This is a specification document for landscape planting work (Section 32 90 00) for the Bath VAMC EHRM Infrastructure and Data Center Upgrades project (VA Project No. 528A6-22-700, AE Works Project No. VBAT-006).
The specification establishes comprehensive requirements for planting materials, soil preparation, installation, and maintenance. Plant materials must comply with ANSI Z60.1 standards and include ground cover, vines, shrubs, trees, sod, seed, sprigs, and plugs, all of which must be disease-free, pest-free, and grown under climatic conditions similar to the project site. Sod must be certified and classified to TPI Guideline Specifications as GSS, machine-cut to 19 mm uniform thickness with 6 mm tolerance, and placed within 36 hours of harvesting. Planting soils must contain 5-10 percent organic matter per ASTM D5268 standards, with maximum particle size of 19 mm and no more than 3 percent retained on a 6 mm screen. The specification requires soil testing by an independent or university laboratory recognized by the State Department of Agriculture, with comprehensive analysis of organic matter, gradation, pH, nutrients, and contaminants including heavy metals. Installation must occur during optimal planting seasons in weather conditions complying with plant requirements, with ground not frozen, snow-covered, muddy, or exceeding 32 degrees C. A preinstallation meeting is required minimum 30 days before work begins with the Contracting Officer's Representative, contractor, and installer. The contractor's installer must hold Professional Landcare Network or American Nursery and Landscape Association membership and have personnel certified as Certified Landscape Technician (CLT) or Certified Ornamental Landscape Professional (COLP). The specification includes a two-year warranty period beginning from the date of planting completion, requiring replacement of any plants more than 25 percent dead, missing, or defective before final inspection, with only one replacement per plant required unless losses result from contractor non-compliance. Maintenance requirements include weekly inspections, watering, fertilization using organic materials initially, mowing to uniform height, aeration with topdressing, and immediate removal and replacement of dead or dying plants (trees with 20 percent crown death, shrubs and ground cover with 20 percent plant death).
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project No. 528A6-22-700
AE Works Project No. VBAT-006
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
BID DOCUMENTS
32 90 00 - 1
SECTION 32 90 00
PLANTING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Plants, soils, edging, turf, and landscape materials.
1.2 RELATED REQUIREMENTS
1.3 DEFINITIONS
A. Pesticide: Any substance or mixture of substances, including biological control agents, that may prevent, destroy, repel, or mitigate pests and is specifically labeled for use by U.S. Environmental Protection Agency
(EPA). Also, any substance used as plant regulator, defoliant, disinfectant, or biocide.
B. Stand of Turf: 100 percent of established species.
1.4 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American National Standards Institute (ANSI):
1. Z60.1-2014 - Nursery Stock.
C. American Society for Testing And Materials (ASTM):
1. B221-14 - Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.
2. B221M-13 - Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.
3. C33/C33M-16-Concrete Aggregates.
4. C136/C136M-14 - Sieve Analysis of Fine and Coarse Aggregates.
5. C602-13a - Agricultural Liming Materials.
6. D977-13e1 - Emulsified Asphalt.
7. D5268-13 - Topsoil Used for Landscaping Purposes.
D. Hortus Third: Concise Dictionary of Plants Cultivated in United States and Canada.
E. Tree Care Industry Association (TCIA):
1. A300P1-2008 - Tree Care Operations - Trees, Shrubs and Other Woody
Plant Maintenance Standard Practices (Pruning).
2. Z133.1-2012 - Arboricultural Operations - Safety Requirements.
F. Turfgrass Producers International (TPI):
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 2
1. 2006 Guideline Specifications to Turfgrass Sodding.
G. United States Department of Agriculture (USDA):
1. DOA SSIR 42-2014 - Soil Survey Laboratory Methods Manual.
2. Handbook No. 60 - Diagnosis and Improvement of Saline and Alkali
Soils.
1.5 PREINSTALLATION MEETINGS
A. Conduct preinstallation meeting at project site minimum 30 days before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. Contractor.
c. Installer.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Inspection of planting materials.
b. Installation schedule.
c. Installation sequence.
d. Preparatory work.
e. Protection before, during, and after installation.
f. Installation.
g. Inspecting.
h. Environmental procedures.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.6 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Photographs: Color photographs of each plant species showing actual size and condition of plants to be provided with measuring device included for scale. Where more than 20 plants are required of any species, submit minimum three photographs of average, best, and worst quality plant to be provided. Include on each photograph, plant full scientific name, size, and source nursery.
3. Installation instructions.
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 3
4. Warranty.
C. Samples:
1. Filter Fabric: 300 by 300 mm (12 by 12 inches).
2. Edging Materials and Accessories: Manufacturer's standard sizes.
D. Test reports: Certify products comply with specifications.
E. Certificates: Certify products comply with specifications.
1. Plant Materials: Department of Agriculture certification by State
Nursery Inspector declaring material to be free from insects and disease.
2. Seed and Turf Materials: Notarized certificate of product analysis.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Installer, including supervisor with project experience list.
G. Operation and Maintenance Data:
1. Care instructions for each plant material.
1.7 QUALITY ASSURANCE
A. Installer Qualifications:
1. Regularly installs specified products.
2. Installed specified products with satisfactory service on five similar installations for minimum five years.
a. Project Experience List: Provide contact names and addresses for completed projects.
3. Member in good standing of either Professional Landcare Network or
American Nursery and Landscape Association.
4. Personnel assigned to Work certified in one of the following categories from Professional Landcare Network and submit one copy of certificate to Contracting Officer’s Representative:
a. Certified Landscape Technician (CLT) - Exterior, with maintenance specialty areas, designated CLT-Exterior.
b. Certified Landscape Technician (CLT) - Interior, designated
CLT-Interior.
c. Certified Ornamental Landscape Professional, designated COLP.
B. Independent or university laboratory, recognized by State Department of
Agriculture, with experience and capability to conduct testing indicated and that specializes in types of tests to be performed.
C. Contracting Officer’s Representative may review plant materials either at place of growth or project site before planting for compliance with
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 4 requirements. Contracting Officer’s Representative retains right to inspect trees and shrubs to determine if any unacceptable conditions exist and to reject any trees or shrubs at any time during Project. All rejected trees and shrubs must be immediately removed from Project site.
1. Submit plant material source information to Contracting Officer’s
Representative seven days in advance of delivery to Project site.
D. Material Test Reports: For existing native surface topsoil.
1. For each unamended soil type, provide soil analysis and written report by qualified soil-testing laboratory stating percentages of organic matter; gradation of sand, silt, and clay content; cation exchange capacity; deleterious material; pH; and mineral and plant-nutrient content of soil.
2. Comply with USDA's Handbook No. 60 testing methods and written recommendations.
3. Soil-testing laboratory to oversee soil sampling; with depth, location, and number of samples to be taken per instructions from
Contracting Officer’s Representative. Take minimum 3 representative samples from varied locations for each soil to be used or amended for planting purposes.
4. Report suitability of tested soil for plant growth.
5. Based on test results, state recommendations for soil treatments and soil amendments to be incorporated. State recommendations in weight per 92.9 sq. m (1000 sq. ft.) or volume per 0.76 cu. m (1 cu. yd.)
for nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory planting soil suitable for healthy, viable plants.
6. Report presence of problem salts, minerals, or heavy metals, including aluminum, arsenic, barium, cadmium, chromium, cobalt, lead, lithium, and vanadium. If such problem materials are present, provide additional recommendations for corrective action.
1.8 DELIVERY
A. Deliver packaged products in manufacturer's original sealed packaging.
B. Bulk Products:
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 5
1. Deliver bulk products away from buildings, utilities, pavement, and existing turf and planted areas. Maintain dry bulk product storage away from contaminants.
