About this file

This is an Environmental Design Narrative document for a VA construction project at the Robert J. Dole VA Medical Center in Wichita, Kansas. The document details a comprehensive asbestos and lead inspection of Building 3, which is part of a project to construct an addition and renovate the facility's pharmacy spaces. The inspection, conducted on March 26-28, 2024, identified six asbestos-containing materials, primarily consisting of floor tiles, mastics, and floor leveling compounds on the second floor, with an estimated total impact area of approximately 5,800 square feet. Additionally, the survey found two lead-containing paint samples, including a grey door frame paint on the ground floor pharmacy break room.

The project involves a three-story addition to Building 3, approximately 2,500 square feet per floor, and renovation of the ground floor and half of the first floor to modernize the Outpatient and Inpatient Pharmacy spaces. The renovation aims to address current healthcare design requirements, improve pharmacy workflow, and create new administrative workspaces. The environmental narrative provides detailed recommendations for asbestos and lead-based paint removal, emphasizing that all abatement activities must be performed by licensed professionals in accordance with EPA-AHERA training requirements. The project is being managed by the Department of Veterans Affairs Technology Acquisition Center Austin, with the solicitation number 36C77625B0034.

View the file

Other files

File Type Posted
36C77625B0034 0005.docx DOCX document
BID OPENING ATTENDEES LIST.docx DOCX document
Redacted Abstract of Bids - Wichita Minor Construction.pdf PDF
Revised Geotech Report - VA Renovation and Additions.pdf PDF
Construction Heavy Wage Rates - Sedgwick County - 8-22-25.pdf PDF
00 01 10 Table of Contents.pdf PDF
Addendum 01_COMBINED DRAWINGS.pdf PDF
36C77625B0034 0004.docx DOCX document
Technical Question Tracker - Wichita Minor Construction.docx DOCX document
Construction Building Wage Rates - Sedgwick County - 8-22-25.pdf PDF
589-707 Grading CAD Files 1 of 2.zip ZIP file
13 21 13 Pass Through Cabinet.pdf PDF
Front End Narrative.pdf PDF
589-707 Grading CAD Files 2 of 2.zip ZIP file
12 93 14 Bicycle Storage Lockers.pdf PDF
589-707_Equipment Cutbook 1 of 2.pdf PDF
36C77625B0034 0003.docx DOCX document
589-707 Equipment Cutbook 2 of 2.pdf PDF
589-707 Combined MEP Calcs.pdf PDF
589-707 Combined MEP Cutsheets.pdf PDF
36C77625B0034 0002.docx DOCX document
Completed Site Visit Sign-in Sheet.pdf PDF
36C77625B0034 0001.docx DOCX document
Attachment 10 - Site Visit Instructions.docx DOCX document
Attachment 9 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 3 - Drawings Volume 1.pdf PDF
Attachment 2 - Specs Volume 2.pdf PDF
Attachment 7 - Combined PCRA.pdf PDF
36C77625B0034.pdf PDF
Attachment 4 - Drawings Volume 2.pdf PDF
Attachment 6 - Geotech Report.pdf PDF
Attachment 8 - Construction Wage Rates - Sedgwick County - 6-20-25.pdf PDF
Attachment 5 - Drawings Volume 3.pdf PDF
Attachment 1 - Specs Volume 1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

PROJECT NAME

VA589-707 (2309)

Construct Addition and Renovate Bldg 3 and Associated Parking

SUBMITTAL 100% Bid Set SUBJECT Architectural Design Narrative

Architecture 1

Project Overview and Background

The Robert J. Dole VA Medical Center is a Joint Commission accredited, complexity level 2 facility located in Wichita, Kansas. The Medical Center is a primary and secondary care facility.

It is a teaching hospital, providing a full range of patient care services, with state-of-the-art technology. Comprehensive health care is provided through primary care, secondary care, and long-term care in areas of medicine, surgery, psychiatry, physical medicine and rehabilitation, cardiology, neurology, oncology, dentistry, visual impairment, and low vision rehabilitation, spinal cord dysfunction, TBI, polytrauma, pain management, PTSD, homeless, MHICM, prosthetic laboratory/orthotics, and extended care services.

Building 3, the Administration Building, is a thirteen-bay, three-story, rectangular building with a hip roof, exhibiting a five-course, common-bond brick exterior, and constructed in the Colonial

Revival style with a symmetrical façade. The building has brick quoins, a cornice with dentil details, and cornice returns. The building has a three-bay (w/d/w), gable-roof, central projecting entrance pavilion with cornice returns. The central double-leaf entry is filled with automatic sliding glass doors, sidelights, and transom. The windows have been replaced with 8/8, double-hung windows. The second-floor tripartite window is surmounted by a decorative arched wooden panel. The addition of an ambulance entrance in 1971 includes a single-story, flat-roof canopy projecting from the primary façade of the building. The roof has gabled dormers with lunette transoms, pilasters, and cornice returns on the front and rear roof. The building has punched window openings and is approx. 15,000 square feet built in approximately 1932. This building is part of the Historical District on campus and will need to be reviewed in part with the State

Historical Preservation Organization. Building 3 is surrounded on two sides by existing building

1 to the East, and buildings 26 and 29 to the North / Northeast.

The building currently houses Outpatient Pharmacy, Inpatient Pharmacy, Exam Rooms and

Administration and Doctor Offices. The existing exam room spaces and administration offices in the building are to remain but may see updated layouts as part of the project renovation scope.

The existing Outpatient Pharmacy and Inpatient Pharmacy although adequate at the time of original installation, but recent changes to healthcare guidelines and VA design standards have

VA589-707 (2309)

Construct Addition and Renovate Bldg 3 and Associated Parking

Architecture 2 made this facility outdated and not functional based on current healthcare practices, trends, and patient pharmacy capacity.

This project involves designing a three-story addition to Building 3 at approximately 2,500 SF per floor. Renovation of the entire ground floor and half of the level one floor plan. The remainder of level 1 and level 2 shall receive corridor renovations only. The new project space (addition plus renovation) shall address the current design requirements for Outpatient Pharmacy on the ground floor and Inpatient Pharmacy on the first floor. The new Outpatient Pharmacy area on the ground floor will create a new pharmacy waiting and counseling space. This space will accessible from Building 29 to provide easy access for the veteran to receive medications after their primary care appointments and to provide overflow waiting space in Building 29 for the pharmacy. The existing Outpatient pharmacy space will be updated to meet the current pharmacy design requirements and to maximize pharmacy process. The first floor of the new addition and renovation of the existing area shall update the size of the Inpatient pharmacy area for current patient needs. The second floor will create a space to provide administrative workspace in the new addition and to renovate the existing administrative areas as needed to maximize office area for VA staff.

