Amendment 0003 Attachment 06 - Drawings 0123027 - HVAC.pdf
PDF 2 MB Posted
- Solicitation number
- 36C77625B0029
About this file
This file is a set of mechanical engineering drawings for a VA warehouse construction project in Butler, PA. The drawings include detailed mechanical site plans, mechanical details, and comprehensive mechanical schedules for various HVAC system components. Key equipment and systems include:
Two Air Handling Units (AHU-1 and AHU-2) with specifications for airflow, fan performance, and cooling coil capacities, located in the mechanical room. The project also features multiple exhaust fans (EF-1, EF-2, EF-3), mechanical pumps for heating hot water and chilled water, steam heat exchangers, steam traps, and unit heaters. The mechanical design includes extensive specifications for louvers, air devices, expansion systems, and condensate return units, with specific technical details on equipment performance, electrical requirements, and mounting configurations. The drawings are part of the VA's construction project for a warehouse facility, prepared by Above Group and dated July 22, 2025, with a focus on mechanical systems design and installation.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
LO
P E D
O W
N
H
O S
P
IT
A L
R O
A D
SECOND STREET
"B
S T
R E
E T
"A
S T
R E
E T
V A
N
WAREHOUSE
RECEIVING DOCK
GENERATOR ROOM
OPEN OFFICE AREA
EX 8'x8' EXPANSION LOOP
EX 10" HWS
EX 10" HWREX 12" CHWS
EX 12" CHWR
FIRE PUMP ROOM
7 7
EX 6" H
PS EX 3"
P
CR
EX 8'x8' EXPANSION LOOP
EX ANCHOR (LOCATION ASSUMED,
NOT FIELD VERIFIED)
EX 10" HWS
EX 10" HWR
EX 12" CHWS
EX 12" CHWR
EX 8'x8' EXPANSION LOOP
M-402
EX ANCHOR (LOCATION ASSUMED,
NOT FIELD VERIFIED)
EX ANCHOR (LOCATION ASSUMED,
NOT FIELD VERIFIED)
EX ANCHOR (LOCATION ASSUMED,
NOT FIELD VERIFIED)
EX ANCHOR (LOCATION ASSUMED,
NOT FIELD VERIFIED)
EX ANCHOR (LOCATION ASSUMED,
NOT FIELD VERIFIED)
EX ANCHOR (LOCATION ASSUMED,
NOT FIELD VERIFIED)
EX ANCHOR (LOCATION ASSUMED,
NOT FIELD VERIFIED)
MINIMUM TOP OF PIPE DEPTH AT
MANHOLE IS 60"
1/16" / 12"
1/16" / 12"
3" CHWR U/G
3" CHWS U/G
2 1/2" HPS U/G
1" HPR U/G
1 1/4" PC U/G
1" FOO U/G
1" FOR U/G
1" FOS U/G 1/
/ 1
2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/0
V A
M C
B u tl e r
V
IS
N
W a re h o u s e
/0
V A
B u tl e r_ V
IS
N
W a re h o u s e
R
M
E P
F P
F A
T .r v t
/2
/2
:3
:2
A
M
M-100
MECHANICAL SITE PLAN CONSTRUCT A WAREHOUSE
FOR VISN 4 WESTERN
MARKET DISTRIBUTION
BUTLER, VA
529-314
06/02/2025 ADL JMC
BID DOCUMENTS
CODED NOTES:
DRAWING NOTES:
1. INFORMATION SHOWN ON THIS DRAWING PERTAINING TO EXISTING CONDITIONS HAVE BEEN
OBTAINED FROM AVAILABLE DRAWINGS, VA DOCUMENTATION, AND MAY NOT INDICATE ACTUAL
EXISTING CONDITIONS IN DETAIL OR DIMENSION. CONTRACTOR SHALL VERIFY EXISTING UTILITIES
AND DEPTHS OF EXISTING PIPING CONNECTIONS.
2. PROVIDE 48" MIN. BURY DEPTH FROM TOP OF PIPING TO FINISHED GRADE.
3. UNDERGROUND HPS PIPING SHALL BE PRE-MANUFACTURED SYSTEM. BASIS OF DESIGN: PERMA-
PIPE.
4. UNDERGROUND CHWS/R PIPING SHALL BE PRE-MANUFACTURED SYSTEM. BASIS OF DESIGN: PERMA-
PIPE.
CONNECT NEW 2-1/2" HPS TO EX 6" HPS UNDERGROUND PIPING WITH (2) TWO NEW ISOLATION VALVES.
CONTRACTOR SHALL COORDINATE STEAM OUTAGE WITH COR PRIOR TO DEMOLITION. OUTAGE SHALL INCLUDE SYSTEM COOLDOWN, DEMOLITION OF EX UNDERGROUND PIPING, PREPARING PIPING FOR NEW CONNECTIONS, NEW CONNECTIONS, TESTING, AND WARM-UP AND OPERATION. REFER TO "1 / M-402".
CONNECT NEW 1-1/4" PCR TO EX 3" PCR UNDERGROUND PIPING WITH (2) TWO NEW ISOLATION VALVES.
CONTRACTOR SHALL COORDINATE OUTAGE WITH COR PRIOR TO DEMOLITION. OUTAGE SHALL INCLUDE
SYSTEM COOLDOWN, DEMOLITION OF EX UNDERGROUND PIPING, PREPARING PIPING FOR NEW
CONNECTIONS, NEW CONNECTIONS, TESTING, AND WARM-UP AND OPERATION. REFER TO "3 / M-402".
CONNECT TO EX 12" CHWS/R PIPING UNDERGROUND WITH NEW 3" CHWS/R PIPING AND ISOLATION VALVES. CONTRACTOR SHALL COORDINATE CHILLED WATER OUTAGE WITH COR PRIOR TO DEMOLITION.
OUTAGE SHALL INCLUDE DEMOLITION OF EX UNDERGROUND PIPING, PREPARING PIPING FOR NEW
CONNECTIONS, NEW CONNECTIONS, TESTING AND OPERATION.
PROVIDE MANHOLE WITH POST-UP LADDER AND HIGH / LOW VENT. COORDINATE MANHOLE LOCATION BASED ON THE SURVEY OF THE EXISTING UTILITIES. MANHOLE COVERS SHALL BE 36"Ø MIN. STEEL
PLATES LIDS. REFER TO DETAIL "2 / M-502".
STEAM CONDENSATE PIPING ANCHOR. COORDINATE CONCRETE SIZE AND INSTALLATION WITH PIPING
SYSTEM MANUFACTURER.