2. Install erosion control materials to prevent erosion or displacement of bulk products.
1.9 STORAGE AND HANDLING
A. Store seeds and other packaged materials in dry locations away from contaminants.
B. Plant Storage and Protection: Store and protect plants not planted on day of arrival at Project site as follows:
Shade and protect plants in outdoor storage areas from wind and direct sunlight until planted.
1. Do not store plant materials directly on concrete or bituminous surfaces.
C. Topsoil: Before stockpiling topsoil, eradicate on site undesirable growing vegetation. Clear and grub existing vegetation three to four weeks before stockpiling existing topsoil.
D. Root Control Barrier and Weed Control Fabric: Store materials in site in enclosures or under protective covering in dry location out of direct sunlight. Do not store materials directly on ground.
E. Remove damaged plants from Project site.
1.10 FIELD CONDITIONS
A. Environment:
1. Coordinate installation of planting materials during optimal planting seasons for each type of plant material required.
2. Restrictions: Do not plant when ground is frozen, snow covered, muddy, or when air temperature exceed 32 degrees C
(90 degrees F).
B. Weather Limitations: Install plantings only during current and forecasted weather conditions that are comply with plant requirements.
Apply associated products in compliance with manufacturers' instructions.
1.11 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 6
B. Manufacturer's Warranty: Warrant plantings and against material defects.
1. Warranty Period: Two years.
2. Plant and Turf Warranty Periods will begin from date of planting completion.
3. Contracting Officer's Representative will reinspect plants and turf at end of Warranty Period. Replace any dead, missing, or defective plant material and turf immediately. Warranty Period will end on date of this inspection provided Contractor has complied with warranty work required by this specification. Comply with following requirements:
a. Replace any plants more than 25 percent dead, missing or defective plant material before final inspection.
b. Only one replacement of each plant will be required except when losses or replacements are due to failure to comply with these requirements.
c. Complete remedial measures directed by Contracting Officer’s
Representative to ensure plant and turf survival.
d. Repair damage caused while making plant or turf replacements.
PART 2 - PRODUCTS
2.1 PRODUCTS - GENERAL
A. Provide each product from one source or manufacturer.
2.2 PLANT MATERIALS
A. Plant Materials: ANSI Z60.1, conforming to varieties specified and be true to scientific name as listed in Hortus Third. Well-branched, well-formed, sound, vigorous, healthy planting stock free from disease, sunscald, windburn, abrasion, and harmful insects or insect eggs and having healthy, normal, and undamaged root system.
1. Ground Cover and Vine Plants: Provide number and length of runners for size specified on drawings, together with proper age for grade of plants specified. Provide vines and ground cover plants well established in removable containers, integral containers, or formed homogeneous soil sections. Provide plants grown under climatic conditions similar to those in locality of project. Spray all plants
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 7 budding into leaf or having soft growth with an anti-desiccant at nursery before digging.
2.3 SOD
A. Sod: Nursery grown, certified and classified in TPI's "Guideline
Specifications to Turfgrass Sodding" as GSS. Machine cut sod at uniform thickness of 19 mm (3/4 inch) within tolerance of 6 mm (1/4 inch), excluding top growth and thatch. Each individual sod piece to be strong enough to support its own weight when lifted by ends. Broken pads, irregularly shaped pieces, and torn or uneven ends will not be permitted.
B. Sod Species: Genetically pure, free of weeds, pests, and disease.
2.4 SEED
A. Grass Seed: State-approved seed of latest season's crop delivered in original sealed packages, bearing producer's guaranteed analysis for percentages of mixtures, purity, germination, weed seed content, and inert material. Label in conformance with AMS Seed Act and applicable state seed laws. Wet, moldy, or otherwise damaged seed will not be acceptable. Field mixes will be acceptable when field mix is performed on site in presence of Contracting Officer's Representative.
B. Seed Mixtures: Proportion seed mixtures by weight.
2.5 TURF SELECTIONS
A. Grasses for Cool Regions:
1. Bentgrasses: Redtop (Agrostis alba) and Colonial (Agrostis tenuis).
2. Bluegrasses: Kentucky (Popratensis), Rough-stalked (Potrivialis) and
Canada(Poa compressa).
3. Fescue: Red (Festucrubra), Meadow (Festucpratensis) and Tall
(Festucarundinacea).
4. Ryegrasses: Perennial (Lolium perenne).
B. Grasses for Warm Regions:
1. Bermuda grass (Cynodon dactylon).
2. Carpetgrass (Axonopus affinis).
3. Centipedegrass (Eremochloophiuroides).
4. St. Augustinegrass (Stenotaphrum secundatum).
5. Zoysiagrass (Zoysimatrella).
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 8
2.6 SPRIGS
A. Sod Sprigs: Healthy living stems, stolons, or rhizomes and attached roots of locally adapted grass without adhering soil, including two to three nodes and from 100 to 150 mm (4 to 6 inches) long. Obtain from heavy, dense certified sod classified as TPI GSS. Provide sprigs grown under climatic conditions similar to those of project site. Coordinate harvesting and planting to prevent sun exposure for more than 30 minutes before covering and moistening. Sprigs containing weeds or other detrimental material or that are heat damaged will be rejected.
2.7 PLUGS
A. Plugs: Nursery grown sod, certified and classified in TPI's "Guideline
Specifications to Turfgrass Sodding" as GSS.
B. Square or round sections with deep, mature root system.
1. Species to match adjacent sod.
2. Plug Size: 50 mm (2 inches) by 50 mm (2 inches).
2.8 PLANTING SOILS
A. Planting Soil: Evaluate soil for use as topsoil according to
ASTM D5268. From 5 to 10 percent organic matter as determined by topsoil composition tests of Organic Carbon, 6A, Chemical Analysis
Method described in USDA DOA SSIR 42. Maximum particle size, 19 mm
(3/4 inch), with maximum 3 percent retained on 6 mm (1/4 inch) screen.
Mix topsoil with following soil amendments and fertilizers as recommended by soils analysis.
B. Existing Planting Soil: Existing, native surface topsoil formed under natural conditions retained during excavation process and stockpiled on-site. Verify suitability of native surface topsoil to produce viable planting soil. Clean soil of roots, plants, sod, stones, clay lumps, and other extraneous materials harmful to plant growth.
1. Supplement with planting soil when quantities are insufficient.
2. Mix existing, native surface topsoil with soil amendments and fertilizers as recommended by soils analysis.
C. Imported Planting Soil: Imported topsoil or manufactured topsoil from off-site sources are acceptable if sufficient topsoil is not available on site to meet specified depth. At least 10 days before topsoil delivery, notify Contracting Officer’s Representative of topsoil sources. Obtain imported topsoil displaced from naturally well-drained
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 9 construction or mining sites where topsoil is at least 100 mm
(4 inches) deep. Topsoil from bogs, or marshes will be rejected.
2.9 INORGANIC SOIL AMENDMENTS
A. Lime: Commercial grade hydrated or burnt limestone containing calcium carbonate equivalent (CCE) specified in ASTM C602 of minimum 80 percent.
B. Sulfur: 100 percent elemental.
C. Iron Sulfate: 100 percent elemental.
D. Aluminum Sulfate: Commercial grade.
E. Perlite: Horticultural grade.
F. Agricultural Gypsum: Coarsely ground from recycled scrap gypsum board comprised of calcium sulfate dehydrate 91 percent, calcium 22 percent, sulfur 17 percent, minimum 96 percent passing through 850 micrometers
20 mesh screen, 100 percent passing through 970 micrometers 16 mesh screen.
G. Coarse Sand: ASTM C33/C33M, clean and free of materials harmful to plants.
H. Vermiculite: Horticultural grade for planters.
I. Diatomaceous Earth: Calcined, 90 percent silica, with approximately 140 percent water absorption capacity by weight.
J. Zeolites: Mineral clinoptilolite with at least 60 percent water absorption by weight.
2.10 ORGANIC SOIL AMENDMENTS
A. Organic Matter: Commercially prepared compost. Free of substances toxic to plantings and as follows:
1. Organic Matter Content: Wood cellulose fiber, wood chips, ground or shredded bark from project site when available. Biobased content 100 percent. Wood cellulose fiber processed to contain no growth or germination-inhibiting factors, dyed with non-toxic, biodegradable dye to appropriate color to facilitate visual metering of materials application.
2. Feedstock: Agricultural, food, or industrial residuals; biosolids;
yard trimmings; or source-separated or compostable mixed solid waste.
B. Peat: Natural product of sphagnum moss peat derived from fresh-water site, conforming to ASTM D4427 and containing no invasive species, Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 10 including seeds. Shred and granulate peat to pass 12.5 mm (1/2 inch) mesh screen and condition in storage pile for minimum 6 months after excavation. Biobased content minimum 100 percent.
C. Composted Derivatives: Ground bark, nitolized sawdust, humus, or other green wood waste material free of stones, sticks, invasive species, including seeds, and soil stabilized with nitrogen and having following properties:
1. Particle Size: Minimum percent by weight passing:
a. 4.75 mm (No. 4) mesh screen: 95.
b. 2.36 mm (No. 8) mesh screen: 80.
2. Nitrogen Content: Minimum percent based on dry weight:
a. Fir sawdust: 0.7.
b. Fir or pine bark: 1.0.
3. Biobased Content: 100 percent.
D. Manure: Well-rotted, horse or cattle manure containing maximum 25 percent by volume of straw, sawdust, or other bedding materials; free of seeds, stones, sticks, soil, and other invasive species.
2.11 WEED CONTROL FABRIC
A. Roll Type Polypropylene or Polyester Mats: Woven, needle punched, or non-woven fabric treated for protection against deterioration due to ultraviolet radiation. Minimum 99 percent opaque to prevent photosynthesis and seed germination, fabric allows air, water, and nutrients to pass through to plant roots.
1. Minimum weight: 0.11 kg per square meter (5 ounces per square yard).
2. Minimum thickness: 0.50 mm (20 mils).
2.12 EROSION CONTROL
A. Erosion Control Blankets: 100 percent agricultural straw stitched with degradable nettings, designed to degrade within 12 months.
B. Erosion Control Fabric: Knitted construction of polypropylene yarn with uniform mesh openings 19 to 25 mm (3/4 to 1 inch) square with strips of biodegradable paper. Minimum filler paper strip life of six months.
C. Erosion Control Net: Heavy, twisted jute mesh weighing approximately
605 grams per meter (1.22 pounds per linear yard) and 1200 mm (4 feet) wide with mesh openings approximately 25 mm (1 inch) square.
D. Erosion Control Material Anchors: As recommended by erosion control material manufacturer.
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 11
2.13 WATER
A. Water: Source approved by Contracting Officer's Representative and suitable quality for irrigation, containing no elements toxic to plant life, including acids, alkalis, salts, chemical pollutants, and organic matter. Use collected storm water or graywater when available.
2.14 PESTICIDES
A. Consider IPM (Integrated Pest Management) practices to minimize use of all pesticides and chemical products. Obtain Contracting Officer's
Representative's approval for allowable products, product alternatives, scheduling and application procedures. Evaluate existing weather and site conditions before application. Apply products during favorable weather and site conditions according to manufacturer's instructions and warranty requirements.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas to receive plants for compliance with requirements and conditions affecting installation and performance.
1. Verify that no materials that would inhibit plant growth are present in planting area. If such materials are present, remove soil and contaminants ad directed by Contracting Officer's Representative and provide new planting soil.