The current site parking configuration on the south side of campus consists of several small parking areas that do not meet current patient capacity needs. This project includes a parking reconfiguration that will maximize parking throughout the south side of the campus and allow more efficient access to the VA campus buildings. This will include updating the current building

3 parking lot that will be regraded to match the adjacent parking grades to help facilitate the parking quantity. Along with this scope of work, the entry and exit on the south face of Building

3 will be restored with a stair up to level one and a covered porch that shall be design

VA589-707 (2309)

Construct Addition and Renovate Bldg 3 and Associated Parking

Architecture 3

Historic Preservation

The Wichita VAMC and Building 3 are historic and require special attention with regard to design and aesthetic. For the Building 3 addition, located at the western portion of the South face of campus, this project aims to tie into the existing character of Building 3, while standing apart as something that is not historic itself. For the exterior design, the new addition will utilize similar brick and cast stone elements that relate in character to both Building 3 and the recently built

Building 29. This design sets the front façade back so that it does not align with the existing

Building 3 façade. In this regard, there is a clear distinction between the existing and new buildings. The western-most portion of the addition does protrude south past the face of Building

3; however, a part of this project scope will be to regrade the approach to the front entry and provide a stair and covered porch up to the level one entrance. This new stair and porch will protrude further south than the building addition.

At the roof level, the addition will attach to Building 3 by way of a flat roof that will connect the existing Building 3 pitched roof to a new pitched roof over the rest of the addition on the west.

Construction Phasing

Phased construction is a requirement to maintain an operational facility, especially for critical

Inpatient and Outpatient pharmacy services. Please refer to general phasing drawing sheets for additional phased construction information.

A general summary of the intended phasing will be to build all levels of the addition and then renovate portions of the existing building incrementally. In this manner, new pharmacy spaces will be constructed and utilized while existing spaces are renovated.

VA589-707 (2309)

Construct Addition and Renovate Bldg 3 and Associated Parking

Architecture 4

Occupancy & Classifications

NFPA 101 - 2021 EDITION [IBC 2021 EDITION (Where applicable)]

NEW BUSINESS (Ch. 38) AND EXISTING BUSINESS (Ch. 39) OCCUPANCIES

NFPA 220-2021 CHAPTER 4- TABLE 4.1.1

CONSTRUCTION TYPE: TYPE 1 (332)

FIRE RESISTANCE RATINGS

COLUMNS: 3 HR

BEAM, GIRDERS, TRUSSES: 3 HR

FLOOR/CEILING ASSEMBLIES: 2 HR

ROOF/CEILING ASSEMBLIES: 1 1/2 HR

EXTERIOR NON-BEARING WALLS: NR

INTERIOR NON-BEARING WALLS: NR

FIRE-RESISTIVE REQUIREMENTS:

NON-COMBUSTIBLE MATERIALS FOR STRUCTURAL FRAME, FLOORS, ROOF DECK,

EXTERIOR NON-BEARING WALLS, INTERIOR NON-BEARING WALLS (U.N.O. AT

EXTERIOR)

BUILDING IS EQUIPPED WITH A FULLY AUTOMATIC FIRE SPRINKLER SYSTEM

THROUGHOUT.

BUILDING AREA:

AREA LIMITATION: 85,500 SQUARE FEET (2021 IBC TABLE 506.2)

EXISTING TOTAL AREA 14,151 GROSS SQUARE FEET

NEW ADDITION AREA 7,500 GROSS SQUARE FEET

VA589-707 (2309)

Construct Addition and Renovate Bldg 3 and Associated Parking

Architecture 5

VA Planning, Design and Construction Criteria

Design Manual Reference PG-18-10

Design and Construction Procedures, PG-18-3

A/E Submission Instructions, PG-18-15, Minor and NRM Projects, Vol C

Standard Details. Program Guide, PG-18-4

Equipment Guide List PG-18-5

Equipment Guide List Index

Space Planning Criteria, PG-18-9

VA-Space and Equipment Planning System (VA-SEPS)

Architectural Accessibility and VA Barrier Free Design Standards PG-18-13

Asbestos Abatement Design Manual

VA Signage Design Guide

Master Construction Specifications, Program Guide PG-18-1

VA Design Alerts

VHA Fire Protection Design Manual

VHA National BIM/CAD Standards

Physical Security Design Manual

Whole Building Commissioning Process Manual

VA Sustainable Design Manual

Infrastructure Standards for Telecommunications Spaces

National Codes and Standards (NFPA, NEC, Natl. Plumbing Code, EPA, OSHA, Department of Veterans Affairs)

VA589-707 (2309)

Construct Addition and Renovate Bldg 3

SUBJECT Interior Design Narrative

Interior Design 1

Interior Design Concept

The renovation and addition of Building 3 will feature modernized interior finishes and millwork.

The interior finishes selected support a comfortable and healing environment by replicating soft, natural colors and textures for patient and staff well-being. Finishes that are durable and easy to maintain were selected to withstand high foot traffic, equipment uses, and enhanced cleaning and disinfection measures. Anti-microbial plastic laminate and impervious countertop materials such as solid surface and quartz will reinforce all millwork through patient and caregiver areas. Lastly, patient and caregiver comfort and privacy will be supported with acoustical ceilings with high NRC ratings and privacy partitions at all pharmacy consult windows.

Floor finishes throughout the inpatient and outpatient pharmacies emphasize work areas and circulation paths. Rubber flooring provides comfort underfoot for staff who are on their feet for long periods of time and durability for cart traffic. Wall protection such as rigid vinyl wallcoverings, bumper guards, and corner guards will be applied in all high-traffic areas where cart traffic is expected. Buffer rooms will receive a resinous floor with a smooth and broadcast-free finish complete with an integral base and epoxy paint coated wall and ceiling surfaces for easy cleaning.

Reference the provided 3D walkthrough videos for rendered views of Building 3.

Signage & Wayfinding

New signage will meet the guidelines provided in the VA Signage Design Manual. Directional and identification signage will enforce a firm distinction between staff and patient areas and provide clear direction for visiting staff in the pharmacies. The final sign design and messages will be determined by the VA and any applicable facility standards so that new signage is cohesive with the campus’s current wayfinding strategy.

VA589-707 (2309)

Construct Addition and Renovate Bldg 3

Interior Design 1

Interior Finish Board – Patient Areas

VA589-707 (2309)

Construct Addition and Renovate Bldg 3

Interior Design 2

Interior Finish Board – Pharmacy Work Areas

VA589-707 (2309)

Construct Addition and Renovate Bldg 3

Interior Design 3

Interior Finish Board Legend

ABBR. MATERIAL MANUFACTURER SIZE SERIES/COLLECTION COLOR

FLOOR

CPT1 CARPET TILE INTERFACE 10” X 40” RECLAIM 104143 FADED DENIM

CPT2 CARPET TILE INTERFACE 20” X 20” LIGHTHEARTED 107401 MAJESTIC

LVT1 LUXURY VINYL TILE INTERFACE 10” X 40” EARTHEN FORMS / HEARTH 4.5MM A03504 MARBLE DUST

LVT2 LUXURY VINYL TILE INTERFACE 10” X 40” EARTHEN FORMS / HEARTH 4.5MM A03502 GRIS

MAT1 ENTRY WAY SYSTEM INTERFACE 20” X 20” STEP REPEAT COLLECTION SR999 104936 IRON

PT1 PORCELAIN TILE DALTILE 12” X 24” RIGID CLAY / PLATEAU DUNE RC11

RES1 RESINOUS FLOOR DUR-A-FLEX -- HYBRIFLEX ES SMOKE BLUE

RES2 RESINOUS FLOOR DUR-A-FLEX -- HYBRIFLEX ES CONCRETE GREY

RF1 RUBBER SHEET FLOOR NORA -- ENVIRONCARE 3.0MM 7046 DRIVE-IN

RF2 RUBBER SHEET FLOOR NORA -- ENVIRONCARE 3.0MM 7051 SNOWBALL FIGHT

WSF1 WELDED SHEET FLOOR TEKNOFLOR -- FORESTSCAPES 52210 ABACOA

BASE

RB1 RUBBER BASE NORA 4” WALL BASE COBBLESTONE

RES1 RESINOUS FLOOR DUR-A-FLEX 6” HYBRIFLEX EF SMOKE BLUE

RES2 RESINOUS FLOOR DUR-A-FLEX 6” HYBRIFLEX EF CONCRETE GREY

RF1 RUBBER SHEET FLOOR – INTEGRAL BASE NORA 4” ENVIRONCARE 3.0MM 7046 DRIVE-IN

VA589-707 (2309)

Construct Addition and Renovate Bldg 3

Interior Design 4

RF2 RUBBER SHEET FLOOR – INTEGRAL BASE NORA 4” ENVIRONCARE 3.0MM 7051 SNOWBALL FIGHT

WSF1 WELDED SHEET FLOOR – INTEGRAL BASE TEKNOFLOR 4” FORESTSCAPES 52210 ABACOA

WALL

CT1 CERAMIC TILE DALTILE 8” X 24” COLOR WHEEL LINEAR ARCHITECTURAL GRAY 0109

P1 FIELD PAINT SHERWIN WILLIAMS - EGGSHELL GREEK VILLA SW7551

P2 ACCENT PAINT SHERWIN WILLIAMS - EGGSHELL FAVORITE JEANS SW9147

P3 EPOXY PAINT SHERWIN WILLIAMS - EGGSHELL GREEK VILLA SW7551

P8 ACCENT PAINT SHERWIN WILLIAMS EGGSHELL MOUNTAIN AIR SW6224

P9 ACCENT PAINT SHERWIN WILLIAMS EGGSHELL NIEBLA AZUL SW9137

PT2 PORCELAIN TILE DALTILE 12’’ X 24” CALLIGO TUSK

RWC1 RIGID VINYL WALLCOVERING INPRO -- ROLLED PALADIUM RIGID SHEET EGGSHELL 0111

RWC2 RIGID VINYL WALLCOVERING INPRO -- ROLLED PALADIUM RIGID SHEET CLEAR BLUE 0390

WP1 WOOD WALL PANELS SOUNDPLY 24” X 48” ALTA WALNUT

CEILING

P5 ACCENT CEILING PAINT SHERWIN WILLIAMS -- FLAT FAVORITE JEANS SW9147

WCP1 WOOD CEILING PANELS SOUNDPLY 24” X 48” LATUS WALNUT

DOOR

P7 DOOR FRAMES SHERWIN WILLIAMS -- SEMI-GLOSS DORIAN GRAY SW7017

WALL PROTECTION

CG1 CORNER GUARD INPRO 2” WING, 8” HEIGHT SURFACE MOUNT STAINLESS

STEEL CORNER GUARD

STAINLESS STEEL

VA589-707 (2309)

Construct Addition and Renovate Bldg 3

Interior Design 5

CG2 END-WALL PROTECTOR INPRO 2” WING, 8’ HEIGHT SURFACE MOUNT STAINLESS

STEEL END WALL PROTECTOR

STAINLESS STEEL

CG3 CORNER GUARD INPRO 2” WING, 48” HEIGHT 160 HIGH IMPACT CORNER GUARD EGGSHELL 0111

CG4 CORNER GUARD INPRO 2” WING, 48” HEIGHT 160 HIGH IMPACT CORNER GUARD CLEAR BLUE 0390

CG9 END-WALL PROTECTOR INPRO 2” WING, 48” HEIGHT 160D HIGH IMPACT END WALL

PROTECTOR

EGGSHELL 0111

HR1 HANDRAIL INPRO -- 800 HANDRAIL GRAYSTON 0151

MILLWORK

PL1 PLASTIC LAMINATE WILSONART -- WILSONART HD (ANTI-MICROBIAL) RALEIGH WALNUT

PL2 PLASTIC LAMINATE WILSONART -- SOLICOR DESIGNER WHITE

QTZ1 QUARTZ WILSONART -- QUARTZ SELECT Q6018 URBAN CLOUD

SSM1 SOLID SURFACE WILSONART -- -- 1573MG FROSTY WHITE

MIRAGE

OTHER

RP1 RESIN PANEL 3FORM -- VARIA ROBIN B39

STR1 STAIR TREADS AND RISERS NORA -- NORAMENT HAMMERED 5337 ASH

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBJECT Medical Planning Design Narrative

Medical Planning 1

Medical Planning Overview

The medical planning effort for the VA Wichita Building 3 Addition/Renovation of the Inpatient and Outpatient Pharmacy Service design project includes the core functions of Prescription

Receiving/Dispensing; Prescription Filling; Controlled Substance Vault; Outpatient Mail Outs;

Bulk Storage; Hazardous and Non-Hazardous Compounding; Unit Dose Repackaging; and

Admin Areas.

Pharmacy Space Programming

The primary Inpatient and Outpatient Pharmacy spaces and functions are identified in the VA

Pharmacy Services Design Guide (268) published in April 2018. This addition/renovation effort will comply with the elements of that criteria and design guide. The Pharmacy is comprised of all functional areas required to receive, process, fill, store and distribute all manners of medications to the Veteran population supported by the Wichita VA Medical Center.

The following major functions are included in the renovation of the VA Wichita Inpatient and

Outpatient Pharmacy:

• Dispensing and Consult Area: Work area with secure transaction windows / pass throughs for dispensing medication to patients, and for conducting general (non-confidential) consults with Pharmacists.

• Dispensing Window: Secure transaction window with pass-thru for dispensing medication to patients; not intended for patient consults.

• Consult Room: Private space for confidential patient consults with Pharmacists.

• Filling / Assembly Area: Pharmacist / Technician work stations, and active shelving for storage of medications and prepackaged items required for filling of prescriptions.

• Automated Filling / Storage: Space for automated filling robot, and for storage of bulk medications and supplies.

• Processing Area: Pharmacist workstation for initial receiving and validation of prescriptions, and for conducting phone consultations with providers.

589-707 (2309) Construct Addition and Renovate Bldg 3

Medical Planning 2

• Secured Dispensing / Storage: Restricted access work area for storing / processing narcotics and controlled substances. Includes space for packaging and holding mail-out prescriptions, handling returned mail, and for expired drug collection / disposal.

• Mail Out Area: Work space for packaging and shipping of filled prescriptions, and for processing returned mail.

• Call Center: Space for Pharmacy Technicians to conduct phone consults with patients.

• Inventory Receiving / Breakdown: Space for receiving, verification, and breakdown of deliveries.

• Repackaging Area: Work area and equipment for processing bulk medications into individual unit doses.

• Non-Sterile Compounding: Must comply with requirements in USP <795>.

• Sterile Compounding Anteroom: Transition area from non-sterile to positive or negative pressure buffer area; for scrubbing and garbing prior to entering Buffer Rooms.

• Sterile Non-Hazardous Drug Buffer Room: Positive pressure buffer area / clean room for mixing, transferring, and assembling components of non-hazardous drug compounded sterile preparations.

• Sterile Hazardous Drug Buffer Room: Negative pressure buffer area / clean room for mixing, transferring, and assembling components of hazardous drug compounded sterile preparations.

• Sterile Compounding Storage Room: Storage for sterile fluid bags and IV admixture materials and supplies.

• Hazardous Drug Storage Room: Negative pressure space for unpacking and storage of hazardous drugs; connect bypass-through to the Sterile Hazardous Drug Buffer Room.

• Sterile Compounding Workarea: Non-sterile work area adjacent to Buffer Rooms and connected with a pass-through, for support of both hazardous and non-hazardous compounded sterile preparation activities.

• Filling / Assembly Carousel: Automated storage and retrieval system for drugs and medication supplies required for filling orders. Space includes static shelving for overstock or bulky items that are not compatible with the carousel bins.

589-707 (2309) Construct Addition and Renovate Bldg 3

Medical Planning 3

Outpatient Pharmacy Planning and Flow

The proposed layout of the Outpatient Pharmacy will adhere to the VA Design Guide adjacencies and functional relationships.

Figure MP1: Outpatient pharmacy adjacency bubble diagram from VA Design Guide

589-707 (2309) Construct Addition and Renovate Bldg 3

Medical Planning 4

Figure MP2: Outpatient pharmacy adjacency mockup diagram from the VA Design Guide

Inpatient Pharmacy Planning and Flow

The proposed layout of the Inpatient Pharmacy will adhere to the VA Design Guide adjacencies and functional relationships.

Figure MP3: Inpatient pharmacy adjacency bubble diagram from VA Design Guide

589-707 (2309) Construct Addition and Renovate Bldg 3

Medical Planning 5

Figure MP4: Inpatient pharmacy adjacency mockup diagram from the VA Design Guide

Planning Concepts

The selected planning concepts is based on the space program developed for the Inpatient and Outpatient Pharmacy Service on the ground and first floors of the addition/renovation of

Building 3. We are also tracking administrative and clinical space for departments/staff that will occupy part of the first floor and all of the second floor. These will be tracked as double loaded corridor administrative and clinical space (office, team rooms, etc).

The initial space program or Program for Design (PFD) was drafted following programmatic requirements of the VHA’s Pharmacy Service Design Guide, Pharmacy Service Space

Planning Criteria (Chapter 268), and the VA Space and Equipment Planning System (SEPS).

The draft space program was subsequently refined based on the Pharmacy User Group

Interviews and an interim review/comment period for approval of the PFD.

589-707 (2309) Construct Addition and Renovate Bldg 3

Medical Planning 6

The PFD is included in the submission for reference. Outpatient Pharmacy includes the main administrative areas and is planned at 5,035 Net Square Feet (NSF). Inpatient Pharmacy is planned for 3,722 NSF.

Pharmacy Programmatic Requirements

Description:

Outpatient:

• 4 Receiving/Dispensing Windows (2 Standard; 1 ADA; 1 Private)

• 9 Pharmacist Workstations

• 4 Pharmacist Tech Workstations

• 2 Call Center Workstations

• Secured Dispensing (Vault)

• Mail-Out Workstation

• 3 Procurement Tech Workstations

• 4 Offices (Chief, 2 Asst Chief; and AO) in Outpatient

• 1 Staff Consult/Counseling Room

• 4 Non-VA Care Pharmacists Cubicles

• 2 Non-VA Care Techs Cubicles

• 3 Intermittent/Students Cubicles

• 1 ADPAC Cubicles

• 2 Touchdown Cubicles

Inpatient:

• 4 Pharmacists Cubicles

• 4 Tech Cubicles

• 1 Tech Supervisor

• 1 Inpatient Supervisor Office

• 1 CSP Workstation

• Carousel (maintain existing in place)

• Repackaging Area

• Non-Sterile Compounding

589-707 (2309) Construct Addition and Renovate Bldg 3

Medical Planning 7

• Sterile Compounding, Hazardous

• Sterile Compounding, Non-Hazardous

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBJECT Environmental Design Narrative

Environmental 1

Project Overview and Background

Riverfront Safety & Health, LC (RSH), a Service-Disabled Veteran Owned Small Business, has provided a limited asbestos & lead identification survey and abatement plan in support of the 100% Construction Document stage for the Construct Addition and Renovate Bldg. 3 for Pharmacy and Associated ADA Parking Project, (VA Project 589-707) proposed at the Robert J. Dole VA Medical Center in Wichita, Kansas (The Project).