PROVIDE MANHOLE WITH POST-UP LADDER AND HIGH / LOW VENT. COORDINATE MANHOLE LOCATION BASED ON THE SURVEY OF THE EXISTING UTILITIES. MANHOLE COVERS SHALL BE 36"Ø MIN. STEEL
PLATE LIDS WITH "STEAM" LABEL ON TOP OF LIDS. REFER TO DETAIL "2 / M-502".
1" FOS, 1" FOR, AND 1 1/2" FOO FROM UNDERGROUND TANK TO DAY TANK. LINES SHOULD BE ENCLOSED IN A PREMANUFACTURED CONDUIT, APPROXIMATELY 12" IN DIAMETER, BURIED WITH AT LEAST TWO FEET
OF COVERAGE.
3000 GALLON UNDERGROUND FUEL OIL TANK. INSTALL PER DETAIL "9 / M-504".
COORDINATE CHILLED WATER AND STEAM/CONDENSATE SHUTDOWNS WITH COR. SYSTEM DRAINING AND REFILLING, WATER TREATMENT, PIPE CLEANING, AND OFF-HOURS WORK WILL BE REQUIRED AND
MUST BE INCLUDED IN CONSTRUCTION SCHEDULE. CHILLED WATER SYSTEM SERVICES A VA
COMMUNITY LIVING CENTER (CLC) WHICH IS A CRITICAL UTILITY FACILITY AND REQUIRES SPECIAL
COORDINATION FOR LOSS OF UTILITIES.
STEAM AND CONDENSATE PIPING IN THIS AREA MUST BE MINIMUM OF 5'-0" BELOW GRADE. PSRDM STANDARDS COMPLIANCE REQUIRES THIS DEPTH WHERE CARS CAN PARK OR WITHIN 8'8" OF WHERE
CARS CAN PARK.
AT POINT OF UTILITY INTERSECTION SHOWN, PIPE INVERT ELEVATIONS FROM GRADE TO TOP OF PIPE ARE AS FOLLOWS: (CHWS & CHWS @ 48", HPS, HPR & PCR @ 79.5", AND FOO, FOR, & FOS @ 60")
N 0 15' 30' 60' 90'
1" = 30'
1" = 30'-0"1
SITE PLAN - MECHANICAL STEAM OPTION
Revisions Date
1 Addendum #1 07/22/2025
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
TEST PLUG (TYP.)
AIR VENT WHEN
COIL IS NOT
SELF-ELEVATING
MV
WATER COIL
WATER COIL
WATER COIL
MV
MV
AIR VENT WHEN
COIL IS NOT
SELF-ELEVATING
DRAIN WHEN COIL IS
NOT SELF-DRAINING
TEST PLUG (TYP.)
PIPE HANGER SHALL SUPPORT PIPING
INDEPENDENT OF COIL
REDUCER, IF REQUIRED
TI
FE
MV
TEMPERATURE
INDICATION TO ECC
SINGLE COIL
DOUBLE COIL
DRAIN
REDUCER, IF REQUIRED
DRAIN
TI
FE
MV
FLOW
ELEMENT
DRAIN WHEN COIL IS
NOT SELF-DRAINING
MODULATING CONTROL
VALVE
MODULATING
CONTROL VALVE
CHWR
CHWS
CHWR
CHWS
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS
(TYP.)
WATER SUPPLY
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
MV
MODULATING CONTROL VALVE
NOTE:
1. CIRCUIT SETTER WITH MEMORY STOP CAN BE USED IN LIEU OF COMBINATION/ISOLATION VALVE.
1/4" x 1-1/4" IRON
PIPE STRAP
FLANGED
CONNECTION
1/4" x 1-1/4" IRON
PIPE CLAMP
4" 5/8" ø ROD
HIGH DENSITY POLYETHYLENE
(HDPE) SLEEVE WITH INTEGRAL
HOLLOW MOLDED WATER STOP
RING 4" LARGER THAN OUTSIDE
DIAMETER OF PIPE
PIPE SLEEVE
EXTERIOR WALL
WATER STOP
NOTES:
1. PROVIDE ANCHORS ONLY
WHERE SHOWN ON
DRAWINGS.
2. EXTEND SLEEVE ABOVE
FLOOR WHERE SPECIFIED.
INSULATION BOLT
(TYPICAL)
FLOOR
SLAB
FIRE-STOPPING
MATERIAL
BOLT
PIPEPIPE SLEEVE
WHERE SPECIFIED
RISER
CLAMP
RISER
PIPE SLEEVE
WHERE
SPECIFIED
RISER CLAMP.
BOTTOM CLAMP
REQUIRED AT
ANCHOR POINTS
ONLY.ELEVATION
PLAN
RISER
CLAMP
HPC
HPS (90 PSIG)
NC
NC
H P
S
M P
S
MPS
MPS
HPS
HPS
MPC
STEAM TRAP (TYP.)
5 x PIPE DIA. MIN.
10 x PIPE DIA. MIN.
10 x PIPE DIA. MIN.
5 x PIPE DIA. MIN.
NONO
NC
1.
2.
3.
4.
5.
6.
7.
NOTES:
SEE FLOOR PLANS FOR PIPE SIZES.
INSTALL VALVES AS RECOMMENDED BY MANUFACTURER.
BYPASS SHALL BE SIZED TO MEET THE CAPACITY OF THE COMBINED CAPACITY OF THE TWO PRVs.
PROVIDE NECESSARY UNIONS FOR THE REMOVAL OF VALVE WITH THREADED CONNECTIONS.
SLOPE THE PILOT CONTROL LINE FROM THE PRV AS INDICATED.
PROVIDE MINIMUM PIPE DIAMETERS AS INDICATED UPSTREAM AND DOWNSTREAM OF PRVs.
ALL UPSTREAM REDUCERS SHALL BE ECCENTRIC IF REQUIRED.
PILOT CONTROL
LINE. SLOPE
1"/12" MIN. (TYP.)
ECCENTRIC REDUCER IF
REQUIRED
REDUCER IF REQUIRED (TYP.)
VENT TO ATMOSPHERE
SAFETY VALVE
ALL PIPING, FITTINGS, EQUIPMENT AND DEVICES ON STEAM AND CONDENSATE AT 15 PSIG OR
GREATER SHALL BE FORGED OR CAST STEEL.
8.
TOP PIPE TO BE MAXIMUM OF
7'-0" A.F.F.
MPS (30 PSIG) 1
STEAM SUPPLY
STEAM CONDENSATE RETURN
STEAM TRAP. SEE STEAM
TRAP ASSEMBLY DETAIL.
PRESSURE GAUGE
INCREASER IF REQUIRED
REDUCER IF REQUIRED
STRAINER
CONTROL VALVE
GATE VALVE
1/2" CHECK VALVE
VACUUM
BREAKER
PIPE HANGER
SHALL SUPPORT
PIPING
INDEPENDENT OF
COIL (TYP.)
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATOR UNITS, THE
RUNOUT PIPING FOR CONNECTIONS TO COIL SHALL BE INSTALLED WITH SWING JOINTS TO
ALLOW FOR THE VIBRATION.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR
USE OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF
FILTERS, VALVES, OR EQUIPMENT.
3. TRAP EACH COIL SEPARATELY WHEN INSTALLED IN A BANK OF TWO OR MORE HIGH. ALSO
PROVIDE SEPARATE VACUUM BREAKER FOR EACH COIL.
4. SUPPLY & RETURN PIPES ARE SHOWN FROM SAME END. STEAM COIL MAY HAVE SUPPLY &
RETURN PIPES FROM OPPOSITE ENDS.
5. ALL PIPING, FITTINGS, EQUIPMENT AND DEVICES ON STEAM AND CONDENSATE AT 15 PSIG
OR GREATER SHALL BE FORGED OR CAST STEEL.
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN.)
1-5/8" 12 GAUGE CHANNEL
OR 2"x2"x1/4" ANGLE
1/2" DIA. HANGER RODS W/ 36" MAX.
SPACING ON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH
COMPRESSIVE STRENGTH
INSULATION (9 PSF MIN.
DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTES:
SEE SPECS FOR DETAILED
HANGER REQUIREMENTS
5 FT
6 8 10
9 1110 12
1312 14 16
1614 17 19
864 532 2 1/21 1/21 1 1/4THRU 3/4
7 7
7 98
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
FT.
FT.
1" M
A X
HORIZONTAL
ABOVE 2" DIA. PIPE 2" DIA. PIPE AND SMALLER
VERTICAL
ABOVE 2" DIA. PIPE 2" DIA. PIPE AND SMALLER
2-1/2" DIA.
2-1/2" DIA.
PIPE HANGERS - PROVIDE DOUBLE
DEFLECTION NEOPRENE (TYPE HN)
FOR FIRST TWO ON EACH SIDE OF
PUMP (SEE NOTE NO. 1)
PRESSURE GAGE
1/2" [15mm]
STRAINERFLEXIBLE
CONNECTION
BALL OR
BUTTERFLY
TYP.
NOTE:
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.
2. STRAIGHT LENGTHS OF UNOBSTRUCTED PIPE WITHOUT INLINE APPURTENANCES SHALL BE INSTALLED
UP/DOWNSTREAM OF FLOW CONTROL BALANCING VALVE PER MFR'S INSTALLATION INSTRUCTIONS.
BALANCING
DEVICE
TYPICAL MANUAL AIR VENT
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" [20mm] BALL VALVE
ADAPTER TO 3/4" [20mm] HOSE
THREAD-PROVIDE HOSE CAP NUT
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR PLANS LOCATE
DRAIN AT BOTTOM OF SCALE POCKET.
AUTOMATIC AIR VENT - SEE
SPECS FOR TYPE AND RANGE
1/2" BALL VALVE
ROUTE 1/4" COPPER TO
NEAREST FLOOR DRAIN
BRASS OR CAST IRON AUTOMATIC AIR
VENT WITH NPS 1/2" NIPPLE CONNECTION
CIRCULATING WATER PIPING
MV OR
AV
TURBINE INSERTION
FLOW METER
INSERTION 1" FULL PORT
BALL VALVE FOR HOT TAP
REFER TO MANUFACTURER'S
RECOMMENDATIONS FOR UPSTREAM
AND DOWNSTREAM DISTANCE
MIN. 5 DIA
MIN. 10 DIA
ELEVATION
SECTION
DRIP LEG OR EQUIPMENT CONNECTION.
MAKE THE SAME SIZE AS THE SUPPLY MAIN
OR EQUIPMENT CONNECTION. SEE NOTE 1
SCHEDULE 80 STEEL PIPE.
SEE SPECS
M
IN
1" GATE
VALVESTEAM TRAP
BYPASS-INSTALL IN HORIZONTAL PLANE
LEVEL WITH TRAP OR IN VERTICAL PLANE
& BELOW TRAP.
PIPE SIZE SHALL BE AS
INDICATED ON DRAWINGS
SCHEDULE 80 STEEL PIPE
DIELECTRIC FITTING WHERE
RETURN IS COPPER PIPE
FLOW
6" M
IN
NOTES:
1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 6" SCALE POCKET BELOW TRAP INLET.
2. DRIP POCKET PIPE SIZE SAME AS STEAM MAIN.
3. ALL PIPING, FITTINGS, EQUIPMENT AND DEVICES ON STEAM AND CONDENSATE AT 15 PSIG OR GREATER
SHALL BE FORGED OR CAST STEEL.
4. ALL TRAP STATIONS SHALL COMPLY WITH VHA DIRECTIVE 1810.
3/4" DRAIN
(ALTERNATE LOCATIONS)
(TYPICAL)
CAP (TYPICAL)
6"
DRIP LEG (TYPICAL)
6"
PIPE TO STEAM TRAP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/0
V A
M C
B u tl e r
V
IS
N
W a re h o u s e
/0
V A
B u tl e r_ V
IS
N
W a re h o u s e
R
M
E P
F P
F A
T .r v t
/2
/2
:3
:3
A
M
M-501
MECHANICAL DETAILS CONSTRUCT A WAREHOUSE
FOR VISN 4 WESTERN
MARKET DISTRIBUTION
BUTLER, VA
529-314
06/02/2025 ADL JMC
BID DOCUMENTS
N.T.S.1
WATER COIL PIPING CONNECTION
N.T.S.2
TERMINAL UNIT WATER COIL PIPING CONNECTION
N.T.S.10
SUPPORT ANCHOR (CHILLED WATER)
N.T.S.13
SUPPORT/ANCHOR FOR PIPE RISERS
N.T.S.5
STEAM PRESSURE REDUCING STATION - 1/3, 2/3
N.T.S.3
STEAM COIL PIPING CONNECTION DETAIL
N.T.S.6
PIPE HANGERS
N.T.S.9
INSTALLATION OF THERMOMETER WELLS
N.T.S.12
IN-LINE PUMP CONNECTIONS
N.T.S.11
DRAIN VALVE AND AIR VENT CONNECTIONS
N.T.S.8
CHILLED WATER FLOW METER DETAIL
N.T.S.4
STEAM TRAP ASSEMBLY
Revisions Date
1 Addendum #1 07/22/2025
6" M
IN
(T Y
P
D
D
NOTES:
1. THE ABOVE DETAIL SHOWS REQUIRED PIPING FOR TWO HEAT EXCHANGERS IN PARALLEL. INDICATE IF 100% REDUNDANT OR NOT.
2. PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING HEIGHT SHALL BE ADJUSTED TO FACILITATE
GRAVITY RETURN OF STEAM CONDENSATE.
