AHERA risk rating system and AHERA abatement categories. Previous data and assessments were to be utilized to reduce survey time and effort.
• Provide a complete update to prior Baseline Asbestos Assessment Surveys to ensure compliance with EPA AHERA and OSHA asbestos notification requirements to building occupants are met.
• Bulk samples were to be collected of suspect materials for confirmatory laboratory analysis (samples will be collected and analyzed in accordance with the recommended EPA protocol) when necessary to confirm or clarify existing asbestos surveys. The contractor was to collect all samples of suspected ACM in accordance with EPA and OSHA regulations preventing airborne fiber exposure to the inspectors and facility personnel.
Explanation of Summary Table for Re-inspection and Assessment of ACM’s
Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.
The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:
• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)
• Material Type - Friable (F); Non-Fable (NF)
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
• Recommended Response Action - 1 through 7
Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)
• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.
1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints.
Asbestos debris originating from the ACBM in question may also indicate damage.
2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.
4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers;
separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage;
significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM.
Asbestos debris originating from the ACBM in question may also indicate damage.
5. ACBM with Potential for Damage - Potential damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
7. Any remaining friable ACBM or Friable Suspected ACBM
INSPECTION LIMITATIONS
This report is intended for the VAMC. This report is not intended to serve as a bidding document or as a project specification document. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document or the findings, conclusions, or recommendations is at the risk of said user. Additionally, the passage of time may result in a change in the environmental characteristics at this site. This report does not warrant against future operations or conditions that could affect the recommendations made. The results, findings, conclusions and recommendations expressed in this report are based only on conditions that were observed during the inspection of the site. There may be additional suspect asbestos containing materials in inaccessible or concealed spaces that are revealed during demolition activities. All such unidentified materials should be treated as Presumed Asbestos Containing Material (PACM) in accordance with 29 CFR 1926.71 and
1910.1001. The PACM’s should be sampled to confirm the presence of asbestos prior continuation of the demolition activities. Subcontractors and employees working within the structures at the site should be made aware of the locations of the ACMs and the possibility of concealed suspect ACMs that could be found during demolition activities. They should be advised not to disturb the ACM’s or PACM’s.
2.0 INSPECTOR NAMES AND CONTACT INFORMATION
Company: USFin Development, LLC 5993 Staunton Rd.
Edwardsville, IL 62025
(618) 789-0449
Inspector 1: Brett Brumbaugh USFin Development, LLC 7920 N. Woodbridge Rd.
Monclova, OH 43542 419-382-9574 brett@usfingroup.com
Inspector 2: Grant Dick USFin Development, LLC 5993 Staunton Rd.
Edwardsville, IL 62025
(618) 789-0449 grant@usfingroup.com
3.0 INSPECTOR TRAINING CERTIFICATES AND LICENSES
Inspector 1: Brett Brumbaugh
US EPA Trained Asbestos Inspector 1987 Original Training 1988-2014 Annual Refreshers
US EPA Trained Asbestos Management Planner 1987 Original Training 1988-2014 Annual Refreshers
State Certified: GA, OH, MI, IN, PA, KY, VA
Inspector 2: Grant Dick
US EPA Trained Asbestos Inspector 2011 Original Training 2012-2014 Annual Refreshers
US EPA Trained Asbestos Management Planner
2011 Original Training 2012-2014 Annual Refreshers
State Certified: AL, GA, IL, MO
A S
B E
S T
O S
R E
IN
S
P E
C T
IO
N
R E
P O
R T
M
O N
T G
O M
E R
Y V
A M
C
M O
N T
G O
M E
R Y
, A L
F
E B
R U
A R
Y
B E
S T
O S
R E
IN
S
P E
C T
IO
N
R E
P O
N
T G
O M
E R
Y V
A M
C
M O
N T
G O
M E
R Y
B
R U
A R
Y
B E
S T
O S
R E
IN
S
P E
C T
IO
N
R E
P O
N
T G
O M
E R
Y V
A M
C
M O
N T
G O
M E
R Y
B
R U
A R
Y
4.0 ASBESTOS SAMPLING DATA AND FORMS
4.1 Bulk Sampling Protocol
EPA and OSHA define an ACBM as any material which contains greater than 1percent asbestos.
For the purposes of this inspection, any sample containing more than “trace” or less than 1% asbestos is considered to be an ACBM. The ACBM inspection and bulk sampling were performed in accordance with AHERA (40 CFR Part 763). AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).
The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect ACBM, as follows:
• Surfacing Material
a) Three samples from homogeneous areas up to 1,000 square feet
b) Five samples from homogeneous areas between 1,000 and 5,000 square feet
c) Seven samples from homogeneous areas over 5,000 square feet
• Thermal System Insulation
a) Minimum of three samples per homogeneous sampling area
• Miscellaneous Material
a) Per the discretion of the inspector in a manner sufficient to determine asbestos content (usually 2 or more samples per homogeneous sampling area)
4.2 Sample Collection/Analytical Procedures
Samples for asbestos analysis were collected by EPA-trained inspectors. Proper safety measures such as wetting the material before sampling, cleaning up the area by wet-wiping any resulting residual debris, and wearing proper personal protective equipment, were employed. Coring tools and knives were utilized to be certain of sampling the entire thickness of a material. All samples were placed in appropriately labeled airtight containers for shipment to the laboratory.
4.3 Survey Access Limitations
All accessible areas within the facility were inspected for ACBM, including access panels to chases, areas above suspended ceilings, and crawl spaces. Any areas not inspected included non-accessible pipe chases, areas above plaster ceilings, areas above patient-care operations, secured areas, and areas occupied by patients where access could not be gained.
The areas not inspected, or where access could not be obtained, must be assumed to contain asbestos and be inspected prior to any renovation or maintenance activities.
4.4 Non-Asbestos-Containing Building Materials
The following materials were not sampled (per EPA) because they are not considered suspect asbestos-containing materials:
• Slate roofing shingles
• Brick materials
• Ceramic tiles
• Cinderblock and concrete
• Marble, travertine, and terrazzo
• Fiberglass insulating materials (yellow, white, and pink colored)
• Glass materials
• Rubber and synthetic materials including Styrofoam and isocyanates
• Wood materials
• Metal materials
4.5 List of Acronyms Used in Report
ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act EPA United States Environmental Protection Agency HazCom Hazard Communication MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NVLAP National Voluntary Laboratory Accreditation Program PLM Polarized Light Microscopy TSI Thermal Systems Insulation USFin USFin Development, LLC (Prime Contractor) VA United States Department of Veterans Affairs VAMC VA Medical Center
ASBESTOS BULK SAMPLING INFORMATION
Facility: MONTGOMERY VAMC Location: MONTGOMERY, AL Inspection Dates: FEBRUARY 2-3, 2015 Laboratory: EMSL ANALYTICAL - ANN ARBOR, MI Inspector: GRANT DICK Page 1 of 1
BUILDING SAMPLE
NUMBER
HOMOG.
AREA
SAMPLE LOCATION MATERIAL DESCRIPTION LABORATORY ANALYSIS
RESULT
8 8-1 H-5 1 st floor hallway/entry – Radiator Brown board behind radiator No Asbestos Detected
T-27 T27-1 H-6 South side of hut – window Window glazing No Asbestos Detected
T-27 T27-2 H-6 West side of hut – window Window glazing No Asbestos Detected
T-28 T28-1 H-6 South side of hut – window Window glazing No Asbestos Detected
T-28 T28-2 H-6 East side of hut – window Window glazing No Asbestos Detected
5.0 LABORATORY IDENTITY, CONTACT INFORMATION, AND LAB REPORTS
Laboratory: EMSL Analytical, Inc.
212 S. Wagner Road Ann Arbor, MI 48103 734-668-6810 www.EMSL.com
Accreditation: NVLAP Asbestos Bulk Accredited Laboratory
Accreditation Number: 101048-4
Expires: 6-30-15 http://www.emsl.com/
LABORATORY ANALYSIS REPORT
6.0 ACM DESCRIPTIONS AND INFORMATION
BUILDING SUMMARY: Building 1
Homog.
Area Asbestos Material Locations Quantity Condition Friability
H-1
Inaccessible pipe insulation
(steam & domestic water) behind plaster walls and above plaster ceilings
Ground through 6th Floor of Block A & B Unknown Good Friable
H-2 Pipe insulation (steam) 6A103 Penthouse Attic 55 lf
Good with minor damage
(open ends & seams)
Friable
6.0 Photographs of ACM Materials - Building 1
H-1 Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings
H-2 Pipe insulation (steam)
BUILDING SUMMARY: Building 4
Area Asbestos Material Locations Quantity Condition Friability
H-1
Inaccessible pipe insulation
(steam & domestic water) behind plaster walls and above plaster ceilings
Ground Floor Unknown Good Friable
6.0 Photographs of ACM Materials - Building 4
Inaccessible behind walls and above ceilings
BUILDING SUMMARY: Building 6
Area Asbestos Material Locations Quantity Condition Friability
H-1
Inaccessible pipe insulation
(steam & domestic water) behind plaster walls and above plaster ceilings
Basement and 1st Floors ~400 lf Good Friable
H-3
Steam pipe insulation underground in clay tile
(inaccessible)
Underground between buildings & in crawl space Unknown Good Friable
H-4 9" Vinyl floor tile and mastic 103 and 203 28 sf Good Non-Friable
6.0 Photographs of ACM Materials - Building 6
H-3 Steam pipe insulation underground in clay tile (inaccessible)
H-4 9" Vinyl floor tile and mastic
BUILDING SUMMARY: Building 7
Area Asbestos Material Locations Quantity Condition Friability
H-1
Inaccessible pipe insulation
(steam & domestic water) behind plaster walls and above plaster ceilings
Basement and 1st Floors ~400 lf Good Friable
H-3
Steam pipe insulation underground in clay tile
(inaccessible)
Underground between buildings & in crawl space
6.0 Photographs of ACM Materials - Building 7
BUILDING SUMMARY: Building 8
Area Asbestos Material Locations Quantity Condition Friability
H-1
Inaccessible pipe insulation
(steam & domestic water) behind plaster walls and above plaster ceilings
Basement and 1st Floors ~400 lf Good Friable
H-3
Steam pipe insulation underground in clay tile
(inaccessible)
Underground between buildings & in crawl space
6.0 Photographs of ACM Materials - Building 8
BUILDING SUMMARY: Building 13
Area Asbestos Material Locations Quantity Condition Friability
H-4 9" vinyl floor tile and mastic
(under newer 12" floor tile) 006A storage 160 sf Good Non-Friable
H-4 9" vinyl floor tile and mastic (under newer 12" floor tile)
BUILDING SUMMARY: Building 14
Area Asbestos Material Locations Quantity Condition Friability
H-4 9" vinyl floor tile and mastic Parts storage off W.
Mezzanine area 144 sf Good Non-Friable
H-4 9" vinyl floor tile and mastic
7.0 ACM RISK ASSESSMENT FORMS
AHERA RESPONSE ACTIONS BASED ON HAZARD RANKING
HAZARD
RANK
REMOVAL
PRIORITY
AHERA CATEGORY RESPONSE ACTION REQUIRED BY
AHERA
7 1 Significantly Damaged Evacuate or isolate the area if needed. Remove the ACBM (or enclose or encapsulate if sufficient to contain fibers).
Repair of TSI is allowed if feasible and safe. O&M required for all friable ACBM.
6 2 Damaged with Potential for Significant Damage
Evacuate or isolate the area if needed. Remove, enclose, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required for all friable ACBM.
5 3 Damaged with Potential for Damage
Remove, enclose, encapsulate, or repair to correct damage.
O&M required for all friable
ACBM.
4 4 Damaged Remove, enclose, encapsulate, or repair to correct damage.
O&M required for all friable
ACBM.
3 5 Potential for Significant Damage
Evacuate or isolate the area if needed. Remove, enclose, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required for all friable ACBM.
2 6 Potential for Damage O&M required for all friable
ACBM.
1 7 No Damage O&M required for all friable
ACBM.
Montgomery VAMC
Building 1
Asbestos Assessments and Cost Estimates
Homog.
Area Asbestos Material Locations
Sample
Number(s) Quantity AHERA Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
H-1
Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings
Ground through 6th
Floor of Block A & B HL943, 944, 946 Unknown 1
O&M; Remove at renovation or demolition 7 n/a $525,000
H-2 Pipe insulation (steam) 6A103 Penthouse Attic 55 lf 4 Repair damage; Continue O&M.
Remove at renovation or demolition 4 $1,000 $3,000
Asbestos Assessments and Cost Estimates
Homogeneous Area H-1 Homogeneous Area H-2
Asbestos Assessments and Cost Estimates
Homogeneous Area H-2 Homogeneous Area H-2
Building 4
Asbestos Assessments and Cost Estimates
Homog.
Area Asbestos Material Locations
Sample
Number(s) Quantity AHERA Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
H-1
Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings
Ground Floor Unknown 1 O&M; Remove at renovation or demolition 7 n/a $110,000
Building 6
Asbestos Assessments and Cost Estimates
Homog.
Area Asbestos Material Locations
Sample
Number(s) Quantity AHERA Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
H-1
Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings
Basement and 1st
Floors ~400 lf 1
O&M; Remove at renovation or demolition 7 n/a $8,000
H-3 Steam pipe insulation underground in clay tile
(inaccessible)
Underground between buildings & in crawl space
Unknown 1 O&M; Remove at renovation 7 n/a $15,000
H-4 9" Vinyl floor tile and mastic 103 and 203 28 sf 1 O&M; Remove at renovation 7 n/a $1,500
Building 6
Asbestos Assessments and Cost Estimates
Homogeneous Area H-3 Homogeneous Area H-4
Building 7
Asbestos Assessments and Cost Estimates
Homog.
Area Asbestos Material Locations
Sample
Number(s) Quantity AHERA Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
H-1
Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings
Basement and 1st
Floors ~400 lf 1
O&M; Remove at renovation or demolition 7 n/a $8,000
H-3 Steam pipe insulation underground in clay tile
(inaccessible)
Underground between buildings & in crawl space
Building 7
Asbestos Assessments and Cost Estimates
Homogeneous Area H-3
Building 8
Asbestos Assessments and Cost Estimates
Homog.
Area Asbestos Material Locations
Sample
Number(s) Quantity AHERA Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
H-1
Inaccessible pipe insulation (steam & domestic water) behind plaster walls and above plaster ceilings
Basement and 1st
Floors ~400 lf 1
O&M; Remove at renovation or demolition 7 n/a $8,000
H-3 Steam pipe insulation underground in clay tile
(inaccessible)
Underground between buildings & in crawl space
Building 8
Asbestos Assessments and Cost Estimates
Homogeneous Area H-3
Building 13
Asbestos Assessments and Cost Estimates
Homog.
Area Asbestos Material Locations
Sample
Number(s) Quantity AHERA Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
H-4 9" vinyl floor tile and mastic (under newer 12" floor tile) 006A storage HL925 160 sf 1 O&M; Remove at renovation 7 n/a $1,500
Building 13
Asbestos Assessments and Cost Estimates
Homogeneous Area H-4
Building 14
Asbestos Assessments and Cost Estimates
Homog.
Area Asbestos Material Locations
Sample
Number(s) Quantity AHERA Assessment Recommendation Removal Priority
Repair Cost
Estimate
Removal
Cost
Estimate
H-4 9" vinyl floor tile and mastic Parts storage off W.
Mezzanine area HL991 144 sf 1 O&M; Remove at renovation 7 n/a $1,400
Building 14
Asbestos Assessments and Cost Estimates
Homogeneous Area H-4
XXXXX
xxxxx hl949 hl950
KEY PLAN
N
O R
T H
CA
B
BLDG. 4
D
DENOTES LOCATION OF ROY F. WESTON SAMPLE
DENOTES NEGATIVE ASBESTOS SAMPLE
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES LOCATION OF BEM SAMPLE
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 1
SECOND FLOOR BLOCK "A"
2B-100
2B-102
2B-101
2A-107A
2A-132
2A-131A
2A-132A
2A-128
2A-130
2A-131
2A-131B
2A-128A
A
2A-133A
2A-133
2A-134A
2A-134
A A
2A-137
2A-136
2A-139
2A-127
2A-135
2A-138
2A-126
2A-125
2A-124
2A-126A
2A-124A
2A-122A
2A-122
2A-123
2A-121
2A-121B
2A-115A
2A-140
2A-141
2A-1422A-143
C2-4
C2-9
2A-112
S2-3 2A-109
2A-110
2A-111
2A-108
2A-115
2A-114
2A-113
2A-116
2A-117
S2-5
2A-115B
2A-120A
2A-120
2A-121A
2A-119A
2A-119 2A-118
2A-118A
E2-P2
2A-100B
2A-100A
C2-4
2A-100
S2-1
2A-100C
2A-100D
2A-100E
E2-P3
2A-101
2A-104
2A-103A
2A-107
C2-3
2A-104A
2A-105
2A-106
2A-102A
2A-103
2A-103B
2A-102
2A-106A
C2-1
E2-P1
2A-100F
E2-S2E2-S1
A A
2B-101A
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D4
BLDG 1
2ND FL
BLOCK A
1" = 40'-0" 1 D4
KEY PLAN
N O
R T
H
CA
B
BLDG. 4
D
DENOTES POSITIVE ASBESTOS SAMPLE BY ROY F. WESTON
DENOTES NEGATIVE ASBESTOS SAMPLE BY ROY F. WESTON
HL939
HL940
HL941
HL936
HL937
HL938
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 1
GROUND FLOOR BLOCK "A"
GA-128C
G A B
GA-128F
GA-128G
GA-128E
GA-130
GA-103
GA-104A
GA-111
GA-107GA-109
GA-131
STAIR
N0. 3
GA-124
GA-123
GA-125 GA-127
NO. 5
STAIR
GA-113
GA-118
CG-3
CG-6
CG-8
CG-4
GA-102
GA-100
EG-P3
EG-P1
EG-P2
GA-104
GA-101
GA-100A
GA-112
CG-1
GA-108
GA-111A
GA-110
GA-121
GA-115
GA-128
GA-128A
CG-5
GA-129
GA-117
GA-120
GA-122
GA-130A
GA-116
GA-119
GA-108A
CG-8A
CG-7
GA-114
GA-125A
CG-6A
CG-55
EG-S1 EG-S2
GA-106
N0. 1
STAIR
H-1
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D1
BLDG 1
GRND FL
BLOCK A
hl951
KEY PLAN
N O
R T
H
CA
B
BLDG. 4
D
DENOTES LOCATION OF ROY F. WESTON SAMPLE
DENOTES NEGATIVE ASBESTOS SAMPLE
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES LOCATION OF BEM SAMPLE
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 1
SECOND FLOOR BLOCK "B"
2B-102A
2B-142
2B-141
2B-140
2B-109
2B-104A
2B-104 2B-106
2B-138
C2-19
2B-138A 2B-136
2B-102B
2B-100
2B-102
2B-101A
2B-101
2B-103
2B-103A
2B-108
2B-107A
2B-104B
C2-10
2B-105 2B-107
S2-2
2B-111
2B-110
2B-115
2B-113
C2-13
2B-114A
2B-116
2B-117
2B-118
2B-145
2B-143 2B-144
2B-139
2B-146
2B-150
2B-137 2B-148
2B-135
2B-134
2B-152
2B-153
2B-147
2B-149
2B-151
2B-154
2B-1272B-131
C2-22
C2-11
2B-133
2B-112
2B-132 2B-130
2B-129
2B-114
S2-4 2B-120
2B-128
C2-14 2B-121
2B-126
2B-125
2B-123
2B-119
2B-122 2B-124
E2-P2
E2-P1
2A-100F
2C-103
2C-102
2C-100
2C-101
2B-109A
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D5
BLDG 1
2ND FL
BLOCK B
1 D5
GB-113A
N0. 2
CG-16
CG-15
GB-127
NO. 4
GB-106
CG-2
CG-13
GB-116A
CG-10
GB-110
GB-115
CG-9
GB-101GB-100
GB-126
GB-103
GB-116
GB-102 GB-104 GB-105
GB-118
GB-120
GB-121
GB-119
CG-11
GB-138
CG-18
GB-139
GB-117A
GB-133
GB-137
GB-117
GB-135
CG-20
CG-23
CG-22
GB-109
GB-114
GB-114A GB-111
GB-112
GB-113
CG-14
GB-107
GB-131
GB-128
GB-126A GB-126B
GB-127A
GB-127B
GB-128A
GB-130
GB-134
GB-136
GB-129
STAIR
STAIR
GB-122
GB-104A
GB-108
GB-126C
GB-140
KEY PLAN
N O
R T
H
CA
B
BLDG. 4
D
DENOTES POSITIVE ASBESTOS SAMPLE BY ROY F. WESTON
DENOTES NEGATIVE ASBESTOS SAMPLE BY ROY F. WESTON
HL931
HL935
HL934
HL933
HL932
HL942
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 1
GROUND FLOOR BLOCK "B"
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D2
BLDG 1
BLOCK B
hl947 hl943 hl944 hl946 hl948
TSI
KEY PLAN
N
O R
T H
CA
B
BLDG. 4
D
DENOTES LOCATION OF ROY F. WESTON SAMPLE
DENOTES NEGATIVE ASBESTOS SAMPLE
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES LOCATION OF BEM SAMPLE
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 1
FIRST FLOOR BLOCK "A"
1A-124F
1A-132A
1A-132
1A-130
1A-124E
1A-127
1A-127A
1A-127B
1A-124B
1A-124C
1A-124G
1A-124D
1A-124A
1A-124
1A-136A
1A-136
1A-134
1A-129
1A-131
1A-133A
1A-133
C
1A-135
1A-135A
1A-102
E1-S2E1-S1
C1-30
1A-101
1A-100
1A-118
1A-116
1A-126
1A-128
1A-125
C
S1-5
C1-6A
S1-3
1A-117
1A-115
C
1A-120
1A-119
1A-121
1A-119A
1A-122
1A-122A
1A-122B
1A-122C
1A-109
1A-110
1A-111
1A-1121A-114
1A-113
C1-4
1A-107
1A-108
S1-1
1A-108A
1A-103
1A-103A
E1-P3
1A-104
1B-100
1B-101
C
1A-105 1A-106
E1-P1
E1-P2
C1-1
C1-7
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D3
BLDG 1
1ST FL
BLOCK A
SMOKE WALL
FIRE WALL
CONCRETE PLATFORM
FIRE AND SMOKE WALL LEGEND
6A-103
6A-101
6A-102
S6-1
6A-100
E6-S1
C6-1
ATTIC SPACE
MECH SPACE
ATTIC
SPACE
STAIR
MECH SPACE
ELEVATOR
ELECTRICAL RM
ROOF
DN
H-2
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D9
BLDG 1
FL 6
FD
SMOKE WALL
FI RE WALL-2HR
FI RE WALL-1HR
FI RE AND SMOKE WALL LEG END
TOILET
TOILET
MALE
FEMALE
TOILET
MEDICATION
NOURISHMENT KITCHEN
STORAGE
TOILET
TOILET
TOILET
PIPE
CHASE
MALE /
FEMALE TOILET
MALE / FEMALE TOILET PIPE
CHASE
TOILETCHAPLAIN STORAGETOILETTOILET
EQUIP
CLOSET
TOILET
NURSING EQUIP
TOILET
NURSING SUPPLY
NURSING SUPPLY
MALE
FEMALE
TOILET
TOILET
NOURISHMENT STATION
EMS EQUIP
SUPPLIES
STORAGE
CORRIDOR CORRIDORCORRIDOR
ELEVATOR LOBBY
CORRIDOR
ELECTRICAL CLOSET
TOILET
TOILET
UPPER MECH AREA
TOILET
NURSING
CLASS
RM
2-BED
RM
SOILED UTILITYPHYSICIAN OFFICE
TOILET
4-BED
RM
2-BED
RM
2-BED
RM
1-BED
RM
NURSE MGR
NURSE STATION
ELEVATOR
CHAPEL
STORAGE
EXAM
HAC
NURSE MGR
MED RM
SOCIAL WORKER
STAIR
4-BED
RM
2-BED
RM
1-BED
RM
1-BED
RM
TOILET
CLEAN LINEN
ELECTRICAL CLOSET
OFFICE
STAIR
PASTORAL CARE
ELEVATOR
1-BED
RM
SOILED UTILITY
STAIR
CLEAN EQUIP
EQUIP
STORAGE
DAY RM
NURSING EQUIP
UTILITY
OFFICE
EXAM RM
ELEVATOR STAIR
EYE
CLINIC
EYE
CLINIC
TRIAGE
ELECTRICAL CLOSET
PHYSICIAN ASST
EXAM RM
TRIAGE
EXAM RM
PHYSICIAN OFFICE
ELEVATOR
CPE
SUPV
CHAPLAIN
EXAM RM
TOILET
EXAM RM
EXAM RM
EYE
CLINIC
WAITING RM
WAITING RM
TOILET
TOILET
EXAM RM
EXAM RM
EXAM RM
PHYSICIAN
OFFICE
EXAM RM
TOILET
WAITING RM
CPAP
CLINIC
TOILET
TOILET
TRIAGE
STAIR
EXAM RM
EXAM RM
EXAM RM
TOILET
SPD
STORAGE
ELECTRICAL CLOSET
ASST
CHIEF
PROTECTIVE
SVC
TRIAGE
TRIAGE
ELEVATOR
TOILET
NURSING EQUIP STORAGE
PYXIS
CLEAN UTILITY
TOILET
4-BED
RM
TOILET
4-BED
RM
TOILET
TOILET
1-BED
RM
TOILET
TOILET
2-BED
RM
2-BED
RM
1-BED
RM
1-BED
RM
2-BED
RM
TOILET
TOILET
CORRIDOR
CORRIDOR
HAC
STORAGE
IRM
TOILET
TOILETTOILET
3B-126A
3B-129
3B-101A
3A-129
3B-136A
3B-137
3B-112
3B-113
3B-117
3B-119A 3B-118A
3B-133A
3A-109A
3A-103A
3B-103 3B-109A
3B-104A3A-1013A-102A3A-104A
3A-136A
3A-114
3A-117
3A-118A
3B-131B
3B-121B
3B-114
3A-119A
3A-113
3A-141
3A-131B
3A-121B
C3-4 C3-10C3-3
C3-17
C3-1
3A-127
3A-126A
3A-121A
3C-100
3B-128A
C3-16
3A-139
3A-133
3B-1093B-105
3B-105A
3B-115
3A-120
3A-126
3A-131
3A-128
3B-102
C3-9
E3-P2
3A-100
3A-138
3A-136
3A-140
3A-108
3A-112
3A-116
S3-5
3A-118 3A-119
3A-115B
3A-115
3A-115A
3A-115C
3A-111
3A-110
3A-106
S3-1
3A-100A
E3-S2
3A-105 3A-109
S3-3
3A-135
3A-104
3A-102
3A-100C
3B-100
3B-101
3B-104
E3-P1 S3-2
3B-138
3B-135
3B-143
3B-127
3B-136
3B-139
3B-142
3B-141
3B-140
3B-133
3B-134
E3-P3
3A-100B
3B-125
3B-124A
3B-126
3B-128
3B-132
3B-131
3B-131A
3B-132A
3B-130
3B-124
3B-123
3B-121
3B-122
3B-122A
3B-119 3B-120
3B-121A
3B-120A
3B-116
S3-4
3B-118
3B-115B
3B-115A
3B-115C
3B-111
3B-110
3B-108 3B-106
3B-107
E3-S1
3A-105A
3A-107
3A-142 3A-143
3A-137
3A-134
3A-133A
3A-132
3A-132A
3A-131A
3A-130
3A-128A
3A-124A
3A-125
3A-124
3A-123
3A-122
3A-121
3A-122A
3A-120A
C3-11
3B-134A3A-134A
ROOF
FP
DESK
DN
DN
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D6
BLDG 1
3RD FL
D6
NOTE: H1 IN A & B BLOCKS IN WALLS & CEILING CHASES
SM OKE W ALL
FI R E W ALL-2HR
FI R E W ALL-1HR
FI R E AND SM OKE W ALL LEG END
MEDICATION
TOILET
STORAGE
TOILET
NOURISHMENT KITCHEN
TOILET
MEDICATION
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
EXIT NURSE
SOILED
LINEN
HAC
M/F
STAFF
TOILET
STAFF TOILET
TOILET
TOILET
M/F TOILETCLOSET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
NURSING
SUPPLY
NURSING
SUPPLY
PIPE CHASE
IRM
STORAGE
STORAGE
PHYSICIAN
OFFICE
OFFICE
PHYSICIAN
OFFICE
WAITING RM
CORRIDOR CORRIDOR
BREAK RM
ELECTRIC
CLOSET
EXIT
NURSE
CORRIDORCORRIDOR
CORRIDOR
R.O. / C&P
TEAM
ELEVATOR
LOBBY
STAIR
R.O. / C&P
TEAM
EXAM RM
STORAGE
OFFICE
EXAM RM
EXAM RM
TOILET
PHYSICIAN/EXAM
RM
SOCIAL
WORKER
TOILET
WOMEN'S VET
CO-ORDR
STORAGE
STAIR
C&P MGR
NURSE
STAFF
TOILET
SOCIAL
WORKER
STORAGE
ELECTRICAL
CLOSET
HAC
DIETICIAN
SUPPLY
RMSTAIR
EXAM RM
TOILET
EXAM RM
EXAM RM
EXAM RM
PHYSICIAN
OFFICE
WAITING RM
TOILET
GREEN TEAM
PHARMACY
TOILET
DIETICIAN
STORAGE
ELECTRICAL CLOSET
EXAM RMEXAM RM
IRM
AFGE
STORAGE
AFGE
LOCAL 503
EXAM RM
SOCIAL
WORKER
PHYSICIAN
OFFICE
ELECTRICAL
CLOSET
EMPLOYEE
KITCHEN
OFFICE
TOILET
GROUP RM GROUP RM
TOILET
PA/NURSE
PRACTITIONER
EXAM RM
EXAM RM
STAIR
EXAM RM
SOCIAL
WORKER
TOILET
ELEVATOR
ELEVATOR
ELEVATOR
C&P CHECK-IN
ELEVATORELEVATOR
PHYSICIAN
OFFICE
EEO MGRSOILED
UTILITY
STAIR
EXAM RM
TRIAGE
WAITING
RM
PHYSICIAN
EXAM RM
I.T. TRAINING
RM
TOILET
NURSE
PRACTITIONER
STAFF
PSYCHOLOGIST
TRIAGE
STAFF
PSYCHIATRIST
TOILET
STAFF
PSYCHOLOGIST
STAFF
PSYCHIATRIST
TOILET
NURSE
TOILET
NURSE
SOCIAL
WORKER
PATIENT
WAITING AREA
TOILET
TOILET
TOILET
NURSE PSTATION
OFFICE
ANTE
RM
TOILET
TOILET
TOILET
TOILET
4A-112
4A-104A
4A-101
4B-114
4B-113
4A-102A
4B-112
4B-119A
4B-120A
4B-121A
4B-122A
4B-126A
4B-131A
4B-142 4B-141
4B-140
4B-137
4B-136A
4B-134A
4B-133A
4B-1034A-141
4A-103A
4A-134A
4A-133A
4A-131A
4A-128A
4A-114
4B-131B
4A-113
4B-109A
4B-129
4B-121B
4B-104A
4A-109A
4A-129
4A-131B
4A-121B
4B-120
4B-136
4B-133
4B-119
C4-4 C4-11
4B-139
4B-127
4B-143
C4-10C4-3
C4-1
4A-100B
4A-103
C4-17
S4-1
4A-100A
4B-126
4B-109
4B-107A
4B-107
4B-128
4B-130
4B-128A
4B-131
4B-132
4B-132A
4B-116
4B-117
S4-4
4B-101
4B-101A
4A-136
4A-137
4A-139
4A-143
4A-127
4A-142
4A-140
4A-116
4A-117S4-5
4B-125
4B-124A
4B-124
4B-123
4B-122
4B-121
4B-118
4B-118A
4B-115B
4B-1154B-115C
4B-115A
4B-111
4B-110
4B-108
4B-1064B-104
4B-100
4A-100C
4A-102
4A-1044A-1064A-108
4A-110
4A-111
4A-115B
4A-115
4A-115A
4A-115C
4A-119 4A-118
4A-118A
4A-119A
4B-134
4B-135
4B-138
S4-2
4B-105 4B-102
4B-105A
E4-P1
E4-P2
E4-P3
4A-100
E4-S2E4-S1
4A-105
4A-105A
4A-107 4A-109
4A-107A
S4-3
4A-138
4A-135
4A-134
4A-133 4A-132
4A-132A
4A-131
4A-130
4A-128
4A-126
4A-126A
4A-125
4A-124
4A-124A
4A-123
4A-122A
4A-122
4A-121
4A-120
4A-121A
4A-120A
4A-136A
C4-9 C4-16
FP
FP
UP DN UP DN
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D7
BLDG 1
4TH FL
NOTE: H1 IN A & B BLOCKS IN WALL AND CEILING CHASES
SM OKE W ALL
FI R E W ALL
FI R E AND SM OKE W ALL LEG END
HR RESTROOM
HR
RESTROOM
HR RESTROOM
UTILITY
HR
STORAGE
STAIR
UTILITY
ATTIC
CORRIDOR
UTILITY
HR
OFFICE
HR
OFFICE
HR
OFFICE
HR
OFFICE
CORRIDOR
ELEVATOR
ELEVATOR
ELEVATOR
HR OFFICE
HR OFFICEHR OFFICE
HR OFFICE
ELEVATORELEVATOR
ELEVATOR LOBBY
STAIR
EQUIP RM
ATTIC
ATTIC
ATTIC
CORRIDOR
STAIR
HR
OFFICEHR OFFICE
FP
ROOF
ROOF
ROOF
ROOF
ROOF
ROOFROOF
ROOF
UP DN
5A-102
5A-101A
5A-110 5A-112
5A-106A
5A-117
5A-118
5B-101
5B-102
S5-2
5B-103
5B-100
C5-2
5A-111
5A-108
5A-107
5A-107A
5A-106
5A-105
C5-1
E5-P2
E5-P1
E5-P3
5A-104
5A-1035A-101
5A-100
E5-S2E5-S1
C5-5
S5-1
5A-109
5A-114
5A-115
5A-113
5A-116
C5-3
S5-3
5A-106B
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D8
BLDG 1
5TH FL
NOTE: H1 IN B BLOCK WALL AND CEILING CHASES
CROSSWALK
OPEN AREA FOR STAIRS
RETAINING WALL
UP
UP
RETAINING WALL
UP
CART WASH
LIFT
UP
UP
UP
UP
U P
EG-S4
RAMP
CHILLER PLANT
LOADING DOCK
OVER DOOR
STAIR NO. 2
CANOPY
EXTERIOR
CANOPY
GE-104
GE-104A
GE-104B
GE-117 GE-105A
GE-106
GE-107
SG-8
SG-9
GE-116
GE-101
GE-111 GE-115
GE-109
GE-113D
GE-102
GE-107A
GE-107B
GE-105
GE-103
GE-112
GE-114B
GE-120
GE-110B
GE-110AGE-110GE-108
GE-100
GE-119B
GE-119
GE-118
CG-59
GE-109A
GE-109B
CG-59A
GE-100A
CG-55
GE-119A
CG-56
CG-57A
CG-57
GE-103A
CG-58
GE-101A
GE-113
GE-113A GE-113B
GE-113E
CG-60
GE-114A
GE-114
24,878 SQUARE FEET
VCT MASTIC
15 LINEAR FEET
ASBESTOS PIPE
INSULATION
KEY PLAN
N O
R T
H
BLDG. 4
A B
D
C
DENOTES POSITIVE ASBESTOS SAMPLE BY ROY F. WESTON
DENOTES NEGATIVE ASBESTOS SAMPLE BY ROY F. WESTON
HL954
HL955
HL957
HL958
HL956
HL945
HL952
HL953
HL959
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 4
GROUND FLOOR
H-1
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D10
BLDG 4
SCALE: 1/4"=1'-0"
FIRST FLOOR PLAN - BLDG #8
SECOND FLOOR PLAN - BLDG #8
SCALE: 1/4"=1'-0"
B A S E M E N T
F L O O R
P L A N
B L D G
S C A L E
HAS
DSS
OFFICE
DSS
OFFICE
DSS
OFFICE
DSS
OFFICE
Office Police Security
TOILET
TOILET
HBPC OFFICE
108-A
HBPC OFFICE
HBPC OFFICE
Financial Management
PAYROLL
101-A
PAYROLL
104105
TOILET
TOILET
ROOF
ROOF
B-05
HRMS Storage
B-03B
Bathroom
B-05B
Bathroom
B-03
DSS Storage
B-01
Storage
B-04
Storage
B-06
Payroll
B-03A
B-05A
AHU
AHU
201-A 201-B208-A208-B
H-3
8-1
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D18
BLDG 8
hl961 hl960 hl962
XXXXX
KEY PLAN
N
O R
T H
BLDG. 4
A
D
B C
DENOTES LOCATION OF ROY F. WESTON SAMPLE
DENOTES LOCATION OF BEM SAMPLE
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES NEGATIVE ASBESTOS SAMPLE
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 4
FIRST FLOOR
BEM_NT_FS/CAD/DGN/ACTIVE/01-GSA-18-CSEF/WEST CAMPUS
1E-114D
1E-117C1E-115 EXTERIOR
STAIR NO. 2
1E-117A
1E-117B
1E-117
1E-118
CANOPY
CANOPY
OVER DOOR
1E-116
1E-114C
1E-114B
1E-114A
1E-114
1E-108I
1E-108J
1E-108G
1E-108H
1E-108E
1E-111 1E-112
1E-108D
C1-35
1E-108F
1E-108
S1-4
1E-108C1E-105
1E-104C
1E-104B
1E-104A
C1-34
1E-108A
1E-108B
S1-8
S1-9
1E-107
1E-104
E N
C
LO
S E
D W
A
LK
W A
Y
1E-103A
1E-103
E B
1E-101A
1E-101
1E-102
1E-109C
1E-113 1E-114E
CHILLER PLANT ROOF
1E-110D
CHILLER PLANT ROOF
1E-110
1E-110C
1E-110B
1E-110A
1E-109
1E-109D
1E-109B
1E-109A
EXTERIOR
STAIR NO. 1
C1-31
1E-106
OVER
CANOPY
WALKWAY
1E-106B
1E-106A
1E-100D
1E-100C
1E-100A1E-100B
1E-100
COVERED
WALKWAY
C1-33
C
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D11
BLDG 4
hl992 hl993 hl978 hl977 hl982 hl981 hl979 hl980 hl986 hl987 hl985 hl984 hl996 hl995 hl994 hl990 hl983 hl989 hl988 hl998 hl997 hl991
XXXXX
DENOTES NEGATIVE ASBESTOS SAMPLE
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES LOCATION OF BEM SAMPLE
DENOTES LOCATION OF ROY F. WESTON SAMPLE
GROUND FLOOR PLAN - BUILDING #14
EAST MEZZANINE
WEST MEZZANINE
EMERGENCY GENERATOR ROOM
SHOP AREA
BOILER #1 BOILER #2
B O
IL
E
R
OFFICE
LOCKER ROOM
GEAR ROOM
TRANSFORMER/SWITCH
PUMP ROOM
FEED WATER AREA
STORAGETOILET
PARTS
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 14
BEM_NT_FS/CAD/DGN/ACTIVE/01-GSA-18-CSEF/WEST CAMPUS
= Floor Tile
H-4
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D20
BLDG 14
D20
DENOTES LOCATION OF ROY F. WESTON SAMPLE
DENOTES LOCATION OF BEM SAMPLE
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES NEGATIVE ASBESTOS SAMPLE
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 6
BASEMENT
LEGEND
U P
B01 B02
SB-1
CRAWL SPACE
H-3
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D12
BLDG 6
BASEMENT
hl913 hl918 hl919 hl915
XXXXX
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES NEGATIVE ASBESTOS SAMPLE
DENOTES LOCATION OF BEM SAMPLE
DENOTES LOCATION OF ROY F. WESTON SAMPLE
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 6
FIRST FLOOR
LEGEND
D O W N
U P
106-C106-B104B
104A 106
106-A
D O W N
DOWN
DOWN
E1-P6
S1-1
D O
WN
D O
WN
H-4
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D13 hl914 hl912
XXXXX
DENOTES LOCATION OF ROY F. WESTON SAMPLE
DENOTES LOCATION OF BEM SAMPLE
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES NEGATIVE ASBESTOS SAMPLE
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 6
SECOND FLOOR
LEGEND
DOWN
204B
209 208B
206 207
204C
208A204A
S2-1
E2-P6
209A 209B
D O
WN
D O
WN
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D14
2ND FL
N
EW
B05
B06 B07B04
B04A
B03
B02
B08B09
B11 B10
B01
EB1
SCALE: 1/4"=1'-0"
BASEMENT FLOOR PLAN - BLDG #7
H-3
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D15
BLDG 7
BASEMENT
112A
100 101
103 104
110 111
E1P7
S11
SCALE: 1/4"=1'-0"
FIRST FLOOR PLAN - BLDG #7
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D16
SECOND FLOOR PLAN
215A
202 216
216A
206 205
209A
208210
210A
S2-1
E2-P7
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D17
2ND FL
hl927 hl930 hl928 hl926 hl929 hl925
XXXXX
DENOTES NEGATIVE ASBESTOS SAMPLE
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES LOCATION OF BEM SAMPLE
DENOTES LOCATION OF ROY F. WESTON SAMPLE
AIR CONDITIONING
SHOP REFRIGERATION AND
002B
CLOSET
LOCKER ROOM
002A
TOILET
003B
SMALL PARTS
003C
HAV
003A
STOCK ROOM
CARPENTRY
PLUMBING
005A
TRANSFORMER ROOM
006A
POWER ROOM
007A
TOILET
OFFICE
ELECTRIC SHOP
GARAGE
STORAGE
OFFICE
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 13
= Floor Tile
H-4
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D19
BLDG 13
hl992 hl993 hl978 hl977 hl982 hl981 hl979 hl980 hl986 hl987 hl985 hl984 hl996 hl995 hl994 hl990 hl983 hl989 hl988 hl998 hl997 hl991
XXXXX
DENOTES NEGATIVE ASBESTOS SAMPLE
DENOTES POSITIVE ASBESTOS SAMPLE
DENOTES LOCATION OF BEM SAMPLE
DENOTES LOCATION OF ROY F. WESTON SAMPLE
GROUND FLOOR PLAN - BUILDING #14
EAST MEZZANINE
WEST MEZZANINE
EMERGENCY GENERATOR ROOM
SHOP AREA
BOILER #1 BOILER #2
B O
IL
E
R
OFFICE
LOCKER ROOM
GEAR ROOM
TRANSFORMER/SWITCH
PUMP ROOM
FEED WATER AREA
STORAGETOILET
PARTS
LEGEND
CENTRAL ALABAMA VETERANS
HEALTH CARE SYSTEM
WEST CAMPUS, MONTGOMERY, AL
BUILDING 14
BEM_NT_FS/CAD/DGN/ACTIVE/01-GSA-18-CSEF/WEST CAMPUS
= Floor Tile
H-4
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
D20
BLDG 14
D20
Scale
Date
Drawn By
Checked By
Project Number
MONTGOMERY
VAMC
MONTGOMERY, AL
US DEPARTMENT OF
VETERANS AFFAIRS
2015 ASBESTOS
REINSPECTION
USFIN
DEVELOPMENT,
LLC
FEBRUARY 2015
NOT TO SCALE
photos photos