EHRM Infrastructure Upgrades - Montgomery Project Documentation

This is a comprehensive set of construction documents for the EHRM Infrastructure Upgrades project at Central Alabama Veterans Health Care System (CAVHS) West Campus in Montgomery, Alabama (Project #619-21-106). The project involves improving, reconfiguring, expanding, and renovating existing spaces across 11 buildings (01, 04, 05, 06, 07, 08, 12, 13, 14, 40, and 99) to accommodate new telecommunication rooms and construct a new data center. The design team includes SPEES Design Build as the architect/engineer of record, with WSP as the structural and RCDD consultant. The work is being performed for the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management. The documents consist of 407 sheets organized by discipline, including civil, structural, architectural, environmental, fire protection, plumbing, mechanical, electrical, and telecommunications systems.

The fire protection system for Building 99 (Data Center) includes fully sprinklered wet pipe systems with light hazard occupancies using FM-approved, standard response sprinklers; a pre-action clean agent gaseous suppression system interlocked with smoke detectors in the MCR; and a double-check detector backflow device on the fire riser. The plumbing system incorporates domestic cold and hot water supplies, sanitary sewer lines with minimum slopes of 1/4" per linear foot, vent through roof installations, roof drains with overflow capacity, and reduced-pressure backflow preventers. The project is at 100% Construction Documents phase as of October 24, 2025, with drawings issued for construction by SPEES Design Build and reviewed by the COR.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECTURAL

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

PHONE: (206) 590-2118

DESIGN TEAM

CIVIL

ELECTRICAL/OIT

SPEES DESIGN BUILD

MECHANICAL

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

PHONE: (206) 590-2118

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

PHONE: (206) 590-2118

RCDD

WSP

211 N BROADWAY, #2800

ST. LOUIS, MO, 63102

PHONE: (615) 571-8922

STRUCTURAL

WSP

211 N BROADWAY, #2800

ST. LOUIS, MO, 63102

PHONE: (615) 571-8922

WSP

211 N BROADWAY, #2800

ST. LOUIS, MO, 63102

PHONE: (615) 571-8922

PROJECT INFORMATION

STATE:

COUNTY:

JURISDICTION:

OWNER:

CODE ANALYSIS

PROJECT DESCRIPTION

THE PROPOSED DESIGN SHALL IMPROVE,

RECONFIGURE, EXPAND, AND RENOVATE

EXISTING SPACES FOR NEW

TELECOMMUNICATION ROOMS, AND THE

CONSTRUCTION OF NEW DATA CENTER.

APPLICABLE BUILDINGS:

01, 04, 05, 06, 07, 08, 12, 13, 14, 40, 99 (DATA CENTER)

ICRA CLASS REQUIREMENTS

REQUIREMENTS DEPENDANT ON

EACH INDIVIDUAL ROOM LOCATION.

ALABAMA

MONTGOMERY

MONTGOMERY

GOV, VETERANS AFFAIRS

BUILDING TYPE

BUILDING 01 - MEDICAL

BUILDING 04 - MEDICAL

BUILDING 05 - NON-MEDICAL

BUILDING 06 - NON-MEDICAL

BUILDING 07 - NON-MEDICAL

BUILDING 08 - NON-MEDICAL

BUILDING 12 - NON-MEDICAL

BUILDING 13 - NON-MEDICAL

BUILDING 14 - NON-MEDICAL

BUILDING 40 - MEDICAL

BUILDING 99 - NON-MEDICAL

SIGNATURE LINE

COR

BUILDINGS WITHIN THE SCOPE OF THIS PROJECT

CENTRAL ALABAMA VETERANS HEALTH CARE SYSTEM (CAVHS) WEST CAMPUS - MONTGOMERY, AL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/1 /2

:5

:2 a m

B

IM

/6

-2

-1 a

V A

M o n tg o m e ry

E H

R M

/V A

M Y

G

E N

S H

E E

T S

S

D B

.r v t

G-001

COVER SHEET

JG/JS JS

100% CONSTRUCTION

DOCUMENTS

10/24/2025

619-21-106EHRM INFRASTRUCTURE

UPGRADES - MONTGOMERY

VA AL - CENTRAL ALABAMA (WEST CAMPUS)

215 PERRY HILL ROAD, MONTGOMERY, AL 36109

EHRM INFRASTRUCTURE UPGRADES - MONTGOMERY

CENTRAL ALABAMA VETERANS HEALTH CARE SYSTEM (CAVHS) WEST CAMPUS

215 PERRY HILL ROAD MONTGOMERY, AL 36109-3798

PROJECT #: 619-21-106

NOT TO SCALE

LOCATION MAP

TRUE

NORTH

1" = 160'-0"

VICINITY PLAN

PROJECT

NORTH

CENTRAL ALABAMA VETERANS HEALTH CARE SYSTEM (CAVHS)

- MONTGOMERY, AL

Revisions: Date:

JG/JS

DRAWING INDEX

PAGE # SHEET # SHEET NAME

GENERAL

1 OF 407 G-001 COVER SHEET

2 OF 407 G-002 DRAWING INDEX

CIVIL

3 OF 407 C-001 CIVIL SHEET INDEX AND GENERAL NOTES

4 OF 407 C-002 GENERAL NOTES AND LEGEND

5 OF 407 CD200 MCR BUILDING DEMOLITION PLAN

6 OF 407 CS100 OVERALL CIVIL SITE PLAN

7 OF 407 CS200 MCR BUILDING SITE PLAN

8 OF 407 CS201 MCR BUILDING HORIZONTAL CONTROL PLAN

9 OF 407 CG100 OVERALL EROSION CONTROL PLAN

10 OF 407 CG101 EROSION CONTROL GENERAL NOTES AND DETAILS

11 OF 407 CG200 MCR BUILDING EROSION CONTROL PLAN

12 OF 407 CG201 MCR BUILDING GRADING AND DRAINAGE PLAN

13 OF 407 CG202 MCR BUILDING STORMWATER BMP PLAN

14 OF 407 CU200 MCR BUILDING UTILITY PLAN

15 OF 407 CU250 CIVIL UTILITY CONSTRUCTION DETAILS

16 OF 407 CU300 OVERALL FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

17 OF 407 CU301 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

18 OF 407 CU302 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

19 OF 407 CU303 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

20 OF 407 CU304 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

21 OF 407 CU500 COMMUNICATION DUCTBANK DETAILS

22 OF 407 CU501 COMMUNICATION TRENCHING DETAILS

23 OF 407 CU502 BUILDING CONNECTION DETAILS

STRUCTURAL

24 OF 407 S-001 STRUCTURAL GENERAL NOTES

25 OF 407 S-002 STRUCTURAL GENERAL NOTES

26 OF 407 S-003 ABRREVIATIONS AND SYMBOLS

27 OF 407 S-101 FOUNDATION PLAN

28 OF 407 S-111 ROOF PLAN

29 OF 407 S-201 STRUCTURAL WALL ELEVATIONS

30 OF 407 S-202 STRUCTURAL WALL ELEVATIONS

31 OF 407 S-501 TYPICAL CONCRETE DETAILS

32 OF 407 S-502 CONCRETE FOUNDATION DETAILS

33 OF 407 S-511 TYPICAL STRUCTURAL STEEL DETAILS

34 OF 407 S-512 TYPICAL STRUCTURAL STEEL DETAILS

35 OF 407 S-531 TYPICAL CMU WALL DETAILS

36 OF 407 S-532 TYPICAL CMU WALL DETAILS

37 OF 407 S-541 MECHANICAL ANCHORAGE DETAILS

38 OF 407 S-542 TYPICAL DETAILS-CABINET TO CFS FRAMED WALL

39 OF 407 S-543 TYPICAL DETAILS-CABINET TO WOOD FRAMED WALL

40 OF 407 S-544 TYPICAL DETAILS-CABINET TO CONCRETE AND CMU WALL

41 OF 407 S-545 TYPICAL PENETRATIONS IN EXISTING STRUCTURE

ENVIRONMENTAL

42 OF 407 001HA100 BLDG 01 - LVL 00G - ABATEMENT DRAWINGS

43 OF 407 001HA101 BLDG 01 - LVL 01 - ABATEMENT DRAWINGS

44 OF 407 001HA102 BLDG 01 - LVL 02 - ABATEMENT DRAWINGS

45 OF 407 001HA103 BLDG 01 - LVL 03 - ABATEMENT DRAWINGS

46 OF 407 001HA104 BLDG 01 - LVL 04 - ABATEMENT DRAWINGS

47 OF 407 001HA105 BLDG 01 - LVL 05 - ABATEMENT DRAWINGS

48 OF 407 004HA100 BLDG 04 - LVL 00 - ABATEMENT DRAWINGS

49 OF 407 004HA101 BLDG 04 - LVL 01 - ABATEMENT DRAWINGS

50 OF 407 005HA100 BLDG 05 - LVL 01 - ABATEMENT DRAWINGS

51 OF 407 006HA100 BLDG 06 - LVL 01 - ABATEMENT DRAWINGS

52 OF 407 007HA100 BLDG 07 - LVL 01 - ABATEMENT DRAWINGS

53 OF 407 008HA100 BLDG 08 - LVL 01 - ABATEMENT DRAWINGS

54 OF 407 012HA100 BLDG 12 - LVL 01 - ABATEMENT DRAWINGS

55 OF 407 013HA100 BLDG 13 - LVL 1 - ABATEMENT DRAWINGS

56 OF 407 014HA100 BLDG 14 - LVL 00 - ABATEMENT DRAWINGS

57 OF 407 040HA100 BLDG 40 - LVL 00 - ABATEMENT DRAWINGS

ARCHITECTURAL

58 OF 407 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS

59 OF 407 AS101 ICRA DETAILS

60 OF 407 AS102 ICRA STANDARDS

61 OF 407 01AS100B BLDG 01 -LVL 00B -PHASING PLAN

62 OF 407 01A-100G BLDG 01 -LVL 00G -ARCHITECTURAL PLAN

63 OF 407 01AS100G BLDG 01 -LVL 00G -PHASING PLAN

64 OF 407 01A-400Ga BLDG 01 -LVL 00G -DEMO, FLOOR PLANS & RCPS

65 OF 407 01A-400Gb BLDG 01 -LVL 00G -DEMO, FLOOR PLANS & RCPS

66 OF 407 01A-101 BLDG 01 -LVL 01 -ARCHITECTURAL PLAN

67 OF 407 01AS101 BLDG 01 -LVL 01 -PHASING PLAN

68 OF 407 01A-401a BLDG 01 -LVL 01 -DEMO, FLOOR PLANS & RCPS

69 OF 407 01A-401b BLDG 01 -LVL 01 -DEMO, FLOOR PLANS & RCPS

70 OF 407 01A-102 BLDG 01 -LVL 02 -ARCHITECTURAL PLAN

71 OF 407 01AS102 BLDG 01 -LVL 02 -PHASING PLAN

72 OF 407 01A-402a BLDG 01 -LVL 02 -DEMO, FLOOR PLANS & RCPS

73 OF 407 01A-402b BLDG 01 -LVL 02 -DEMO, FLOOR PLANS & RCPS

74 OF 407 01A-103 BLDG 01 -LVL 03 -ARCHITECTURAL PLAN

75 OF 407 01AS103 BLDG 01 -LVL 03 -PHASING PLAN

76 OF 407 01A-403a BLDG 01 -LVL 03 -DEMO, FLOOR PLANS & RCPS

77 OF 407 01A-403b BLDG 01 -LVL 03 -DEMO, FLOOR PLANS & RCPS

78 OF 407 01A-104 BLDG 01 -LVL 04 -ARCHITECTURAL PLAN

79 OF 407 01AS104 BLDG 01 -LVL 04 -PHASING PLAN

80 OF 407 01A-404a BLDG 01 -LVL 04 -DEMO, FLOOR PLANS & RCPS

81 OF 407 01A-404b BLDG 01 -LVL 04 -DEMO, FLOOR PLANS & RCPS

82 OF 407 01A-105 BLDG 01 -LVL 05 -ARCHITECTURAL PLAN

83 OF 407 01AS105 BLDG 01 -LVL 05 -PHASING PLAN

84 OF 407 01A-405 BLDG 01 -LVL 05 -DEMO, FLOOR PLANS & RCPS

85 OF 407 01AS106 BLDG 01 -LVL 06 -PHASING PLAN

86 OF 407 04A-100 BLDG 04 -LVL 00 -ARCHITECTURAL PLAN

87 OF 407 04AS100 BLDG 04 -LVL 00 -PHASING PLAN

88 OF 407 04A-400a BLDG 04 -LVL 00 -DEMO, FLOOR PLAN & RCP

89 OF 407 04A-400b BLDG 04 -LVL 00 -DEMO, FLOOR PLAN & RCP

90 OF 407 04A-101 BLDG 04 -LVL 01 -ARCHITECTURAL PLAN

91 OF 407 04AS101 BLDG 04 -LVL 01 -PHASING PLAN

92 OF 407 04A-401 BLDG 04 -LVL 01 -DEMO, FLOOR PLANS & RCPS

93 OF 407 05A-101 BLDG 05 -LVL 01 -ARCHITECTURAL PLAN

94 OF 407 05AS101 BLDG 05 -LVL 01 -PHASING PLAN

95 OF 407 05A-401 BLDG 05 -LVL 01 -DEMO, FLOOR PLANS & RCPS

96 OF 407 06AS100 BLDG 06 -LVL 00 -PHASING PLAN

97 OF 407 06A-101 BLDG 06 -LVL 01 -ARCHITECTURAL PLAN

98 OF 407 06AS101 BLDG 06 -LVL 01 -PHASING PLAN

99 OF 407 06A-401 BLDG 06 -LVL 01 -DEMO, FLOOR PLANS AND RCPS

100 OF 407 06AS102 BLDG 06 -LVL 02 -PHASING PLAN

101 OF 407 07AS100 BLDG 07 -LVL 00 -PHASING PLAN

102 OF 407 07A-101 BLDG 07 -LVL 01-ARCHITECTURAL PLAN

103 OF 407 07AS101 BLDG 07 -LVL 01 -PHASING PLAN

104 OF 407 07A-401 BLDG 07 -LVL 01 -DEMO, FLOOR PLANS & RCPS

105 OF 407 07AS102 BLDG 07 -LVL 02 -PHASING PLAN

106 OF 407 08AS100 BLDG 08 -LVL 00 -PHASING PLAN

107 OF 407 08A-101 BLDG 08 -LVL 01 -ARCHITECTURAL PLAN

108 OF 407 08AS101 BLDG 08 -LVL 01 -PHASING PLAN

109 OF 407 08A-401 BLDG 08 -LVL 01 -DEMO, FLOOR PLANS & RCPS

110 OF 407 08AS102 BLDG 08 -LVL 02 -PHASING PLAN

111 OF 407 12A-101 BLDG 12 -LVL 01 -ARCHITECTURAL PLAN

112 OF 407 12AS101 BLDG 12 -LVL 01 -PHASING PLAN

113 OF 407 12A-401 BLDG 12 -LVL 01 -DEMO, FLOOR PLANS & RCPS

114 OF 407 13A-101 BLDG 13 -LVL 1 -ARCHITECTURAL PLAN

115 OF 407 13AS101 BLDG 13 -LVL 01 -PHASING PLAN

116 OF 407 13A-401 BLDG 13 -LVL 01 -DEMO, FLOOR PLANS & RCPS

117 OF 407 14AS100 BLDG 14 -LVL 00 -PHASING PLAN

118 OF 407 14A-101 BLDG 14 -LVL 01 -ARCHITECTURAL PLAN

119 OF 407 14AS101 BLDG 14 -LVL 01 -PHASING PLAN

120 OF 407 14A-401 BLDG 14 -LVL 01 -DEMO, FLOOR PLANS & RCPS

121 OF 407 40A-100 BLDG 40 -LVL 00 -ARCHITECTURAL PLAN

122 OF 407 40AS100 BLDG 40 -LVL 00 -PHASING PLAN

123 OF 407 40A-400 BLDG 40 -LVL 00 -DEMO, FLOOR PLANS & RCPS

124 OF 407 A-101 BLDG 99 -FLOOR PLAN

125 OF 407 A-102 BLDG 99 -FIRE LIFE SAFETY PLAN

126 OF 407 A-103 BLDG 99 -ROOF PLAN

127 OF 407 A-104 BLDG 99 -RCP

128 OF 407 A-605 BLDG 99 -EXTERIOR DETAILS

129 OF 407 A-606 BLDG 99 -INTERIOR DETAILS AND ELEVATIONS AND EQUIPMENT SCHEDULE

130 OF 407 AE201 BLDG 99 -ELEVATIONS

131 OF 407 AE202 BLDG 99 -ELEVATIONS

132 OF 407 AE301 BLDG 99 -BUILDING SECTIONS

133 OF 407 AE401 BLDG 99 -WALL SECTIONS

134 OF 407 A-601 ROOM FINISH SCHEDULE

135 OF 407 A-602 DOOR DETAILS

136 OF 407 A-603 DETAILS

137 OF 407 A-604 DETAILS

138 OF 407 AE421 ELEVATIONS, TYPICAL DETAILS & TR WALL PLAN VIEW

139 OF 407 AW001 SIGNAGE MESSAGE SCHEDULE

140 OF 407 AW002 SIGNAGE LOCATION PLAN & DETAILS

FIRE PROTECTION

141 OF 407 FX001 FIRE PROTECTION GENERAL NOTES, ABBREVIATION & LEGENDS

142 OF 407 099-FX101 BUILDING -099 -LEVEL -01 -FIRE PROTECTION PLAN

143 OF 407 FX501 FIRE PROTECTION DETAILS & SCHEDULE

PLUMBING

144 OF 407 P-001 PLUMBING GENERAL NOTES

145 OF 407 P-002 PLUMBING GENERAL NOTES, ABBREVIATIONS & LEGENDS

146 OF 407 099-P-101 BUILDING -099 -FOUNDATION -PLUMBING PLAN

147 OF 407 099-P-102 BUILDING -099 -LEVEL -01 -PLUMBING PLAN

148 OF 407 099-P-103 BUILDING -099 -ROOF -PLUMBING PLAN

149 OF 407 P-501 PLUMBING DETAILS

MECHANICAL

150 OF 407 M-001 MECHANICAL GENERAL NOTES

151 OF 407 M-002 MECHANICAL ABBREVIATION & LEGENDS

152 OF 407 001-M-101 BUILDING -001 -LEVEL -00 -MECHANICAL OVERALL PLAN

153 OF 407 001-M-102 BUILDING -001 -LEVEL -01 -MECHANICAL OVERALL PLAN

154 OF 407 001-M-103 BUILDING -001 -LEVEL -02 -MECHANICAL OVERALL PLAN

155 OF 407 001-M-104 BUILDING -001 -LEVEL -03 -MECHANICAL OVERALL PLAN

156 OF 407 001-M-105 BUILDING -001 -LEVEL -04 -MECHANICAL OVERALL PLAN

157 OF 407 001-M-106 BUILDING -001 -LEVEL -05 -MECHANICAL OVERALL PLAN

158 OF 407 001-M-107 BUILDING -001 -LEVEL -06 -MECHANICAL OVERALL PLAN

159 OF 407 001-M-108 BUILDING -001 -LEVEL -07 -MECHANICAL OVERALL PLAN

160 OF 407 001-M-401 BUILDING -001 -LEVEL -00 -DEMOLITION, FLOOR PLANS & RCPS

161 OF 407 001-M-402 BUILDING -001 -LEVEL -00 -DEMOLITION, FLOOR PLANS & RCPS

162 OF 407 001-M-403 BUILDING -001 -LEVEL -00 -PARTIAL FLOOR PLAN

163 OF 407 001-M-404 BUILDING -001 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

164 OF 407 001-M-405 BUILDING -001 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

165 OF 407 001-M-406 BUILDING -001 -LEVEL -02 -DEMOLITION, FLOOR PLANS & RCPS

166 OF 407 001-M-407 BUILDING -001 -LEVEL -02 -DEMOLITION, FLOOR PLANS & RCPS

167 OF 407 001-M-408 BUILDING -001 -LEVEL -03 -DEMOLITION, FLOOR PLANS & RCPS

168 OF 407 001-M-409 BUILDING -001 -LEVEL -03 -DEMOLITION, FLOOR PLANS & RCPS

169 OF 407 001-M-410 BUILDING -001 -LEVEL -04 -DEMOLITION, FLOOR PLANS & RCPS

170 OF 407 001-M-411 BUILDING -001 -LEVEL -04 -DEMOLITION, FLOOR PLANS & RCPS

171 OF 407 001-M-412 BUILDING -001 -LEVEL -05 -DEMOLITION, FLOOR PLANS & RCPS

172 OF 407 001-M-413 BUILDING -001 -LEVEL -06 -FLOOR PLAN

173 OF 407 001-M-414 BUILDING -001 -LEVEL -07 -ROOF PLAN

174 OF 407 004-M-101 BUILDING -004 -LEVEL -00 -OVERALL PLAN

175 OF 407 004-M-102 BUILDING -004 -LEVEL -01 -OVERALL PLAN

176 OF 407 004-M-401 BUILDING -004 -LEVEL -00 -DEMOLITION & FLOOR PLANS

177 OF 407 004-M-402 BUILDING -004 -LEVEL -00 -DEMOLITION & RCPS

178 OF 407 004-M-403 BUILDING -004 -LEVEL -00 -FLOOR PLAN

179 OF 407 004-M-404 BUILDING -004 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

180 OF 407 005-M-101 BUILDING -005 -LEVEL -01 -OVERALL PLAN

181 OF 407 005-M-401 BUILDING -005 -LEVEL -01 -DEMOLITION & FLOOR PLANS

182 OF 407 006-M-101 BUILDING -006 -LEVEL -01 -OVERALL PLAN

183 OF 407 006-M-401 BUILDING -006 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

184 OF 407 007-M-101 BUILDING -007 -LEVEL -01 -OVERALL PLAN

185 OF 407 007-M-401 BUILDING -007 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

186 OF 407 008-M-101 BUILDING -008 -LEVEL -01 -OVERALL PLAN

187 OF 407 008-M-401 BUILDING -008 -LEVEL -01 -DEMOLITION & FLOOR PLANS

188 OF 407 012-M-101 BUILDING -012 -LEVEL -01 -OVERALL PLAN

189 OF 407 012-M-401 BUILDING -012 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

190 OF 407 013-M-101 BUILDING -013 -LEVEL -01 -OVERALL PLAN

191 OF 407 013-M-401 BUILDING -013 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

192 OF 407 040-M-101 BUILDING -040 -LEVEL -00 -OVERALL PLAN

193 OF 407 040-M-401 BUILDING -040 -LEVEL -00 -DEMOLITION, FLOOR PLANS & RCPS

194 OF 407 099-MH101 BUILDING -099 -LEVEL -01 -HVAC DUCT PLAN

195 OF 407 099-MH102 BUILDING -099 -LEVEL -01 -HVAC RCP

196 OF 407 099-MH103 BUILDING -099 -ROOF -HVAC PLAN

197 OF 407 099-MP101 BUILDING -099 -LEVEL -01 -HVAC PIPING PLAN

198 OF 407 099-M-301 DATA CENTER -SECTION VIEW

199 OF 407 099-M-302 DATA CENTER -SECTION VIEW

200 OF 407 099-M-303 GENERATOR BUILDING -SECTION VIEW

201 OF 407 M-501 MECHANICAL DETAILS I

202 OF 407 M-502 MECHANICAL DETAILS II

203 OF 407 M-601 MECHANICAL SCHEDULES I

204 OF 407 M-602 MECHANICAL SCHEDULES II

205 OF 407 M-603 MECHANICAL SCHEDULES II

206 OF 407 M-701 MECHANICAL CONTROLS I

207 OF 407 M-702 MECHANICAL CONTROLS II

208 OF 407 M-703 MECHANICAL CONTROLS III

209 OF 407 M-704 MECHANICAL CONTROLS IV

210 OF 407 M-705 MECHANICAL CONTROLS V

211 OF 407 M-706 MECHANICAL CONTROLS VI

212 OF 407 M-800 DATA CENTER - PRESSURE MAP PLAN

ELECTRICAL

213 OF 407 EG001 ABBREVIATIONS, GENERAL NOTES

214 OF 407 EG002 ELECTRICAL LEGENDS

215 OF 407 ES001 ELECTRICAL FACILITY SITE PLAN

216 OF 407 ES002 ENLARGED SITE -ELECTRICAL PLAN -EXISTING

217 OF 407 ES003 ENLARGED SITE -ELECTRICAL PLAN -REVISED

218 OF 407 01EP100 BLDG 01 -LEVEL 00 -ELECTRICAL PLAN

219 OF 407 01EP101 BLDG 01 -LEVEL 01 -ELECTRICAL PLAN

220 OF 407 01EP102 BLDG 01 -LEVEL 02 -ELECTRICAL PLAN

221 OF 407 01EP103 BLDG 01 -LEVEL 03 -ELECTRICAL PLAN

222 OF 407 01EP104 BLDG 01 -LEVEL 04 -ELECTRICAL PLAN

223 OF 407 01EP106 BLDG 01 -LEVEL 06 -ELECTRICAL PLAN

224 OF 407 01EP107 BLDG 01 -LEVEL 07-ELECTRICAL PLAN

225 OF 407 04EP100 BLDG 04 -LEVEL 00 -ELECTRICAL PLAN

226 OF 407 05EP101 BLDG 05 -LEVEL 01 -ELECTRICAL PLAN

227 OF 407 06EP100 BLDG 06 -LEVEL 00 -ELECTRICAL PLAN

228 OF 407 07EP100 BLDG 07 -LEVEL -00 -ELECTRICAL PLAN

229 OF 407 07EP101 BLDG 07 -LEVEL -01 -ELECTRICAL PLAN

230 OF 407 08EP100 BLDG 08 -LEVEL -00 -ELECTRICAL PLAN

231 OF 407 12EP100 BLDG 12 -LEVEL 00 -ELECTRICAL PLAN

232 OF 407 13EP100 BLDG 13 -LEVEL 00 -ELECTRICAL PLAN

233 OF 407 14EP100 BLDG 14 -LEVEL 00 -ELECTRICAL PLAN

234 OF 407 40EP100 BLDG 40 -LEVEL 00 -ELECTRICAL PLAN

235 OF 407 99EL101 DATA CENTER -LIGHTING PLAN

236 OF 407 99EP101 DATA CENTER -POWER PLAN

237 OF 407 99EP102 DATA CENTER -POWER PLAN -MECHANICAL EQUIPMENT

238 OF 407 99EP103 DATA CENTER -POWER PLAN -RECEPTACLE

239 OF 407 99EG101 DATA CENTER -GROUNDING PLAN

240 OF 407 99EG102 DATA CENTER -GROUNDING PLAN -LIGHTNING PROTECTION

241 OF 407 99EF101 DATA CENTER -FIRE ALARM SYSTEM PLAN

242 OF 407 99EP201 DATA CENTER -EXTERIOR ELEVATION PLANS

243 OF 407 99EP202 DATA CENTER -EXTERIOR ELEVATION PLANS

244 OF 407 01EP400a BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS

245 OF 407 01EP400b BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS

246 OF 407 01EP400c BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS

247 OF 407 01EP400d BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS

248 OF 407 01EP400e BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS

249 OF 407 01EP401a BLDG 01 -LEVEL -01 -ENLARGED ELECTRICAL PLANS

250 OF 407 01EP401b BLDG 01 -LEVEL -01 -ENLARGED ELECTRICAL PLANS

251 OF 407 01EP402a BLDG 01 -LEVEL -02 -ENLARGED ELECTRICAL PLANS

252 OF 407 01EP402b BLDG 01 -LEVEL -02 -ENLARGED ELECTRICAL PLANS

253 OF 407 01EP403a BLDG 01 -LEVEL -03 -ENLARGED ELECTRICAL PLANS

254 OF 407 01EP403b BLDG 01 -LEVEL -03 -ENLARGED ELECTRICAL PLANS

255 OF 407 01EP404a BLDG 01 -LEVEL -04 -ENLARGED ELECTRICAL PLANS

256 OF 407 01EP404b BLDG 01 -LEVEL -04 -ENLARGED ELECTRICAL PLANS

257 OF 407 01EP405 BLDG 01 -LEVEL -05 -ENLARGED ELECTRICAL PLANS

258 OF 407 04EP400a BLDG 04 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

259 OF 407 04EP400b BLDG 04 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

260 OF 407 04EP400c BLDG 04 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

261 OF 407 04EP401 BLDG 04 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

262 OF 407 05EP401 BLDG 05 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

263 OF 407 06EP401 BLDG 06 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

264 OF 407 07EP401 BLDG 07 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

265 OF 407 08EP401 BLDG 08 -LEVEL -01 -ENLARGED ELECTRICAL PLANS

266 OF 407 12EP400 BLDG 12 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

267 OF 407 13EP400 BLDG 13 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

268 OF 407 14EP401 BLDG 14 -LVL 01 -ENLARGED ELECTRICAL PLAN

269 OF 407 40EP400 BLDG 40 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

270 OF 407 EP501 ELECTRICAL DETAILS

271 OF 407 EP502 ELECTRICAL DETAILS

272 OF 407 EP503 ELECTRICAL DETAILS

273 OF 407 EP504 ELECTRICAL DETAILS

274 OF 407 EP505 ELECTRICAL DETAILS

275 OF 407 EP506 ELECTRICAL DETAILS

276 OF 407 EP507 ELECTRICAL DETAILS

277 OF 407 EP508 ELECTRICAL DETAILS

278 OF 407 EP509 ELECTRICAL DETAILS

279 OF 407 EP510 ELECTRICAL DETAILS

280 OF 407 EP511 ELECTRICAL DETAILS

281 OF 407 EP512 ELECTRICAL DETAILS

282 OF 407 EF601 FIRE ALARM SYSTEMS RISER DIAGRAM AND MATRICES

283 OF 407 EG601 TELECOMMUNICATIONS BONDING RISER DIAGRAM

284 OF 407 00EP601 MEDIUM VOLTAGE -ONE-LINE DIAGRAM -EXISTING

285 OF 407 00EP611 MEDIUM VOLTAGE -ONE-LINE DIAGRAM -REVISED

286 OF 407 01EP601 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 2 -EXISTING

287 OF 407 01EP602 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 2 -EXISTING

288 OF 407 01EP611 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 2 -REVISED

289 OF 407 01EP612 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 2 -REVISED

290 OF 407 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING

291 OF 407 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED

292 OF 407 05EP601 BLDG 05 -ONE-LINE DIAGRAM

293 OF 407 06EP601 BLDG 06 -ONE-LINE DIAGRAMS

294 OF 407 07EP601 BLDG 07 -ONE-LINE DIAGRAMS

295 OF 407 08EP601 BLDG 08 -ONE-LINE DIAGRAM

296 OF 407 12EP601 BLDG 12 -ONE-LINE DIAGRAMS

297 OF 407 13EP601 BLDG 13 -ONE-LINE DIAGRAM -EXISTING

298 OF 407 13EP611 BLDG 13 -ONE-LINE DIAGRAM -REVISED

299 OF 407 14EP601 BLDG 14 -ONE-LINE DIAGRAMS

300 OF 407 40EP601 BLDG 40 -ONE-LINE DIAGRAMS

301 OF 407 99EP601 DATA CENTER -ONE-LINE DIAGRAM

302 OF 407 EP701 ELECTRICAL SCHEDULES

303 OF 407 01EP701 ELECTRICAL SCHEDULES

304 OF 407 01EP702 ELECTRICAL SCHEDULES

305 OF 407 01EP703 ELECTRICAL SCHEDULES

306 OF 407 01EP704 ELECTRICAL SCHEDULES

307 OF 407 01EP705 ELECTRICAL SCHEDULES

308 OF 407 01EP706 ELECTRICAL SCHEDULES

309 OF 407 04EP701 ELECTRICAL SCHEDULES

310 OF 407 05EP701 ELECTRICAL SCHEDULES

311 OF 407 06EP701 ELECTRICAL SCHEDULES

312 OF 407 07EP701 ELECTRICAL SCHEDULES

313 OF 407 08EP701 ELECTRICAL SCHEDULES

314 OF 407 12EP701 ELECTRICAL SCHEDULES

315 OF 407 13EP701 ELECTRICAL SCHEDULES

316 OF 407 14EP701 ELECTRICAL SCHEDULES

317 OF 407 40EP701 ELECTRICAL SCHEDULES

318 OF 407 99EP701 ELECTRICAL SCHEDULES

319 OF 407 99EP702 ELECTRICAL SCHEDULES

TELECOM

320 OF 407 TNG001 ABBREVIATIONS, AND SHEET INDEX

321 OF 407 TNG002 GENERAL NOTES

322 OF 407 TNG003 TELECOMMUNICATIONS LEGEND

323 OF 407 01TN1000 BLDG 01 -LEVEL 000 -TELECOMMUNICATIONS PLAN

324 OF 407 01TN100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN

325 OF 407 01TN101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN

326 OF 407 01TN102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN

327 OF 407 01TN103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN

328 OF 407 01TN104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN

329 OF 407 01TN105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN

330 OF 407 01TN106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN

331 OF 407 04TN100 BLDG 04 -LEVEL 00 -TELECOMMUNICATIONS PLAN

332 OF 407 04TN101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN

333 OF 407 05TN101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN

334 OF 407 06TN100 BLDG 06 -LEVEL 00 -TELECOMMUNICATIONS PLAN

335 OF 407 06TN101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN

336 OF 407 06TN102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN

337 OF 407 07TN100 BLDG 07 -LEVEL -00 -TELECOMMUNICATIONS PLAN

338 OF 407 07TN101 BLDG 07 -LEVEL -01 -TELECOMMUNICATIONS PLANS

339 OF 407 07TN102 BLDG 07 -LEVEL -02 -TELECOMMUNICATIONS PLAN

340 OF 407 08TN100 BLDG 08 -LEVEL -00 -TELECOMMUNICATIONS PLAN

341 OF 407 08TN101 BLDG 08 -LEVEL -01 -TELECOMMUNICATIONS PLAN

342 OF 407 08TN102 BLDG 08 -LEVEL -02 -TELECOMMUNICATIONS PLAN

343 OF 407 12TN100 BLDG 12 -LEVEL 00 -TELECOMMUNICATIONS PLAN

344 OF 407 13TN100 BLDG 13 -LEVEL 00 -TELECOMMUNICATIONS PLAN

345 OF 407 14TN100 BLDG 14 -LEVEL 00 -TELECOMMUNICATIONS PLAN

346 OF 407 14TN101 BLDG 14 -LEVEL 01 -TELECOMMUNICATIONS PLAN

347 OF 407 40TN100 BLDG 40 -LEVEL 00 -TELECOMMUNICATIONS PLAN

348 OF 407 99TN101 DATA CENTER -TELECOMMUNICATIONS PLAN

349 OF 407 99TN102 DATA CENTER -HORIZONTAL DISTRIBUTION OVERHEAD PLAN

350 OF 407 99TN103 DATA CENTER -FIBER BACKBONE OVERHEAD PLAN

351 OF 407 01TN400a BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

352 OF 407 01TN400b BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

353 OF 407 01TN400c BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

354 OF 407 01TN400d BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

355 OF 407 01TN400e BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

356 OF 407 01TN401a BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

357 OF 407 01TN401b BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

358 OF 407 01TN401c BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

359 OF 407 01TN401d BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

360 OF 407 01TN401e BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

361 OF 407 01TN401f BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

362 OF 407 01TN402a BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

363 OF 407 01TN402b BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

364 OF 407 01TN402c BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

365 OF 407 01TN402d BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

366 OF 407 01TN402e BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

367 OF 407 01TN402f BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS

368 OF 407 01TN403a BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

369 OF 407 01TN403b BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

370 OF 407 01TN403c BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

371 OF 407 01TN403d BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

372 OF 407 01TN403e BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS

373 OF 407 01TN404a BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS

374 OF 407 01TN404b BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS

375 OF 407 01TN404c BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS

376 OF 407 01TN404d BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS

377 OF 407 01TN404e BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS

378 OF 407 01TN405a BLDG 01 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

379 OF 407 01TN405b BLDG 01 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS

380 OF 407 04TN400a BLDG 04 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

381 OF 407 04TN400b BLDG 04 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

382 OF 407 04TN400c BLDG 04 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

383 OF 407 04TN401a BLDG 04 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

384 OF 407 04TN401b BLDG 04 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

385 OF 407 05TN401 BLDG 05 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

386 OF 407 06TN401 BLDG 06 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

387 OF 407 07TN401a BLDG 07 -LEVEL -01 -ENLARGED TELECOMMUNICATIONS PLANS

388 OF 407 07TN401b BLDG 07 -LEVEL -01 -ENLARGED TELECOMMUNICATIONS PLANS

389 OF 407 08TN401a BLDG 08 -LEVEL -01 -ENLARGED TELECOMMUNICATIONS PLANS

390 OF 407 08TN401b BLDG 08 -LEVEL -01 -ENLARGED TELECOMMUNICATIONS PLANS

391 OF 407 08TN402 BLDG 08 -LEVEL -02 -ENLARGED TELECOMMUNICATIONS PLANS

392 OF 407 12TN400 BLDG 12 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

393 OF 407 13TN400a BLDG 13 -LEVEL 0 -ENLARGED TELECOMMUNICATIONS PLANS

394 OF 407 13TN400b BLDG 13 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

395 OF 407 14TN401a BLDG 14 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

396 OF 407 14TN401b BLDG 14 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

397 OF 407 40TN400a BLDG 40 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

398 OF 407 40TN400b BLDG 40 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

399 OF 407 TN501 TELECOMMUNICATIONS DETAILS

400 OF 407 TN502 TELECOMMUNICATIONS DETAILS

401 OF 407 TN503 TELECOMMUNICATIONS DETAILS

402 OF 407 TN504 TELECOMMUNICATIONS DETAILS

403 OF 407 TN505 TELECOMMUNICATIONS DETAILS

404 OF 407 TN506 TELECOMMUNICATIONS DETAILS

405 OF 407 TN601 SITE FIBER RISER DIAGRAM -CORE A

406 OF 407 TN602 SITE FIBER RISER DIAGRAM -CORE B

407 OF 407 TN701 TELECOMMUNICATIONS SCHEDULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT/DISCIPLINE

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/3 /2

:1

:1

P M

B

IM

/6

-2

-1 a V

A M o n tg o m e ry E

H R

M /V

A M

Y G

E N

S H

E E

T S

S

D B

.r v t

G-002

DRAWING INDEX

JG/JS JS

100% CONSTRUCTION

DOCUMENTS

10/24/2025

619-21-106EHRM INFRASTRUCTURE

UPGRADES - MONTGOMERY

VA AL - CENTRAL ALABAMA (WEST CAMPUS)

215 PERRY HILL ROAD, MONTGOMERY, AL 36109

Revisions: Date:

FIRE PROTECTION WET

FIRE PROTECTION PRE-ACTION

PIPING SYSTEMS

FPW

FPPA

PIPING SYMBOLS

PL4

PL7

A

26-P 3

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

PUMP NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (PUMP)

DRAWING NUMBER WHERE DRAWN

FIRE PROTECTION DRYFPD

FIRE PROTECTION OTHERFPO

ABBREVIATIONS

CONTINUATION

DROP IN PIPE

ELBOW

TEE

UNION

TOP CONNECTION

BOTTOM CONNECTION

TOP CONNECTION, 45(DEG) OR 90° (DEG)

BOTTOM CONNECTION, 45(DEG) OR 90° (DEG)

PIPE UP

PIPE DOWN

VALVE (AS INDICATED OR SPECIFIED)

CHECK VALVE

BACKFLOW PREVENTER

ZONE CONTROL VALVE

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

LIMIT OF DEMOLITION

FIRE PROTECTION GENERAL NOTES

PENDENT SPRINKLER

UPRIGHT SPRINKLER WITH GUARD

FIRE PROTECTION SYMBOLS

1. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE CURRENT VA

GUIDES AND LOCAL FIRE PROTECTION CODES AND ORDINANCES.

2. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS. IN CASES OF CONFLICT BETWEEN

MANUFACTURER REQUIREMENTS, DRAWINGS, OR SPECIFICATIONS, THE MORE

STRINGENT REQUIREMENT SHALL GOVERN.

3. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS, EQUIPMENT AND MATERIALS

WITH OTHER TRADES IN ACCORDANCE WITH NFPA 13.

4. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING PENETRATIONS OF

FIRE RATED ASSEMBLIES AS REQUIRED.

5. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END OF

THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE

INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE

SPREAD THROUGH THE UNSEALED PENETRATION.

6. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES,

TRAPS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED IN

ACCORDANCE WITH THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION

WITH FIRE PROTECTION INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT

SERVED.

7. ROOMS THAT DO NOT HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER HEAD UPRIGHT. PROVIDE

SPRINKLER PROTECTION CAGES IN TELECOMMUNICATION SPACES PER VA FPDM

SECTION 3.7.C. ALL EXPOSED FIRE PROTECTION LINES SHALL BE PAINTED RED.

8. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

9. HAZARD CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN ACCORDANCE WITH

THE LATEST VERSIONS OF NFPA 13 AND THE VA FIRE PROTECTION DESIGN GUIDE.

10. MODIFY EXISTING SPRINKLER SYSTEM WITHIN THE LIMITS OF CONTRUCTION TO COMPLY

WITH NFPA 13. PROVIDE TEMPORARY UPRIGHT SPRINKLER HEADS TO PROTECT SPACES

WHERE CEILINGS ARE REMOVED FOR CONSTRUCTION UNTIL THE NEW CEILING IS

INSTALLED AND NEW DROPS TO NEW PENDENT SPRINKLERS ARE INSTALLED.

TEMPORARY SPRINKLERS ARE NOT REQUIRED IF NEW OR EXISTING CEILING IS IN PLACE

AT THE END OF THE WORK SHIFT. IF CEILING IS TO BE REMOVED PERFORM SPRINKLER

AT TIME OF REMOVAL.IF THESE REQUIREMENTS CANNOT BE MET CONTRACTOR NEEDS

TO PROIVDE 1-HR FIRE RATED WALL AND FIRE WATCH.

11. NFPA STANDARDS: FIRE-SUPPRESSION-SYSTEM,SPECIALTIES, ACCESSORIES,

INSTALLATION, AND TESTING SHALL COMPLY WITH THE LATEST EDITION OF NFPA 13

"INSTALLATION OF SPRINKLER SYSTEMS."

12. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN DRAWINGS OR A LICENSED

FIRE PROTECTION ENGINEER STAMP ON ALL SHOP DRAWING.

13. FIRE PROTECTION IS DELEGATED DESIGN PER DIVISION 21 SPECIFICATIONS.

14. FIRE SPRINKLER LAYOUT IS SCHEMATIC IN NATURE. THE CONTRACTOR IS RESPONSIBLE

FOR PROVIDING AN NFPA 13 COMPLIANT LAYOUT.

FIRE PROTECTION DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY

AFTER THE DAMAGE OCCURS.

F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING FIRE PROTECTION EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

ADDITIONAL SYMBOLS

A/E: ARCHITECT/ENGINEER

AFF: ABOVE FINISH FLOOR

AFG: ABOVE FINISH GRADE

AI: ANALOG INPUT

AO: ANALOG OUTPUT

ASJ: ALL SERVICE JACKET

BACNET: BUILDING AUTOMATION AND

CONTROL NETWORK

BAS: BUILDING AUTOMATION

SYSTEM

BFP: REDUCED PRESSURE

BACKFLOW PREVENTER

BHP: BRAKE HORSEPOWER

COR: CONTRACTING OFFICER'S

REPRESENTATIVE

CV: CONTROL VALVE

CXA: COMMISSIONING AGENT

DDC: DIRECT DIGITAL CONTROL

DOE: DEPARTMENT OF ENERGY

DWG: DRAWING

E: EXISTING

ECC: ENGINEERING CONTROL

CENTER AKA BAS

EL: ELEVATION

EPA: ENVIRONMENTAL

PROTECTION AGENCY

F: FAHRENHEIT

FDC: FIRE DEPARTMENT (HOSE)

CONNECTION

FS: FLOW SWITCH

GAL: GALLON

GPD: GALLONS PER DAY

GPH: GALLONS PER HOUR

GPM: GALLONS PER MINUTE

HP: HORSEPOWER

HZ: HERTZ

ID: INSIDE DIAMETER

INV: INVERT

KW: KILOWATT

KWH: KILOWATT HOUR

LB: POUND

MAX: MAXIMUM

MFG: MANUFACTURER

MIN: MINIMUM

NC: NORMALLY CLOSED

NO: NORMALLY OPEN

NOM: NOMINAL

NPS: NOMINAL PIPE SIZE

NTS: NOT TO SCALE

OC: ON CENTER

OD: OUTSIDE DIAMETER

OR: OPERATING ROOM

PD: PRESSURE DROP OR

DIFFERENCE

PG: PRESSURE GAUGE

PID: PROPORTIONAL-INTEGRAL-

DIFFERENTIAL

PLC: PROGRAMMABLE LOGIC

CONTROLLERS

PPB: PARTS PER BILLION

PPM: PARTS PER MILLION

PRV: PRESSURE REDUCING VALVE

PSI: POUNDS PER SQUARE INCH

PSIA: POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG: POUNDS PER SQUARE INCH

GAUGE

RAD: RADIANS

RPM: REVOLUTIONS PER MINUTE

SF: SQUARE FEET

SPEC: SPECIFICATION

SQFT: SQUARE FEET

STD: STANDARD

TDH: TOTAL DYNAMIC HEAD

TYP: TYPICAL

V: VOLT

VA: VETERANS ADMINISTRATION

VAMC: VETERANS ADMINISTRATION

MEDICAL CENTER

VA TIL:

WWW.CFM.VA.GOV/TIL/INDEX.ASP

VHA: VETERANS HEALTH

ADMINISTRATION

VSD: VARIABLE SPEED DRIVE

YCO: YARD CLEANOUT

YH: YARD HYDRANT

ZCV

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/2 /2

:3

:0

A

M

B

IM

/6

-2

-1 a V

A M o n tg o m e ry

E H

R M

/V A

M O

N T

G O

M E

R Y

M

-0

M E

S

D B

.r v t

FX001

FIRE PROTECTION GENERAL NOTES,

ABBREVIATION & LEGENDS

MGH/JW SH/CY/RQ/EA/BC

100% CONSTRUCTION

DOCUMENTS

10/24/2025

619-21-106EHRM INFRASTRUCTURE

UPGRADES - MONTGOMERY

VA AL - CENTRAL ALABAMA (WEST CAMPUS)

215 PERRY HILL ROAD, MONTGOMERY, AL 36109

Revisions: Date:

2436 COCHETOPA CT

FORT COLLINS, CO 80525

GREY ROCK LIFE SAFETY

E E A

A E

E

SHOWN AREA

TRUE

NORTH

GENERATOR

ENCLOSURE

MECHANICAL

YARD

MCR

CORRIDOR

ENTRANCE ROOM

#2

MECH

ELEC

UNPACKING/

PACKING

ENTRANCE ROOM

#1

TOILET

CORRIDOR

FIRE WATER LINE TO WALL

MOUNTED FIRE DEPARTMENT

CONNECTION

(TYP. 8)

99-DCDA-01-115

DCBA

9 (TYP.)

SECURE

STORAGE

STORAGE

TRANSFORMER

YARD

FIRE RISER

(TYP)

SEE 99-P-101 FOR

CONTINUATION

1 DATA CENTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/2 /2

:0

:1

A

M

B

IM

/6

-2

-1 a V

A M o n tg o m e ry E

H R

M /V

A M

Y

D A

T A

C E

N T

E R

M

E

S D

B .r v t

099-FX101

BUILDING - 099 - LEVEL - 01 - FIRE

PROTECTION PLAN

MGH/JW SH/CY/RQ/EA/BC

100% CONSTRUCTION

DOCUMENTS

10/24/2025

619-21-106EHRM INFRASTRUCTURE

UPGRADES - MONTGOMERY

VA AL - CENTRAL ALABAMA (WEST CAMPUS)

215 PERRY HILL ROAD, MONTGOMERY, AL 36109

3/16" = 1'-0"

BUILDING - 099 - LEVEL - 01- FIRE PROTECTION PLAN

PROJECT

NORTH

INSTALL NEW FM APPROVED, UPRIGHT, STANDARD RESPONSE SPRINKLERS WITH

FUSIBLE LINKS. PROVIDE LISTED MECHANICAL GUARDS ALL EXPOSED FIRE

PROTECTION LINES SHALL BE PAINTED RED.

FURNISH AND INSTALL DOUBLE CHECK DETECTOR BACKFLOW DEVICE. SEE

SCHEDULE AND FIRE HEADER DETAIL ON SHEET FX-501.

FURNISH AND INSTALL CLEAN AGENT FIRE SUPPRESSION SYSTEM. CLEAN AGENT

FIRE SUPPRESION SYSTEM SHALL BE A PRE-ACTION SYSTEM INTERLOCKED WITH

THE DATA CENTER SMOKE DETECTORS.

PROVIDE WALL OPENING AND PIPE SLEEVE. SEE "PIPE THRU WALL

(RATED/UNRATED) DETAIL" ON SHEET M-501.

EMERGENCY PUSH BUTTON ABORT SWITCH FOR GASEOUS FIRE SUPPRESSION BY

ELECTRICAL, SEE ELECTRICAL SHEETS FOR FURTHER DETAILS. SIGNAGE SHALL BE

PER SPECIFICATION 21 22 00.

FURNISH AND INSTALL WET SPRINKLER PIPE PER SPECIFICATION 23 13 13.

SPRINKLER PIPE SIZES SHALL BE AS PER THE LATEST EDITION OF NFPA 13.

FIRE DEPARTMENT CONNECTION (FDC) PIPING SHALL BE INSTALLED WITH A

POSITIVE SLOPE TOWARD THE FDC TO ENSURE DRAINAGE AWAY FROM THE

SYSTEM CONNECTION

MANUAL PULL STATION FOR GASEOUS FIRE SUPPRESSION BY ELECTRICAL. SEE

ELECTRICAL SHEETS FOR FURTHER DETAILS. SIGNAGE SHALL BE PER

SPECIFICATION 21 22 00.

ALL SPACES OTHER THAN MCR, GENERATOR ENCLOSURE AND ENTRANCE ROOMS

SHALL HAVE QUICK RESPONSE SPRINKLERS.

FURNISH AND INSTALL CLEAN AGENT SHUT OFF VALVE SYSTEM PER SPECIFICATION

21 22 00.

SITE PLAN

LEGEND

KEYNOTES #

LIGHT HAZARD OCCUPANCIES

ORDINARY HAZARD GROUP 1 OCCUPANCIES

ORDINARY HAZARD GROUP 2 OCCUPANCIES

EXTRA HAZARD GROUP 1 OCCUPANCIES

FIRE PROTECTION NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE

DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST VERIFY ALL

DIMENSIONS BY FIELD MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE CURRENT VA

GUIDES AND LOCAL FIRE PROTECTION CODES AND ORDINANCES.

3. CONTRACTOR SHALL HAVE NICET III/IV TECHNICIAN DESIGN DRAWINGS OR A

LICENSED FIRE PROTECTION ENGINEER STAMP ON ALL SHOP DRAWINGS.

4. COORDINATE EXACT LOCATION OF PIPING, SPRINKLERS, EQUIPMENT AND

MATERIALS WITH OTHER TRADES IN ACCORDANCE WITH NFPA 13

5. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA COR

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

6. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING PENETRATIONS OF

FIRE RATED ASSEMBLIES AS REQUIRED.

7. TELECOM ROOMS SHALL HAVE FM APPROVED, UPRIGHT, STANDARD RESPONSE

SPRINKLERS WITH FUSIBLE LINKS.PROVIDE LISTED MECHANICAL GUARDS. ALL

EXPOSED FIRE PROTECTION LINES SHALL BE PAINTED RED.

8. TELECOM ROOMS ARE CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.

ANY OTHER HAZARD CLASSIFICATION AND SPRINKLER DENSITY ARE TO BE IN

ACCORDANCE WITH THE LASTEST VERISONS OF NFPA 13 AND VA FIRE PROTECTION

DESIGN GUIDE.

9. DO NOT INSTALL SPRINKLER HEADS OR PIPING ABOVE TELECOMMUNICATION RACKS

WHERE FEASIBLE BUT STILL IN ACCORDANCE WITH NFPA 13.

10. INSTALL SPRINKLER HEADS IN SUCH A WAY AS TO AVOID INTERFERENCE FROM

DUCTWORK.

Revisions: Date:

2436 COCHETOPA CT

FORT COLLINS, CO 80525

FIRE HEADER DETAIL 1

SCALE: NTS

CLEAN AGENT SYSTEM DETAIL2

NOZZLE HEAD (TYPICAL)

CLEAN AGENT FIRE

ALARM CONTROL PANEL

CLEAN AGENT CANISTER

SEQUENCE OF OPERATION

MANUAL RELEASE STATION

DISCHARGE ABORT

PUSHBUTTON SWITCH

DETECTOR (TYPICAL)

SCALE: NTS

NOTES:

PRE-DISCHARGE

ALARM

DISCHARGE

ALARM

ELECTRIC

VALVE

ACTUATOR

FIRE RISER DOUBLE CHECK DETECTOR BACKFLOW DEVICE

EQUIPMENT TAG BASIS OF DESIGN MANUFACTURER MODEL MODEL SIZE VALVES REMARKS

99-DCDA -01-115 ZURN/WILKINS 350DA 6" GATE -

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

MGH/JW SH/CY/EA/JJ/MA

100% CONSTRUCTION

DOCUMENTS

10/24/2025

619-21-106EHRM INFRASTRUCTURE

UPGRADES - MONTGOMERY

VA AL - CENTRAL ALABAMA (WEST CAMPUS)

215 PERRY HILL ROAD, MONGOMERY, AL 36109

Revisions: Date:

FIRE PROTECTION DETAILS & SCHEDULE

FX501

2436 COCHETOPA CT

FORT COLLINS, CO 80525

109 OF 410 407

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

SPEES DESIGN BUILD

23830 PACIFIC HIGHWAY S. SUITE 300

KENT, WA 98032

/2 /2

:1

:3

P

M

B

IM

/6

-2

-1 a V

A M o n tg o m e ry

E H

R M

/V A

M O

N T

G O

M E

R Y

M

-0

M E

S

D B

.r v t

P-001

PLUMBING GENERAL NOTES

MGH/JW SH/CY/RQ/EA/BC

100% CONSTRUCTION

DOCUMENTS

10/24/2025

619-21-106EHRM INFRASTRUCTURE

UPGRADES - MONTGOMERY

VA AL - CENTRAL ALABAMA (WEST CAMPUS)

215 PERRY HILL ROAD, MONTGOMERY, AL 36109

PLUMBING GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY

AFTER THE DAMAGE OCCURS.

F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT

FIRST OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING PLUMBING EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING PLUMBING

EQUIPMENT THAT IS TO REMAIN.

PLUMBING DEMOLITION GENERAL NOTES VA PLUMBING GENERAL NOTES

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT

BEFORE BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA

STANDARDS, AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS. IN CASES OF CONFLICT BETWEEN

MANUFACTURER REQUIREMENTS, DRAWINGS, OR SPECIFICATIONS, THE

MORE STRINGENT REQUIREMENT SHALL GOVERN.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER

TRADES.

5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA

COR PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE

END OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF

MINERAL WOOL SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE

PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED

PENETRATION.

8. INSTALL ALL GRAVITY CONDENSATE DRAIN PIPING WITH A MINIMUM OF 1/8"

PER LINEAR FOOT (1%) SLOPE.

9. INSTALL ALL SANITARY SEWER LINES WITH A SLOPE OF 1/4" PER LINEAR

FOOT (2%) OF RUN. WHERE INDICATED ON PLANS, SANITARY SEWER LINES

CAN BE INSTALLED WITH A MINIMUM SLOPE OF 1/8" PER LINEAR FOOT (1%) OF

RUN. CONTRACTOR MAY INSTALL PIPING WITH A SLOPE GREATER THAN THAT

SPECIFIED ABOVE, BUT NEVER LESS.

10. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A

FURRED CHASE, ABOVE HARD SUSPENDED CEILING, OR ABOVE AN

ACOUSTICAL CEILING UNLESS EXPLICITLY NOTED ON THE DRAWINGS AS

BEING ROUTED EXPOSED IN A FINISHED ROOM OR SPACE.

11. ACCESS PANELS IN HARD SUSPENDED CEILINGS AND WALLS (NOT INCLUDING

ACCESSIBLE WET WALLS) ARE REQUIRED FOR ALL VALVES, TRAPS,

CLEANOUTS, CONTROLS, WATER HAMMER ARRESTORS ETC. ACCESS

PANELS SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE

ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH PLUMBING

INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.

12. SEISMIC PROVISIONS NOT REQUIRED.

13. ALL PRESSURES LISTED ARE GAUGE PRESSURE UNLESS OTHERWISE NOTED.

Revisions: Date:

10/24/25

144 OF 410 407

VTR

FD

CO

WH

WCO

CO

AC: ALTERNATING CURRENT

A/E: ARCHITECT/ENGINEER

AFF: ABOVE FINISH FLOOR

AFG: ABOVE FINISH GRADE

AG: AIR GAP

AI: ANALOG INPUT

AO: ANALOG OUTPUT

ASHRAE: AMERICAN SOCIETY OF HEATING

REFRIGERATION, AIR

CONDITIONING ENGINEERS

ASJ: ALL SERVICE JACKET

ASME: AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

ASPE: AMERICAN SOCIETY OF

PLUMBING ENGINEERS

ASR: AUTOMATIC SPRINKLER RISER

BACNET: BUILDING AUTOMATION AND

CONTROL NETWORK

BAS: BUILDING AUTOMATION SYSTEM

BFP: REDUCED PRESSURE

BACKFLOW PREVENTER

BHP: BRAKE HORSEPOWER

BTU: BRITISH THERMAL UNIT

BTU/H: BRITISH THERMAL UNIT PER

HOUR

CFM: CUBIC FEET PER MINUTE

CO: CLEANOUT

COR: CONTRACTING OFFICER'S

REPRESENTATIVE

CV: CONTROL VALVE

CXA: COMMISSIONING AGENT

DB: DECIBELS

DB(A): DECIBELS (A WEIGHTED)

DDC: DIRECT DIGITAL CONTROL

DFU: DRAINAGE FIXTURE UNITS

DI: DIGITAL INPUT

DI: DEIONIZED WATER

DN: DIAMETER NOMINAL

DO: DIGITAL OUTPUT

DOE: DEPARTMENT OF ENERGY

DW: DISHWASHER

DWG: DRAWING

DWV: DRAINAGE, WASTE AND VENT

E: EXISTING

ECC: ENGINEERING CONTROL

CENTER AKA BAS

EL: ELEVATION

EPA: ENVIRONMENTAL PROTECTION

AGENCY

F: FAHRENHEIT

FCO: FLOOR CLEANOUT

FD: FLOOR DRAIN

FDC: FIRE DEPARTMENT (HOSE)

CONNECTION

FOP: FUEL OIL PUMP

FOR: FUEL OIL RETURN

FOS: FUEL OIL SUPPLY

FOV: FUEL OIL VENT

FS: FLOW SWITCH

FSK: FOIL-SCRIM-KRAFT FACING

FU: FIXTURE UNITS

GAL: GALLON

GCO: GRADE CLEANOUTS

GPD: GALLONS PER DAY

GPH: GALLONS PER HOUR

GPM: GALLONS PER MINUTE

GPR: GAS PRESSURE REGULATOR

GRS: GAS REGULATOR STATION

GT: GREASE TRAP

GVTR: GAS VENT THROUGH ROOF

H&CW: HOT AND COLD WATER

HB: HOSE BIB

HD: HUB DRAIN

HEX: HEAT EXCHANGER

HG: MERCURY

HOA: HANDS-OFF-AUTOMATIC

HP: HORSEPOWER

HVE: HIGH VOLUME EVACUATION

HWCP: HOT WATER CIRCULATING PUMP

HZ: HERTZ

ID: INSIDE DIAMETER

INV: INVERT

IPC: INTERNATIONAL PLUMBING

CODE

KW: KILOWATT

KWH: KILOWATT HOUR

LAV: LAVATORY

LB: POUND

LBS/HR: POUNDS PER HOUR

PIPING SYMBOLS

OIL LADEN WASTE

OXYGEN

NITROUS OXIDE

ORAL EVACUATION

FIRE PROTECTION

NATURAL GAS

NITROGEN

PIPING SYSTEMS

D

OA

N2

NG

O

N2O

F

ADDITIONAL SYMBOLS

PL4

PL7

A

26-P 3

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

PUMP NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (PUMP)

DRAWING NUMBER WHERE DRAWN

DOMESTIC COLD WATER, COLD WATER

DOMESTIC HOT WATER, HOT WATER

LABORATORY VACUUM

MEDICAL VACUUM

MEDICAL AIR

DOMESTIC HOT WATER RETURN, HOT WATER RETURN

LABORATORY AIR

LV

LA

MA

MV

VENT (SANITARY)

CONDENSATE DRAIN

SOIL, WASTE, OR SANITARY SEWERSS

STORM WATERSD

FUEL OIL RETURN

FUEL OIL SUPPLYFOS

FOR

PIPING VALVES ABBREVIATIONS

MA: MEDICAL AIR

MAV: MEDICAL AIR VENT

MAX: MAXIMUM

MBH: 1000 BTU PER HOUR

MFG: MANUFACTURER

MG: MILLIGRAM

MIN: MINIMUM

MV: MEDICAL VACUUM

N2: NITROGEN

N20: NITROGEN OXIDE

NC: NORMALLY CLOSED

NG: NATURAL GAS

NO: NORMALLY OPEN

NOM: NOMINAL

NPS: NOMINAL PIPE SIZE

NTS: NOT TO SCALE

O2: OXYGEN

OC: ON CENTER

OD: OUTSIDE DIAMETER

OR: OPERATING ROOM

OSD: OPEN SIGHT DRAIN

OS&Y: OUTSIDE STEM AND YOKE

OXY: OXYGEN

PA: PASCAL

PD: PRESSURE DROP OR

DIFFERENCE

PG: PRESSURE GAUGE

PID: PROPORTIONAL-INTEGRAL-

DIFFERENTIAL

PLC: PROGRAMMABLE LOGIC

CONTROLLERS

PPB: PARTS PER BILLION

PPM: PARTS PER MILLION

PRV: PRESSURE REDUCING VALVE

PSI: POUNDS PER SQUARE INCH

PSIA: POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG: POUNDS PER SQUARE INCH

GAUGE

PVC: POLYVINYL CHLORIDE

PW: POTABLE WATER

RAD: RADIANS

RD: ROOF DRAIN

RO: REVERSE OSMOSIS

RPM: REVOLUTIONS PER MINUTE

SAN: SANITARY SEWER

SCFM: STANDARD CUBIC FEET PER

MINUTE

SF: SQUARE FEET

SMACNA: SHEET METAL AND AIR

CONDITIONING CONTRACTORS

NATIONAL ASSOCIATION

SPEC: SPECIFICATION

SPS: STERILE PROCESSING SERVICES

SQFT: SQUARE FEET

SS: STAINLESS STEEL

STD: STANDARD

SW: STORM WATER

SWP: STEAM WORKING PRESSURE

TCV: TEMPERATURE CONTROL VALVE

TD: TRENCH DRAIN

TDH: TOTAL DYNAMIC HEAD

TEMP: TEMPERATURE

TMV: THERMOSTATIC MIXING VALVE

T/P: TEMPERATURE AND PRESSURE

TP: TRAP PRIMER

TSTAT: THERMOSTAT

TYP: TYPICAL

V: VOLT

VA: VETERANS ADMINISTRATION

CSS: SERVICE

VAC: VACUUM

VAMC: VETERANS ADMINISTRATION

MEDICAL CENTER

VA TIL: WWW.CFM.VA.GOV/TIL/INDEX.ASP

VHA: VETERANS HEALTH

ADMINISTRATION

VSD: VARIABLE SPEED DRIVE

VTR: VENT THROUGH ROOF

W: WASTE

WAGD: WASTE ANESTHESIA GAS

DISPOSAL

WC: WATER CLOSET

WCO: WATER CLEANOUT

WG: WATER GAUGE

WH: WALL HYDRANT

WOG: WATER, OIL, GAS

WPD: WATER PRESSURE DROP

WS: WASTE STACK

WSFU: WATER SUPPLY FIXTURE UNITS

YCO: YARD CLEANOUT

YH: YARD HYDRANT

ACID LADEN WASTE

GREASE WASTE

NON POTABLE WATER

EXISTING PIPE TO BE REMOVEDX

OW

ACID

GW

NPW

GATE VALVE

GLOBE VALVE

GATE VALVE WITH 3/4"

HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

PRESSURE

REGULATING VALVE

PRESSURE SAFETY VALVE

CALIBRATED BALANCING

VALVE

CONTINUATION

DROP IN PIPE

VALVE IN RISER

ELBOW

TEE

UNION

TOP CONNECTION

BOTTOM CONNECTION

DIRECTION OF PIPE PITCH (DOWN)

VENT THRU ROOF

PRESSURE REDUCING VALVE

BALL JOINT

FLEXIBLE CONNECTOR

TOP CONNECTION,

45(DEG) OR 90° (DEG)

BOTTOM CONNECTION,

45(DEG) OR 90° (DEG)

CAPPED OUTLET

PIPE UP

PIPE DOWN

STRAINER

FLOOR DRAIN WITH TRAP

FLOOR DRAIN WITH CLEANOUT

FLOOR SINK WITH HALF GRATE

FLOOR SINK WITH FULL GRATE

DIRECTION OF FLOW

FLOOR PENETRATION

FREEZE-PROOF WALL HYDRANT

WALL CLEANOUT

HOSE BIB

WATER HAMMER

ARRESTOR/ACCESS

THERMOMETER

THERMOMETER WELL

STRAINER WITH

BLOW-OFF AND

HOSE CONNECTION

PRESSURE GAUGE

FLOW METER

CLEAN OUT

FLOOR CLEANOUT

P-TRAP

HOSE BIBBPOINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

LIMIT OF DEMOLITION

SAN

RISER SYSTEM

RISER NUMBER FCO

T

M

SOFTENED WATERSW

PUMPED SEWAGEPSS

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:

A) PROTECTING, COVERING, AND SEALING EXISTING EQUIPMENT AND

SURROUNDINGS DURING DEMOLITION FROM DIRT, DUST, AND DEBRIS.

B) ENSURING THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING

DURING DEMOLITION.

C) PREVENTING INJURY TO PERSONS AND DAMAGE TO PROPERTY.

D) PROVIDING ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

E) REPAIRING DAMAGED PROPERTY TO ITS ORIGINAL CONDITION IMMEDIATELY

AFTER THE DAMAGE OCCURS.

F) TAKING EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT

FIRST OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING PLUMBING EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING PLUMBING

EQUIPMENT THAT IS TO REMAIN.

PLUMBING DEMOLITION GENERAL NOTES

VA PLUMBING GENERAL NOTES

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS,

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURER'S RECOMMENDATIONS. IN CASES OF CONFLICT BETWEEN

MANUFACTURER REQUIREMENTS, DRAWINGS, OR SPECIFICATIONS, THE MORE

STRINGENT REQUIREMENT SHALL GOVERN.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER

TRADES.

5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND VA COR

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END

OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

8. INSTALL ALL GRAVITY CONDENSATE DRAIN PIPING WITH A MINIMUM OF 1/8" PER

LINEAR FOOT (1%) SLOPE.

9. INSTALL ALL SANITARY…