Amendment 0003 Attachment 01 - M402.pdf

PDF 495 KB Posted

Attached to
529-314 | Construct Warehouse | Butler, PA | Samantha/Leslie Minor Construction
Solicitation number
36C77625B0029
Issued by

About this file

This document is a mechanical engineering drawing for a VA warehouse construction project in Butler, PA, specifically detailing mechanical piping enlarged plans for steam and chilled water manholes. The technical drawing, created by Above Group for the VA Office of Construction and Facilities Management, includes three detailed views: a chilled water manhole mechanical piping enlarged plan, a steam manhole mechanical piping enlarged plan, and a manhole section. The drawing shows various valve types including gate valves, check valves, and globe valves, with specific pipe specifications for underground (U/G) connections ranging from 1" to 12" in diameter for chilled water supply and return lines, steam lines, and other mechanical infrastructure. The drawing is part of the contract documentation for constructing a warehouse facility for VISN 4, with a project identifier of M-402.

View the file

Other files

File Type Posted
Amendment 0005 Attachment 1- Tech Questions Tracker - Butler Warehouse - Complete 07282025.pdf PDF
36C77625B0029 0005.pdf PDF
36C77625B0029 0004.pdf PDF
Amendment 0003 Attachment 02 Geotechnical Report.pdf PDF
Amendment 0003 Attachment 07 - Drawings 0123027_FP.pdf PDF
36C77625B0029 0003.pdf PDF
Amendment 0003 Attachment 03 Geotech Rep Appendix 1.pdf PDF
Amendment 0003 Attachment 04 Geotech Rep Appendix 2.pdf PDF
Amendment 0003 Attachment 08 - Tech Questions Tracker - Butler - Complete.pdf PDF
Amendment 0003 Attachment 06 - Drawings 0123027 - HVAC.pdf PDF
Amendment 0003 Attachment 05 - Specification 21 30 13 - ELECTRIC DRIVEN FIRE PUMPS.pdf PDF
Attachment 07 Wage Rates Butler County_07222025.pdf PDF
36C77625B0029 0002.pdf PDF
Site Visit Sign in Completed.pdf PDF
36C77625B0029 0001.pdf PDF
36C77625B0029_1.pdf PDF
Attachment 02 - Butler_Warehouse - FINAL BID DrawingsPart-1 of 3.pdf PDF
Attachment 10 - Site Visit map.pdf PDF
Attachment 11 - Seasonal Influenza with Vaccines.pdf PDF
Attachment 06- Limitations on Subcontracting - Construction.pdf PDF
Attachment 07 Wage Rates Butler County_03282025.pdf PDF
Attachment 03 - Butler_Warehouse - FINAL BID DrawingsPart-2 of 3.pdf PDF
Attachment 09 - Brand Name Requirement JA_Butler_Redacted.pdf PDF
Attachment 05 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
Attachment 04 - Butler_Warehouse - FINAL BID DrawingsPart-3 of 3.pdf PDF
Attachment 01 - Butler Warehouse_Final_BID_Specs.pdf PDF
Attachment 08 - PCRA_ICRA.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-402

2 1/2" HPS U/G

1" HPR U/G

1 1/4" PC U/G

EX 3" PC U/G

EX 6" HPS U/G

1 1/4" PC U/G

2 1/2" HPS U/G

1" HPR U/G

1" HPS U/G

STP-01

Y-STRAINER

CHECK VALVE

GLOBE VALVE

GATE VALVE (TYP)

GATE VALVE (TYP)

EX 12" CHWS U/G

EX 12" CHWR U/G

3" CHWR U/G3" CHWS U/G

GATE VALVE (TYP)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s

/0

V A

M C

B u tl e r

V

IS

N

W a re h o u s e

/0

V A

B u tl e r_ V

IS

N

W a re h o u s e

R

M

E P

F P

F A

T .r v t

/2

/2

:1

:2

A

M

M-402

MECHANICAL ENLARGED PLANS CONSTRUCT A WAREHOUSE

FOR VISN 4 WESTERN

MARKET DISTRIBUTION

BUTLER, VA

529-314

06/02/2025 ADL JMC

BID DOCUMENTS

CODED NOTES:

DRAWING NOTES:

1. INFORMATION SHOWN ON THIS DRAWING PERTAINING TO EXISTING CONDITIONS HAVE BEEN

OBTAINED FROM AVAILABLE DRAWINGS, VA DOCUMENTATION, AND MAY NOT INDICATE ACTUAL

EXISTING CONDITIONS IN DETAIL OR DIMENSION. CONTRACTOR SHALL VERIFY EXISTING UTILITIES

AND DEPTHS OF EXISTING PIPING CONNECTIONS.

2. PROVIDE 48" MIN. BURY DEPTH FROM TOP OF PIPING TO FINISHED GRADE.

3. UNDERGROUND HPS PIPING SHALL BE PRE-MANUFACTURED SYSTEM. BASIS OF DESIGN: PERMA-

PIPE.

4. UNDERGROUND CHWS/R PIPING SHALL BE PRE-MANUFACTURED SYSTEM. BASIS OF DESIGN: PERMA-

PIPE.

CONNECT NEW 2-1/2" HPS TO EX 6" HPS UNDERGROUND PIPING WITH (2) TWO NEW ISOLATION VALVES.

CONTRACTOR SHALL COORDINATE STEAM OUTAGE WITH COR PRIOR TO DEMOLITION. OUTAGE SHALL INCLUDE SYSTEM COOLDOWN, DEMOLITION OF EX UNDERGROUND PIPING, PREPARING PIPING FOR NEW

CONNECTIONS, NEW CONNECTIONS, TESTING, AND WARM-UP AND OPERATION.

CONNECT NEW 1-1/4" PCR TO EX 3" PCR UNDERGROUND PIPING WITH (2) TWO NEW ISOLATION VALVES.

CONTRACTOR SHALL COORDINATE OUTAGE WITH COR PRIOR TO DEMOLITION. OUTAGE SHALL INCLUDE

SYSTEM COOLDOWN, DEMOLITION OF EX UNDERGROUND PIPING, PREPARING PIPING FOR NEW

CONNECTIONS, NEW CONNECTIONS, TESTING, AND WARM-UP AND OPERATION.

PROVIDE 12' W CAST IN PLACE MANHOLE WITH POST-UP LADDER AND HIGH / LOW VENT COFFER CONNECTIONS. COORDINATE THE SIZE OF THE MANHOLE BASED ON THE SURVEY OF THE EXISTING UTILITIES AND ACCESS UNDER THE ROAD. MANHOLE COVER SHALL BE 36"Ø MIN. STEEL PLATES WITH

"STEAM" LABEL ON TOP OF LIDS.

N 0 1' 2' 3' 4'

3/4" = 1'-0"

1/4" = 1'-0"

STEAM MANHOLE MECHANICAL PIPING - ENLARGED PLAN

0 2' 4' 8' 12'

1/4" = 1'-0"

3/4" = 1'-0"

MANHOLE SECTION

1/4" = 1'-0"

CHILLED WATER MANHOLE MECHANICAL PIPING - ENLARGED PLAN

Revisions Date

Sheets
M-402 - MECHANICAL ENLARGED PLANS

File details come from the government source that posted it. Updated .