Attachment 11 - 16270 BUILDING 1 LEVEL 1 CLINICS RENO - ADD 1.pdf

PDF 12 MB Posted

Attached to
Des Monies, IA - Construction - Y1DZ--DBB Bldg 1 Clinic Renovations VISN 23
Solicitation number
36C77625B0027_1
Issued by

About this file

This document is an Addendum (#1) to a solicitation for the Building 1 Level 1 Clinic Renovation project at the VA Central Iowa Health Care System in Des Moines, Iowa. The addendum modifies several original drawings and specifications, including updates to site logistics plans, demolition plans, equipment plans, and the table of contents. Key changes include revising opening schedules, adding a new specification section for Steel Helical Piers, and modifying the quality control section to require contractors to have a minimum of 5 years of construction experience similar to the contract's scope.

The project involves renovations to the first-level clinics, with the addendum providing technical details for contractors bidding on the project. Attached to the addendum are updated drawings (including site, civil, architectural, and equipment plans), revised specifications, and reports including an asbestos inspection report dated 1/15/2024 and a lead inspection report from the same date. The solicitation is part of VA Project 636A6-21-109, and the addendum is intended to be acknowledged by bidders upon submission of their proposal.

View the file

Other files

File Type Posted
Attachment 5 - Brand Name Justification - Des Moines IA.pdf PDF
Attachment 9 - PCRA Des Moines IA B1L1 Renovation.pdf PDF
Attachment 11 - Solicitation Amendments 0001-0006.pdf PDF
Attachment 6 - Wage Rates 7.25.25 - Polk County.pdf PDF
Attachment 10 - ICRA-1.3 Building 1 Level 1 Clinic Renovation.pdf PDF
Attachment 1 - Des Moines IA B1L1 SOW REVISED 6.9.25.pdf PDF
Attachment 7 - Des Moines IA - Bldg 1 Level 1 - Tech Questions Tracker - 36C77625B0043 7.30.25.pdf PDF
Attachment 8 - Limitations on Subcontracting - Construction - Covenant Construction Services.pdf PDF
36C77625C0102_1.docx DOCX document
Attachment 3 - Des Moines IA B1L1 Spec VOL 2 06.04.2025.pdf PDF
Attachment 2 - Des Moines IA B1L1 Spec VOL 1 06.04.2025.pdf PDF
Attachment 4 - Des Moines IA B1L1 CD Drawings - Final.pdf PDF
Solicitation Amendment 0006 - 36C77625B0027.pdf PDF
Soliciation Amendment 0005 36C77625B0027.pdf PDF
Attachment 14 - M3110 Cabinet Warming info.pdf PDF
Attachment 15 - Des Moines IA - Bldg 1 Level 1 - Tech Questions Tracker.pdf PDF
Attachment 13 - Contactor Lay Down Space.pdf PDF
Attachment 12 - Bid Alternate per Specs.pdf PDF
Solication Amendment 0004 36C77625B0027.docx DOCX document
Attachment 6 - Wage Rates 7.25.25 - Polk County.pdf PDF
Solicitation Amendment 0003 - 36C77625B0027.pdf PDF
Solicitation Amendment 0002 - 36C77625B0027.pdf PDF
Site Visit Sign In Sheet 7-17-25.pdf PDF
Attachment 6 - Wage Rates 6.27.25 - Polk County.pdf PDF
Solicitation Amendment 0001 - 36C77625B0027.pdf PDF
Attachment 10 - ICRA-1.3 Building 1 Level 1 Clinic Renovation.pdf PDF
Attachment 6 - Wage Rates 6.27.25 - Des Moines County.pdf PDF
Attachment 8 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 4 - Des Moines IA B1L1 CD Drawings - Final.pdf PDF
Attachment 1 - Des Moines IA B1L1 SOW REVISED 6.9.25.pdf PDF
Attachment 9 - PCRA Des Moines IA B1L1 Renovation.pdf PDF
Solicitation 36C77625B0027 Building 1 Level 1 Renovations Construction - Des Moines IA.pdf PDF
Attachment 7 - Site Visit Instructions Des Moines.docx DOCX document
Attachment 2 - Des Moines IA B1L1 Spec VOL 1 06.04.2025.pdf PDF
Attachment 5 - Brand Name Justification - Des Moines IA.pdf PDF
Attachment 3 - Des Moines IA B1L1 Spec VOL 2 06.04.2025.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

13605 1st Avenue North Suite 100, Plymouth, MN 55441 P 763.412.4000 F 763.412.4090 ae-mn.com

INSTRUCTIONS TO BIDDERS

ADDENDUM #1

July 29, 2025

Building 1 Level 1 Clinic Renovation

VA Central Iowa Health Care System

Des Moines, IA 50310

Project #636A6-21-109

The Contents of this Addendum alter and amend the original drawings and specifications and take precedence over the related items therein.

Drawings:

1. Drawing GI000 – COVER SHEET

a. Added Site Logistics Plan.

2. Drawing GI001 – SHEET INDEX

a. Revised Sheet Index.

