ATT 02 - 619-21-106_VA-Montgomery_SPECS_updated 080526.pdf

PDF 12 MB Posted

Attached to
Y1DA--Construction | 619-21-106 | EHRM Infrastructure Upgrades - Montgomery (VA-27-00002289)
Solicitation number
36C77626R0112
Issued by

About this file

This is a comprehensive specification document for construction services related to EHRM Infrastructure Upgrades at Montgomery VA Medical Center in Montgomery, Alabama (Project 619-21-106). The project encompasses significant infrastructure modernization across multiple buildings (1, 4, 5, 6, 7, 8, 12, 13, 14, 40) and campus-wide systems, including electrical panel upgrades with normal and emergency power provisions, HVAC reconfiguration and expansion, data center replacement with new construction, communication infrastructure upgrades (Cat 6A cabling, data outlets, patch panels), fiber optic backbone installation campus-wide, physical security upgrades, site civil work, and comprehensive hazardous material abatement (asbestos, lead-based paint removal).

The contract is structured into eight primary work items: General Requirements and Management; General Construction including selective demolition; Electrical Work; Mechanical Work; Telecommunications Work; Structural Work; Site and Civil Work; and Environmental Remediation. The specification mandates strict security protocols including badge access requirements, document control procedures, vehicle authorization protocols, and employee screening. Critical operational requirements include maintaining 24/7 medical center operations with construction phased to minimize disruption, with specific ICRA (Infection Control Risk Assessment) classifications determining work hours—Class II and III areas requiring normal business hours with 21-28 days advance notice, and Class IV areas (Buildings 1 and 40) permitting work on maximum one room at a time during normal business hours. The contractor must provide detailed phasing plans addressing infrastructure cutover procedures, maintain existing utility services continuously, conduct pre-construction surveys documenting existing conditions, provide as-built drawings, implement comprehensive warranty management with 4 and 9-month inspections, and coordinate all activities with the VA Contracting Officer's Representative throughout the project duration.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24 OCTOBER 2025

EHRM

INFRASTRUCTURE

UPGRADES

PROJECT #: 619-21-106

MONTGOMERY VA MEDICAL CENTER –

MONTGOMERY, ALABAMA

SPECIFICATIONS

DIV 00-33

100% SUBMITTAL

CONSTRUCTION DOCUMENTS 2

EHRM INFRASTRUCTURE UPGRADES PROJECT #: 619-21-106

MONTGOMERY VA MEDICAL CENTER – MONTGOMERY, AL PUB. DATE: 2022-07

TABLE OF CONTENTS 00 01 10 - 01

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 07 Seals Page 00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24 01 33 23 Shop Drawings, Product Data, and Samples 11-23 01 35 26 Safety Requirements 05-24 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 19 Selective Demolition 08-17 02 65 00 Above Ground Storage Tank Removal 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17

TABLE OF CONTENTS 00 01 10 - 02

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 31 00 Steel Decking 01-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-21 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 72 00 Roof Accessories 01-21 07 81 00 Sprayed Applied Fireproofing 07-23 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 17 10 Integrated Door Assemblies 01-21 08 34 53 Security Doors and Frames 01-21 08 71 00 Door Hardware 03-24 08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 66 00 Static Dissipative Sealer for Concrete Substrates 01-21 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

TABLE OF CONTENTS 00 01 10 - 03

SECTION NO. DIVISION AND SECTION TITLES DATE

10 14 00 Signage 01-21 10 26 00 Wall and Door Protection 01-21 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-21

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 22 00 Clean Agent Fire Suppression Systems 05-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23 22 07 11 Plumbing Insulation 09-15 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15 22 40 00 Plumbing Fixtures 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 09-23 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 03-23 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 03-23 23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC Insulation 02-20 23 08 00 Commissioning of HVAC Systems 03-23 23 09 23 Direct-Digital Control System for HVAC 03-23 23 23 00 Refrigerant Piping 03-24 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 03-23 23 37 00 Air Outlets and Inlets 03-23 23 50 11 Boiler Plant Mechanical Equipment 03-22 23 72 00 Air-to-Air Energy Recovery Equipment 03-20 23 81 23 Computer-Room Air-Conditioners 03-20 23 81 43 Air-Source Unitary Heat Pumps 03-23 23 82 16 Air Coils 03-20 23 84 00 Humidity Control Equipment 03-20

DIVISION 26 – ELECTRICAL

TABLE OF CONTENTS 00 01 10 - 04

SECTION NO. DIVISION AND SECTION TITLES DATE

26 05 11 Requirements for Electrical Installations 11-22 26 05 13 Medium-Voltage Cables 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 41 Underground Electrical Construction 11-22 26 05 73 Overcurrent Protective Device Coordination Study 11-22 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 11-22 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 11-22 26 22 00 Low-Voltage Transformers 11-22 26 23 00 Low-Voltage Switchgear 01-17 26 24 13 Distribution Switchboards 11-22 26 24 16 Panelboards 11-22 26 25 11 Busways 11-22 26 27 26 Wiring Devices 11-22 26 29 11 Motor Controllers 11-22 26 29 21 Enclosed Switches and Circuit Breakers 11-22 26 32 13 Engine Generators 11-22 26 33 53 Static Uninterruptible Power Supply 11-22 26 36 23 Automatic Transfer Switches 11-22 26 41 00 Facility Lightning Protection 11-22 26 43 13 Surge Protective Devices 11-22 26 51 00 Interior Lighting 03-24 26 56 00 Exterior Lighting 11-22

DIVISION 27 – COMMUNICATIONS

27 05 26 Grounding and Bonding for Communications Systems 11-22 27 05 33i Raceways and Boxes for Communications Systems 11-22 27 05 36i Cable Trays for Communications Systems 11-22 27 05 53i Identification for Communications Systems 11-22 27 10 00i Structured Cabling 11-22 27 11 16i Communications Cabinets Tacks Frames and Enclosures 11-22 27 11 19i Communications Termination Blocks and Patch Panels 11-22 27 11 26 Communications Rack-Mounted Power Protection & Power Strips 11-22 27 13 13 Communications Copper Backbone Cabling 11-22 27 13 13.13i Communications Copper Cable Splicing and Terminations 11-22 27 13 23 Communications Optical Fiber Backbone Cabling 06-15 27 13 23.13i Communications Optical Fiber Splicing and Terminations 11-22 27 15 13i Communications Copper Horizontal Cabling 05-24 27 16 19i Communications Patch Cords Station Cords and Cross Connects 11-22

TABLE OF CONTENTS 00 01 10 - 05

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and Security 10-18 28 05 26 Grounding and Bonding for Electronic Safety and Security 09-11 28 05 28.33 Conduit and Backbone for Electronic Safety and Security 09-11 28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 13 53 Security Access Detection 09-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 17 23 Pavement Markings 08-16

DIVISION 33 – UTILITIES

33 10 00 Water Utilities 03-17 33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 12-17

MONTGOMERY VA MEDICAL CENTER – MONTGOMERY, AL

SEALS PAGE 00 01 07 - 01

SECTION 00 01 07

SEALS PAGE

CERTIFICATION

The technical material and data contained in these Contract Documents were prepared under the supervision and direction of the undersigned, whose seal, as a licensed professional to practice as such, is affixed below.

James M. King, Registered Architect Division 0, 1, 4 & 6-10

Michael Hubbard, P.E.

Mechanical Engineer Division 22-23

L. Ryan Litzko, P.E.

Electrical Engineer Division 26

Mark Morgan, PE

CIH

Division 02

MONTGOMERY VA MEDICAL CENTER – MONTGOMERY, AL

SEALS PAGE 00 01 07 - 02

Dante Valdez, S.E.

Structural Engineering Division 5, 13

Peter Bailey, P.E.

Civil Engineering Division 3, 31-33

Greg Kimble, PE Fire Protection Engineer Division 21, 27-28 (Fire alarm)

Kris Good

RCDD

Division 27-28 (No Fire alarm)

MONTGOMERY VA MEDICAL CENTER – MONTGOMERY, AL PUB. DATE: 2020-05

LIST OF DRAWING SHEETS 00 01 15 - 01

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

1 OF 410 G-001 COVER SHEET

2 OF 410 G-002 DRAWING INDEX

3 OF 410 C-001 CIVIL SHEET INDEX AND GENERAL NOTES

4 OF 410 C-002 GENERAL NOTES AND LEGEND

5 OF 410 CD200 MCR BUILDING DEMOLITION PLAN

6 OF 410 CS100 OVERALL CIVIL SITE PLAN

7 OF 410 CS200 MCR BUILDING SITE PLAN

8 OF 410 CS201 MCR BUILDING HORIZONTAL CONTROL PLAN

9 OF 410 CG100 OVERALL EROSION CONTROL PLAN

10 OF 410 CG101 EROSION CONTROL GENERAL NOTES AND DETAILS

11 OF 410 CG200 MCR BUILDING EROSION CONTROL PLAN

12 OF 410 CG201 MCR BUILDING GRADING AND DRAINAGE PLAN

13 OF 410 CG202 MCR BUILDING STORMWATER BMP PLAN

14 OF 410 CU200 MCR BUILDING UTILITY PLAN

15 OF 410 CU250 CIVIL UTILITY CONSTRUCTION DETAILS

16 OF 410 CU300 OVERALL FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

17 OF 410 CU301 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

18 OF 410 CU302 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

19 OF 410 CU303 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

20 OF 410 CU304 FIBER OPTIC OUTSIDE PLANT UTILITY PLAN

21 OF 410 CU500 COMMUNICATION DUCTBANK DETAILS

22 OF 410 CU501 COMMUNICATION TRENCHING DETAILS

23 OF 410 CU502 BUILDING CONNECTION DETAILS

24 OF 410 S-001 STRUCTURAL GENERAL NOTES

25 OF 410 S-002 STRUCTURAL GENERAL NOTES

26 OF 410 S-003 ABRREVIATIONS AND SYMBOLS

27 OF 410 S-101 FOUNDATION PLAN

28 OF 410 S-111 ROOF PLAN

29 OF 410 S-201 STRUCTURAL WALL ELEVATIONS

30 OF 410 S-202 STRUCTURAL WALL ELEVATIONS

31 OF 410 S-501 TYPICAL CONCRETE DETAILS

32 OF 410 S-502 CONCRETE FOUNDATION DETAILS

33 OF 410 S-511 TYPICAL STRUCTURAL STEEL DETAILS

34 OF 410 S-512 TYPICAL STRUCTURAL STEEL DETAILS

35 OF 410 S-531 TYPICAL CMU WALL DETAILS

36 OF 410 S-532 TYPICAL CMU WALL DETAILS

00 01 15 -

LIST OF DRAWING SHEETS 00 01 15 - 02

37 OF 410 S-541 MECHANICAL ANCHORAGE DETAILS

38 OF 410 S-542 TYPICAL DETAILS-CABINET TO CFS FRAMED WALL

39 OF 410 S-543 TYPICAL DETAILS-CABINET TO WOOD FRAMED WALL

40 OF 410 S-544 TYPICAL DETAILS-CABINET TO CONCRETE AND CMU WALL

41 OF 410 S-545 TYPICAL PENETRATIONS IN EXISTING STRUCTURE

42 OF 410 001HA100 BLDG 01 - LVL 00G - ABATEMENT DRAWINGS

43 OF 410 001HA101 BLDG 01 - LVL 01 - ABATEMENT DRAWINGS

44 OF 410 001HA102 BLDG 01 - LVL 02 - ABATEMENT DRAWINGS

45 OF 410 001HA103 BLDG 01 - LVL 03 - ABATEMENT DRAWINGS

46 OF 410 001HA104 BLDG 01 - LVL 04 - ABATEMENT DRAWINGS

47 OF 410 001HA105 BLDG 01 - LVL 05 - ABATEMENT DRAWINGS

48 OF 410 004HA100 BLDG 04 - LVL 00 - ABATEMENT DRAWINGS

49 OF 410 004HA101 BLDG 04 - LVL 01 - ABATEMENT DRAWINGS

50 OF 410 005HA100 BLDG 05 - LVL 01 - ABATEMENT DRAWINGS

51 OF 410 006HA100 BLDG 06 - LVL 01 - ABATEMENT DRAWINGS

52 OF 410 007HA100 BLDG 07 - LVL 01 - ABATEMENT DRAWINGS

53 OF 410 008HA100 BLDG 08 - LVL 01 - ABATEMENT DRAWINGS

54 OF 410 012HA100 BLDG 12 - LVL 01 - ABATEMENT DRAWINGS

55 OF 410 013HA100 BLDG 13 - LVL 01 - ABATEMENT DRAWINGS

56 OF 410 014HA100 BLDG 14 - LVL 00 - ABATEMENT DRAWINGS

57 OF 410 040HA100 BLDG 40 - LVL 00 - ABATEMENT DRAWINGS

58 OF 410 A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS

59 OF 410 AS101 ICRA DETAILS

60 OF 410 AS102 ICRA STANDARDS

61 OF 410 01AS100B BLDG 01 -LVL 00B -PHASING PLAN

62 OF 410 01A-100G BLDG 01 -LVL 00G -ARCHITECTURAL PLAN

63 OF 410 01AS100G BLDG 01 -LVL 00G -PHASING PLAN

64 OF 410 01A-400Ga BLDG 01 -LVL 00G -DEMO, FLOOR PLANS & RCPS 65 OF 410 01A-400Gb BLDG 01 -LVL 00G -DEMO, FLOOR PLANS & RCPS

