13 21 13 Pass Through Cabinet.pdf
PDF 56 KB Posted
- Solicitation number
- 36C77625B0034
About this file
This specification document (Section 13 21 13) details requirements for Clean Room Pass-Thru Cabinets for the Robert J. Dole VA Medical Center in Wichita, Kansas, as part of a construction addition and renovation project. The specifications call for a wall-mounted, fully welded stainless steel pass-thru cabinet from Atmos-Tech Industries, designed to maintain Class 100 to 10,000 (ISO 5 to ISO 8) cleanroom conditions. The cabinet features Type 304 #4 finish stainless steel construction, clear tempered safety glass viewing windows, Type 316 stainless steel lever compression door latches, and a mechanical interlock system. Specific dimensions include an inside width and height of 36 inches, a depth of 36 inches, with an outside width of 42 inches and outside height of 38 inches. The document provides detailed requirements for manufacturer qualifications, installation procedures, materials, and performance standards for the cleanroom pass-thru cabinet.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
589-707 | Construct Addition & Renovate Building 3 for Pharmacy and Associated Parking
Robert J. Dole VAMC – Wichita, KS 100% Bid Set – Addendum 01
13 21 13 -1
CLEAN ROOM PASS-THRU CABINETS
SECTION 13 21 13
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Wall Mount Fully Welded Steel Pass Thru Cabinets
1.2 RELATED SECTIONS
A. Section 07 92 00 - Joint Sealants.
1.3 REFERENCES
A. ASTM A 269 - Standard Specification for Seamless and Welded Austenitic Stainless Steel Tubing for General Service.
B. ASTM A 666 - Standard Specification for Austenitic Stainless Steel Sheet, Strip, Plate, and Flat Bar.
C. ASTM B 209 - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate.
D. ASTM B 221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.
E. FS 209E - Cleanroom and Workstation Requirements, Controlled Environments.
F. ISO 146744-1 - Cleanrooms and associated controlled environments Part 1: Classification of air cleanliness
1.4 DESIGN / PERFORMANCE REQUIREMENTS
A. Cleanroom Pass Through shall be capable of maintaining the following cleanroom performance requirements when installed as follows.
1. Capable of maintaining Class 100 to 10,000 (ISO 5 to ISO 8) conditions in accordance with FS 209E and ISO 146744-1.
1.5 SUBMITTALS
A. Submit under provisions of Section 01 30 00 - Administrative Requirements.
B. Product Data: Manufacturer's data sheets on each product to be used, including:
1. Preparation instructions and recommendations.
2. Storage and handling requirements and recommendations.
3. Installation methods.
C. Manufacturer's Certificates: Certify products meet or exceed specified requirements.
D. Closeout Submittals: Provide manufacturer's maintenance instructions
1 08/22/2025
13 21 13 -2 that include recommendations for periodic checking and adjustment of cable tension and periodic cleaning and maintenance of all railing and infill components.
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in the manufacture of products specified in this section with minimum 10 years documented experience.
B. Installer Qualifications: Company specializing in performing work of this section with minimum 5 years documented experience.
C. Preinstallation Meetings: Conduct meeting to verify project requirements, substrate conditions, utility connections, manufacturer's installation instructions.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Store products in manufacturer's unopened packaging until ready for installation.
B. Do not deliver materials or assemblies to site until installation spaces are ready to receive units.
1.8 SEQUENCING
A. Ensure that locating templates and other information required for installation of products of this section are furnished to affected trades in time to prevent interruption of construction progress.
B. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress.
1.9 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturers:
1. Atmos-Tech Industries (JSN U1200)
B. Requests for substitutions will be considered in accordance with provisions in Division 01.
2.2 CLEAN ROOM PASS THRU CABINETS
A. Wall Mount Stainless Steel Pass Thru, JSN U1200
1. Standard Features
a. Formed and stitch-welded stainless steel construction
b. Double wall construction
13 21 13 -3
c. Stainless steel flush-mount hinges
d. Formed stainless steel door frames
e. Viewing windows
f. Solid Polyethylene door gaskets
2. Materials:
a. Type 304 #4 finish Stainless Steel (standard)
3. Viewing Windows:
a. Clear Tempered Safety Glass (standard)
4. Door Latch:
a. Type 316 stainless steel lever compression door latches
(standard)
5. Interlock Hardware:
a. Mechanical Interlock with Type 316 Stainless Steel Handles
6. Mounting:
a. 8 Piece Stainless Steel Mounting Frame, Standard mount, inside finish both sets
b. Stainless Steel Support Gussets (compatible with all mounting frames)
7. Size:
a. Inside Width 36 inches
b. Inside Height 36 inches (762 mm)
c. Depth 36 inches (762 mm)
d. Outside Width 42 inches (895 mm)
e. Outside Height 38 inches (845 mm)
PART 3 EXECUTION
3.1 EXAMINATION
A. Do not begin installation until openings and substrates have been properly prepared.
B. Verify exact location of clean room pass-thru for installation.
C. Verify that rough openings and surfaces are ready to receive work.
D. If opening and substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.
3.2 PREPARATION
A. Clean surfaces thoroughly prior to installation.
B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
C. Provide templates and rough-in measurements as required.
3.3 INSTALLATION
A. Install in accordance with manufacturer's instructions.
B. Install pass- thru, plumb and level. Seal the perimeter of both sides of the opening as required.
13 21 13 -4
C. Upon completion of installation operate unit and make necessary adjustments.
D. Connect mechanical services as specified under Division 15.
E. Connect electrical services as specified under Division 16.
3.4 PROTECTION
A. Protect installed products until completion of project.
B. Touch-up, repair or replace damaged products before Substantial Completion.
END OF SECTION
File details come from the government source that posted it. Updated .