3. Drawing CD101 – DEMO PLAN

a. Revised demo plan as indicated.

4. Drawing CS101 – SITE, GRADING, AND EROSIOIN CONTROL PLAN

a. Revised extents of replacement concrete.

b. Modified elevations along sidewalk and curb ramp to provide better drainage.

5. Drawing C-100 – CIVIL DETAILS

a. Revised Detail 2.

6. Drawing AE602 – DOOR SCHEDULE AND ELEVATIONS

a. Opening Schedule: Revised Opening 1430 as indicated.

7. Drawing QH110 – FIRST LEVEL EQUIPMENT PLANS

a. Equipment Schedule: Added Equipment #A5090.

b. Equipment Schedule: Revised Equipment #M3110 as indicated.

8. Drawing QH411 – ENLARGED EQUIPMENT PLANS

a. Enlarged Plan 1: Removed equipment tag as indicated.

b. Enlarged Plan 2: Removed equipment tag as indicated.

c. Equipment Schedule: Added Equipment #A5090.

d. Equipment Schedule: Revised Equipment #M3110 as indicated.

Specifications:

1. Specification 00 01 10 – Table of Contents

a. Added Section 31 26 00 – Steel Helical Piers

2. Specification 01 45 00 – Quality Control

a. Revised Section 3.4, Item B to include, “with a minimum of 5 years construction experience on construction similar to the scope of this Contract”.

13605 1st Avenue North Suite 100, Plymouth, MN 55441 P 763.412.4000 F 763.412.4090 ae-mn.com

3. Specification 31 26 00 – Steel Helical Piers

a. Added Section.

ATTACHMENTS:

DRAWINGS: GI000, GI001, CD101, CS101, C-100, AE602, QH110 and QH411 SPECIFICATIONS: 00 01 10, 01 45 00 and 31 26 00 REPORTS: ASBESTOS INSPECTION REPORT DATED 1/15/2024 AND LEAD INSPECTION REPORT DATED 1/15/2024

The inclusion of this Addendum shall be acknowledged upon submission of the Contractor’s Bid. By submission of a Bid, Bidder agrees to full acceptance of the provisions herein. All other provisions of these Specifications, Drawings, and Contract Documents shall remain unchanged and in full effect.

This Addendum shall be attached to and become part of the Specifications for the above Contract.

ISSUED BY ANDERSON: TO, JU, AW

END OF ADDENDUM #1

VA Central Iowa Health Care System VA Project 636A6-21-109

Building 1 Level 1 Clinics Renovation 02-21-2025

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 01-01-23

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-24

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24

01 33 23 Shop Drawings, Product Data, and Samples 11-23

01 35 26 Safety Requirements 12-23

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 06-21

01 57 19 Temporary Environmental Controls 01-21

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 04-22

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 04-22

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 12-23

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.13 Glovebag Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

02 82 13.31 Asbestos Transite Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 01-21

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 01-21

04 20 00 Unit Masonry 08-17

04 72 00 Cast Stone Masonry 01-21

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 01-01-23

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 31 00 Steel Decking 01-21

05 36 00 Composite Metal Decking 01-21

05 40 00 Cold-Formed Metal Framing 01-21

05 50 00 Metal Fabrications 08-18

05 51 00 Metal Stairs 01-21

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 01-21

07 21 13 Thermal Insulation 01-21

07 22 00 Roof and Deck Insulation 01-21

07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21

07 53 23 EPDM Roofing 01-21

07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21

07 60 00 Flashing and Sheet Metal 01-21

07 71 00 Roof Specialties 01-21

07 81 00 Applied Fireproofing 07-23

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 14 73.20 Wood Sliding Door Assemblies

08 17 00 Integrated Door Opening Assemblies

08 31 13 Access Doors and Frames 04-22

08 34 00 Special Function Doors 01-23

08 56 53 Extreme High Impact Resistant Windows 01-21

08 71 00 Door Hardware 03-24

08 71 13 Automatic Door Operators 01-21

08 80 00 Glazing 01-21

08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 30 00 Specialty Moldings and Trims

09 30 13 Ceramic/Porcelain Tiling 01-21

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 01-01-23

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

09 51 00 Acoustical Ceilings 12-18

09 62 63 Stainless Steel Wall Base

09 65 13 Resilient Base and Accessories 01-21

09 65 16 Resilient Sheet Flooring 06-22

09 65 19 Resilient Tile Flooring 05-18

09 68 00 Carpeting 01-21

09 91 00 Painting 01-21

09 96 00 High Performance Resinous Wall Coatings 06-22

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 21 23 Cubicle Curtain Tracks 01-21

10 26 00 Wall and Door Protection 01-21

10 26 23.11 Decorative Protection Panels

10 28 00 Toilet, Bath, and Laundry Accessories 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

10 51 13 Metal Lockers 10-23

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17

12 32 00 Manufactured Wood Casework 01-21

12 36 00 Countertops 11-23

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23

22 05 19 Meters and Gages for Plumbing Piping 09-20

22 05 23 General-Duty Valves for Plumbing Piping 09-20

22 05 33 Heat Tracing for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 05-21