The federal National Emission Standard for Asbestos (NESHAP) requires that prior to any demolition or renovation activity in a building, a thorough inspection of the affected facility or part of the facility where the demolition or renovation operation will occur, must be performed for the presence of asbestos, including Category I and Category II non-friable asbestos-containing material (ACM). The limited project specific asbestos and lead, and mold survey was performed by Jamison Bear, and Travis Carter, of RSH, on March 26, 27, and 28, 2024.

Mr. Bear and Mr. Carter are accredited under the Asbestos Hazard Emergency Response Act (AHERA) and the U.S. Environmental Protection Agency Model Accreditation Program for Asbestos Building Inspectors. All work was performed under the direct supervision of a Certified Industrial Hygienist (CIH), Mr. Justin R. Rhyneer to ensure standard EPA- NESHAP/AHERA/OSHA field inspection and sampling methods were employed for representative project inspection. Principal contacts for this project were Tyler McCune of the Robert J. Dole VA Medical Center and Zack Long from Spur-Design. Access to areas of investigation was provided during regular hospital hours.

During The Project inspection performed on March 26, 27, and 28, 2024, the scope of The Project was understood to include the following:

Interior finishes within Building 3 on the ground floor, first floor, second floor, and attic are scheduled for renovation. Finishes scheduled for renovation may include but are not limited to the following materials: floor coverings, cove bases, mastics, wall and ceiling materials, ceiling tiles, CMU block, structural concrete, lights, HVAC, water lines, as well as various paints and coatings.

The exterior finishes with Building 3 include brick, brick grout, windows, and the parking lot on buildings 3, 1, 4, 29 and 62.

The limited asbestos and lead field survey was conducted with the following limitations:

• At the time of the inspection, RSH performed inspections based on drawings showing proposed areas of renovation and modifications to existing buildings.

• The areas within Project scope were part of a fully functioning healthcare facility.

Limitations of the inspection were at least partially based upon the operation of the facility and due to, but not limited to, occupation of, use of, and access to areas within The Project scope.

589-707 (2309) Construct Addition and Renovate Bldg 3

Environmental 2

• The limited mold assessment was based on visual observations only.

• General areas that were inaccessible for inspection limited the inspector’s ability to directly observe and/or collect sufficient bulk samples included: any components located within chases. Original building chases with asbestos pipe insulation is thought present within all buildings.

• Inspection was non-intrusive in nature, therefore exterior wall voids and assumed chase locations were not penetrated for observation.

Based on the age of the facility and potential methodology of contract work, anticipated suspect materials included caulks, duct seam sealants, black tar, asbestos fire doors, asbestos pipe insulation, asbestos floor tiles, asbestos black tile mastic, structural caulks, asbestos plaster, various adhesives, ceiling texture on drywall and transit panels and potential Lead Based Paint (LBP) on structural concrete, plaster walls, plaster ceilings, doors/door frames and original structural steel components. Lead-Based Glazing (LBG) is frequently encountered when impact to ceramic tiles and plumbing fixtures such as sinks and toilets is necessary.

This report summarizes the asbestos and lead-related issues identified for this project. The sampling results have been summarized in Tables 1, and 2 with the laboratory analytical reports and sample chains of custody contained in Appendices A and B.

Scope of Work

Riverfront provided inspection personnel accredited under the Asbestos Hazard Emergency Response Act (AHERA), U.S. Environmental Protection Agency Model Accreditation Program for Asbestos Building Inspectors to perform the following:

Verify the presence, location, quantity, appearance, and condition of all applicable building materials exhibiting asbestos, lead and mold containing materials within areas of scheduled work at the Robert J Dole VA Medical Center in Wichita Kansas, identified by the VA as likely to be impacted during future Buildings 3 Construct Addition and Renovate Design. Standard EPA/AHERA/OSHA requirements and field sampling methods were employed to ensure representative sample collection.

Asbestos Inspection and Results

Riverfront personnel collected a total of two hundred forty-three (243) representative samples of suspected asbestos-containing materials related to The Project. Sampled indoor building materials included plasters, floor tiles and related mastics, cove bases and mastics, CMU block and mortar, floor leveling compound, ceiling tile texture, duct seam sealants, ceiling batting insulation, wood panel adhesive, canvas wrap on fiberglass pipe insulation, wall covering adhesives and sink soundproofing. The suspect materials, which were similar in general appearance and age of construction, were grouped into homogeneous material sets and sampled. Three bulk samples were collected of each material with a couple of exceptions. Spray-

589-707 (2309) Construct Addition and Renovate Bldg 3

Environmental 3 applied and troweled on surfacing materials were sampled per industry standards as follows:

three samples for <1,000 square feet of material, five samples for >1,000 but <5,000 square feet, and seven samples were collected for estimated quantities >5,000 square feet. The other exception exerts that small amounts of patching may require less than three bulk samples to reliably determine any asbestos content. Practical precautions were used in collecting samples to ensure the safety of all personnel and staff.

All samples were safely collected, placed in sealed containers, and transferred with a written chain-of-custody, to EMSL, an AIHA & NVLAP accredited laboratory, for analysis. All samples were analyzed using polarized light microscopy (PLM) analysis with dispersion staining (DS) according to U.S. Environmental Protection Agency (EPA) Method 600 IR-93/116 which is presently recommended by the EPA. Asbestos Containing Materials are defined by the EPA as having greater than 1% asbestos as measured by PLM methods.

Six (6) of the 243 samples collected during this limited survey, representing three (3) homogeneous areas were detected as asbestos-containing (ACM) and may be affected by the project scope. The asbestos-containing materials identified during this inspection were as follows:

• Grey Mastic underlying Green 9” x 9” Floor Tile Positive analytical results were associated with bulk floor tile samples SH1895-A77, SH1895-A80 and SH1895-A81. Analytical results were positive, containing fiber content between two and three% Chrysotile asbestos. This material is present in Building 3:

Second floor: Corridor and several East Wing Offices and was used as accent floor tile paired with a cream 9” x 9” main field floor tile. An estimated quantity of 300 square feet of Non-ACM green 9” x 9” accent floor tile and underlying ACM grey floor mastic are likely to be impacted by The Project. Lab analysis noted the mastic color as brown, but the inspector noted appearance as grey. The material was in good condition at the time of inspection. There is also a layer of asbestos-containing grey floor leveling compound on concrete underlying all floor coverings on the Second Floor of Building 3.

• Grey Mastic underlying Cream with grey specks 9” x 9” Floor Tile Positive analytical results were associated with bulk floor tile samples SH1895-A78, SH1895-A82, and SH1895-A83. Analytical results were positive, containing 2% Chrysotile asbestos. This material is present in Building 3: Second Floor: Corridor and several East Wing Offices and was used as the main-field floor tile paired with a green 9” x 9” accent floor tile. An estimated quantity of 1,500 square feet of Non-ACM cream 9” x 9” main-field floor tile and underlying ACM grey floor mastic are likely to be impacted by The Project. Lab analysis noted the mastic color as tan, but the inspector noted appearance as grey. The material was in good condition at the time of inspection. There is also a layer of asbestos-containing grey floor leveling compound on concrete underlying all floor coverings on the Second Floor of Building 3.

• Grey Floor Leveling Compound underlying Green 9”x9” Floor Tile and mastic Positive analytical results were associated with bulk floor tile sample SH1895-A81. Analytical results were positive containing 2% Chrysotile asbestos. This positive material sample

589-707 (2309) Construct Addition and Renovate Bldg 3

Environmental 4 was collected in Building 3: Second Floor: Corridor. However, this compound cannot be differentiated from any other grey floor leveling compound on the second floor, and as such, is to be presumed to be an asbestos-containing material on the whole of the second floor. An estimated quantity of 4,000 square feet of grey leveling compound is likely to be impacted by The Project. The material was in good condition at the time of the inspection and lies upon a layer of concrete.

A summary of The Project material sampling efforts, including sample numbers, descriptions, locations, quantities, category (friable or non-friable) are presented in Table 1. The full laboratory analytical reports for RSH collected samples are presented as Appendix A.

Post-Inspection Historic Asbestos Records Review

A summary of historical asbestos results for Building 3 is provided from previously known asbestos-containing building materials provided by Integrated Solutions Inc from 2005 Inspection and Assessment in Appendix C. A post-inspection review of historic records reveals that substantial asbestos abatement has occurred in Building 3, however, ACM still exists. It is presumed that historic ACM TSI still exists above hard ceilings, within plaster chases, and in inaccessible areas of the building. Sampling efforts indicate that the residual historic flooring mastic may still exist beneath newer floor coverings as two mastics on the second floor were analyzed as having >1% asbestos content.

Presumed Asbestos-Containing Materials

Due to the non-invasive, non-destructive methods and other limitations of the inspection, RSH personnel were not able to gain access to nor sample all suspect asbestos materials. Therefore, a few materials are to be considered presumed asbestos-containing materials or PACM. Among these, is a black coating that was observed on the inside of the exterior wall. This material is common in construction throughout the VA system and commonly is analyzed as having asbestos content >1%. Another material is exterior waterproofing below grade on the exterior of the building. This material was not observed but can historically be found deep below grade and applied sporadically. Door slabs are to be considered PACM as inspectors could not rely on finding tags or the information obtained from them. Finally, another PACM is historic window frame caulks, interior and exterior. These materials are commonly found buried beneath newer renovation finishes. Any window caulks, other than those specifically sampled and analyzed during this inspection, are to be considered PACM. Roofing related items weren’t sampled during this inspection due to either access issues and/or that sampling would have voided warranties.

Roofing materials including but not limited to flashings, flashing mastics, bituminous coatings, and roof membranes are to be considered PACM.

Lead Inspection and Results

A targeted lead inspection was performed to identify lead-based paint and/or lead-based glazing on primary substrates potentially impacted by project work. Common substrates include but are not limited to plaster, drywall, wood, for paint and ceramic, and porcelain for glazing. Lead based Sample readings were collected in accessible project work locations.

589-707 (2309) Construct Addition and Renovate Bldg 3

Environmental 5

Riverfront collected lead readings from potentially impacted materials and targeted surfaces to identify the presence of lead-based paint (LBP), which is defined by the EPA as greater than or equal to 1.0 mg/cm2 lead by surface loading (as tested by an XRF instrument) EPA/HUD compliant XRF (X-Ray Fluorescence) sampling methods, which are non-destructive, were employed for this project assessment.

It is stressed that this sampling was intended to identify the presence of lead-based paint and/or lead glazed tiles and blocks within readily accessible areas of the building likely to become disturbed during The Project and associated with this particular project design, and not necessarily an EPA-HUD type “surface-by- surface” inspection. Readings were collected by an EPA-HUD trained Lead Inspector/Risk Assessor.

Testing locations and results are provided in Table 2. A total of 85 readings were collected including calibration readings and painted or suspect lead containing surfaces. Of these 85 readings, only 2 are considered lead containing and had results above the EPA/HUD standard of 1.0 mg/cm2. The lead-based paint conditions on materials were noted to be intact with no exceptions. The only positive reading (>1.0 mg/cm2) was collected from a grey door frame paint at the Ground Floor Pharmacy Break Room and is thought to be impacted by The Project. A summary of lead readings for The Project is provided in Table 2.

Presumed Lead-Based Paints and Ceramic Glazings

Many window-related components on the First and Second Levels have been covered over with newer materials in a previous renovation project. It is presumed that the historic wood components still exist buried within the system and that said components are painted with lead-based paints.

In general, it is common for glazings associated with ceramic wall tiles, floor tiles, construction block, and plumbing fixtures to contain lead in excess of the 1.0 mg/cm2 threshold. Unless testing proves otherwise, the glazings on these materials are presumed to be lead-based and therefore, by default, the component tile, block, or fixture as well.

Mold Impacted Materials Inspection Results A visual mold inspection was performed in accessible locations within areas of The Project. As the survey was non-invasive, observation inside the perimeter plaster exterior walls or chases was not possible. However, there was no visual evidence of window system wood trim deterioration or water staining/paint delamination at the perimeter walls. Suspect mold growth was not observed, and remediation was not considered necessary for this project.

Conclusions and Recommendations

Assuming future construction/renovation plans include the demolition, disturbance and/or penetration of noted ACM materials, the following general recommendations are provided regarding their handling:

• A comprehensive asbestos remediation design specification is being developed to

589-707 (2309) Construct Addition and Renovate Bldg 3

Environmental 6 govern the proper repair, handling and/or removal of ACM. This specification is being prepared in accordance with current VA/EPA/OSHA/State and Local project design guidelines and should be written to account for the potential disturbance of any ACM, directly or indirectly, during construction related activities.

• Should any identified ACM components require disturbance and/or removal as part of planned renovation plans, such components should be removed in whole or protected in place, as deemed most appropriate by construction needs and/or asbestos remediation project design specifications.

• All ACM and LBP removal activity is to be performed by professional asbestos abatement contractors and workers that are licensed in the State of Kansas for such and trained/accredited in accordance with applicable EPA-AHERA training requirements.

Specific abatement of the following items will be necessary prior to disturbance by other trades:

• A PACM black coating exists on the interior side of the exterior wall. It is also presumed that a PACM waterproofing exists on the exterior side of the wall below grade. Both materials are to be removed by the Abatement Contractor in a negative pressure enclosure to facilitate work by other trades where exterior building penetrations and new openings to existing buildings occur.

• A PACM door slab will be impacted on the Ground Floor of Building 3: Entry to 1A. This door is to be removed in tact by the Abatement Contractor and disposed of as ACM.

There is also an associated grey, lead-based painted, metal door frame to be removed in a negative pressure enclosure by the Abatement Contractor and disposed of as LBP. All other door slabs to be removed in The Project are to be removed by the Abatement Contractor and disposed of as ACM waste.

• Windows on the First Floor are to be demolished and replaced. It is presumed that historic asbestos-containing caulks and lead based paint lie inaccessible within the current system. Windows to be removed as part of the scope of The Project will need to be removed by the Abatement Contractor.

• An asbestos-containing grey leveling compound was discovered under floor coverings on the Second Floor. Floor coverings are to be replaced and many of the walls are to be demolished and reconfigured in a new installation. These activities will disturb the leveling compound and will necessitate its removal by the Abatement Contractor. There are also asbestos-containing brown and tan mastics under the 9” floor tiles on the East Wing that will require abatement, but removal of the leveling compound down to the concrete substrate will accomplish this.

• Roofing related items are to be considered as PACM and where impacted by The Project, removed by the Abatement Contractor. Roofing materials include but not limited to, flashings, flashing mastics, bituminous coatings, and roof membranes.

589-707 (2309) Construct Addition and Renovate Bldg 3

Environmental 7

• Plumbing fixtures are to be removed in several locations as part of the scope of The Project. Currently, these fixtures are presumed lead containing materials and as such will require abatement by the Abatement Contractor.

Riverfront appreciates the opportunity to assist with this project. Please feel free to contact us with any questions or concerns.

Sincerely, October 04, 2024 Justin R. Rhyneer, CIH Date Principal

Table 1: Asbestos Bulk Sampling Summary Table 2: Lead XRF Shot Summary Attachment A: Asbestos Laboratory Results Attachment B: Professional Certifications

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set SUBJECT Environmental Design Narrative –

Table 1

TABLE 1: ASBESTOS BULK SAMPLING SUMMARY

Field Sampling on March 26,27, and 28, 2024, Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

SH1895-

A1

2x2 Ceiling Tile 101A-3

Cat II non-friable Bldg. 3

Good - None Detected

SH1895-

A2

4-inch Dark Grey Cove

Base with Lt.

grey mastic

101A-3

Cat II non-friable

Bldg. 3

Good - None

Detected

SH1895-

A3

12x12 Crème floor tile with multicolored specs w/black mastic

Cat I

SH1895-

A4

Medium Grey Duct Sealant

SH1895-

A5

Plaster above ceiling with Tan skim Coat.

SH1895-

A6

Drywall 101A-3

Cat II

SH1895-

A7

Fiberglass with white seam wrap

SH1895-

A8

Plaster above ceiling with White skim

Coat.

101B-3

SH1895-

A9

Grey caulk on door frame

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

SH1895-

A10

Drywall Joint Compound

101A-3 Friable

SH1895-

A11

White caulk on exterior of medical prep room

Medical Prep Room

Cat II non-friable Bldg. 3 Good - None

Detected

SH1895-

A12

White caulk on interior window

Bldg. 3 Good - None

SH1895-

A13

Plaster with white skim coat.

SH1895-

A14

2x2 Ceiling Tile medium fisher

Corridor in Pharmacy

Ground floor

Cat II

Detected

SH1895-

A15

4-inch Dark Grey Cove

Base with white

Ground floor

Cat II

SH1895-

A16

4-inch Medium Grey Cove

Base with white

Telecom Area

Cat II

A17

4inch Beige

Cove Base with white mastic

Cat II

SH1895-

A18

Plaster above ceiling with Tan skim Coat.

Corridor in Pharmacy

Cat II

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

Ground floor

SH1895-

A19

Plaster above ceiling with green skim

Coat.

Ground floor

Cat II

SH1895-

A20

Glass block window grout

Cat II

SH1895-

A21

Drywall

Cat II non-friable Bldg. 3 Good - None

Detected

SH1895-

A22

Fiberglass seam sealant

Cat II

A23

Medium Grey floor sheeting with grey mastic

Cat II

A24

Medium Grey floor sheeting with Clear

Ground floor

Cat II

A25

Drywall Joint

009A Friable

A26

Medium Grey floor sheeting with Clear

009A

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

A27

Resilient floor Grey speckled.

Breakroom

A28

SH1895-

A29

H1895- A30

Stainless steel sink pad non-friable Bldg. 3 Good - None

Detected

SH1895-

A31

Stainless steel sink pad non-friable Bldg. 3 Good - None

Detected

SH1895-

A32

White window Caulk non-friable Bldg. 3 Good - None

Detected

SH1895-

A33

Beige stair tread with white

Good

- None Detected

SH1895-

A34

Lt. Grey ceiling caulk

Vault non-friable Bldg. 3 Good - None

Detected

SH1895-

A35

Cream colored carpet Mastic.

Office 005-

Cat II non-friable Bldg. 3 Good - None

Detected

SH1895-

A36

White end seam sealant on fiberglass

003-3

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos

A37

White end seam

003-3 Cat II

A38

White end seam

003-3 Cat II

A39 Door grout

003-3

A40

Medium Grey Duct Sealant

Attic

A41

Fire Caulk 003-3

A42

Fire Caulk 003-3

SH1895-

A43 Fire Caulk 003-3

Cat II

SH1895-

A44

Seam Sealant on fiberglass

SH1895-

A45

Seam Sealant on fiberglass

SH1895-

A46

Drywall, joint compound and tape 1hr fire rated.

003-3 Friable

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

SH1895-

A47

Drywall, joint compound, and tape 1hr fire rated

Mechanical Room

Detected

SH1895-

A48

Drywall, joint compound, and tape 1hr fire rated.

Detected

SH1895-

A49 Flange

Gasket 003-3

Cat I

SH1895-

A50

Flange Gasket 003-3

Cat I

SH1895-

A51

Flange Gasket 003-3

Cat I

A52

Rose colored

Drywall & Joint

017-3 Friable

Detected

SH1895-

A53

12x12 Black colored Floor Tile with Grey

Mastic

017-3

SH1895-

A54

12x12 Cream floor tile with multicolored specs w/grey

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

SH1895-

A55

Glue Pucks on Concrete

SH1895-

A56

SH1895-

A57

SH1895-

A58

2x2 Ceiling Tile medium fisher

SH1895-

A59

Dark Tan Speckled resilient floor with grey mastic.

1st Floor Lobby friable Bldg. 3 Good - None

Detected

SH1895-

A60

Dark Tan Speckled resilient floor

SH1895-

A61

Dark Tan Speckled resilient floor

A62

6in tan cove base with cream colored mastic

A63

6in tan cove base with cream colored mastic

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos

A64

6in tan cove

A65

12x12 Black colored Floor Tile with Grey

A66

12x12 grey speckled floor tile with Grey

109-3

SH1895-

A67

6in black cove

109-3

SH1895-

A68

6in black cove

108-3

SH1895-

A69

12x12 grey speckled floor tile with Grey non-friable Bldg. 3 Good - None

Detected

SH1895-

A70

Plaster above

SH1895-

A71

Plaster above

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

SH1895-

A72

Plaster above

- None

SH1895-

A73

Dark grey terrazzo cove base

107-3

SH1895-

A74

2x2 Brown floor tile with grey

105-3

SH1895-

A75

2x2 Brown floor

104-3

SH1895-

A76

2x2 Brown floor

106-3

SH1895-

A77

9x9 green floor

Corridor on

Second Floor

Cat I non-friable

Brown Mastic

2% Chrysotile

A78

9x9 cream with specks with

Second Floor

Cat I

Brown

2% Chrysotile

SH1895-

A79

12x12 Black floor tile with on Second

Floor

Cat I

None

SH1895-

A80

9x9 green floor

Second Floor

Cat I

Brown Mastic

2% Chrysotile

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

SH1895-

A81

9x9 green floor

Second Floor

Cat I

Grey Leveler

2% Chrysotile

SH1895-

A82

9x9 cream with

Second Floor

Cat I

Brown Mastic

2% Chrysotile

A83

9x9 cream with

Second Floor

Cat I

Grey Leveler

2% Chrysotile/

Brown Mastic

3% Chrysotile

SH1895-

A84

Dark grey

Floor

Cat I

Detected

SH1895-

A85

Dark grey

Floor

Cat I

SH1895-

A86

Coating on Sink 219A-3

Cat II

SH1895-

A87

HVAC insulation on square duct floor West

Cat II non-friable Bldg. 3

SH1895-

A88

HVAC insulation on round duct floor West

Cat II

SH1895-

A89

Carpet Mastic with grey floor leveler.

219A-3

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

SH1895-

A90

Plaster with yellow/green/tan skim coat.

floor West

Cat II

SH1895-

A91

6in grey cove

213-3

SH1895-

A92

6in grey cove

SH1895-

A93

6in grey cove

SH1895-

A94

HVAC Tape 210-3

Cat II

SH1895-

A95

Drywall with Joint Compound

210-3 Friable

SH1895-

A96 Stair Tread Stair Well

Cat II

SH1895-

A97 Stair Tread Stair Well

Cat II

SH1895-

A98 block glass exterior window plaster.

Exterior right front

Entry

Cat II

SH1895-

A99 block glass

Entry

Cat II

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

SH1895-

A100 block glass

Entry

Cat II

SH1895-

A101 block glass grout.

left front side by Entry

Cat II

SH1895-

A102 block glass grout.

left front side by Entry

Cat II

A103

1st floor window caulk around frame right by front Entry

Cat II

A104

Door frame mastic on brick

A105

A106

SH1895-

A107 Brick grout

Exterior

Cat II

A108

Brick grout

A109

Brick grout

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos Content, PLM

SH1895-

A110

Black coating on brick at ground level

SH1895-

A111

Black coating

SH1895-

A112

Black coating

SH1895-

A113

Tan expansion

SH1895-

A114

SH1895-

A115

SH1895-

A116

Grey Expansion

SH1895-

A117

SH1895-

A118

A119

Red Brick

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos

A120

A121

A122

Expansion

Sealant

Parking lot 3

A123

A124

Parking lot west

A125

Sidewalk west sidewalk

A126

Asphalt

A127 non-friable west

Good -

A128 non-friable west sidewalk

A129 non-friable

NW

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Sample No.

Material Description

Sample Location

Category Homogenous Area

Condition Quantity Asbestos

A130

Curb Expansion non-friable

A131 non-friable

A132 friable

A133 friable

A134

Parking lot 4

A135

A136

A137 non-

Parking lot 1

A138 non-

Parking lot 1

A139

Curb drive.

Parking lot 1-3

Notes: -

1) Positive ACM samples are noted in bold type.

2) An asbestos-containing material is defined as a material that contains greater than 1% asbestos.

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set SUBJECT Environmental Design Narrative –

Table 1

3) A friable asbestos-containing material is a material that can be pulverized, crumbled, or reduced to powder by hand pressure. Likewise, a non-friable asbestos-containing material is a material that cannot be pulverized, crumbled, or reduced to powder by hand pressure. RACM may include non-friable materials where demolition is anticipated to release asbestos fibers.

4) Material is a presumed ACM, asbestos content where reported by PLM at <1% would be anticipated greater than 1% where analyzed by

TEM.

589-707 (2309) Construct Addition and Renovate Bldg 3

SUBMITTAL 100% Bid Set

Table 2

TABLE 2: RSH XRF SUMMARY

Field Readings March 26,27, and 28, 2024.

Sample No.

Floor Area Sample Location

Side Component Substrate Condition Color Result (mg/cm²)

Pre-Cal

Acceptable Calibration Readings Are Between 0.8 and 1.2 mg/cm² 1.1

Pre-Cal

Acceptable Calibration Readings Are Between 0.8 and 1.2 mg/cm² 1

Pre-Cal

Acceptable Calibration Readings Are Between 0.8 and 1.2 mg/cm² 1.1

2132 Pharmacy 101A3 N/A

Door frame Metal Good Dark Grey 0

2133 Pharmacy 101B N/A

Wall

CMU

Block Wall Good White -0.2

2134 Pharmacy 101A3…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .