This document is a Technical Questions and Responses Tracking Sheet for Solicitation #36C77625R0084, relating to a Design-Build EHRM Infrastructure Upgrades project for additional FCUs (Fan Coil Units) in Aurora, Colorado. The tracking sheet contains three key contractor questions and corresponding VA responses, focusing on proposal submission requirements and past performance guidelines.

The key points include: (1) previously completed Past Performance Questionnaires (PPQs) are acceptable for submission, (2) the government will consider past performance examples from proposed Architecture/Engineering (A/E) subcontractors, and the A/E firm does not need to have been the prime contractor on previous projects, and (3) for joint venture (JV) submissions, it is acceptable for the "Project Experience" section to reflect the past performance of only one JV member, provided that member has extensive experience with projects of similar scope, size, and complexity as described in the solicitation. A Subcontractor Consent Form or Letter of Commitment is required at the time of proposal submission, with no specific format preference.

View the file

Other files

File Type Posted
S06- 36C77625R0084 0001.pdf PDF
Att 4- 10.MH.104.pdf PDF
Att 2- 10.MH.102.pdf PDF
Att 6- 10.MP.103.pdf PDF
Att 11 - Division Cost Breakdown.xlsx XLSX spreadsheet
Att 13- DBA Rates - Adams County - 09.15.25.pdf PDF
Att 7 - 10.MP.104.pdf PDF
Att 3- 10.MH.103.pdf PDF
Att 1- SOW 554-21-700P2 EHRM Infra Upgrades.pdf PDF
36C77625R0084.pdf PDF
Att 8 - PEQ.docx DOCX document
Att 10 - Limitations on Subcontracting - Construction.docx DOCX document
Att 5 - 10.MP.102.pdf PDF
Att 12- Service Rates - Adams County 09.15.25.pdf PDF
Att 9 - PPQ.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONS AND SOLICITATION #: 36C77625R0084

RESPONSES TRACKING SHEET PROJECT TITLE: 554-21-700P2 Design-Build EHRM Infrastructure Upgrades ( Additional FCU’s)- Aurora-CO

# RECEIVED ANSWERED CONTRACTOR QUESTION VA RESPONSE

1 Is it acceptable to submit previously completed PPQs from past projects, or do new PPQs need to be submitted?

Previously completed PPQs are acceptable for submission.

2 Will the Government consider past performance examples from a proposed A/E firm acting as our subcontractor, provided the projects meet the stated relevance criteria.

a. If so, does that A/E firm need to have acted as prime on the presented projects?

b. Also, if subcontractor past performance is permitted, is a Subcontractor Consent Form or Letter of Commitment required at the time of proposal submission? If so, is there a specific format or template the Government prefers?

Yes, the Government will consider past performance examples from a proposed A/E acting as a subcontractor.

a. No, A/E does not need to have acted as Prime.

b. Yes, a Subcontractor Consent Form or Letter of

Commitment required at the time of proposal. We don’t have preference for specific format or template.

3 Would it be acceptable for the Phase I “Project Experience” section to reflect the past performance and project history of only one JV member, provided that the member possesses extensive experience with projects of similar scope, size, and complexity as those described in the solicitation.

Yes, it is acceptable if one entity within a JV is able to meet relevancy requirements.

ANSWERED