22 13 00 Facility Sanitary and Vent Piping 09-20

22 14 00 Facility Storm Drainage 09-15

22 40 00 Plumbing Fixtures 12-22

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

03-23

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 01-01-23

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 03-23

23 09 23 Direct-Digital Control System for HVAC 03-23

23 21 13 Hydronic Piping 03-23

23 21 23 Hydronic Pumps 03-23 23 22 13 Steam and Condensate Heating Piping 08-23

23 22 23 Steam Condensate Pumps 04-20

23 25 00 HVAC Water Treatment 03-23

23 31 00 HVAC Ducts and Casings 03-23

23 34 00 HVAC Fans 03-23

23 36 00 Air Terminal Units 03-23

23 37 00 Air Outlets and Inlets 03-23

23 40 00 HVAC Air Cleaning Devices 03-23

23 73 00 Indoor Central-Station Air-Handling Units 03-23

23 82 00 Convection Heating and Cooling Units 03-23

23 82 16 Air Coils 03-23

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

26 05 26 Grounding and Bonding for Electrical Systems 11-22

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 05 73 Overcurrent Protective Device Coordination Study 11-22

26 08 00 Commissioning of Electrical Systems 11-22

26 09 23 Lighting Controls 11-22

26 24 16 Panelboards 11-22

26 27 26 Wiring Devices 11-22

26 29 11 Motor Controllers 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 43 13 Surge Protective Devices 11-22

26 51 00 Interior Lighting 11-22

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 10 00 Control, Communication and Signal Wiring 06-15

27 15 00 Communications Structured Cabling 01-16

27 51 16 Public Address and Mass Notification Systems 01-23

27 51 23 Intercommunications and Program Systems 06-15

27 52 23 Nurse Call and Code Blue Systems 12-20

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 01-01-23

00 01 10-5

SECTION NO. DIVISION AND SECTION TITLES DATE

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

01-23

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

01-23

28 13 00 Physical Access Control System 01-23

28 23 00 Video Surveillance 04-18

28 31 00 Fire Detection and Alarm 10-22

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 08-23

31 26 00 Steel Helical Piers 08-25

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 17 23 Pavement Markings 08-16

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 1

SECTION 01 45 00

QUALITY CONTROL

PART 1 - GENERAL

1.1 DESCRIPTION

This section specifies requirements for Contractor Quality Control

(CQC) for Design-Bid-Build (DBB) or Design-Build (DB) construction projects. This section can be used for both project types.

1.2 APPLICABLE PUBLICATIONS

A. The publication listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

B. ASTM International (ASTM)

1. D3740 - (2012a) Minimum Requirements for Agencies Engaged in the

Testing and/or Inspection of Soil and Rock as Used in Engineering

Design and Construction

2. E329 - (2014a) Standard Specification for Agencies Engaged in the

Testing and/or Inspection of Materials Used in Construction

1.3 SUBMITTALS

Government approval is required for all submittals. CQC inspection reports shall be submitted under this Specification section and follow the [Applicable CQC Control Phase (Preparatory, Initial, or Follow-

Up)]: [Applicable Specification section] naming convention.

1. Preconstruction Submittals

a. Interim CQC Plan

b. CQC Plan

c. Additional Requirements for Design Quality Control (DQC) Plan

2. Design Data

a. Discipline-Specific Checklists

b. Design Quality Control

3. Test Reports

a. Verification Statement

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 2

PART 2 PRODUCTS – NOT USED

PART 3 - EXECUTION

3.1 GENERAL REQUIREMENTS

Establish and maintain an effective quality control (QC) system. that complies with the FAR Clause 52.246.12 titled “Inspection of

Construction”. QC consists of plans, procedures, and organization necessary to produce an end product which complies with the Contract requirements. The QC system covers all design and construction operations, both onsite and offsite, and be keyed to the proposed design and construction sequence. The project superintendent will be held responsible for the quality of work and is subject to removal by the Contracting Office or Authorized designee for non-compliance with the quality requirements specified in the Contract. In this context the highest level manager responsible for the overall construction activities at the site, including quality and production is the project superintendent. The project superintendent maintains a physical presence at the site at all times and is responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.

3.2 CQC PLAN:

A. Submit the CQC Plan no later than 15 days after receipt of Notice to

Proceed (NTP) proposed to implement the requirements of the FAR Clause

52.246.12 titled “Inspection of Construction”. The Government will consider an Interim CQC Plan for the first days of operation, which must be accepted within 10 business days of NTP. Design and/or construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an Interim plan applicable to the particular feature of work to be started. Work outside of the accepted Interim CQC Plan will not be permitted to begin until acceptance of a CQC Plan or another

Interim CQC Plan containing the additional work scope is accepted.

B. Content of the CQC Plan: Include, as a minimum, the following to cover all design and construction operations, both onsite and offsite, including work by subcontractors, designers of record consultants, architects/engineers (A/E), fabricators, suppliers, and purchasing agents:

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 3

1. A description of the QC organization, including a chart showing lines of authority and acknowledgement that the CQC staff will implement the three phase control system for all aspects of the work specified. Include a CQC System Manager that reports to the project superintendent.

2. The name, qualifications (in resume format) duties, responsibilities, and authorities of each person assigned a CQC function.

3. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the Contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities will be issued by the CQC System Manager. Furnish copies of these letters to the

Contracting Officer or Authorized designee.

4. Procedures for scheduling, reviewing, certifying, and managing submittals including those of subcontractors, designers of record, consultants, A/E’s offsite fabricators, suppliers and purchasing agents. These procedures must be in accordance with Section 01 33 23

Shop Drawings, Product Data, and Samples.

5. Control, verification, and acceptance of testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities approved by the Contracting Officer or Authorized designee are required to be used)

6. Procedures for tracking Preparatory, Initial, and Follow-Up control phases and control, verification, and acceptance tests including documentation.

7. Procedures for tracking design and construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.

8. Reporting procedures, including proposed reporting formats.

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 4

9. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks has separate control requirements, and is identified by different trades or disciplines, or it is work by the same trade in a different environment. Although each section of specifications can generally be considered as a definable feature of work, there are frequently more than one definable feature under a particular section. This list will be agreed upon during the Coordination meeting.

10. Coordinate schedule work with Special Inspections required by

Section 01 45 35 Special Inspections, the Statement of Special

Inspections and Schedule of Special Inspections. Where the applicable Code issue by the International Code Council (ICC) calls for inspections by the Building Official, the Contractor must include the inspections in the CQC Plan and must perform the inspections required by the applicable ICC. The Contractor must perform these inspections using independent qualified inspectors.

Include the Special Inspection Plan requirements in the CQC Plan.

C. Additional Requirements for Design Quality Control (DQC) Plan: The following additional requirements apply to the DQC Plan for DB projects only and not DBB projects:

1. Submit and maintain a DQC Plan as an effective QC program which assures that all services required by this contract are performed and provided in a manner that meets professional architectural and engineering quality standards. As a minimum, all documents must be technically reviewed by competent, independent reviewers identified in the DQC Plan. The same element that produced the product may not perform the independent technical review (ITR). Correct errors and deficiencies in the design documents prior to submitting them to the

Government.

2. Include the design schedule in the master project schedule, showing the sequence of events involved in carrying out the project design tasks within the specific Contract period. This should be at a detailed level of scheduling sufficient to identify all major design tasks, including those that control the flow of work. Include review and correction periods associated with each item. This should be a forward planning as well as a project monitoring tool. The schedule reflects calendar days and not dates for each activity. If the

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 5 schedule is changed, submit a revised schedule reflecting the change within 7 calendar days. Include in the DQC Plan the discipline-specific checklists to be used during the design and quality control of each submittal. Submit at each design phase as part of the project documentation these completed discipline-specific checklists.

3. Implement the DQC Plan by a DQC Manager who has the responsibility of being cognizant of and assuring that all documents on the project have been coordinated. This individual must be a person who has verifiable engineering or architectural design experience and is a

Professional Engineer or Registered Architect within the state of

Construction location. Notify the Contracting Officer or Authorized designee, in writing, of the name of the individual, and the name of an alternate person assigned to the position.

D. Acceptance of Plan: Acceptance of the Contractor’s plan is required prior to the start of design and construction. Acceptance is conditional and will be predicated on satisfactory performance during the design and construction. The Government reserves the right to require the Contractor to make changes in the CQC Plan and operations including removal of personnel as necessary, to obtain the quality specified.

E. Notification of Changes: After acceptance of the CQC Plan, notify the

Contracting Officer or Authorized designee in writing of any proposed change. Proposed changes are subject to acceptance by the Government prior to implementation by the Contractor.

3.3 COORDINATION MEETING:

After the Preconstruction Conference Post-award Conference before start of design or construction, and prior to acceptance by the Government of the CQC Plan, meet with the Contracting Officer or Authorized designee to discuss the Contractor’s quality control system. Submit the CQC Plan a minimum of 5 business days prior to the Coordination Meeting.

During the meeting, a mutual understanding of the system details must be developed, including the forms for recording the CC operations, design activities (if applicable), control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor’s Management and control with the

Government’s Quality Assurance. Minutes of the meeting will be

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 6 prepared by the Government, signed by both the Contractor and

Contracting Officer or Authorized designee and will become a part of the contract file. There can be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings or address deficiencies in the CQC system or procedures which can require corrective action by the Contractor.

3.4 QUALITY CONTROL ORGANIZATION:

A. Personnel Requirements: The requirements for the CQC organization are a

Safety and Health Manager, CQC System Manager, a Design Quality Manager

(if applicable), and sufficient number of additional qualified personnel to ensure safety and Contract compliance. The Safety and

Health Manager shall satisfy the requirements of Specification 01 35 26

Safety Requirements and reports directly to a senior project (or corporate) official independent from the CQC System Manager. The Safety and Health Manager will also serve as a member of the CQC Staff.

Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization. The

Contractor’s CQC staff maintains a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure Contract compliance. The CQC staff will be subject to acceptance by the

Contracting Officer or Authorized designee. Provide adequate office space, filing systems, and other resources as necessary to maintain an effective and fully functional CQC organization. Promptly complete and furnish all letters, material submittals, shop drawings submittals, schedules and all other project documentation to the CQC organization.

The CQC organization is responsible to maintain these documents and records at the site at all times, except as otherwise acceptable to the

Government.

B. CQC System Manager: Identify as CQC System Manager an individual within the onsite work organization that is responsible for overall management of CQC and has the authority to act in all CQC matters for the

Contractor. The CQC system Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to the scope of this Contract. This CQC System manager is on

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 7 the site at all times during construction and is employed by the

General Contractor. Identify in the plan an alternate to serve in the event of the CDQC System Manager’s absence. The requirements for the alternate are the same as the CQC System Manager.

C. CQC Personnel: In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist in the CQC System Manager for the following areas, as applicable: electrical, mechanical, civil, structural, environmental, architectural, materials technician submittals clerk, Commissioning

Agent/LEED specialist, and low voltage systems. These individuals or specified technical companies are directly employed by the General

Contractor and cannot be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager; be physically present at the construction site during work on the specialized personnel’s areas of responsibility; have the necessary education or experience in accordance with the Experience Matrix listed herein.

These individuals can perform other duties but need to be allowed sufficient time to perform the specialized personnel’s assigned quality controls duties as described in the CQC Plan. A single person can cover more than one area provided that the single person is qualified to perform QC activities in each designated and that workload allows.

EXPERIENCE MATRIX

Area Qualifications

Civil

Graduate Civil Engineer or Construction

Manager with 2 years experience in the type of work being performed on this project or technician with 5 years related experience.

Mechanical

Graduate Mechanical Engineer with 2 years experience or construction professional with 5 years of experience supervising mechanical features of work in the field with a construction company.

Electrical

Graduate Electrical Engineer with 2 years related experience or construction professional with 5 years of experience supervising electrical features of work in the field with a construction company.

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 8

Area Qualifications

Structural

Graduate Civil Engineer (with Structural

Track or Focus), Structural Engineer, or

Construction Manager with 2 years experience or construction professional with 5 years experience supervising structural features of work in the field with a construction company.

Architectural

Graduate Architect with 2 years experience or construction professional with 5 years of related experience.

Environmental Graduate Environmental Engineer with 3 years experience.

Submittals Submittal Clerk with 1 year experience.

Concrete, Pavement, and Soils Materials Technician with 2 years experience for the appropriate area.

Testing, Adjusting, and

Balancing (TAB)

Specialist must be a member of AABC or an experienced technicaion of the firm certified by the NEBB.

Design Quality Control Manager Registered Architect or Professional

Engineer

D. Additional Requirements: In addition to the above experience and education requirements, the CQC System Manager and Alternate CQC System

Manager are required to have completed the Construction Quality

Management (CQM) for Construction course. If the CQC System Manager does not have a current specification, obtain the CQM for Contractors course identification within 90 days of award. This course is periodically offered by the Naval Facilities Engineering Command and the Army Corps of Engineers. Contact the Contracting Officer or

Authorized designee for information on the next scheduled class.

E. Organizational Changes: Maintain the CQC staff at full strength at all times. When it is necessary to make changes to the CQC staff, revise the CQC Plan to reflect the changes and submit the changes to the

Contracting Officer or Authorized designee for acceptance.

3.5 SUBMITTALS AND DELIVERABLES: Submittals have to comply with the requirements in Section 01 33 23 Shop Drawings, Product Data, and

Samples. The CQC organization is responsible for certifying that all submittals and deliverables are in compliance with the contract

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 9 requirements. When Section 01 91 00 General Commissioning Requirements is included in the contract, the submittals required by the section have to be coordinated with the Section 01 33 23 Shop Drawings, Product

Data, and Samples to ensure adequate time is allowed for each type of submittal required.

3.6 CONTROL:

A. CQC is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control are required to be conducted by the CQC System Manager for each definable feature of the construction work as follows:

1. Preparatory Phase: This phase is performed prior to beginning work on each definable feature of work after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:

a. A review of each paragraph of applicable specifications, references codes, and standards. Make available during the preparatory inspection a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field. Maintain and make available in the field for use by Government personnel until final acceptance of the work.

b. Review of the Contract drawings.

c. Check to assure that all materials and equipment have been tested, submitted, and approved.

d. Review of provisions that have been made to provide required control inspection and testing.

e. Review Special Inspections required by Section 01 45 35 Special

Inspections, that Statement of Special Inspections and the

Schedule of Specials Inspections.

f. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the Contract.

g. Examination of required materials, equipment, and sample work to assure that they are on hand conform to approved shop drawings or submitted data, and are properly stored.