2. Do not mix or place soils and soil amendments in frozen, wet, or muddy conditions.
3. Suspend soil spreading, grading, and tilling operations if soil moisture becomes excessive. Resume soil preparations when moisture content returns to acceptable level.
4. If soil is excessively dry, not workable, and too dusty, moisten uniformly.
5. Special conditions may exist that warrant variance in specified planting dates or conditions. Submit written request to Contracting
Officer’s Representative stating special conditions and proposed variance.
B. Proceed with planting operations only after unsatisfactory conditions have been corrected.
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 12
3.2 PREPARATION
A. Protect existing and proposed landscape features, elements, and site construction and completed work from damage. Protect trees, vegetation, and other designated features by erecting high-visibility, reusable construction fencing. Locate fence no closer to trees than drip line.
Plan equipment and vehicle access to minimize and confine soil disturbance and compaction to areas indicated on drawings.
B. Install erosion control materials at all areas inside or outside limits of construction that are disturbed by planting operations. Provide erosion control and seeding with native plant species to protect slopes.
C. Stake out approved plant material locations and planter bed outlines on project site before digging plant pits or beds. Contracting Officer’s
Representative reserves right to adjust plant material locations to meet field conditions. Do not plant closer than 152 mm (6 inches) to building wall, pavement edge, fence or wall edge, and other similar structures. Provide on-site locations for excavated rock, soil, and vegetation.
3.3 GROUND COVER AND PLANT INSTALLATION
A. Place ground cover and plants, not including trees, shrubs, and vines, as indicated on drawings.
B. Use prepared soil mixture for backfill.
C. Plant ground cover in areas to receive erosion control materials through material after erosion control materials are in place.
3.4 SODDING
A. Place sod maximum 36 hours after initial harvesting according to
TPI GSS, except as modified herein.
B. For slopes 2 to 1 and greater, lay sod with long edge perpendicular to contour. For V-ditches and flat bottomed ditches, lay sod with long edge perpendicular to water flow. On sloped areas, start sodding at bottom of slope.
C. Finishing: After sodding, blend edges of sodded area smoothly into surrounding area. Eliminate air pockets and provide true and even surface. Trim frayed areas and patch holes and missing areas with sod.
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 13
D. Rolling: Immediately after sodding, firm entire area, except slopes in excess of 3: 1, with roller maximum 134 kg (90 lbs.) for each foot of roller width.
E. Watering: Start watering sodded areas as required by daily temperature and wind conditions. Water at rate sufficient to ensure thorough wetting of soil to minimum 150 mm (6 inches) deep. Prevent run-off, puddling, and wilting. Do not drive watering trucks over turf areas, unless otherwise directed. Prevent watering of other adjacent areas or plant materials.
3.5 SPRIGGING
A. Plant sod sprigs after finish grade is properly prepared and thoroughly soaked day in advance. Plant sprigs in rows spaced maximum 300 mm
(12 inches) apart with springs placed in rows at maximum 150 mm
(6 inches) apart. Firm entire area with roller not exceeding 130 kg/m
(90 lb./ft.)of roller width. Do not roll slopes over maximum 3: 1.
Water thoroughly and keep soil moist. Weed by hand or hoe. Do not treat sprig area with herbicide.
3.6 PLUGGING
A. Plant fresh sod plugs after finish grade is properly prepared. Plant plugs in rows, spaced 300 mm (12 inches) apart in both directions. On slopes, contour rows to near level. Water thoroughly and keep soil moist. Weed by hand or hoe. Do not treat plug area with herbicide.
3.7 SEEDING
A. Broadcast and Drop Seeding: Uniformly broadcast seed at rate of (3.45 pounds per 1000 square feet). Use broadcast or drop seeders. Sow one-half seed in one direction and sow remainder at right angles to first sowing. Cover seed uniformly to maximum 6 mm (1/4 inch) deep in clay soils and 13 mm (1/2 inch) deep in sandy soils by means of spike-tooth harrow, cultipacker, raking, or other approved device.
B. Rolling: Immediately after seeding, firm entire area, except for slopes in excess of 3 to 1, with roller not exceeding 130 kg/m (90 lb./ft.) of roller width.
3.8 TURF RENOVATION
A. General: Restore to original condition existing turf areas damaged during turf installation and construction operations. Keep at least one
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 14 paved pedestrian access route and one paved vehicular access route to each building clean at all times. Clean other paving when work in adjacent areas is complete.
B. Vertical Mowing: At completion of aerating and, with Contracting
Officer's Representative's approval to proceed, vertical mow turf areas indicated on drawings with approved device to 6 mm (1/4 inch) deep above existing soil level to reduce thatch build-up, grain, and surface compaction. Remove all debris generated during this operation off site.
3.9 PLANT MAINTENANCE
A. Frequency: Begin maintenance immediately after plants have been installed. Inspect plants at least once week and perform required maintenance promptly.
B. Promotion of Plant Growth and Vigor: Water, prune, fertilize, mulch, eradicate weeds, and perform other operations necessary to promote plant growth and vigor.
3.10 SLOPE EROSION CONTROL MAINTENANCE
A. Provide slope erosion control maintenance to prevent undermining of all slopes in newly landscaped and natural growth areas. Maintenance tasks include immediate repairs to weak spots in sloped areas to intercept and direct water flow to prevent development of large gullies and slope erosion.
1. Fill eroded areas with amended topsoil and replant with same plant species.
2. Reinstall erosion control materials damaged due to slope erosion.
3.11 REMOVAL OF DYING OR DEAD PLANTS
A. Remove dead and dying plants and provide new plants immediately upon commencement of specified planting season and replace stakes, guys, mulch, and eroded earth mound water basins. No additional correction period will be required for replacement plants beyond original warranty period. Plants will be considered dead or dying as follows:
1. Tree: Main leader died back or minimum 20 percent of crown died.
2. Shrub and Ground Cover: Minimum 20 percent of plant died.
3. Determination: Scrape on maximum 2 mm (1/16 inch) square branch area to determine dying plant material cause and provide recommendations for replacement.
Bath VAMC
EHRM Infrastructure and Data Center Upgrades
32 90 00 - 15
3.12 TURF MAINTENANCE
A. Mow turf to uniform finished height measured from soil. Perform mowing in manner that prevents scalping, rutting, bruising, uneven and rough cutting. Before mowing, remove and dispose of all rubbish, debris, trash, leaves, rocks, paper, and limbs or branches on turf areas. Sweep or vacuum clean adjacent paved areas.
B. Apply fertilizer in manner that promotes health, growth, vigor, color and appearance of cultivated turf areas. Determine method of application, fertilizer type and frequencies by results of laboratory soil analysis. Provide organic fertilizer. If organic fertilizer does not produce desired effect, contact Contracting Officer's
Representative for approval before applying synthetic fertilizer. Apply fertilizer by approved methods and according to manufacturer's instructions.
C. Watering: Perform irrigation in manner that promotes health, growth, color, and appearance of cultivated vegetation, complying with Federal, State, and local water agency and authority directives. Prevent overwatering, water run-off, erosion, and ponding due to excessive quantities or rate of application.
D. Aeration: Eradicate weeds and, with Contracting Officer's
Representative's approval to proceed, aerate turf areas with approved device. Core, by pulling soil plugs to minimum 4 inches deep. After aeration operations are complete, top-dress entire area 6.35 mm
(1/4 inch) deep. Blend all parts of topdressing mixture to uniform consistency. Clean all soil plugs off of other paving when work is complete.
3.13 CLEANING
A. Remove and legally dispose of all excess soil and planting debris.
3.14 PROTECTION
A. Protect plants from traffic and construction operations.
B. Provide temporary fences or enclosures and signage, at planted areas.
Maintain fences and enclosures during maintenance period.
C. Remove protective materials immediately before acceptance.
D. Repair damage.
- - - E N D - - -