66 OF 410 01A-101 BLDG 01 -LVL 01 -ARCHITECTURAL PLAN

67 OF 410 01AS101 BLDG 01 -LVL 01 -PHASING PLAN

68 OF 410 01A-401a BLDG 01 -LVL 01 -DEMO, FLOOR PLANS & RCPS 69 OF 410 01A-401b BLDG 01 -LVL 01 -DEMO, FLOOR PLANS & RCPS

70 OF 410 01A-102 BLDG 01 -LVL 02 -ARCHITECTURAL PLAN

71 OF 410 01AS102 BLDG 01 -LVL 02 -PHASING PLAN

72 OF 410 01A-402a BLDG 01 -LVL 02 -DEMO, FLOOR PLANS & RCPS 73 OF 410 01A-402b BLDG 01 -LVL 02 -DEMO, FLOOR PLANS & RCPS

74 OF 410 01A-103 BLDG 01 -LVL 03 -ARCHITECTURAL PLAN

75 OF 410 01AS103 BLDG 01 -LVL 03 -PHASING PLAN

76 OF 410 01A-403a BLDG 01 -LVL 03 -DEMO, FLOOR PLANS & RCPS 77 OF 410 01A-403b BLDG 01 -LVL 03 -DEMO, FLOOR PLANS & RCPS

LIST OF DRAWING SHEETS 00 01 15 - 03

78 OF 410 01A-104 BLDG 01 -LVL 04 -ARCHITECTURAL PLAN

79 OF 410 01AS104 BLDG 01 -LVL 04 -PHASING PLAN

80 OF 410 01A-404a BLDG 01 -LVL 04 -DEMO, FLOOR PLANS & RCPS 81 OF 410 01A-404b BLDG 01 -LVL 04 -DEMO, FLOOR PLANS & RCPS

82 OF 410 01A-105 BLDG 01 -LVL 05 -ARCHITECTURAL PLAN

83 OF 410 01AS105 BLDG 01 -LVL 05 -PHASING PLAN

84 OF 410 01A-405 BLDG 01 -LVL 05 -DEMO, FLOOR PLANS & RCPS

85 OF 410 01AS106 BLDG 01 -LVL 06 -PHASING PLAN

86 OF 410 04A-100 BLDG 04 -LVL 00 -ARCHITECTURAL PLAN

87 OF 410 04AS100 BLDG 04 -LVL 00 -PHASING PLAN

88 OF 410 04A-400a BLDG 04 -LVL 00 -DEMO, FLOOR PLAN & RCP 89 OF 410 04A-400b BLDG 04 -LVL 00 -DEMO, FLOOR PLAN & RCP

90 OF 410 04A-101 BLDG 04 -LVL 01 -ARCHITECTURAL PLAN

91 OF 410 04AS101 BLDG 04 -LVL 01 -PHASING PLAN

92 OF 410 04A-401 BLDG 04 -LVL 01 -DEMO, FLOOR PLANS & RCPS

93 OF 410 05A-101 BLDG 05 -LVL 01 -ARCHITECTURAL PLAN

94 OF 410 05AS101 BLDG 05 -LVL 01 -PHASING PLAN

95 OF 410 05A-401 BLDG 05 -LVL 01 -DEMO, FLOOR PLANS & RCPS

96 OF 410 06AS100 BLDG 06 -LVL 00 -PHASING PLAN

97 OF 410 06A-101 BLDG 06 -LVL 01 -ARCHITECTURAL PLAN

98 OF 410 06AS101 BLDG 06 -LVL 01 -PHASING PLAN

99 OF 410 06A-401 BLDG 06 -LVL 01 -DEMO, FLOOR PLANS AND RCPS

100 OF 410 06AS102 BLDG 06 -LVL 02 -PHASING PLAN

101 OF 410 07AS100 BLDG 07 -LVL 00 -PHASING PLAN

102 OF 410 07A-101 BLDG 07 -LVL 01-ARCHITECTURAL PLAN

103 OF 410 07AS101 BLDG 07 -LVL 01 -PHASING PLAN

104 OF 410 07A-401 BLDG 07 -LVL 01 -DEMO, FLOOR PLANS & RCPS

105 OF 410 07AS102 BLDG 07 -LVL 02 -PHASING PLAN

106 OF 410 08AS100 BLDG 08 -LVL 00 -PHASING PLAN

107 OF 410 FX001 FIRE PROTECTION GENERAL NOTES, ABBREVIATION & LEGENDS

108 OF 410 099-FX101 BUILDING -099 -LEVEL -01 -FIRE PROTECTION PLAN

109 OF 410 FX501 FIRE PROTECTION DETAILS & SCHEDULE

110 OF 410 08A-101 BLDG 08 -LVL 01 -ARCHITECTURAL PLAN

111 OF 410 08AS101 BLDG 08 -LVL 01 -PHASING PLAN

112 OF 410 08A-401 BLDG 08 -LVL 01 -DEMO, FLOOR PLANS & RCPS

113 OF 410 08AS102 BLDG 08 -LVL 02 -PHASING PLAN

114 OF 410 12A-101 BLDG 12 -LVL 01 -ARCHITECTURAL PLAN

115 OF 410 12AS101 BLDG 12 -LVL 01 -PHASING PLAN

116 OF 410 12A-401 BLDG 12 -LVL 01 -DEMO, FLOOR PLANS & RCPS

117 OF 410 13A-101 BLDG 13 -LVL 1 -ARCHITECTURAL PLAN

118 OF 410 13AS101 BLDG 13 -LVL 01 -PHASING PLAN

LIST OF DRAWING SHEETS 00 01 15 - 04

119 OF 410 13A-401 BLDG 13 -LVL 01 -DEMO, FLOOR PLANS & RCPS

120 OF 410 14AS100 BLDG 14 -LVL 00 -PHASING PLAN

121 OF 410 14A-101 BLDG 14 -LVL 01 -ARCHITECTURAL PLAN

122 OF 410 14AS101 BLDG 14 -LVL 01 -PHASING PLAN

123 OF 410 14A-401 BLDG 14 -LVL 01 -DEMO, FLOOR PLANS & RCPS

124 OF 410 40A-100 BLDG 40 -LVL 00 -ARCHITECTURAL PLAN

125 OF 410 40AS100 BLDG 40 -LVL 00 -PHASING PLAN

126 OF 410 40A-400 BLDG 40 -LVL 00 -DEMO, FLOOR PLANS & RCPS

127 OF 410 A-101 BLDG 99 -FLOOR PLAN

128 OF 410 A-102 BLDG 99 -FIRE LIFE SAFETY PLAN

129 OF 410 A-103 BLDG 99 -ROOF PLAN

130 OF 410 A-104 BLDG 99 -RCP

131 OF 410 A-605 BLDG 99 -EXTERIOR DETAILS

132 OF 410 A-606 BLDG 99 -INTERIOR DETAILS AND ELEVATIONS AND EQUIPMENT SCHEDULE

133 OF 410 AE201 BLDG 99 -ELEVATIONS

134 OF 410 AE202 BLDG 99 -ELEVATIONS

135 OF 410 AE301 BLDG 99 -BUILDING SECTIONS

136 OF 410 AE401 BLDG 99 -WALL SECTIONS

137 OF 410 A-601 ROOM FINISH SCHEDULE

138 OF 410 A-602 DOOR DETAILS

139 OF 410 A-603 DETAILS

140 OF 410 A-604 DETAILS

141 OF 410 AE421 ELEVATIONS, TYPICAL DETAILS & TR WALL PLAN VIEW

142 OF 410 AW001 SIGNAGE MESSAGE SCHEDULE

143 OF 410 AW002 SIGNAGE LOCATION PLAN & DETAILS

144 OF 410 P-001 PLUMBING GENERAL NOTES

145 OF 410 P-002 PLUMBING GENERAL NOTES, ABBREVIATIONS & LEGENDS

146 OF 410 099-P-101 BUILDING -099 -FOUNDATION -PLUMBING PLAN

147 OF 410 099-P-102 BUILDING -099 -LEVEL -01 -PLUMBING PLAN

148 OF 410 099-P-103 BUILDING -099 -ROOF -PLUMBING PLAN

149 OF 410 P-501 PLUMBING DETAILS

150 OF 410 M-001 MECHANICAL GENERAL NOTES

151 OF 410 M-002 MECHANICAL ABBREVIATION & LEGENDS

152 OF 410 001-M-101 BUILDING -001 -LEVEL -00 -MECHANICAL OVERALL PLAN

153 OF 410 001-M-102 BUILDING -001 -LEVEL -01 -MECHANICAL OVERALL PLAN

154 OF 410 001-M-103 BUILDING -001 -LEVEL -02 -MECHANICAL OVERALL PLAN

155 OF 410 001-M-104 BUILDING -001 -LEVEL -03 -MECHANICAL OVERALL PLAN

156 OF 410 001-M-105 BUILDING -001 -LEVEL -04 -MECHANICAL OVERALL PLAN

157 OF 410 001-M-106 BUILDING -001 -LEVEL -05 -MECHANICAL OVERALL PLAN

158 OF 410 001-M-107 BUILDING -001 -LEVEL -06 -MECHANICAL OVERALL PLAN

159 OF 410 001-M-108 BUILDING -001 -LEVEL -07 -MECHANICAL OVERALL PLAN

LIST OF DRAWING SHEETS 00 01 15 - 05

160 OF 410 001-M-401 BUILDING -001 -LEVEL -00 -DEMOLITION, FLOOR PLANS & RCPS

161 OF 410 001-M-402 BUILDING -001 -LEVEL -00 -DEMOLITION, FLOOR PLANS & RCPS

162 OF 410 001-M-403 BUILDING -001 -LEVEL -00 -PARTIAL FLOOR PLAN

163 OF 410 001-M-404 BUILDING -001 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

164 OF 410 001-M-405 BUILDING -001 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

165 OF 410 001-M-406 BUILDING -001 -LEVEL -02 -DEMOLITION, FLOOR PLANS & RCPS

166 OF 410 001-M-407 BUILDING -001 -LEVEL -02 -DEMOLITION, FLOOR PLANS & RCPS

167 OF 410 001-M-408 BUILDING -001 -LEVEL -03 -DEMOLITION, FLOOR PLANS & RCPS

168 OF 410 001-M-409 BUILDING -001 -LEVEL -03 -DEMOLITION, FLOOR PLANS & RCPS

169 OF 410 001-M-410 BUILDING -001 -LEVEL -04 -DEMOLITION, FLOOR PLANS & RCPS

170 OF 410 001-M-411 BUILDING -001 -LEVEL -04 -DEMOLITION, FLOOR PLANS & RCPS

171 OF 410 001-M-412 BUILDING -001 -LEVEL -05 -DEMOLITION, FLOOR PLANS & RCPS

172 OF 410 001-M-413 BUILDING -001 -LEVEL -06 -FLOOR PLAN

173 OF 410 001-M-414 BUILDING -001 -LEVEL -07 -ROOF PLAN

174 OF 410 004-M-101 BUILDING -004 -LEVEL -00 -OVERALL PLAN

175 OF 410 004-M-102 BUILDING -004 -LEVEL -01 -OVERALL PLAN

176 OF 410 004-M-401 BUILDING -004 -LEVEL -00 -DEMOLITION & FLOOR PLANS

177 OF 410 004-M-402 BUILDING -004 -LEVEL -00 -DEMOLITION & RCPS

178 OF 410 004-M-403 BUILDING -004 -LEVEL -00 -FLOOR PLAN

179 OF 410 004-M-404 BUILDING -004 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

180 OF 410 005-M-101 BUILDING -005 -LEVEL -01 -OVERALL PLAN

181 OF 410 005-M-401 BUILDING -005 -LEVEL -01 -DEMOLITION & FLOOR PLANS

182 OF 410 006-M-101 BUILDING -006 -LEVEL -01 -OVERALL PLAN

183 OF 410 006-M-401 BUILDING -006 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

184 OF 410 007-M-101 BUILDING -007 -LEVEL -01 -OVERALL PLAN

185 OF 410 007-M-401 BUILDING -007 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

186 OF 410 008-M-101 BUILDING -008 -LEVEL -01 -OVERALL PLAN

187 OF 410 008-M-401 BUILDING -008 -LEVEL -01 -DEMOLITION & FLOOR PLANS

188 OF 410 012-M-101 BUILDING -012 -LEVEL -01 -OVERALL PLAN

189 OF 410 012-M-401 BUILDING -012 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

190 OF 410 013-M-101 BUILDING -013 -LEVEL -01 -OVERALL PLAN

191 OF 410 013-M-401 BUILDING -013 -LEVEL -01 -DEMOLITION, FLOOR PLANS & RCPS

192 OF 410 040-M-101 BUILDING -040 -LEVEL -00 -OVERALL PLAN

193 OF 410 040-M-401 BUILDING -040 -LEVEL -00 -DEMOLITION, FLOOR PLANS & RCPS

194 OF 410 099-MH101 BUILDING -099 -LEVEL -01 -HVAC DUCT PLAN

195 OF 410 099-MH102 BUILDING -099 -LEVEL -01 -HVAC RCP

196 OF 410 099-MH103 BUILDING -099 -ROOF -HVAC PLAN

197 OF 410 099-MP101 BUILDING -099 -LEVEL -01 -HVAC PIPING PLAN

198 OF 410 099-M-301 DATA CENTER -SECTION VIEW

199 OF 410 099-M-302 DATA CENTER -SECTION VIEW

200 OF 410 099-M-303 GENERATOR BUILDING -SECTION VIEW

LIST OF DRAWING SHEETS 00 01 15 - 06

201 OF 410 M-501 MECHANICAL DETAILS I

202 OF 410 M-502 MECHANICAL DETAILS II

203 OF 410 M-601 MECHANICAL SCHEDULES I

204 OF 410 M-602 MECHANICAL SCHEDULES II

205 OF 410 M-603 MECHANICAL SCHEDULES II

206 OF 410 M-701 MECHANICAL CONTROLS I

207 OF 410 M-702 MECHANICAL CONTROLS II

208 OF 410 M-703 MECHANICAL CONTROLS III

209 OF 410 M-704 MECHANICAL CONTROLS IV

210 OF 410 M-705 MECHANICAL CONTROLS V

211 OF 410 M-706 MECHANICAL CONTROLS VI

212 OF 410 M-800 DATA CENTER - PRESSURE MAP PLAN

213 OF 410 EG002 ELECTRICAL LEGENDS

214 OF 410 99EF101 DATA CENTER -FIRE ALARM SYSTEM PLAN

215 OF 410 EF601 FIRE ALARM SYSTEMS RISER DIAGRAM AND MATRICES

216 OF 410 EG001 ABBREVIATIONS, GENERAL NOTES

217 OF 410 EG002 ELECTRICAL LEGENDS

218 OF 410 ES001 ELECTRICAL FACILITY SITE PLAN

219 OF 410 ES002 ENLARGED SITE -ELECTRICAL PLAN -EXISTING

220 OF 410 ES003 ENLARGED SITE -ELECTRICAL PLAN -REVISED

221 OF 410 01EP100 BLDG 01 -LEVEL 00 -ELECTRICAL PLAN

222 OF 410 01EP101 BLDG 01 -LEVEL 01 -ELECTRICAL PLAN

223 OF 410 01EP102 BLDG 01 -LEVEL 02 -ELECTRICAL PLAN

224 OF 410 01EP103 BLDG 01 -LEVEL 03 -ELECTRICAL PLAN

225 OF 410 01EP104 BLDG 01 -LEVEL 04 -ELECTRICAL PLAN

226 OF 410 01EP106 BLDG 01 -LEVEL 06 -ELECTRICAL PLAN

227 OF 410 01EP107 BLDG 01 -LEVEL 07-ELECTRICAL PLAN

228 OF 410 04EP100 BLDG 04 -LEVEL 00 -ELECTRICAL PLAN

229 OF 410 05EP101 BLDG 05 -LEVEL 01 -ELECTRICAL PLAN

230 OF 410 06EP100 BLDG 06 -LEVEL 00 -ELECTRICAL PLAN

231 OF 410 07EP100 BLDG 07 -LEVEL -00 -ELECTRICAL PLAN

232 OF 410 07EP101 BLDG 07 -LEVEL -01 -ELECTRICAL PLAN

233 OF 410 08EP100 BLDG 08 -LEVEL -00 -ELECTRICAL PLAN

234 OF 410 12EP100 BLDG 12 -LEVEL 00 -ELECTRICAL PLAN

235 OF 410 13EP100 BLDG 13 -LEVEL 00 -ELECTRICAL PLAN

236 OF 410 14EP100 BLDG 14 -LEVEL 00 -ELECTRICAL PLAN

237 OF 410 40EP100 BLDG 40 -LEVEL 00 -ELECTRICAL PLAN

238 OF 410 99EL101 DATA CENTER -LIGHTING PLAN

239 OF 410 99EP101 DATA CENTER -POWER PLAN

240 OF 410 99EP102 DATA CENTER -POWER PLAN -MECHANICAL EQUIPMENT

241 OF 410 99EP103 DATA CENTER -POWER PLAN -RECEPTACLE

LIST OF DRAWING SHEETS 00 01 15 - 07

242 OF 410 99EG101 DATA CENTER -GROUNDING PLAN

243 OF 410 99EG102 DATA CENTER -GROUNDING PLAN -LIGHTNING PROTECTION

244 OF 410 99EF101 DATA CENTER -FIRE ALARM SYSTEM PLAN

245 OF 410 99EP201 DATA CENTER -EXTERIOR ELEVATION PLANS

246 OF 410 99EP202 DATA CENTER -EXTERIOR ELEVATION PLANS

247 OF 410 01EP400a BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS 248 OF 410 01EP400b BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS 249 OF 410 01EP400c BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS 250 OF 410 01EP400d BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS 251 OF 410 01EP400e BLDG 01 -LEVEL -00 -ENLARGED ELECTRICAL PLANS 252 OF 410 01EP401a BLDG 01 -LEVEL -01 -ENLARGED ELECTRICAL PLANS 253 OF 410 01EP401b BLDG 01 -LEVEL -01 -ENLARGED ELECTRICAL PLANS 254 OF 410 01EP402a BLDG 01 -LEVEL -02 -ENLARGED ELECTRICAL PLANS 255 OF 410 01EP402b BLDG 01 -LEVEL -02 -ENLARGED ELECTRICAL PLANS 256 OF 410 01EP403a BLDG 01 -LEVEL -03 -ENLARGED ELECTRICAL PLANS 257 OF 410 01EP403b BLDG 01 -LEVEL -03 -ENLARGED ELECTRICAL PLANS 258 OF 410 01EP404a BLDG 01 -LEVEL -04 -ENLARGED ELECTRICAL PLANS 259 OF 410 01EP404b BLDG 01 -LEVEL -04 -ENLARGED ELECTRICAL PLANS

260 OF 410 01EP405 BLDG 01 -LEVEL -05 -ENLARGED ELECTRICAL PLANS

261 OF 410 04EP400a BLDG 04 -LEVEL 00 -ENLARGED ELECTRICAL PLANS 262 OF 410 04EP400b BLDG 04 -LEVEL 00 -ENLARGED ELECTRICAL PLANS 263 OF 410 04EP400c BLDG 04 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

264 OF 410 04EP401 BLDG 04 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

265 OF 410 05EP401 BLDG 05 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

266 OF 410 06EP401 BLDG 06 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

267 OF 410 07EP401 BLDG 07 -LEVEL 01 -ENLARGED ELECTRICAL PLANS

268 OF 410 08EP401 BLDG 08 -LEVEL -01 -ENLARGED ELECTRICAL PLANS

269 OF 410 12EP400 BLDG 12 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

270 OF 410 13EP400 BLDG 13 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

271 OF 410 14EP401 BLDG 14 -LVL 01 -ENLARGED ELECTRICAL PLAN

272 OF 410 40EP400 BLDG 40 -LEVEL 00 -ENLARGED ELECTRICAL PLANS

273 OF 410 EP501 ELECTRICAL DETAILS

274 OF 410 EP502 ELECTRICAL DETAILS

275 OF 410 EP503 ELECTRICAL DETAILS

276 OF 410 EP504 ELECTRICAL DETAILS

277 OF 410 EP505 ELECTRICAL DETAILS

278 OF 410 EP506 ELECTRICAL DETAILS

279 OF 410 EP507 ELECTRICAL DETAILS

280 OF 410 EP508 ELECTRICAL DETAILS

281 OF 410 EP509 ELECTRICAL DETAILS

282 OF 410 EP510 ELECTRICAL DETAILS

LIST OF DRAWING SHEETS 00 01 15 - 08

283 OF 410 EP511 ELECTRICAL DETAILS

284 OF 410 EP512 ELECTRICAL DETAILS

285 OF 410 EF601 FIRE ALARM SYSTEMS RISER DIAGRAM AND MATRICES

286 OF 410 EG601 TELECOMMUNICATIONS BONDING RISER DIAGRAM

287 OF 410 00EP601 MEDIUM VOLTAGE -ONE-LINE DIAGRAM -EXISTING

288 OF 410 00EP611 MEDIUM VOLTAGE -ONE-LINE DIAGRAM -REVISED

289 OF 410 01EP601 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 2 -EXISTING

290 OF 410 01EP602 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 2 -EXISTING

291 OF 410 01EP611 BLDG 01 -ONE-LINE DIAGRAM -PART 1 OF 2 -REVISED

292 OF 410 01EP612 BLDG 01 -ONE-LINE DIAGRAM -PART 2 OF 2 -REVISED

293 OF 410 04EP601 BLDG 04 -ONE-LINE DIAGRAM -EXISTING

294 OF 410 04EP611 BLDG 04 -ONE-LINE DIAGRAM -REVISED

295 OF 410 05EP601 BLDG 05 -ONE-LINE DIAGRAM

296 OF 410 06EP601 BLDG 06 -ONE-LINE DIAGRAMS

297 OF 410 07EP601 BLDG 07 -ONE-LINE DIAGRAMS

298 OF 410 08EP601 BLDG 08 -ONE-LINE DIAGRAM

299 OF 410 12EP601 BLDG 12 -ONE-LINE DIAGRAMS

300 OF 410 13EP601 BLDG 13 -ONE-LINE DIAGRAM -EXISTING

301 OF 410 13EP611 BLDG 13 -ONE-LINE DIAGRAM -REVISED

302 OF 410 14EP601 BLDG 14 -ONE-LINE DIAGRAMS

303 OF 410 40EP601 BLDG 40 -ONE-LINE DIAGRAMS

304 OF 410 99EP601 DATA CENTER -ONE-LINE DIAGRAM

305 OF 410 EP701 ELECTRICAL SCHEDULES

306 OF 410 01EP701 ELECTRICAL SCHEDULES

307 OF 410 01EP702 ELECTRICAL SCHEDULES

308 OF 410 01EP703 ELECTRICAL SCHEDULES

309 OF 410 01EP704 ELECTRICAL SCHEDULES

310 OF 410 01EP705 ELECTRICAL SCHEDULES

311 OF 410 01EP706 ELECTRICAL SCHEDULES

312 OF 410 04EP701 ELECTRICAL SCHEDULES

313 OF 410 05EP701 ELECTRICAL SCHEDULES

314 OF 410 06EP701 ELECTRICAL SCHEDULES

315 OF 410 07EP701 ELECTRICAL SCHEDULES

316 OF 410 08EP701 ELECTRICAL SCHEDULES

317 OF 410 12EP701 ELECTRICAL SCHEDULES

318 OF 410 13EP701 ELECTRICAL SCHEDULES

319 OF 410 14EP701 ELECTRICAL SCHEDULES

320 OF 410 40EP701 ELECTRICAL SCHEDULES

321 OF 410 99EP701 ELECTRICAL SCHEDULES

322 OF 410 99EP702 ELECTRICAL SCHEDULES

323 OF 410 TNG001 ABBREVIATIONS, AND SHEET INDEX

LIST OF DRAWING SHEETS 00 01 15 - 09

324 OF 410 TNG002 GENERAL NOTES

325 OF 410 TNG003 TELECOMMUNICATIONS LEGEND

326 OF 410 01TN1000 BLDG 01 -LEVEL 000 -TELECOMMUNICATIONS PLAN

327 OF 410 01TN100 BLDG 01 -LEVEL 00 -TELECOMMUNICATIONS PLAN

328 OF 410 01TN101 BLDG 01 -LEVEL 01 -TELECOMMUNICATIONS PLAN

329 OF 410 01TN102 BLDG 01 -LEVEL 02 -TELECOMMUNICATIONS PLAN

330 OF 410 01TN103 BLDG 01 -LEVEL 03 -TELECOMMUNICATIONS PLAN

331 OF 410 01TN104 BLDG 01 -LEVEL 04 -TELECOMMUNICATIONS PLAN

332 OF 410 01TN105 BLDG 01 -LEVEL 05 -TELECOMMUNICATIONS PLAN

333 OF 410 01TN106 BLDG 01 -LEVEL 06 -TELECOMMUNICATIONS PLAN

334 OF 410 04TN100 BLDG 04 -LEVEL 00 -TELECOMMUNICATIONS PLAN

335 OF 410 04TN101 BLDG 04 -LEVEL 01 -TELECOMMUNICATIONS PLAN

336 OF 410 05TN101 BLDG 05 -LEVEL 01 -TELECOMMUNICATIONS PLAN

337 OF 410 06TN100 BLDG 06 -LEVEL 00 -TELECOMMUNICATIONS PLAN

338 OF 410 06TN101 BLDG 06 -LEVEL 01 -TELECOMMUNICATIONS PLAN

339 OF 410 06TN102 BLDG 06 -LEVEL 02 -TELECOMMUNICATIONS PLAN

340 OF 410 07TN100 BLDG 07 -LEVEL -00 -TELECOMMUNICATIONS PLAN

341 OF 410 07TN101 BLDG 07 -LEVEL -01 -TELECOMMUNICATIONS PLANS

342 OF 410 07TN102 BLDG 07 -LEVEL -02 -TELECOMMUNICATIONS PLAN

343 OF 410 08TN100 BLDG 08 -LEVEL -00 -TELECOMMUNICATIONS PLAN

344 OF 410 08TN101 BLDG 08 -LEVEL -01 -TELECOMMUNICATIONS PLAN

345 OF 410 08TN102 BLDG 08 -LEVEL -02 -TELECOMMUNICATIONS PLAN

346 OF 410 12TN100 BLDG 12 -LEVEL 00 -TELECOMMUNICATIONS PLAN

347 OF 410 13TN100 BLDG 13 -LEVEL 00 -TELECOMMUNICATIONS PLAN

348 OF 410 14TN100 BLDG 14 -LEVEL 00 -TELECOMMUNICATIONS PLAN

349 OF 410 14TN101 BLDG 14 -LEVEL 01 -TELECOMMUNICATIONS PLAN

350 OF 410 40TN100 BLDG 40 -LEVEL 00 -TELECOMMUNICATIONS PLAN

351 OF 410 99TN101 DATA CENTER -TELECOMMUNICATIONS PLAN

352 OF 410 99TN102 DATA CENTER -HORIZONTAL DISTRIBUTION OVERHEAD PLAN

353 OF 410 99TN103 DATA CENTER -FIBER BACKBONE OVERHEAD PLAN

354 OF 410 01TN400a BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 355 OF 410 01TN400b BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 356 OF 410 01TN400c BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 357 OF 410 01TN400d BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 358 OF 410 01TN400e BLDG 01 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 359 OF 410 01TN401a BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 360 OF 410 01TN401b BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 361 OF 410 01TN401c BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 362 OF 410 01TN401d BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 363 OF 410 01TN401e BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 364 OF 410 01TN401f BLDG 01 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

LIST OF DRAWING SHEETS 00 01 15 - 10

365 OF 410 01TN402a BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 366 OF 410 01TN402b BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 367 OF 410 01TN402c BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 368 OF 410 01TN402d BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 369 OF 410 01TN402e BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 370 OF 410 01TN402f BLDG 01 -LEVEL 02 -ENLARGED TELECOMMUNICATIONS PLANS 371 OF 410 01TN403a BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS 372 OF 410 01TN403b BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS 373 OF 410 01TN403c BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS 374 OF 410 01TN403d BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS 375 OF 410 01TN403e BLDG 01 -LEVEL 03 -ENLARGED TELECOMMUNICATIONS PLANS 376 OF 410 01TN404a BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS 377 OF 410 01TN404b BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS 378 OF 410 01TN404c BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS 379 OF 410 01TN404d BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS 380 OF 410 01TN404e BLDG 01 -LEVEL 04 -ENLARGED TELECOMMUNICATIONS PLANS 381 OF 410 01TN405a BLDG 01 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS 382 OF 410 01TN405b BLDG 01 -LEVEL 05 -ENLARGED TELECOMMUNICATIONS PLANS 383 OF 410 04TN400a BLDG 04 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 384 OF 410 04TN400b BLDG 04 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 385 OF 410 04TN400c BLDG 04 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 386 OF 410 04TN401a BLDG 04 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 387 OF 410 04TN401b BLDG 04 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

388 OF 410 05TN401 BLDG 05 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

389 OF 410 06TN401 BLDG 06 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS

390 OF 410 07TN401a BLDG 07 -LEVEL -01 -ENLARGED TELECOMMUNICATIONS PLANS 391 OF 410 07TN401b BLDG 07 -LEVEL -01 -ENLARGED TELECOMMUNICATIONS PLANS 392 OF 410 08TN401a BLDG 08 -LEVEL -01 -ENLARGED TELECOMMUNICATIONS PLANS 393 OF 410 08TN401b BLDG 08 -LEVEL -01 -ENLARGED TELECOMMUNICATIONS PLANS

394 OF 410 08TN402 BLDG 08 -LEVEL -02 -ENLARGED TELECOMMUNICATIONS PLANS

395 OF 410 12TN400 BLDG 12 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

396 OF 410 13TN400a BLDG 13 -LEVEL 0 -ENLARGED TELECOMMUNICATIONS PLANS 397 OF 410 13TN400b BLDG 13 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 398 OF 410 14TN401a BLDG 14 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 399 OF 410 14TN401b BLDG 14 -LEVEL 01 -ENLARGED TELECOMMUNICATIONS PLANS 400 OF 410 40TN400a BLDG 40 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS 401 OF 410 40TN400b BLDG 40 -LEVEL 00 -ENLARGED TELECOMMUNICATIONS PLANS

402 OF 410 TN501 TELECOMMUNICATIONS DETAILS

403 OF 410 TN502 TELECOMMUNICATIONS DETAILS

404 OF 410 TN503 TELECOMMUNICATIONS DETAILS

405 OF 410 TN504 TELECOMMUNICATIONS DETAILS

LIST OF DRAWING SHEETS 00 01 15 - 11

406 OF 410 TN505 TELECOMMUNICATIONS DETAILS

407 OF 410 TN506 TELECOMMUNICATIONS DETAILS

408 OF 410 TN601 SITE FIBER RISER DIAGRAM -CORE A

409 OF 410 TN602 SITE FIBER RISER DIAGRAM -CORE B

410 OF 410 TN701 TELECOMMUNICATIONS SCHEDULE

EHRM INFRASTRUCTURE UPGRADES PROJECT#: 619-21-106

MONTGOMERY VA MEDICAL CENTER – MONTGOMERY, AL PUB. DATE: 2021-11

GENERAL REQUIREMENTS 01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM INFRASTRUCTURE UPGRADES as required by drawings and specifications.

Project scope includes but is not limited to the following infrastructure upgrades:

Electrical (electrical panel upgrade, power [normal, emergency]); Bonding; UPS; Building

Management System interfaces; new and upgrades to existing HVAC; reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes);

replacement of the existing Data Center with a new construction of a general small Data

Center; communication infrastructure (new data outlets, patch panels, upgrades to Cat

6A cable) in buildings as necessary; physical security upgrades; upgrade to fiber infrastructure backbone campus-wide within buildings and between buildings; site civil work / investigation as required; and hazardous material abatement. Project scope includes Buildings 1, 4, 5, 6, 7, 8, 12, 13, 14, 40, and campus site.

B. Visits to the site by Bidders may be made only by appointment with the VA Medical

Center Contracting Officer’s Representative (COR).

C. Offices of Spees Design Build, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the

Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

GENERAL REQUIREMENTS 01 00 00 -2

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, EHRM INFRASTRUCTURE UPGRADES: Work includes all general, safety, and management requirements depicted in the contract documents.

B. ITEM II, GENERAL CONSTRUCTION: Work includes general construction, alterations, and selective demolition depicted in the contract documents.

C. ITEM III, ELECTRICAL WORK: Work includes all labor, materials, equipment, and supervision to perform the required electrical construction work on this project as depicted in the contract documents.

D. ITEM IV, MECHANICAL WORK: Work includes all labor, material, equipment, and supervision to perform the required mechanical construction work on this project depicted in the contract documents.

E. ITEM V, TELECOMMUNICATIONS WORK: Work includes all labor, material, equipment, and supervision to perform the required telecommunications construction work on this project depicted in the contract documents.

F. ITEM VI, STRUCTURAL WORK: Work includes all labor, material, equipment, and supervision to perform the required structural construction work on this project depicted in the contract documents.

G. ITEM VII, SITE AND CIVIL WORK: Work includes all labor, material, equipment, and supervision to perform the required site and civil construction work on this project depicted in the contract documents.

H. ITEM VIII, ENVIRONMENTAL WORK: Work includes all labor, material, equipment, and supervision to perform the required environmental remediation work on this project depicted in the contract documents.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

GENERAL REQUIREMENTS 01 00 00 -3

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. Physical security of the construction site and installations will meet requirements depicted in the next paragraph “Security Procedures,” the VA Design Manual

“Physical Security Design Manual for VA Life-Safety Protected Facilities,” and any other applicable VA documentation.

2. The Contractor is responsible for determining the security plan that will define both physical and administrative security procedures. Once approved by the VA, these procedures will remain effective for the entire duration of the project.

3. The General Contractor is responsible for assuring that all subcontractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the

Contracting Officer so that security escort and/or arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the

Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close or shut down the project site and order General

Contractor’s employees off the premises in the event of a national emergency. The

General Contractor may return to the site only with the written approval of the

Contracting Officer.

C. Key Control

1. The General Contractor shall provide duplicate keys and lock combinations to the

Contracting officers representative (COR) for the purpose of security inspections of

GENERAL REQUIREMENTS 01 00 00 -4

every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall install all permanent cores at completion of the work.

See Section 08 71 00 DOOR HARDWARE and coordinate with the VA COR.

D. Document Control

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked

“Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project.

Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).

a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

GENERAL REQUIREMENTS 01 00 00 -5

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA

Medical Center Facility Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on

Government premises to areas authorized or approved by the Contracting Officer. The

Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Limited amounts of well-organized and unobtrusive materials and tools may be kept in the construction area during construction. The VA Medical Center COR may request items be relocated at any points.

C. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government.

The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed. Possible locations and requirements will be discussed and determined by the COR during the post-bid, pre-construction meeting.

D. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the

Contractor shall protect them fromdamage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

GENERAL REQUIREMENTS 01 00 00 -6

E. Working space and space available for storing materials shall be as determined by the

COR.

F. Workers are subject to the rules of the VA Medical Center that are applicable to their conduct.

G. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

H. Execute work so as to interfere as little as possible with normal functioning of the VA

Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working or storage areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical

Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

I. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems

(except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, GENERAL REQUIREMENTS 01 00 00 -7 electricity, gas or steam, payment of such fee shall be the responsibility of the

Government and not the Contractor.

J. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week.

Therefore, any interruption in service must be scheduled and coordinated with the

COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

a. Normal working hours for this contract will be from 8:00 AM – 4:30 PM (local time), Monday through Friday except for weekends and established Federal

Holidays.

b. Performing on-site work outside normal working hours will require approval from the Contracting Officer (CO) and the Contracting Officer’s Representative (COR).

Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR 21 calendar days in advance of the proposed date of starting work in

ICRA Class I and II work areas, and 28 calendar days in advance of ICRA Class III and

IV work areas, as well as critical infrastructure buildings (i.e. Boiler Plant, Chiller

Plant, etc.). Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to the VA Medical Center Director, COR and

Contractor.

3. A/E recommended phasing plans, put together with input from the VA COR and

Epidemiologist, takes into consideration the complexity of the Medical Center

GENERAL REQUIREMENTS 01 00 00 -8

complexity and broad scope of buildings impacted by TR/TE renovations and recabling efforts. Phasing of TR/TE renovations and individual room Cat 6A recabling will be heavily influenced by the ICRA precautions required by the VA, informed by the associated patient risk levels. Critical patient care areas should be considered distinct from non-patient care areas (engineering, admin space, etc.), and the contractor shall regularly consult with the VA on patient care area phasing plans before commencing construction work and upon completion.

4. The following tables outline healthcare and non-healthcare spaces, and recommended phasing constraints:

Non-Healthcare Buildings

Location ICRA Class Construction Hours –

TR/TEs

Construction Hours – Cat 6a Re-cabling

Building 4 II/III Normal business hours Nights / Weekends

Building 5 II/III Normal business hours Nights / Weekends

Building 6 II/III Normal business hours Nights / Weekends

Building 7 II/III Normal business hours Nights / Weekends

Building 8 II/III Normal business hours Nights / Weekends

Building 12 II/III Normal business hours Nights / Weekends

Building 13 II/III Normal business hours Nights / Weekends

Building 14 II/III Normal business hours Nights / Weekends

HEALTHCARE BUILDINGS

Location ICRA Class Construction Hours – TR/TEs Construction Hours – Cat 6a

Re-cabling

GENERAL REQUIREMENTS 01 00 00 -9

II

*Normal business hours, pending VA approval of

Contractor work plan submitted at least 28 calendar days in advance of start of work.

*Class II - Contractor shall present work plan to the VA

COR 21 calendar days in advance of work for VA pre-approval, showing max rooms that may be re-cabled in a phasing area during 1 work shift

III

*Normal business hours, pending VA approval of

Contractor work plan submitted at least 28 calendar days in advance of start of work.

*Contractor shall present work plan at least 28 calendar days in advance of work for VA pre-approval; (3) rooms maximum may be worked on at one time to allow for equipment movement and coordination with VA staff and services. Any variations in room maximum will be on a case-by-case basis and must be approved by the

VA COR in advance of construction activities.

K. Buildings 1, IV

*Normal business hours, pending VA approval of

Contractor work plan submitted at least 28 calendar days in advance of start of work.

*Contractor shall present work plan at least 28 calendar days in advance of work for VA pre-approval; (1) room maximum may be worked on at one time to allow for equipment

GENERAL REQUIREMENTS 01 00 00 -10

movement and coordination with VA staff and services. Any variations in room maximum will be on a case-by-case basis and must be approved by the

VA COR in advance of construction activities.

5. Contractor shall provide work plans to VA for final approval. Contractor shall consider the following constraints in phasing:

a. Contractor shall not commence any planned phase of work without authorization from the COR and an approved outage schedule. It is the Contractor’s responsibility to review any appropriate VA phasing forms with VA COR during

Preconstruction Meeting. All subsequent planned outages will need to be documented and approved by the COR prior to regulated outages.

b. The Government may halt work in patient care areas at no cost if work impedes patient care.

c. The contractor will coordinate with the VA for movement of furniture from new

TR spaces prior to work starting.

d. Any TR work that causes excessive noise and/or vibrations shall be coordinated with the VA COR and shall occur only during nights and/or weekends as approved by VA COR.

e. Contractor is responsible for ensuring continuous network connectivity for patient care spaces. Outages shall not exceed 1 work shift. Cable pulling shall only occur during non-working, non-peak hours, and scheduled weekends as approved by the

VA COR, or as noted otherwise in the above tables.

f. Contractor is responsible for providing a work plan to the VA for approval regarding separation of existing cables and new, and all anticipated demo work.

GENERAL REQUIREMENTS 01 00 00 -11

g. Contractor to ensure all work in current phase is complete and approved by VA before proceeding to next phase.

6. Taking the above into consideration, the A/E recommends the following phased sequence of construction activities:

_______PROPOSED PHASING SEQUENCE

Phase 1 Overview – Campus Infrastructure

*Same-numbered…