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 10

h. Review of the appropriate Activity Hazard Analysis (AHA) to assure safety requirements are met.

i. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards – contract defined or industry standard if not contract defined - for that feature of work.

j. Check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.

k. Discussion of the initial control phase.

l. The Government needs to be notified at least 48 hours or 2 business days in advance of beginning the Preparatory control phase. Include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. Document the results of the Preparatory phase actions by separate minutes prepared by the CQC System Manager and attach to the daily CQC report. Instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.

B. Initial Phase: This phase is accomplished at the beginning of a definable feature of work. Accomplish the following:

1. Check work to ensure that it is in full compliance with contract requirements. Review minutes of the Preparatory meeting.

2. Verify adequacy of controls to ensure full contract compliance.

Verify the required control inspection and testing is in compliance with the contract.

3. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.

4. Resolve all differences.

5. Check safety to include compliance with an upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.

6. The Government needs to be notified at least 48 hours or 2 business days in advance of beginning the initial phase for definable features of work. Prepare separate minutes of this phase by the CQC

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 11

System Manager and attach to the daily CQC report. Indicate the exact location of initial phase for definable feature of work for future reference and comparison with Follow-Up phases.

7. The initial phase for each definable feature of work is repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.

8. Coordinate scheduled work with Special Inspections required by

Section 01 45 35 Special Inspections, the Statement of Special

Inspections, and the Schedule of Special Inspections.

C. Follow-Up Phase: Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements until the completion of the particular feature of work. Record the checks in the CQC documentation. Conduct final Follow-

Up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work. Coordinate scheduled work with Special Inspections required by Section 01 45 35 Special

Inspections, the Statement of Special Inspections, and the Schedule of

Special Inspections

D. Additional Preparatory and Initial Phases on the same definable features of work if: the quality ongoing work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity, or if other problems develop.

3.7 TESTS

A. Testing Procedure: Perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements. Upon request, furnish to the Government duplicate samples of test specimens for possible testing by the

Government. Testing includes operation and acceptance test when specified. Procure the services of a Department of Veteran Affairs approved testing laboratory or establish an approved testing laboratory at the project site. Perform the following activities and record and provide the following data:

1. Verify that testing procedures comply with contract requirements.

2. Verify that facilities and testing equipment are available and comply with testing standards.

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 12

3. Check test instrument calibration data against certified standards.

4. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.

5. Record results of all tests taken, both passing and failing on the

CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the unique sequential control number identifying the test. If approved by the Contracting Officer or Authorized designee, actual test reports are submitted later with a reference to the test number and date taken. Provide an information copy of tests performed by an offsite or commercial test facility directly to the Contracting Officer or Authorized designee.

Failure to submit timely test reports as stated results in nonpayment for related work performed and disapproval of the test facility for this Contract.

B. Testing Laboratories: All testing laboratories must be validated through the procedures contained in Specification section 01 45 29

Testing Laboratory Services.

1. Capability Check: The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician’s testing procedures and techniques.

Laboratories utilized for testing soils, concrete, asphalt and steel is required to meet criteria detailed in ASTM D3740 and ASTM E329.

2. Capability Recheck: If the selected laboratory fails the capability check, the Contractor will be assessed a charge equal to value of recheck to reimburse the Government for each succeeding recheck of the laboratory or the checking of a subsequently selected laboratory. Such costs will be deducted from the Contract amount due the Contractor.

C. Onsite Laboratory: The Government reserves the right to utilize the

Contractor’s control testing laboratory and equipment to make assurance tests, and to check the Contractor’s testing procedures, techniques, and test results at no additional cost to the Government.

3.8 COMPLETION INSPECTION

A. Punch-Out Inspection: Conduct an inspection of the work by the CQC system Manager near the end of the work, or any increment of the work

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 13 established by the specifications. Prepare and include in the CQC documentation a punch list of items which do not conform to the approved drawings and specifications. Include within the list of deficiencies the estimated date by which the deficiencies will be corrected. Make a second inspection the CQC System Manager or staff to ascertain that all deficiencies have been corrected. Once this is accomplished, notify the Government that the facility is ready for the

Government Pre-Final Inspection.

B. Pre-Final Inspection: The Government will perform the Pre-Final

Inspection to verify that the facility is complete and ready to be occupied. A Government Pre-Final Punch List may be developed as a result of this inspection. Ensure that all items on this list have been corrected before notifying the Government, so that a Final Acceptance

Inspection with the customer can be scheduled. Correct any items noted on the Pre-Final Inspection in a timely manner. These inspections and any deficiency corrections required by this paragraph need to be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate construction completion dates.

C. Final Acceptance Inspection: The Contractor’s QC Inspection personnel, plus the superintendent or other primary management person, and the

Contracting Officer’s Authorized designee is required to be in attendance at the Final Acceptance Inspection. Additional Government personnel can also be in attendance. The Final Acceptance Inspection will be formally scheduled by the Contracting Officer’s or Authorized designee based upon results of the Pre-Final Inspection. Notify the

Contracting Officer through the Resident Engineer office at least 14 days prior to the Final Acceptance Inspection and include the

Contractor’s assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the contract, will be complete and acceptable by the date schedule for the Final Acceptance Inspection. Failure of the

Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the

Contractor for the Government’s additional inspection cost in accordance with FAR Clause 52.246-12 titled “Inspection of

Construction”.

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 14

3.9 DOCUMENTATION

A. Quality Control Activities: Maintain current records providing factual evidence that required QC activities and tests have been performed.

Include in these records the work of subcontractors and suppliers on an acceptable form that includes, as a minimum, the following information:

1. The name and area of responsibility of the Contractor/Subcontractor

2. Operating plant/equipment with hours worked, idle, or down for repair.

3. Work performed each day, giving location, description, and by whom.

When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.

4. Test and control activities performed with results and references to specification/drawing requirements. Identify the Control Phase

(Preparatory, Initial, and/or Follow-Up). List deficiencies noted, along with corrective action.

5. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specification/drawing requirements.

6. Submittals and deliverables reviewed, with Contract reference, by whom, and action taken.

7. Offsite surveillance activities, including actions taken.

8. Job safety evaluations stating what was checked, results, and instructions or corrective actions.

9. Instructions given/received and conflicts in plans and specifications.

10. Provide documentation of design quality control activities. For independent design reviews, provide, as a minimum, identification of the Independent Technical Reviewer (ITR) team, the ITR review comments, responses, and the record of resolution of the comments.

B. Verification Statement: Indicate a description of trades working on the project; the number of personnel working; weather conditions encountered; and any delays encountered. Cover both conforming and deficient features and include a statement that equipment and materials incorporated in the work and workmanship comply with the Contract.

Furnish the original and one copy of these records in report form to the Government daily with 1 week after the date covered by the report, except that reports need not be submitted for days on which no work is

13600 30th Street ADDENDUM #1 07-29-2025

Des Moines, IA 50310 VERSION 02-01-21

QUALITY CONTROL

01 45 00 - 15 performed. As a minimum, prepare and submit on report for every 7 days of no work and on the last day of a no work period. All calendar days need to be accounted for throughout the life of the contract. The first report following a day of no work will be for that day only. Reports need to be signed and dated by the CQC System Manager. Include copies of test reports and copies of reports prepared by all subordinate QC personnel within the CQC System Manager Report.

3.10 SAMPLE FORMS

Templates of various quality control reports can be found on the Whole

Building Design Guide website at https://www.wbdg.org/FFC/NAVGRAPH/

01%2045%2000.00%2020_quality_control_reports.pdf

3.11 NOTIFICATION OF NONCOMPLIANCE: The Contracting Officer or Authorized designee will notify the Contractor of any detected noncompliance with the foregoing requirements. The Contractor should take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site will be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer can issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders will be made the subject of claim for extension of time or for excess costs or damages by the Contractor.

--- End of Section ---

VA Central Iowa Health Care System

Building 1 Level 1 Clinics Renovation

13600 30th Street

Des Moines, IA 50310

VA Project 636A6-21-109

08-04-2025

ADDENDUM 1

STEEL HELICAL PILES

31 26 00 - 1

SECTION 31 26 00

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. All items required for executing and completing the steel helical pile work and related work shown on the drawings or specified herein.

B. Structural notes indicated on the drawings regarding steel helical piles should be considered a part of this specification.

1.2 RELATED WORK

A. Pertinent Sections of Division 01.

B. Section 03 30 00 - Cast-in-Place Concrete.

1.3 REFERENCES

A. Codes and Standards: Comply with the provisions of the following codes, specifications, and standards except where more stringent requirements are shown or specified. Where any provisions of other pertinent codes and standards conflict with this specification, the more stringent provision shall govern.

1. ASCE 20 - Standard Guidelines for the Design and Installation of

Pile Foundations.

2. ASME B18.2.1 - Square, Hex, Heavy Hex, and Askew Head Bolts and

Hex, Heavy Hex, Hex Flange, Lobed Head, and Lag Screws (Inch

Series).

3. ASTM A29 - Standard Specification for General Requirements for

Steel Bars, Carbon and Alloy, Hot-Wrought.

4. ASTM A36 - Standard Specification for Carbon Structural Steel.

5. ASTM A53 - Standard Specification for Pipe, Steel, Black and Hot-

Dipped, Zinc-Coated, Welded and Seamless.

6. ASTM A123 - Standard Specification for Zinc (Hot-Dip Galvanized)

Coatings on Iron and Steel Products.

7. ASTM A153 - Standard Specification for Zinc Coating (Hot-Dip) on

Iron and Steel Hardware.

8. ASTM A193 - Standard Specification for Alloy-Steel and Stainless

Steel Bolting for High Temperature or High Pressure Service and

Other Special Purpose Applications.

9. ASTM A252 - Standard Specification for Welded and Seamless Steel

Pipe Piles.

13600 30th Street

Des Moines, IA 50310

VA Project 636A6-21-109

31 26 00 - 2

10. ASTM A320 - Standard Specification for Alloy-Steel and Stainless

Steel Bolting for Low-Temperature Service.

11. ASTM A500 - Standard Specification for Cold-Formed Welded and

Seamless Carbon Steel Structural Tubing in Rounds and Shapes.