3. MAKE THE BYPASS THE SAME SIZE AS THE CONNECTIONS TO THE CONTROL VALVES.
4. CONTROL VALVES SHALL BE IN A 1/3 AND 2/3 SIZE ARRANGEMENT.
5. ALL PIPING, FITTINGS, EQUIPMENT AND DEVICES ON STEAM AND CONDENSATE AT 15 PSIG OR GREATER SHALL BE FORGED OR CAST STEEL.
TEST PLUG
(TYP.)
THERMOMETER (TYP.)
HPS STEAM
SUPPLY
HEAT EXCHANGER (TYP.)
RUN DRAIN LINE FROM
RELIEF VALVE TO NEAREST
FLOOR DRAIN. (TYP.)HWR
HWS
HPR TO FLASH TANK OR TO
HPR MAIN LINE (TYP.)
1/2" CHECK
VALVE VACUUM
BREAKER (TYP.)
SCALE POCKET (TYP.)
SEE SCHEDULES FOR
RELIEF VALVE SETTING
THERMOSTATIC AIR
VENT (TYP.)
CONTROL VALVES IN 1/3 (N.C.)
AND 2/3 (N.C.) SIZE
ARRANGEMENT
BYPASS
IF INSTALLED LOWER THAN MAIN
HPS LINE, PROVIDE ANOTHER
SCALE POCKET/TRAP HERE.
PROVIDE MOTORIZED
ISOLATION VALVE ON
HWS.
N.C.
DDC PRESSURE
SENSORS (TYP.)
PROVIDE MOTORIZED
ISOLATION VALVE ON
HWS.
CONTROL VALVES IN 1/3 (NC)
AND 2/3 (N.C.) SIZE
ARRANGEMENT
5" [127mm] THICK
CONCRETE HOUSEKEEPING
PAD
FLUSHING
CONNECTION
LPR
SCHEDULE 80
STEEL
PIPE
FLOOR
3/4" [20mm] DRAIN, DISCHARGE INTO NEAREST
FLOOR DRAIN, NC.
THERMOMETER
GRAVITY RETURN
FROM FLASH TANK
IF SHOWN ON
FLOOR PLAN
PUMP DISCHARGE
TO PLANT
CONTROL CABINET
VENT
RECEIVER
WATER LEVEL GAUGE
THERMOMETER
NOTE:
1. ALL PIPING, FITTINGS, EQUIPMENT AND DEVICES ON STEAM AND CONDENSATE AT 15
PSIG OR GREATER SHALL BE FORGED OR CAST STEEL.
DRIP LEGT
STEAM JACKET
MANIFOLD
DUCT
LOCATE HANGER AT LAST
ELBOW BEFORE HUMIDIFIER
MODULATING
MOTOR OPERATOR
STEAM SUPPLY
GATE VALVE
STRAINER W/BLOW
DOWN VALVE
AIR LINE
SEPARATOR
TRAP SEE SCHEDULE
XX ON SHEET M-XXX
50Ø STEAM LINE
UNION
TUBE SEPARATOR
GATE VALVE
50Øx40Ø INCREASER
40Ø DRAIN LINE TO
SPLASH BLOCK
65Ø SLEEVE AND
LINK SEAL
CHECK VALVE
IN RISER
FLOAT GUIDE TUBE
STEAM LINE
STRAINER
MANHOLE SUMP
PENBERTHY STEAM SUMP
PUMP. MODEL NO. 2R-SL
CAPACITY 10.4 GPM MIN.
WITH 30 PSI STEAM AND 9'
MIN DISCHARGE HEIGHT
24"
MAX
3"
D
PROVIDE 4-BOLT
FLANGED OUTLET
OPEN DRAIN (NOTE 3)
CONNECTION TO
PRESSURE
VESSEL OR PIPE
VENT PIPE THROUGH ROOF
SUPPORT AS INDICATED ON
DWGS. (NOTES 1, 2)
PIPE THREADED INTO ELBOW
(SAME SIZE AS ELBOW)
DRIP PAN ELBOW
3/4" DRAIN TO FLOOR DRAIN OR
OPEN SIGHT DRAIN (NOTE 4)
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT
BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN
ANSI B31.1. POWER PIPING CODE, APPENDIX II.
2. VENT PIPE SHALL TERMINATE 1829mm [6'] MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS WHICH
PERSONNEL MAY OCCUPY.
4. NO OTHER DRAIN SHALL BE CONNECTED TO THE DRIP PAN ELBOW DRAIN PIPE.
FLEXIBLE CONNECTOR
3" MIN. DISTANCE FROM
BODY TO CENTERLINE
OF HANDLE.
1"
A B
1"
DRAW THRU
BLOW THRU
2" PLUS X
1" MIN.
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE DRAIN
PAN PIPING SHALL BE RIGID COPPER TYPE L OR TYPE M
UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
FLOOR SINK
DRAIN
PAN
NOTES:
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS
INDOORS AND DOES NOT PASS THROUGH RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE
TO BE CONNECTED.
[2 5m m
DIELECTRIC
FITTING
PIPE
INSULATION
2" DIA. SCH. 40
STEEL PIPE STAND
5/8" HILTI ANCHORS,
4 REQUIRED
CONCRETE SLAB
WELDED CONN., (TYPICAL)
INSULATED PIPE STAND, INSULATION
AND JACKETING ON PIPE STAND TO
MATCH INSULATED PIPE.
EXTERIOR
BUILDING WALL
INSULATED PIPING
INSULATION
REFRIGERANT PIPING
FIRE RATED CAULK
7/8" MAX. ANNULAR SPACE
NOTE: NON-INSULATED PIPING SIMILAR.
REFER TO ARCHITECTURAL FOR
FLASHING AND SEALING
REQUIREMENTS OF PENETRATION
ON EXTERIOR SIDE OF WALL
INTERIOR
BUILDING WALL
NOTE: SIMILAR FOR INTERIOR FIRE RATED WALLS, EXCEPT THAT
BOTH SIDES OF WALL ARE TO BE SEALED WITH A FIRE RATED CAULK
A
B B
A
CONCRETE BASE
L
W
5D
5D
2D
ANCHOR BOLT (TYP)
PIPE SLEEVE (5D, 3" MIN.)
1"
WELD HEAD TO PLATE
OR BEND OVER END 5D
PLAN SECTION B-B
SECTION A-A (BASE POURED WITH FLOOR SLAB)
TYPICAL ANCHOR
BOLT NUT & WASHER
16"
EQUIPMENT BASE
L/
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
SECTION A-A (BASE NOT POURED WITH SLAB)
PROVIDE #3 BARS 12" O.C.
EACH WAY IN THE BASE &
DOWEL BASE TO FLOOR
TYPICAL ANCHOR
BOLT NUT & WASHER EQUIPMENT BASE
L/
NOTE:
L & W DIMENSIONS SHALL
BE 6" GREATER THAN THE
EQUIPMENT BASE PLATE.
AHU DDC CONTROL
PANEL BY DIV 23
120 V/24 VAC CONTROL PANEL
TRANSFORMER SIZED TO MEET
LOAD REQUIREMENTS OF BCS CV
TERMINAL CONTROLLER
CPT CONTROL
PANEL BY DIV
CVTUSWITCH
FUSE
SWITCH
TO CVTUs
LOW VOLTAGE
POWER BY DIV 23
24 VAC TO
CVTU
CONTROL
120 VAC BY DIV 16
30°F - 300 °F
H.P. & M.P.
DRIP RETURNS
FLASH TANK
PROVIDE PIPE
SUPPORTS
NOTE:
ALTERNATIVELY, FLASH
TANK CAN BE SUSPENDED
FROM STRUCTURE.
PIPE WITH 1/4" PERFORATIONS SHALL
EXTEND FULL LENGTH OF TANK AND SHALL
BE SAME DIAMETER OF CONDENSATE RETURN
CONNECTION TO TANK. TOTAL AREA OF ALL
1/4" PERFORATIONS SHALL BE EQUIVALENT
TO THE TRANSVERSE AREA OF THE PIPE.
DIELETRIC FITTING
(WHEN RETURN IS COPPER)
RETURN
GRAVITY RETURN
TO CONDENSATE
PUMP
H E
IG
H
T D
E P
E N
D
IN
G O
N
IN
LE
T
O
F C
O N
D E
N S
A T
E P
U M
P
4"
FULL SIZE VENT
OUTSIDE BUILDING
CARRIER PIPE
(CONDENSATE)
CONDUIT VENT
SUMP
PIPE
HANGER
CONDUIT CASING
(TYPICAL)
WARM-UP BYPASS
GRAB IRONS
CARRIER PIPE
(STEAM)
PLAN VIEWPIPE HANGER
GRADE
1" VENT
CARRIER PIPE
(STEAM)
CONDUIT CASING
(TYPICAL)
DRIP POCKET
(SEE DETAIL)
SUMP - 18" x 18" x 18"
DRAIN - PLUGGED
GRAB IRONS
SECTION VIEW
NOTES:
1. DIMENSIONS ARE MINIMUM UNLESS
OTHERWISE NOTED
2. DETAIL IS FOR GENERAL
CONSTRUCTION ELEMENTS . REFER TO
DRAWING "M-402", STRUCTURAL, AND
CIVIL DRAWINGS FOR SPECIFIC
MANHOLE DESIGN REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/0
V A
M C
B u tl e r
V
IS
N
W a re h o u s e
/0
V A
B u tl e r_ V
IS
N
W a re h o u s e
R
M
E P
F P
F A
T .r v t
/2
/2
:3
:3
A
M
M-502
MECHANICAL DETAILS CONSTRUCT A WAREHOUSE
FOR VISN 4 WESTERN
MARKET DISTRIBUTION
BUTLER, VA
529-314
06/02/2025 ADL JMC
BID DOCUMENTS
N.T.S.1
HEAT EXCHANGER - STEAM TO HOT WATER
N.T.S.7
CONDENSATE PUMPS - PIPING CONNECTIONS
N.T.S.4
STEAM HUMIDIFIER PIPING DETAIL
N.T.S.3
STEAM EJECTOR DETAIL
N.T.S.5
STEAM RELIEF VALVE DRIP PAN DETAIL
N.T.S.11
CONDENSATE DRAIN TRAP DETAIL
N.T.S.10
INSULATED VERTICAL PIPE SUPPORT DETAIL
N.T.S.8
PIPING PENETRATION DETAIL
N.T.S.12
CONCRETE EQUIPMENT BASES DETAIL
N.T.S.9
DDC PANEL CONTROL POWER DETAIL
N.T.S.6
FLASH TANK CONNECTION DETAIL
N.T.S.2
CONCRETE STEAM MANHOLE WITH TYPICAL PIPING
Revisions Date
1 Addendum #1 07/22/2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s
/0
V A
M C
B u tl e r
V
IS
N
W a re h o u s e
/0
V A
B u tl e r_ V
IS
N
W a re h o u s e
R
M
E P
F P
F A
T .r v t
/2
/2
:3
:4
A
M
M-801
MECHANICAL SCHEDULES CONSTRUCT A WAREHOUSE
FOR VISN 4 WESTERN
MARKET DISTRIBUTION
BUTLER, VA
529-314
06/02/2025 ADL JMC
BID DOCUMENTS
AIR HANDLING UNIT SCHEDULE
UNIT NO. AREA SERVED LOCATION
AIRFLOW DATA SUPPLY FAN RETURN FAN COOLING COIL PREHEAT COIL FILTER ELECTRICAL DATA
UNIT
WEIGHT BASIS OF DESIGN
SUPPLY AIR
OUTSIDE
AIR CFM QTY.
BHP
(EACH)
HP
(EACH)
MAX
RPM WHEEL TYPE
MAX. ESP
(IN. WG) QTY.
MIN.
(CFM)
MAX.
(CFM)
BHP
(EACH)
HP
(EACH)
MAX
RPM WHEEL TYPE
MAX. ESP
(IN. WG)
EAT
DB
(°F)
EAT
WB
(°F)
LAT
DB
(°F)
LAT
WB
(°F)
MAX FV
(FPM)
MAX
APD
(IN. WG)
MAX
WPD
(FT. WC)
SENS.
CAP.
(MBH)
TOTAL
CAP.
(MBH)
EWT
(°F)
LWT
(°F) GPM
TOTAL
CAP.
(MBH)
EAT
DB
(°F)
LAT
DB
(°F)
MAX FV
FPM
MAX
APD
(IN WG)
STEAM MAX
FV
(FPM)
PRE-FILTER 1 PRE-FILTER 2 SUPPLY FAN ARRAY
MIN. MAX.
STEAM
PIPE (IN.)
CONDENSATE
LBS/HR
PSIG
(VALVE)
RETURN
PIPE (IN.) MERV
APD
MERV
APD
V PH HZINITIAL FINAL INITIAL FINAL
AHU-1 WAREHOUSE MECHANICAL ROOM 109 13000 13500 5250 6 3.18 7.5 3170 BACKWARD CURVED 2.5 2 4125 6750 1.95 4.8 2260 BACKWARD CURVED 1.5 80.0 67.0 54.7 54.2 513 0.82 11.0 374 534 45 57 90.1 492 42.0 75.7 500 0.22 2 529 30.0 1-1/2 500 7 0.28 0.36 13 0.31 0.39 460 3 60 5565 DAIKIN CAH028GDQM
AHU-2 FRONT OF HOUSE MECHANICAL ROOM 109 3500 4000 1050 1 4.88 7.5 1750 BACKWARD CURVED 2.5 1 1025 4000 0.40 4.2 4194 BACKWARD CURVED 1.1 80.0 67.0 54.4 54.0 511 0.87 10.5 140 200 45 57 33.4 118.7 55.0 77.0 500 0.18 2 127.8 30.0 1-1/2 500 7 0.28 0.36 13 0.28 0.36 460 3 60 2809 DAIKIN CAH011GDCM
NOTES:
1. DUCT SMOKE DETECTORS PROVIDED AND CONNECTED BY ELECTRICAL CONTRACTOR. MECHANICAL CONTRACTOR SHALL MOUNT DUCT SMOKE DETECTORS. .
2. CAPACITIES SHOWN ARE MINIMUM AND PRESSURE DROPS ARE MAXIMUM.
3. FILTER EFFICIENCY BASED ON ANSI/ASHRAE 52.2 TEST METHOD.
4. UNIT CONSTRUCTION SHALL INCLUDE 2 INCH R-13 INSULATION PANELS AND ALUMINUM.
5. PROVIDE DIRECT DRIVE FANS WITH INTERNAL VIBRATION ISOLATION.
6. FAN MOTORS SHALL BE SIZED FOR 100% N-1 REDUNDANCY. IF ONE FAN FAILS, THE OTHER FANS SHALL RAMP UP TO MEET SCHEDULED AIRFLOW. PROVIDE ONE VFD PER FAN.
7. PROVIDE EACH FAN WITH INDIVIDUAL BACKDRAFT DAMPER (APD 0.2 IN WC MAX.).
8. PROVIDE AIRFLOW MONITORING FOR EACH FAN.
9. PROVIDE MOTOR SHAFT GROUNDING RINGS.
10. PROVIDE 2-WAY CONTROL VALVE ON COOLING COIL.
11. UNIT SHALL BE SHIPPED AND INSTALLED IN SECTIONS THAT WILL FIT THROUGH DOUBLE DOORS LOCATED IN MECHANICAL ROOM (80" HIGH MAX.).
12. AHU-1: PROVIDE HUMIDIFIER AT 250 PPH AT 30 PSI.
FAN SCHEDULE
FAN NO. AREA SERVED LOCATION FAN TYPE
FAN CHARACTERISTICS ELECTRICAL DATA
WEIGHT
(LBS.) BASIS OF DESIGN COMMENTSCFM
ESP (IN
WC)
FAN
RPM
MOTOR
DRIVE V PH HZ VFDHP BHP
EF-1 RESTROOMS AND LOUNGE ROOF DOWNBLAST 425 0.52 1550 1/15 0.07 DIRECT 120 1 60 NO 29 GREENHECK G-090-D -
EF-2 FORKLIFT CHARGING ROOF DOWNBLAST 1000 0.54 1725 1/4 0.24 DIRECT 120 1 60 NO 49 GREENHECK G-099-A PROVIDE SPARK RESISTANT CONSTRUCTION, EXPLOSION PROOF MOTOR
EF-3 GENERATOR ROOM ROOF DOWNBLAST 1250 0.5 1725 1/3 0.28 DIRECT 120 1 60 NO 51 GREENHECK G-100-A -
NOTES:
1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
2. PROVIDE FACTORY DISCONNECT SWITCH.
3. PROVIDE 0-10V SIGNAL FROM BAS.
4. PROVIDE ELECTRONICALLY COMMUNICATED MOTOR (ECM).
5. PROVIDE SHAFT GROUNDING.
6. PROVIDE SPRING HANGING ISOLATORS, 1 INCH.
7. PROVIDE WITH BACKDRAFT GRAVITY DAMPER.
NOTES:
1. ALL TERMINAL UNITS SHALL BE FURNISHED WITH CONTROLS.
2. CONTRACTOR SHALL COORDINATE 36" OF CLEARANCE FOR ALL VAV BOX CONTROL PANELS
3. CONTROLLERS SHALL BE PROVIDED TO MANUFACTURER FACTORY FOR FACTORY MOUNT AND WIRE. TERMINAL UNIT CONTROLS SHALL BE 24V POWER.
4. PROVIDE POWER SOURCE LABEL ON EACH VAV BOX. REFER TO ELECTRICAL DRAWINGS.
5. CONTRACTOR SHALL COORDINATE 36" CLEARANCE FOR ALL CONTROL PANELS.
SINGLE DUCT AIR TERMINAL UNIT SCHEDULE
UNIT NO. AREA SERVED
INLET SIZE
(IN.)
PRIMARY AIR HOT WATER REHEAT
BASIS OF DESIGN COMMENTSMIN CFM DESIGN CFM
HEATING
CFM NC RATING
MAX APD (IN
WG) MBH EAT (°F) LAT (°F) EWT (°F) LWT (°F) GPM
WPD (FT.
HD)
TU-1-1 MECHANICAL ROOM - 109 14 1500 1500 1500 30 0.5 32.2 55 75 180 160 3.3 2.0 PRICE SDV -
TU-1-2 COPY RM - 108, SUPPLY RM - 107 6 250 450 250 30 0.5 7.2 55 75 180 160 0.5 2.0 PRICE SDV -
TU-1-3 STAFF LOUNGE - 105 5 100 300 200 30 0.5 7.1 55 80 180 160 0.5 2.0 PRICE SDV -
TU-1-4 OPEN OFFICE AREA - 101 14 710 1150 710 30 0.5 32.3 55 85 180 160 2.6 2.0 PRICE SDV -
TU-1-5 WAREHOUSE - 114 14 2000 2000 2000 30 0.5 40.6 55 75 180 160 4.3 2.0 PRICE SDV -
TU-1-6 WAREHOUSE - 114 14 2000 2000 2000 30 0.5 40.6 55 75 180 160 4.3 2.0 PRICE SDV -
TU-1-7 WAREHOUSE - 114 14 2000 2000 2000 30 0.5 40.6 55 75 180 160 4.3 2.0 PRICE SDV -
TU-1-8 WAREHOUSE - 114 14 2000 2000 2000 30 0.5 40.6 55 75 180 160 4.3 2.0 PRICE SDV -
TU-1-9 WAREHOUSE - 114 14 2000 2000 2000 30 0.5 40.6 55 75 180 160 4.3 2.0 PRICE SDV -
TU-1-10 WAREHOUSE - 114 14 2000 2000 2000 30 0.5 40.6 55 75 180 160 4.3 2.0 PRICE SDV -
TU-1-11 RECEIVING DOCK - 115 12 1000 1000 1000 30 0.5 9.3 55 75 180 160 1.1 2.0 PRICE SDV -
VRF INDOOR UNIT SCHEDULE
UNIT NO.
ASSOCIATED
OUTDOOR UNIT CFM (MAX.)
TOTAL COOLING
CAP. (MBH)
SENSIBLE
COOLING CAP.
TOTAL HEATING
CAP. (MBH)
FAN MOTOR
MCA V PH HZ BASIS OF DESIGN COMMENTS
IDU-1 ODU-1 915 34.4 - 36 - 208 1 60 FTX36NVJU -
IDU-2 ODU-1 583 18 - 21.6 - 208 1 60 FTX18WVJU9RXL18WMVJU9 -
NOTES:
1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
2. PROVIDE 7 DAY PROGRAMMABLE THERMOSTAT. UNITS SHALL BE THERMOSTATICALLY CONTROLLED TO CYCLE WITH LOADS.
3. PROVIDE 24V CONDENSATE PUMP AND INLINE CHECK VALVE IN DRAIN LINE.
4. PROVIDE BACNET GATEWAY AND CONNECT TO BAS.
VRF OUTDOOR UNIT SCHEDULE
UNIT NO. NOM. TONS
AMBIENT TEMP.
(°F)
ELECTRICAL DATA UNIT SIZE
BASIS OF DESIGN COMMENTSV PH HZ MCA MOCP LENGTH WIDTH HEIGHT WEIGHT
ODU-1 3 95 208 1 60 19.8 30 34-1/4 12-5/8 29 133 RX36NMVJUA -
ODU-2 1.5 95 208 1 60 18.6 30 34-1/4 12-5/8 29 132 FTX18WVJU9RXL18WMVJU9 -
NOTES:
1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
2. SIZE REFRIGERANT LINES PER MANUFACTURERS RECOMMENDATIONS. PROVIDE OVERSIZE LINES AND/OR REFRIGERATION LINE EXTENSION KIT BASED ON MANUFACTURER
RECOMMENDATIONS FOR EXTENDED REFRIGERATION LINE RUNS.
3. PROVIDE LOW AMBIENT WIND BAFFLE KIT FOR COOLING OPERATION IN AMBIENT TEMPERATURES DOWN TO 0° F.
4. PROVIDE ANTI-RECYCLE COMPRESSOR TIMER.
5. PROVIDE 5 YEAR COMPRESSOR WARRANTY.
CABINET UNIT HEATER SCHEDULE
MARK MANUFACTURER MODEL
MAX AIRFLOW
(CFM)
MAX CAPACITY
(BTU/HR)
PRESSURE DROP
(FT H2O) V/HZ/PH
CUH-1 MODINE CW00298A 150 9.1 0.1 120/60/1
NOTES:
1. PROVIDE WITH MANUFACTURER'S RECESSED WALL MOUNTED FRAME.
2. PROVIDE WITH STANDARD EC MOTOR.
3. PROVIDE WITH INTEGRAL DISCONNECT SWITCH.
AIR HANDLING UNIT BALANCE SCHEDULE
UNIT NO.
NEW WORK PHASE AIRFLOW
SA / RA / OA CFM
AHU-1 13000 / 7750 / 5250
AHU-2 3610 / 2510 / 1100
EXHAUST FAN BALANCE SCHEDULE
UNIT NO. NEW WORK PHASE AIRFLOW CFM
EF-1 375
EF-2 1000
EF-3 1250
MECHANICAL PUMP SCHEDULE
UNIT NO. PUMP TYPE LOCATION SERVICE FLUID GPM
TOTAL
WPD TEMP (F) MIN NPSHA HP RPM
ELECTRICAL DATA WEIGHT
(LBS) BASIS OF DESIGN COMMENTSV PH HZ MCA MOCP
P-1 INLINE MECHANICAL ROOM 109 HEATING HOT WATER WATER 45 34 180 27.85 2 2670 208 1 60 12 15 67 BELL AND GOSSETT e-90E1.25AAB -
P-2 INLINE MECHANICAL ROOM 109 HEATING HOT WATER WATER 45 34 180 27.85 2 2670 208 1 60 12 15 67 BELL AND GOSSETT e-90E1.25AAB -
P-3 INLINE MECHANICAL ROOM 109 CHILLED WATER WATER 125 20 45 14.3 1.5 1708 208 1 60 8 15 80 BELL AND GOSSETT e-903AAB -
P-4 INLINE MECHANICAL ROOM 109 CHILLED WATER WATER 125 20 45 14.3 1.5 1708 208 1 60 8 15 80 BELL AND GOSSETT e-903AAB -
NOTES:
1. PUMPS SHALL OPERATE IN RUN/STANDBY, BAS SHALL CYCLE OPERATION FOR EQUAL RUNTIME.
STEAM HEAT EXCHANGER SCHEDULE
UNIT NO. SERVICE TYPE
MEDIUM PRESSURE STEAM HEATING HOT WATER
BASIS OF DESIGN COMMENTS
FLOW
(LBS/HR)
ENT.
PRESSURE
(PSIG) VALVE PRESSURE (PSI)
INLET TEMP.
(°F)
OUTLET
TEMP. (°F) PD (PSI) FLOW (GPM)
INLET TEMP.
(°F)
OUTELT
TEMP. (°F) PD (PSI)
HEAT EXHANGED
(MBH)
HX-1 HEATING HOT WATER SHELL AND TUBE 617.26 30 15 249.1 249.1 5.94 60 160 180 6.5 586 BELL AND GOSSETT SU-63-2 -
HX-2 HEATING HOT WATER SHELL AND TUBE 617.26 30 15 249.1 249.1 5.94 60 160 180 6.5 586 BELL AND GOSSETT SU-63-2 -
NOTES:
1. HEAT EXCHANGER SHALL BE MADE OF STAINLESS STEEL COMPONENTS.
STEAM TRAP SCHEDULE
UNIT NO. GENERAL LOCATION/DESCRIPTION TRAP TYPE
TRAP
SIZE
(IN.)
INLET PRESSURE (PSIG) STEAM TEMP (°F) STEAM FLOW
RATE
(LBS/HR) SCHEMATIC DRAWING BASIS OF DESIGN COMMENTSOPERATING MAX OPERATING MAX
STP-01 STEAM MANHOLE INVERTED BUCKET 1 90 100 331 338 3400 CD 973-CD2990 ARMSTRONG 973 TRAP SHALL BE CAST STEEL
STP-02 STEAM PIT IN WAREHOUSE INVERTED BUCKET 1 90 100 331 338 3400 CD 973-CD2990 ARMSTRONG 973 TRAP SHALL BE CAST STEEL
STP-03 PRV IN WAREHOUSE INVERTED BUCKET 1 90 100 331 338 3400 CD 973-CD2990 ARMSTRONG 973 TRAP SHALL BE CAST STEEL
STP-04 PRV IN WAREHOUSE INVERTED BUCKET 1 30 60 274 307 3400 CD 973-CD2990 ARMSTRONG 973 TRAP SHALL BE CAST STEEL
STEAM UNIT HEATER SCHEDULE
UNIT NO.
CAPACITY AT
STANDARD
CONDITIONS (MBH)
STEAM PRESSURE
(PSIG)
ENTERING AIR
TEMP (F)
CALCULATED
FINAL AIR TEMP
(F)
CALCULATED
STEAM (LB/HR)
MAX.
CALCULATED
MOUNTING
HEIGHT (IN)
WEIGHT
(LBS)
ELECTRICAL DATA
BASIS OF DESIGN COMMENTSMOTOR HP V PH HZ
SUH-1 25 15 50 131 34 108 34 1/25 120 1 60 MODINE HC 33 -
SUH-2 62 15 50 95 65 108 46 1/15 120 1 60 MODINE V-78 PROVIDE WITH CONE OUTLET AND MOUNTING BRACKET
SUH-3 62 15 50 95 65 108 46 1/15 120 1 60 MODINE V-78 PROVIDE WITH CONE OUTLET AND MOUNTING BRACKET
NOTES:
1. PROVIDE REMOTE THERMOSTAT.
EXPANSION SYSTEM SCHEDULE
MARK MODEL NO. SYSTEM
SYSTEM TEMP (°F) INITIAL PRESS.
PSIG TANK SIZE GAL. MAX. PRESS PSIG
AIR SEPARATOR
MIN. MAX. MARK MODEL NO. INLET SIZE GPM MAX PD.
ET-1-1 B&G D15 HHW 40 180 60 7.8 125 AS-1-1 B&G R-3F 3 190 0.32
NOTES:
1. PROVIDE CHEMICAL SHOT FEEDER, WESSELS MODEL CPFT-5. REFER TO SPECIFICATIONS.
STEAM CONDENSATE RETURN UNIT SCHEDULE
UNIT NO. TYPE
CAPACITY SQ. FT.
EDR
RECEIVER
CAPACITY GAL.
PUMP DATA (EACH PUMP)
BASIS OF DESIGN COMMENTSGPM
DISCHARGE
PSI - SCR HP RPM V PH HZ
CP-1 DUPLEX 8,000 15 12 40 1 3,450 460 3 60 ARMSTRONG 4348-JD -
CP-2 DUPLEX 8,000 15 12 40 1 3,450 460 3 60 ARMSTRONG 4348-JD -
FLASH TANK SCHEDULE
MARK MANUFACTURER MODEL NO.
MAX. CONDENSATE
LOAD (LB/HR) INLET (IN.)
CONDENSATE
OUTLET (IN.) VENT (IN.)
TOTAL HEIGHT
(IN.)
FT-1-1 ARMSTRONG HAFT-4 1500 1-1/2 1-1/2 1-1/2 4
AIR DEVICE SCHEDULE
NO. MIN CFM MAX CFM
NECK
SIZE
(WxH)
NECK
SIZE (ø)
MAX. NC TYPE BASIS OF DESIGN
SUPPLY AIR
S2 0 210 8 18 PERFORATED PRICE SMD
S5 0 320 10 18 PERFORATED PRICE SMD
S20 0 600 16x10 18 DUCT MOUNTED PRICE SDG
RETURN AIR
R2 200 6 18 PERFORATED PRICE PDDR
R4 210 8 18 PERFORATED PRICE PDDR
R5 545 10 18 PERFORATED PRICE PDDR
EXHAUST AIR
E1 100 6 18 PERFORATED PRICE PDDR
E4 210 8 18 PERFORATED PRICE PDDR
LOUVER SCHEDULE
UNIT NO. SIZE (W" x H") AIRFLOW (CFM)
PRESSURE DROP
(IN-WG) SERVICE LOCATION BASIS OF DESIGN
GLP-1 24X40 4,000 0.141 OUTSIDE AIR MECHANICAL ROOM GREENHECK: ESD-635PD
GLP-2 62X44 13,500 0.135 RELIEF AIR MECHANICAL ROOM GREENHECK: ESD-635PD
GLP-3 66X50 13,500 0.136 OUTSIDE AIR MECHANICAL ROOM GREENHECK: ESD-635PD
GLP-4 60X60 14,200 0.127 EXHAUST AIR GENERATOR ROOM GREENHECK: ESD-635PD
GLP-5 62X62 15,400 0.131 MAKE UP AIR GENERATOR ROOM GREENHECK: ESD-635PD
GLP-6 20X20 1,250 0.079 OUTSIDE AIR GENERATOR ROOM GREENHECK: ESD-635PD
GLP-7 30X30 4,000 0.063 RELIEF AIR GENERATOR ROOM GREENHECK: ESD-635PD
NOTES:
1. ALL LOUVERS TO BE AMCA 540 AND AMCA 550 LISTED.
2. PROVIDE ALL LOUVERS WITH INSECT SCREEN, 12" CURB, DUCTED INSTALLATION, AND 600 FPM MAXIMUM THROAT VELOCITY.
Revisions Date
1 Addendum #1 07/22/2025
File details come from the government source that posted it. Updated .