12. ASTM A513 - Standard Specification for Electric-Resistance-Welded

Carbon and Alloy Steel Mechanical Tubing.

13. ASTM A536 - Standard Specification for Ductile Iron Castings.

14. ASTM A572 - Standard Specification for High-Strength Low-Alloy

Columbium-Vanadium Structural Steel.

15. ASTM A618 - Standard Specification for Hot-Formed Welded and

Seamless High-Strength Low-Alloy Structural Tubing.

16. ASTM A656 - Standard Specification for Hot-Rolled Structural

Steel, High-Strength Low-Alloy Plate with Improved Formability.

17. ASTM A958 - Standard Specification for Steel Castings, Carbon and

Alloy, with Tensile Requirements, Chemical Requirements Similar to Standard Wrought Grades.

18. ASTM A1018 - Standard Specification for Steel, Sheet and Strip, Heavy-Thickness Coils, Hot-Rolled, Carbon, Commercial, Drawing, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with

Improved Formability, and Ultra-High Strength.

19. ASTM D1143 - Standard Test Methods for Deep Foundations Under

Static Axial Compressive Load.

20. ASTM D3689 - Standard Test Methods for Deep Foundations Under

Static Axial Tensile Load.

21. ASTM D3966 - Standard Test Methods for Deep Foundations Under

Lateral Load.

22. ASTM F3125 - Standard Specification for High Strength Structural

Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi and 150 ksi

Minimum Tensile Strength, Inch Dimensions.

23. AWS B2.1 - Specification for Welding Procedure and Performance

Qualification.

24. AWS D1.1 - Structural Welding Code - Steel.

25. AWS D1.4 - Structural Welding Code - Reinforced Steel.

26. ICC AC358 - Acceptance Criteria for Helical Piles Systems and

Devices.

13600 30th Street

Des Moines, IA 50310

VA Project 636A6-21-109

31 26 00 - 3

27. OSHA Excavation Safety Guidelines.

28. SAE J429 - Mechanical and Material Requirements for Externally

Threaded Fasteners.

1.4 DEFINITIONS

A. A partial list follows:

1. Bearing Stratum: The soil or highly weathered rock layer that provides the axial tension resistance for the installed helical pile.

2. Brackets: Cap plate, angle, thread bar, or other termination device that is bolted or welded to the end of a helical pile after completion of installation to facilitate attachment to structures or embedment in cast-in-place concrete.

3. Crowd: Axial compressive force or pressure applied to the helical pile as needed during installation to ensure the pile advances into the ground a minimum of 80% of the distance equal to the helix pitch for each revolution.

4. Deflection: The axial displacement of the pile as measured at the pile head under applied load.

5. Effective Torsional Resistance: The average installation torque typically taken over a distance equal to the last three diameters of penetration of the largest helix plate as close to or in the specified bearing stratum.

6. Extension Section: Helical pile component connecting the lead section to the load transfer device. Extension sections may be plain without helix plates or helical including one or more helix plates.

7. Factored Load: Service load times the required load factor.

8. Geotechnical Capacity: The maximum load that can be resisted through the bearing of the helix plates in the soil or highly weathered rock in which they are embedded as characterized by the available subsurface soils, rock and groundwater information, and geotechnical testing data, without exceeding the specified performance criteria.

9. Helical Pile: Consists of one or more helix plates attached to a central shaft and load transfer device for attachment to a structure. May also include surface coating or other corrosion protection means.

13600 30th Street

Des Moines, IA 50310

VA Project 636A6-21-109

31 26 00 - 4

10. Helical Anchor: Same as a Helical Pile. Term generally used when axial tension is the primary service load.

11. Helix Plate (Helices): Generally round steel plate formed into a helical spiral and welded to the central steel shaft.

12. Installation Angle: Angle of inclination between the longitudinal axis of the helical pile and the horizontal.

13. Lead Section: The first helical pile component installed into the soil. It consists of one or more helical plates welded to the central steel shaft.

14. Limit State: A condition beyond which a helical pile component or interface becomes no longer useful for its intended function

(serviceability limit state) or to be unsafe (strength limit state).

15. Loads: Forces or other actions as defined that must be resisted by the piles. Permanent loads are those loads in which variations over time are rare or of small magnitude. All other loads are variable loads. Refer also to Service Load below.

16. Load Factor: A factor that accounts for deviations of the actual load from the service load (load resistance factor design).

17. Load Test: A procedure to test the capacity and relation of load to deflection by applying a compression, tension, and/or lateral load on the helical pile.

18. Mechanical Strength: The maximum compressive, tension, and/or lateral load capable of being resisted by the structural elements of a helical pile.

19. Pile Design Professional: Individual or firm responsible for the design of helical piles, helical anchors, and brackets.

20. Reveal: The distance from ground surface to the end of the last installed extension of a pile, measured along the pile's longitudinal axis.

21. Pitch: The distance measured along the axis of the shaft between the leading and trailing edges of the helix plate.

22. Safety Factor: The ratio of the ultimate resistance to the service load used…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .