516-21-107-CombinedDrawings-Find-LCHCC-EHRM-Upgrades-TMM2139 P1.pdf

PDF 15 MB Posted

Attached to
Y1DZ--516-21-107 EHRM Infrastructure Upgrades Construction Lee County VA Clinic (Cape Coral, FL)
Solicitation number
36C77625B0007
Issued by

About this file

These documents are final construction drawings for the EHRM Infrastructure Upgrades project at the Lee County VA Healthcare Center (HCC) in Cape Coral, Florida, with project number 516-21-107. The comprehensive set of mechanical, electrical, and architectural plans detail infrastructure improvements across four building floors, including telecommunications rooms, electrical rooms, and various medical service areas.

The drawings specify upgrades to HVAC systems, electrical infrastructure, and telecommunications networks, with a focus on supporting the VA's transition to a new Electronic Health Record (EHR) platform. Key elements include installing new fan coil units, reconfiguring telecommunications rooms, upgrading electrical systems with new panels and equipment, and preparing spaces for enhanced technological capabilities. The fully sprinklered facility will feature modernized infrastructure across departments including primary care, surgical specialties, radiology, mental health, and administrative spaces, with detailed plans for each floor's specific technical and medical requirements.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEE COUNTY VA HCC

FINAL DOCUMENTS SUBMITTAL

2489 DIPLOMAT PARKWAY E, CAPE CORAL, FLORIDA 33909

PROJECT No: 516-21-107

SIGNATURE BLOCK

EHRM INFRASTRUCTURE UPGRADES

COVER SHEET

G001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

FINAL DOCUMENTS

SUBMITTAL

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE UPGRADES

LEE COUNTY VA HCC

CAPE CORAL, FLORIDA

516-21-107

Building No. 1 Project Director

05-31-2024 TS EORevisions: Date:

AutoCAD SHX Text

LOCATION MAP

AutoCAD SHX Text

AREA MAP

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text

THOMAS C. STEELE JR.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text tsteele Text Box

REV. 08-27-24

tsteele Text Box tsteele Line tsteele Text Box tsteele Text Box

REVISIONS TO SHEETS ON 08-27-24

tsteele Text Box tsteele Text Box tsteele Text Box tsteele Text Box

DELETED

tsteele Text Box tsteele Text Box tsteele Text Box tsteele Text Box tsteele Text Box tsteele Text Box

ARCHITECTURAL ABBREVIATIONS

ARCHITECTURAL LEGEND

ARCHITECTURAL GENERAL NOTESGENERAL PROJECT NOTES GENERAL SAFETY NOTES

MATERIAL LEGEND

1.

2.

3.

4.

5.

6.

9.

10.

a.

b.

LEGENDS, ABBREVIATIONS AND

NOTES

G002

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

FINAL DOCUMENTS

SUBMITTAL

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE UPGRADES

LEE COUNTY VA HCC

CAPE CORAL, FLORIDA

516-21-107

Building No. 1 Project Director

05-31-2024 TS EORevisions: Date:

AutoCAD SHX Text

AIR CONDITIONING

AutoCAD SHX Text

ACOUSTICAL CEILING TILE

AutoCAD SHX Text

ABOVE FINISH FLOOR

AutoCAD SHX Text

ALUMINUM

AutoCAD SHX Text

BATT INSULATION

AutoCAD SHX Text

BOTTOM OF

AutoCAD SHX Text

CEMENTITIOUS BACKER BOARD

AutoCAD SHX Text

CEMENTITIOUS CRYSTALLINE WATERPROOFING

AutoCAD SHX Text

COLD-FORMED METAL FRAMING

AutoCAD SHX Text

CORNER GUARD

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

CERAMIC MOSAIC TILE

AutoCAD SHX Text

CONCRETE MASONRY UNIT

AutoCAD SHX Text

CASED OPENING

AutoCAD SHX Text

COMMUNICATION

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONTINUOUS

AutoCAD SHX Text

CONTRACTING OFFICER'S REPRESENTATIVE

AutoCAD SHX Text

CERAMIC TILE

AutoCAD SHX Text

CERAMIC TILE BASE

AutoCAD SHX Text

CARPET TILE

AutoCAD SHX Text

DIAMETER

AutoCAD SHX Text

ELECTRIC WATER COOLER

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

EQUAL

AutoCAD SHX Text

EXPOSED STRUCTURE

AutoCAD SHX Text

ET CETERA

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

EXPOSED

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

FIRE HOSE CABINET

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text

FINISH

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

FACE OF

AutoCAD SHX Text

FIELD VERIFY (PRIOR TO ORDERING OR CUTTING)

AutoCAD SHX Text

FABRIC WALLCOVERING

AutoCAD SHX Text

GAGE

AutoCAD SHX Text

GYPSUM WALL BOARD

AutoCAD SHX Text

HANDICAPPED

AutoCAD SHX Text

HOLLOW METAL

AutoCAD SHX Text

HIGH-PRESSURE DECORATIVE LAMINATE

AutoCAD SHX Text

HEATING VENTILATION AND AIR-CONDITIONING

AutoCAD SHX Text

MATERIAL

AutoCAD SHX Text

MAXIMUM

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

MINIMUM

AutoCAD SHX Text

MASONRY OPENING

AutoCAD SHX Text

METAL

AutoCAD SHX Text

NOT IN CONTRACT

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

ON CENTER

AutoCAD SHX Text

OPPOSITE HAND

AutoCAD SHX Text

PORCELAIN BASE

AutoCAD SHX Text

PLASTIC LAMINATE

AutoCAD SHX Text

PRESSURE TREATED

AutoCAD SHX Text

PAIR

AutoCAD SHX Text

PAINT

AutoCAD SHX Text

QUARRY TILE

AutoCAD SHX Text

RESILIENT BASE

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text

REQUIRED

AutoCAD SHX Text

RESINOUS FLOORING

AutoCAD SHX Text

RESINOUS EPOXY WALL - CEILING

AutoCAD SHX Text

ROUGH OPENING

AutoCAD SHX Text

RUBBER FLOORING

AutoCAD SHX Text

SEALED HIGH BUILD GLAZED COATING

AutoCAD SHX Text

SOLID CORE WOOD

AutoCAD SHX Text

SIMILAR

AutoCAD SHX Text

SPECIAL FACED

AutoCAD SHX Text

STAINLESS STEEL

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

SUBSTRATE

AutoCAD SHX Text

SHEET VINYL

AutoCAD SHX Text

SOLID VINYL TILE

AutoCAD SHX Text

TO BE DETERMINED

AutoCAD SHX Text

TELEPHONE

AutoCAD SHX Text

TOP OF

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

UNLESS NOTED OTHERWISE

AutoCAD SHX Text

VINYL COMPOSITION TILE

AutoCAD SHX Text

VINYL WALL COVERING

AutoCAD SHX Text

WALL COVERING

AutoCAD SHX Text

WOOD

AutoCAD SHX Text

WELDED SEAM SHEET FLOORING

AutoCAD SHX Text

AC

AutoCAD SHX Text

ACT

AutoCAD SHX Text

AFF

AutoCAD SHX Text

ALUM

AutoCAD SHX Text

BATT

AutoCAD SHX Text

BO

AutoCAD SHX Text

CBB

AutoCAD SHX Text

CCW

AutoCAD SHX Text

CFMF

AutoCAD SHX Text

CG

AutoCAD SHX Text C

AutoCAD SHX Text

CMT

AutoCAD SHX Text

CMU

AutoCAD SHX Text

CO

AutoCAD SHX Text

COMM

AutoCAD SHX Text

CONC

AutoCAD SHX Text

CONT

AutoCAD SHX Text

COR

AutoCAD SHX Text

CT

AutoCAD SHX Text

CTB

AutoCAD SHX Text

CT

AutoCAD SHX Text

DIA

AutoCAD SHX Text

EWC

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

EQ

AutoCAD SHX Text

ES

AutoCAD SHX Text

ETC

AutoCAD SHX Text

EXIST

AutoCAD SHX Text

EXP

AutoCAD SHX Text

FD

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FHC

AutoCAD SHX Text

FF

AutoCAD SHX Text

FIN

AutoCAD SHX Text

FLR

AutoCAD SHX Text

FO

AutoCAD SHX Text

FV

AutoCAD SHX Text

FWC

AutoCAD SHX Text

GA

AutoCAD SHX Text

GWB

AutoCAD SHX Text

HC

AutoCAD SHX Text

HM

AutoCAD SHX Text

HPDL

AutoCAD SHX Text

HVAC

AutoCAD SHX Text

MATL

AutoCAD SHX Text

MAX

AutoCAD SHX Text

MECH

AutoCAD SHX Text

MFR

AutoCAD SHX Text

MIN

AutoCAD SHX Text

MO

AutoCAD SHX Text

MTL

AutoCAD SHX Text

NIC

AutoCAD SHX Text

NTS

AutoCAD SHX Text

OC

AutoCAD SHX Text

OH

AutoCAD SHX Text

PB

AutoCAD SHX Text

PLAM

AutoCAD SHX Text

PT

AutoCAD SHX Text

PR

AutoCAD SHX Text P

AutoCAD SHX Text

QT

AutoCAD SHX Text

RB

AutoCAD SHX Text

REF

AutoCAD SHX Text

REQ'D

AutoCAD SHX Text

RES

AutoCAD SHX Text

RES-W

AutoCAD SHX Text

RO

AutoCAD SHX Text

RF

AutoCAD SHX Text

SC

AutoCAD SHX Text

SCW

AutoCAD SHX Text

SIM

AutoCAD SHX Text

SP

AutoCAD SHX Text

SS

AutoCAD SHX Text

STL

AutoCAD SHX Text

SUBS

AutoCAD SHX Text

SV

AutoCAD SHX Text

SVT

AutoCAD SHX Text

TBD

AutoCAD SHX Text

TELE

AutoCAD SHX Text

TO

AutoCAD SHX Text

TYP

AutoCAD SHX Text

UNO

AutoCAD SHX Text

VCT

AutoCAD SHX Text

VWC

AutoCAD SHX Text

WC

AutoCAD SHX Text

WD

AutoCAD SHX Text

WSF

AutoCAD SHX Text L

AutoCAD SHX Text

SEALED CONCRETE

AutoCAD SHX Text

SCONC

AutoCAD SHX Text

PORCELAIN TILE

AutoCAD SHX Text

POR

AutoCAD SHX Text

CONTROL JOINT

AutoCAD SHX Text

CJ

AutoCAD SHX Text

GALVANIZED METAL STUD(S)

AutoCAD SHX Text

GMS

AutoCAD SHX Text

REFLECTED CEILING PLAN

AutoCAD SHX Text

RCP

AutoCAD SHX Text

LUXURY VINYL TILE

AutoCAD SHX Text

LVT

AutoCAD SHX Text

COMPOUNDING ASEPTIC CONTAINMENT ISOLATOR

AutoCAD SHX Text

CACI

AutoCAD SHX Text

SOLID SURFACE MATERIAL

AutoCAD SHX Text

SSM

AutoCAD SHX Text

WALL PROTECTION

AutoCAD SHX Text

WP

AutoCAD SHX Text A

AutoCAD SHX Text + 0'-6"

AutoCAD SHX Text

ROOM NAME AND NUMBER

AutoCAD SHX Text

KEY NOTE

AutoCAD SHX Text

PARTITION TYPE

AutoCAD SHX Text

DETAIL CALLOUT

AutoCAD SHX Text

DETAIL NUMBER

AutoCAD SHX Text

SHEET WHERE DETAIL IS DRAWN

AutoCAD SHX Text

SECTION CALLOUT

AutoCAD SHX Text

VERTICAL ELEVATION

AutoCAD SHX Text

COLUMN CENTERLINE DESIGNATION

AutoCAD SHX Text

DEMOLITION NOTE

AutoCAD SHX Text

SECTION NUMBER

AutoCAD SHX Text

SHEET WHERE SECTION IS DRAWN

AutoCAD SHX Text

EXTERIOR ELEVATION CALLOUT

AutoCAD SHX Text

ELEVATION NUMBER

AutoCAD SHX Text

SHEET WHERE ELEVATION IS DRAWN

AutoCAD SHX Text

ROOM

AutoCAD SHX Text

NAME

AutoCAD SHX Text

AutoCAD SHX Text A401

AutoCAD SHX Text

AutoCAD SHX Text A301

AutoCAD SHX Text

AutoCAD SHX Text A201

AutoCAD SHX Text

AutoCAD SHX Text

GA4

AutoCAD SHX Text

INTERIOR ELEVATION CALLOUT

AutoCAD SHX Text

ELEVATION NUMBER

AutoCAD SHX Text

SHEET WHERE ELEVATION IS DRAWN

AutoCAD SHX Text A401

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: FACE OF EXISTING WALL SURFACE FACE OF NEW MASONRY FACE OF NEW WALL STUDS TOP OF SLAB TOP OF MASONRY ALIGN NEW WALLS WITH EXISTING WHERE NOT OTHERWISE INDICATED. B. COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR COORDINATE WITH ALL DISCIPLINE DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE OPENINGS IN SLABS, ROOF, AND WALLS. WHERE NEW HOLES IN EXISTING WALLS AND SLABS ARE CREATED FOR CONDUIT, DUCT, OR PIPE PENETRATIONS, COORDINATE SIZE AND LOCATION. PATCH HOLES CAUSED BY THE REMOVAL OF EQUIPMENT, PIPING, CONDUIT, DUCT, GRILLES, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY. PATCH OR SEAL EXISTING HOLES IN WALLS AND GLASS TO MATCH ADJACENT EXISTING MATERIALS. C. COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED COORDINATE AND PROVIDE SOLID FIRE RETARDANT TREATED WOOD BLOCKING FOR WALL-MOUNTED ITEMS BETWEEN STUDS. COORDINATE LOCATIONS WITH COR FOR GOVERNMENT FURNISHED EQUIPMENT. D. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. E. SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SEAL PIPE PENETRATIONS THROUGH SLABS, MASONRY, SMOKE RATED PARTITIONS AND FIRE-RATED PARTITIONS WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES. F. PATCH ALL DAMAGED EXISTING WALL AND CEILING PATCH ALL DAMAGED EXISTING WALL AND CEILING SURFACES THAT REQUIRE PAINTING TO MATCH ADJACENT SURFACES. G. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR IF APPLICABLE. H. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR NEW CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF NEW CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.) EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE PREPARED AS INDICATED OR SPECIFIED PRIOR TO INSTALLATION OF NEW MATERIALS. I. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN. REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN, AT NO ADDITIONAL COST. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED.

AutoCAD SHX Text A. CONTRACTOR SHALL PROVIDE A PHASING AND CONTRACTOR SHALL PROVIDE A PHASING AND CONTAMINATION CONTAINMENT PLAN BEFORE BEGINNING WORK PER VAMC INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM REQUIREMENTS B. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTATIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY THE ICRA TEAM PRIOR TO START OF WORK, PREPARE PLAN DETAILING PROJECT-SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO COR AND FACILITY ICRA TEAM FOR REVIEW OF COMPLIANCE WITH CONTRACT DOCUMENTS. C. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER. D. DUST PRODUCING TASKS SHALL NOT BE PERFORMED DUST PRODUCING TASKS SHALL NOT BE PERFORMED WITHIN OCCUPIED AREAS WITHOUT THE APPROVAL OF THE COR. E. ALL WORK INSIDE BUILDING SHALL BE PERFORMED ON ALL WORK INSIDE BUILDING SHALL BE PERFORMED ON DAYS AND DURING HOURS APPROVED BY THE COR. IN THE INCIDENT OF AN EMERGENCY MEDICAL CASE, THE CONTRACTOR MAY BE REQUIRED TO CEASE WORK AND CLEAN UP IMMEDIATELY. CONTRACTOR SHALL NOTIFY COR IMMEDIATELY IF ASKED TO CEASE OR ALTER THEIR PLANNED WORK. F. BASED ON PROJECT SCOPE, OFF-HOUR TEMPORARY BASED ON PROJECT SCOPE, OFF-HOUR TEMPORARY CONSTRUCTION BARRIER ERECTION AND DEMO/NEW WORK CONSTRUCTION MAY BE REQUIRED. WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. G. REFER TO SPEC 013526 FOR INFECTION CONTROL REFER TO SPEC 013526 FOR INFECTION CONTROL REQUIREMENTS. H. ALL TR & DATA ROOM EQUIPMENT WILL BE REMOVED OR ALL TR & DATA ROOM EQUIPMENT WILL BE REMOVED OR COVERED BY VA. CONTRACTOR IS RESPONSIBLE FOR REPAIR COST OF ANY DAMAGED EXISTING xxxxxx ROOM EQUIPMENT. I. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED. J. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR. K. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH COR. ALL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENT IN WORK AREA. L. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. M. SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES. N. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL CONTRACTOR SHALL FIELD VERIFY DIMENSIONS & ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON GOVERNMENT FURNISHED EXISTING DRAWINGS AND LIMITED FIELD INVESTIGATION. NOTIFY COR OF ANY DISCREPANCIES PRIOR TO PROCEEDING. O. ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT OTHERWISE INDICATED. P. SEAL ALL CEILING, FLOOR AND WALL PENETRATIONS SEAL ALL CEILING, FLOOR AND WALL PENETRATIONS AROUND CONDUIT AND PIPES - TYPICAL.

AutoCAD SHX Text

EARTH

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

MORTAR, STUCCO CEMENT PLASTER

AutoCAD SHX Text

CONCRETE MASONRY UNIT

AutoCAD SHX Text

SECTION

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

INSULATION RIGID

AutoCAD SHX Text

INSULATION BATT

AutoCAD SHX Text

BRICK

AutoCAD SHX Text

WOOD (ROUGH)

AutoCAD SHX Text

WOOD FINISH

AutoCAD SHX Text COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS. USE OF TEMPORARY WALL TYPE SYSTEM RECOMMENDED. SEPARATE ALL OCCUPIED AREAS FROM DEMOLITION, RENOVATION, OR CONSTRUCTION ACTIVITIES BY ONE-HOUR FIRE RATED TEMPORARY SMOKE-TIGHT CONSTRUCTION PARTITIONS OF GYPSUM BOARD OR OTHER APPROVED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. SEPARATION SHALL EXTEND FROM FLOOR TO UNDERSIDE OF DECK ABOVE. POLY BARRIERS MAY BE USED FOR WORK LASTING LESS THAN 48 HOURS. TEMPORARY CONSTRUCTION CONTAINMENT SYSTEMS THAT ARE GASKETED AT TOP AND BOTTOM TO CREATE AN AIRTIGHT SEAL WHICH MEETS OR EXCEEDS ICRA CLASS IV REQUIREMENTS AND EXCEEDS ASTM E-84 CLASS A STANDARDS FOR FLAME AND SMOKE SPREAD SHALL BE USED AS CONSTRUCTION PARTITIONS. SUCH CONSTRUCTION SHALL BE PROVIDED AT ALL LOCATIONS OF ACTIVE CONSTRUCTION, INCLUDING ENTRIES. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. CLOSELY COORDINATE WITH VA HVAC SHOPS TO MAINTAIN PROPER FUNCTION OF HVAC SYSTEM. HVAC SYSTEM SHALL BE RESTORED TO NORMAL OPERATION AT THE COMPLETION OF WEEKEND WORK. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE CONTRACTOR. 7. EXHAUST HOSES REQUIRED: HEAVY DUTY, FLEXIBLE STEEL REINFORCED; EXHAUST HOSES REQUIRED: HEAVY DUTY, FLEXIBLE STEEL REINFORCED; VENTILATION BLOWER HOSE. 8. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE CONSTRUCTION AREA TO OCCUPIED AREA. PROVIDE MINIMUM SIZE MATS OF 24 INCHES BY 36 INCHES. THESE MATS SHALL BE CHANGED AS OFTEN AS REQUIRED TO MAINTAIN CLEAN WORK AREAS DIRECTLY OUTSIDE CONSTRUCTION AREA AT ALL TIMES. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED MEDICAL CENTER AT THE END OF EACH WORKDAY. VACUUM SHALL UTILIZE HEPA FILTRATION. MAINTAIN SURROUNDING AREA FREQUENTLY. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 11. MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ACCOMMODATE TEMPORARY PARTITIONS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE EXISTING CEILINGS ARE TO REMAIN, THEY ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF TEMPORARY PARTITIONS. 12. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO, DIFFUSERS MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO, DIFFUSERS AND REGISTERS, LIGHT FIXTURES, SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES. RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF TEMPORARY PARTITIONS. 13. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PUBLIC SPACES CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PUBLIC SPACES AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE, REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING CONDITIONS AS PART OF THE PROJECT'S SCOPE/BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE PROJECT/GOVERNMENT. 14. UPON COMPLETION: UPON COMPLETION: a. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE COR AND THOROUGHLY CLEANED BY THE VA ENVIRONMENTAL SERVICES DEPARTMENT. b. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS. c. REMOVE ALL CONSTRUCTION DEBRIS FROM ABOVE CEILING / VERTICAL REMOVE ALL CONSTRUCTION DEBRIS FROM ABOVE CEILING / VERTICAL SHAFTS AND AND UTILITY CHASES THAT HAVE BEEN PART OF CONSTRUCTION. d. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. e. WET MOP AREA WITH CLEANER/DISINFECTANT. WET MOP AREA WITH CLEANER/DISINFECTANT. f. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED. 15. SPRINKLER AND FIRE ALARM ARE TO REMAIN ACTIVE THROUGHOUT PROJECT. TEMPORARY PROTECTION MUST BE PROVIDED IF FIRE ALARM SYSTEM IS DOWN FOR MORE THAN 8 HRS. OR SPRINKLER SYSTEM IS DOWN FOR MORE THAN 10 HRS. 16. IF THERE WILL BE A LAYDOWN AREA: PROVIDE SECURED PERIMETER PROTECTION CONSISTING OF A 7' MIN. HEIGHT CHAIN LINK FENCING WITH LOCKABLE GATE AROUND ALL STORED MATERIALS, SCAFFOLDING, EQUIPMENT, ETC. THESE AREAS ARE TO REMAIN SECURED AT ALL TIMES, INCLUDING WHILE AREA IS OCCUPIED. SITE AND LAYDOWN AREA MUST REMAIN SECURED BY LOCK AND KEY AT ALL TIMES. 17. SHOE COVERS, HEAD COVERING AND SCRUBS/CLEAN SUITS SHALL BE WORN BY ALL CONTRACTOR PERSONNEL IF REQUESTED BY THE COR. CONTRACTOR SHALL PROVIDE ALL PERSONAL PROTECTION EQUIPMENT.

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text

THOMAS C. STEELE JR.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

SIGNAL

1B-191

SIGNAL

1A-139

CRAC

DRY AGENT TANK

CRAC

SERVERS SERVERSSERVERS

ROUTERSDATA

SWITCHES

"B" FO PATH

LIU/PP

"A" FO PATH

LIU/PP

S

TELECOMMUNICATIONS ROOM

PLANS

AE-101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

FINAL DOCUMENTS

SUBMITTAL

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE UPGRADES

LEE COUNTY VA HCC

CAPE CORAL, FLORIDA

516-21-107

Building No. 1 Project Director

05-31-2024 TS EORevisions: Date:

AutoCAD SHX Text

TR

AutoCAD SHX Text 1B-190

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TELECOM RM_TR_1B-190

AutoCAD SHX Text H

AutoCAD SHX Text

RUN AND TERMINATE NEW A/B FO CABLE TO EXISTING DATA SWITCH

AutoCAD SHX Text

TR

AutoCAD SHX Text 1A-208

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TELECOM RM TR_1A-208

AutoCAD SHX Text 14.6

AutoCAD SHX Text

AutoCAD SHX Text

TR

AutoCAD SHX Text 1B-118

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TELECOM_TR_1B-118

AutoCAD SHX Text U

AutoCAD SHX Text

RUN AND TERMINATE NEW A/B FO CABLE TO EXISTING DATA SWITCH

AutoCAD SHX Text

TR

AutoCAD SHX Text 1A-138

AutoCAD SHX Text L.5

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TELECOM RM_TR_1A-138

AutoCAD SHX Text

AutoCAD SHX Text

TR

AutoCAD SHX Text 2A-136

AutoCAD SHX Text

CORR.

AutoCAD SHX Text C2-43

AutoCAD SHX Text

SIGNAL

AutoCAD SHX Text 2A-137

AutoCAD SHX Text L.5

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TELECOM RM_TR_2A-136

AutoCAD SHX Text

AutoCAD SHX Text

TR

AutoCAD SHX Text 2B-146

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TELECOM RM_TR_2B-146

AutoCAD SHX Text U

AutoCAD SHX Text

TR

AutoCAD SHX Text 2B-199

AutoCAD SHX Text

SIGNAL

AutoCAD SHX Text 2B-201

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TELECOM RM_TR_2B-199

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text

RUN AND TERMINATE NEW A/B FO CABLE TO EXISTING DATA SWITCH

AutoCAD SHX Text

TR

AutoCAD SHX Text 3A-150

AutoCAD SHX Text

SIGNAL

AutoCAD SHX Text 3A-151

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TELECOM RM_TR_3A-150

AutoCAD SHX Text

AutoCAD SHX Text L.5

AutoCAD SHX Text

IRMS DATA

AutoCAD SHX Text

/TELE. EQ.

AutoCAD SHX Text 4A-142

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text 4A-103

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

DATA CENTER RM_DCR_4A-142

AutoCAD SHX Text

AutoCAD SHX Text J

AutoCAD SHX Text J.5

AutoCAD SHX Text L

AutoCAD SHX Text

2 EA 4" EMPTY CONDUIT - SERVICE ENTRANCE FROM VAULT AT CORBETT ROAD VIA 3A-150

AutoCAD SHX Text 2 EA 4" CONDUIT - AT&T & CENTURY LINK SERVICE ENTRANCE FIBER OPTIC CABLE & CU VOICE FROM VAULT AT DIPLOMAT PKWY VIA 4A-154

AutoCAD SHX Text 2 EA 4" CONDUIT SLEEVES - NEW 24S OM4, 12S 0S2 FIBER OPTIC "A" & "B" PATH CABLE TO ALL TRS

AutoCAD SHX Text

TR

AutoCAD SHX Text 4A-154

AutoCAD SHX Text

SIGNAL

AutoCAD SHX Text 4A-152

AutoCAD SHX Text

AE-101

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

TELECOM RM_TR_4A-154

AutoCAD SHX Text

AutoCAD SHX Text L.5

AutoCAD SHX Text

RUN AND TERMINATE NEW A/B FO CABLE TO EXISTING DATA SWITCH

AutoCAD SHX Text

EXISTING CONSTRUCTION TO REMAIN

AutoCAD SHX Text

PLAN LEGEND

AutoCAD SHX Text

NEW CONSTRUCTION

AutoCAD SHX Text

EXIST SMOKE PARTITION

AutoCAD SHX Text

EXIST 1-HOUR FIRE PARTITION

AutoCAD SHX Text

EXIST 2-HOUR FIRE PARTITION

AutoCAD SHX Text

EXIST 1-HOUR RATED SMOKE WALL

AutoCAD SHX Text FLOOR PLAN GENERAL NOTES A. TOUCH UP FINISHES AS NEEDED AFTER TOUCH UP FINISHES AS NEEDED AFTER COMPLETION OF WORK. B. DIMENSIONS AT EXISTING CONSTRUCTION ARE TO DIMENSIONS AT EXISTING CONSTRUCTION ARE TO FACE OF EXISTING FINISH OR COLUMN UNO. C. DIMENSIONS AT NEW CONSTRUCTION ARE TO FACE DIMENSIONS AT NEW CONSTRUCTION ARE TO FACE OF STUD OR MASONRY. D. NEW PARTITIONS WHICH FALL ON COLUMN LINES NEW PARTITIONS WHICH FALL ON COLUMN LINES ARE CENTERED ON COLUMN LINES UNO. E. SEE TELECOMMUNICATION SHEET TA401 FOR SEE TELECOMMUNICATION SHEET TA401 FOR EQUIPMENT INFORMATION. F. PAINT ALL WALLS IN THE TELECOM ROOMS AND PAINT ALL WALLS IN THE TELECOM ROOMS AND DATA CENTER ROOM. G. CLEAN ALL WOOD DOORS. PAINT ALL DOOR CLEAN ALL WOOD DOORS. PAINT ALL DOOR FRAMES AND METAL DOORS.

AutoCAD SHX Text

ARCHITECTURAL FLOOR PLAN KEY NOTES (ALL NOTES NOT USED ON ALL SHEETS)

AutoCAD SHX Text

EXISTING EQUIPMENT TO REMAIN

AutoCAD SHX Text

FOR EQUIPMENT QUANTITIES AND GENERAL PLACEMENT, SEE SHEET TA-401

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text

THOMAS C. STEELE JR.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

TH

S

DIS

T

H

CO2

CO

HS

NO2

PS

BT TM

PIPING SYMBOLS AND ABBREVIATIONSHVAC SYMBOLS AND ABBREVIATIONS

22"x8"

22"/8"

22"Ø

EXISTING DUCT TAG

OVAL DUCT SIZE TAG (WIDTH / HEIGHT)

SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)

ROUND DUCT SIZE TAG (DIAMETER)

DUCT BEING DEMOLISHED

(E)22"Ø

RECTANGULAR SUPPLY/OUTSIDE AIR

DUCT RISE

RECTANGULAR RETURN/TRANSFER AIR

DUCT RISE

ROUND SUPPLY/OUTSIDE AIR DUCT RISE

ROUND RETURN/TRANSFER AIR DUCT RISE

RECTANGULAR EXHAUST/RELIEF AIR

DUCT RISE

DROP

DROP

DROP

DROP

DROP

DROP ROUND EXHAUST/RELIEF AIR DUCT RISE

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

ROOM NAME AND NUMBER

CONNECT NEW TO EXISTING

EXISTING PIPE TAG

AREA NOT IN CONTRACT

PIPING BEING DEMOLISHED

PIPE SIZE TAG (DIAMETER)

Room

LIMIT OF DEMOLITION

NEW WORK NOTES

DEMOLISHED WORK NOTES

ACCESS DOOR ON TOP OF DUCT

ACCESS DOOR ON SIDE OF DUCT

ACCESS DOOR ON BOTTOM OF DUCT

SHEET NOMENCLATURE

M P # # #

SERIES

MECHANICAL

(S) STEAM

(H) HVAC

(P) PIPING

(D) DEMO

SERIES

0 - SYMBOLS AND NOTES

1 - PLAN VIEWS

3 - ELEVATIONS AND SECTIONS

4 - LARGE SCALE - PLANS AND SECTIONS

5 - SCHEMATICS AND DETAILS

6 - SCHEDULES

8 - CONTROLS

FD

SD

AVD

MVD

BDD

FSD

48"x2 1/2" D

(E)LINEAR BAR

GRILLE

(E)RTU-XX

(E)TU-XX

EQUIPMENT

TAG

EQUIPMENT TAG

VAV TERMINAL

MANUAL BALANCING

DAMPER

BACKDRAFT DAMPER

COMBINATION

FIRE/SMOKE

DAMPER

FIRE DAMPER

SMOKE DAMPER

AUTOMATIC VOLUME

DAMPER

SYMBOL

TYPE (SEE SCHEDULE)

CFM

ACTIVE SLOT LENGTH

(PLENUM LENGTH)

GRILLES, REGISTERS & DIFFUSERS TAG

DAMPER TAGS AND ABBREVIATIONS

IRH INFRARED HEATER

IU INDUCTION UNIT

JB JUNCTION BOX

JL JUSTIFIED LEFT

JR JUSTIFIED RIGHT

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

kPa KILOPASCAL

KW KILOWATT

KWH KILOWATT HOUR

LOOP LOCK ONLY OPEN POSITION

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND

(OR METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MH MANHOLE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOCP MINIMUM OVERCURRENT PROTECTION

MOV MOTOR OPERATED VALVE

MTD MEAN TEMPERATURE DIFFERENCE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NO NORMALLY OPEN

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NET POSITIVE SUCTION HEAD

AVAILABLE

NPSHR NET POSITIVE SUCTION HEAD

REQUIRED

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OD OUTSIDE DIAMETER

P PUMP

Pa PASCAL

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE)

STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

QNTY QUANTITY

RA RETURN AIR

RAF RETURN AIR FAN

RAT RETURN AIR TEMPERATURE

RD REFRIGERANT DISCHARGE

REA RELIEF AIR

RF RETURN FAN

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RS/RL REFRIGERANT SUCTION AND

REFRIGERANT LIQUID

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAT SUPPLY AIR TEMPERATURE

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SEA SMOKE EXHAUST AIR

SEN SENSIBLE HEAT

SF SUPPLY FAN

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

SSR SOLID SEPARATOR

ST STEAM TRAP

TAB TESTING, ADJUSTING, BALANCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UH UNIT HEATER

V VENT

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VP VACUUM PUMP

VR VACUUM (STEAM CONDENSATE)

RETURN

W WATTS

Wb WET-BULB (TEMPERATURE)

WFMS WATER FLOW MEASURING STATION

WG WATER GAGE

WPD WATER PRESSURE DROP

YR YEAR

EJ EXPANSION JOINT

ENT ENTERING

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FA FREE AREA

FCU FAN COIL UNIT

FD FLOOR DRAIN

FF FINAL FILTER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FLAT ON TOP

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPU FAN POWERED TERMINAL UNIT

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFIER

HB HOSE BIBB

HC HEATING COIL

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HRC HEAT RECOVERY COIL

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HVU HEATING AND VENTILATING UNIT

HWC HOT WATER COIL

HWP HEATING HOT WATER PUMP

HTX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

A/E ARCHITECT / ENGINEER

AAV AUTOMATIC AIR VENT

ACD AUTOMATIC CONTROL DAMPER

AD ACCESS DOOR

AF AFTER FILTER

AFF ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AHU AIR-HANDLING UNIT

AMP AMPERE

APD AIR PRESSURE DROP

AS AIR SEPARATOR

B BOILER

BAS BUILDING AUTOMATION SYSTEM

BBR BASE BOARD RADIATOR

BE BOTTOM ELEVATION

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CV CONSTANT AIR VOLUME

CC COOLING COIL

CD COOLING COIL CONDENSATE DRAIN

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CH CHILLER

CHP CHILLED WATER PUMP

CHS/R CHILLER WATER

CL CENTER LINE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

COR CONTRACTING OFFICER

REPRESENTATIVE

CP CONDENSATE PUMP

CST CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CWP CONDENSER WATER PUMP

DDC DIRECT DIGITAL CONTROLS

DIA DIAMETER

DI DEIONIZED WATER

DP DEW POINT TEMPERATURE

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

ES EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMPERATURE

EH EXHAUST HOOD

PROJECT ABBREVIATIONS

DATA DEVICE TAGS AND ABBREVIATIONS

MECHANICAL EQUIPMENT TAGS

CONDENSER WATER SUPPLY (FROM TOWER)

CONDENSER WATER RETURN (TO TOWER)

HOT WATER HEATING SUPPLY

HOT WATER HEATING RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

LOW PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

PUMPED CONDENSATE DISCHARGE

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

GLYCOL-WATER HEATING SUPPLY

GLYCOL-WATER HEATING RETURN

STEAM VENT PIPE

REFRIGERANT SUCTION AND REFRIGERANT LIQUID

CHILLED WATER SUPPLY

CHILLED WATER RETURN

MAKE-UP WATER

DRAIN PIPING

CONDENSATE DRAIN

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

CONDENSATE TRANSFER PUMP DISCHARGE

CONDENSATE TRANSFER PUMP SUCTION

CONTINUOUS BLOWDOWN

BOILER WATER SAMPLE

BOILER BLOWOFF

FEEDWATER SAMPLE (FROM DEAERATOR)

OVERFLOW

COMPRESSED AIR

NATURAL GAS MAIN FUEL

NATURAL GAS IGNITER FUEL

FUEL OIL SUPPLY

FUEL OIL RETURN

SOFTENED WATER

SUPPLY

DIFFUSER

NECK SIZE

CFM

RETURN

GRILLE

EXHAUST

GRILLE

AD

DOMESTIC COLD WATER

DOMESTIC HOT WATER

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER

DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS

SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

NITROGEN DIOXIDE SENSOR

HUMIDITY SENSOR

HUMIDISTAT

TEMPERATURE & HUMIDITY

SENSOR

DISPLAY

THERMOSTAT

SENSOR

PRESSURE SENSOR

DESCRIPTION DESCRIPTION

RTU-XX

TU-XX

6"Ø A

8"Ø

B

6"x6" C

NECK SIZE

CFM

NECK SIZE

CFM

LPS

LPR

MPS

MPR

HPS

HPR

PCD

SV

HWS

GHS

HWR

GHR

RS/RL

CWS

CWR

CHS

CHR

MW

D

CD

FWPD

FWPS

CTPD

CTPS

BO

CBD

BWS

FWS

OFL

A

G

G(I)

FOS

FOR

SW

DCW

DHW

(E) 2"

(E) 2"

BASE STATION TRANSMITTER TEMPERATURE AND HUMIDITY

RACK MONITORING

GENERAL PIPING SYMBOLS

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

PIPE UP

PIPE DOWN

INVERTED BUCKET TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

THERMOSTATIC TRAP SET INCLUDING PIPING

ACCESSORIES SEE DETAIL

THERMOMETER

PRESSURE GAGE

VENTURI FLOW METER

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

UNION

AUTOMATIC AIR VENT

MANUAL AIR VENTMV

QUICK-COUPLE HOSE CONNECTOR

SYMBOLS SYMBOLS NAME

LC

M

VALVE SYMBOLS AND ABBREVIATIONS

SCHEMATIC VIEW ELEVATION VIEW NAME AND ABBREVIATIONS

GATE VALVE - GV

GLOBE VALVE - GLBV

CHECK VALVE - CV

ANGLE GLOBE VALVE - AGLBV

BUTTERFLY VALVE - BFV

BALL VALVE - BV

THREE WAY VALVE - TWV

PRESSURE REGULATING VALVE - PRV

PRESSURE SAFETY VALVE - PSV

PLUG VALVE - PV

WYE STRAINER

WYE STRAINER (WITH BALL VALVE

AND HOSE CONNECTION)

WYE STRAINER WITH VALVED DRAIN

AND QUICK-COUPLE HOSE CONNECTOR

FLEXIBLE CONNECTION

MODULATING CONTROL VALVE

MODULATING CONTROL BUTTERFLY

VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL

VALVE

THREE-WAY TWO POSITION CONTROL

VALVE

AUTOMATIC BALANCING CONTROL

VALVE

CIRCUIT SETTER VALVE

WATER BALANCE DEVICE

GATE VALVE WITH GLOBE-VALVED

BYPASS

CONTROL VALVE (CV) - FLOAT-

OPERATED

WATER LEVEL CONTROLLER

FLOW METER

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

Building No. 1

Cape Coral, Florida

M001

516-21-107

JMK JSW/RCP05-31-2024

MECHANICAL LEGEND, ABBREVIATIONS,

AND NOTES

EHRM Infrastructure Upgrades - Lee County VA

HCC

FINAL DOCUMENTS

SUBMITTAL

HVAC SHEET INDEX

SHEET

NUMBER DRAWING TITLE

M001 MECHANICAL LEGEND, ABBREVIATIONS, AND NOTES

M002 MECHANICAL NOTES

M101 FIRST FLOOR OVERALL PLAN

M102 SECOND FLOOR OVERALL PLAN

M103 THIRD FLOOR OVERALL PLAN

M104 FOURTH FLOOR OVERALL PLAN

MH401 FIRST FLOOR - TR-1A-138 AND TR-1A-208 - ENLARGED HVAC PLANS

MH402 FIRST FLOOR - TR-1B-118 AND TR-1B-190 - ENLARGED HVAC PLANS

MH403 SECOND FLOOR - TR-2A-136, TR - 2B-146 AND TR-2B-199 - ENLARGED HVAC PLANS

MH404 THIRD FLOOR - TR-3A-150 - ENLARGED HVAC PLANS

MH405 FOURTH FLOOR - TR-4A-154 - ENLARGED HVAC PLANS

MP401 FIRST FLOOR - TR-1A-138 AND TR-1A-208 - ENLARGED PIPING PLANS

MP402 FIRST FLOOR - TR-1B-118 AND TR-1B-190 - ENLARGED PIPING PLANS

MP403 SECOND FLOOR - TR-2A-136 - ENLARGED PIPING PLANS

MP404 SECOND FLOOR - TR-2B-146 AND TR-2B-199 - ENLARGED PIPING PLANS

MP405 THIRD FLOOR - TR-3A-150 - ENLARGED PIPING PLANS

MP406 FOURTH FLOOR - TR-4A-154 - ENLARGED PIPING PLANS

M501 MECHANICAL DETAILS, HVAC SCHEDULES AND CONTROL SCHEDULES AND NOTES

P

R O

FESS I ONA L ENG

I N E

E R

JE

REM

Y M. KNOWLESL I C E NS E

F L O R I D A

No. 90210

STATE OF

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

MECHANICAL NOTES EHRM Infrastructure Upgrades - Lee County VA HCC

Cape Coral, Florida

M002

516-21-107

JMK JSW05-31-2024

FINAL DOCUMENTS

SUBMITTAL

A. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS, BOTH

EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS, AS WELL AS

THOSE WHICH CAN BE REASONABLY ANTICIPATED INCLUDING, BUT NOT

LIMITED TO ARCHITECTURAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND

OTHER SYSTEMS INVOLVED ON THIS PROJECT.

B. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM AND

SHALL CONFORM TO ALL CURRENT REQUIREMENTS FOUND IN THE UNITED

STATES DEPARTMENT OF VETERANS AFFAIRS TECHNICAL INFORMATION

LIBRARY, INCLUDING BUT NOT LIMITED TO THE PHYSICAL SECURITY MANUAL,

HVAC DESIGN MANUAL, AND STEAM, HEATING HOT WATER, AND OUTSIDE

DISTRIBUTION SYSTEM DESIGN MANUAL. ALL WORK SHALL ALSO CONFORM

TO ALL FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO

THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL

CODE.

C. INSTALL ALL EQUIPMENT AND DEVICES IN ACCORDANCE WITH THEIR

RESPECTIVE MANUFACTURER’S INSTALLATION INSTRUCTIONS AT A LEVEL OF

QUALITY AND WORKMANSHIP CONSISTENT WITH THESE DOCUMENTS. ANY

DEVIATIONS BETWEEN THE INSTALLATION INSTRUCTIONS AND THESE

DOCUMENTS WILL BE BROUGHT TO THE ATTENTION TO THE COR BEFORE ANY

COURSE OF ACTION BY THE CONTRACTOR IS INITIATED, INCLUDING

PURCHASE OF EQUIPMENT.

D. CONTRACTOR SHALL COORDINATE ALL WORK DESCRIBED AND ILLUSTRATED

IN THESE DRAWINGS. LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS

INDICATED ON THESE DRAWINGS ARE APPROXIMATE AND SUBJECT TO

ADJUSTMENTS IN THE FIELD. OFFSET DUCTS, PIPING, AND SHIFT EQUIPMENT

AS REQUIRED TO AVOID INTERFERENCE AND CONFLICTS IN THE FIELD.

COORDINATE DUCT AND PIPE ROUTING AND EQUIPMENT LOCATIONS WITH

PLUMBING AND ELECTRICAL INSTALLATIONS AND WITH BUILDING

STRUCTURAL MEMBERS.

E. THESE MECHANICAL DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT TO

BE SCALED. BEFORE BEGINNING WORK, THE CONTRACTOR SHALL VISIT THE

SITE AND COMPLETE MEASURED SURVEY AND CREATE LAYOUT DRAWINGS AS

REQUIRED BY THE SPECIFICATIONS. WORK SHALL NOT BEGIN UNTIL ALL

LAYOUT DRAWINGS ARE APPROVED BY THE COR.

F. DUCT SIZES INDICATED ARE MINIMUM CLEAR INSIDE DIMENSIONS. WHERE

DUCT LINER OCCURS, INCREASE SHEET METAL DUCT SIZES TO

ACCOMMODATE LINER.

G. DUCT AND PIPE SUPPORTS ARE NOT SHOWN ON DRAWINGS.

H. SUPPORT ALL DUCTS, PIPING, AND EQUIPMENT FROM PRIMARY BUILDING

STRUCTURAL MEMBERS. PROVIDE ADDITIONAL STRUCTURAL MEMBERS

WHERE NECESSARY TO ACCOMPLISH THIS REQUIREMENT.

I. NEW AND EXISTING SUPPORT, RODS, AND ASSOCIATED APPURTENANCES

SHALL NOT RESTRICT EQUIPMENT SERVICE AND MAINTENANCE ACCESS.

EXISTING SUPPORTS SHALL BE MODIFIED TO PROVIDE FOR EQUIPMENT

SERVICE AND MAINTENANCE ACCESS.

J. DUCT SUPPORTS SHALL BE IN STRICT ACCORDANCE WITH SMACNA HVAC

DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE -SECOND EDITION

EXCEPT THAT HANGER WIRE SHALL NOT BE USED TO SUPPORT DUCTS OR

EQUIPMENT, AND HANGERS THAT REQUIRE PENETRATION OF DUCT WITH

BOLTS, RIVETS, SCREWS, WIRES OR ANY OTHER FASTENER SHALL NOT BE

USED. DO NOT DAMAGE THE EXISTING SLAB OR JOIST REINFORCING DURING

HANGER INSTALLATION. THE CONTRACTOR SHALL FIELD VERIFY EXISTING

REINFORCING THOUGH NON-DESTRUCTIVE MEANS AS REQUIRED TO INSTALL

NEW HANGERS.

K. CONTRACTOR SHALL REWORK EXISTING HANGERS AND OTHER SUPPORT FOR

DUCT AND PIPING TO COORDINATE WITH NEW EQUIPMENT AND WALL

LOCATIONS. ADD SUPPORT (TRAPEZE, CLEVIS, ETC) AT EQUIPMENT AND ON

EACH SIDE OF NEW WALLS SO FULL WEIGHT OF DUCT AND PIPING IS

SUPPORTED FROM STRUCTURE AND EQUIPMENT AND NEW WALLS BEAR NO

WEIGHT.

L. CONTRACTOR SHALL PROVIDE A LIST OF ALL MECHANICAL EQUIPMENT,

DEVICES, AND ALL APPURTENANCES REQUIRING POWER TO THE COR FOR

REVIEW AND APPROVAL AS PART OF COORDINATION FOR THIS PROJECT. LIST

ALL ELECTRICAL REQUIREMENT CHARACTERISTICS, INCLUDING BUT NOT

LIMITED TO VOLTAGE, AMPERAGE, PHASE, DISCONNECTING MEANS, OVER

CURRENT PROTECTION AND ALL CHARACTERISTICS FOR A FULLY

FUNCTIONAL AND COORDINATED SYSTEM. REFER TO ELECTRICAL DRAWINGS

FOR VOLTAGE REQUIREMENTS OF ALL EQUIPMENT.

M. DO NOT USE SCHEDULED EQUIPMENT IDENTIFICATION NUMBERS SHOWN ON

DRAWINGS FOR FINAL EQUIPMENT SIGNS AND FOR CONTROL SYSTEM

SCHEMATICS. CONTACT COR AND OBTAIN FROM REFRIGERATION AND HVAC

MAINTENANCE SUPERVISOR THE CORRECT NOMENCLATURE AND EQUIPMENT

NUMBERS FOR INCLUSION IN SIGNAGE, CONTROL SCHEMATICS, AND AS-BUILT

DRAWINGS.

N. CONTROL DEVICES ASSOCIATED WITH THE WORK OF THIS PROJECT SHALL BE

RELOCATED AS NECESSARY SO THAT THE FINAL PRODUCT RESULTS IN A

FULLY FUNCTIONAL AND FULLY ACCESSIBLE SYSTEM. CONTRACTOR SHALL

RELOCATE ALL EXISTING CONTROLS, SENSORS, PROBES, OR OTHER DEVICES

AND PROVIDE NEW WIRING, CONDUIT, AND/OR TUBING TO EXTEND SUCH

DEVICES AS NECESSARY TO PRODUCE A FULLY FUNCTIONAL SYSTEM EQUAL

OR BETTER THAN EXISTING. PROTECT AND STORE ALL SUCH RELOCATED

DEVICES.

O. CONTRACTOR SHALL PROVIDE PRIMING AND PAINTING OF ALL FERROUS

METALS AND PIPING ASSOCIATED WITH THIS PROJECT, INCLUDING ANY AND

ALL AREAS DAMAGED BY CONTRACTOR. FINISH COLORS SHALL MATCH

EXISTING WHERE ESTABLISHED. REFER TO SPECIFICATION 099100 PAINTING

FOR ADDITIONAL INFORMATION.

GENERAL MECHANICAL NOTES DEMOLITION MECHANICAL NOTES

A. EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED FROM THE

PROJECT SITE IN ITS ENTIRETY INCLUDING ALL HANGERS, ELECTRICAL

CONDUIT, WIRING, JUNCTION BOXES, PIPING, CONTROLS, ACCESSORIES AND

ALL APPURTENANCES THAT ARE RENDERED USELESS OR ABANDONED BY

THE REMOVAL OF THE INDICATED EQUIPMENT.

B. WHERE THESE DOCUMENTS REQUIRE REMOVAL OF DUCTWORK, PIPING,

EQUIPMENT OR ASSOCIATED APPURTENANCES, CONTRACTOR SHALL

PROTECT ALL EXISTING-TO-REMAIN COMPONENTS FROM DAMAGE.

CONTRACTOR SHALL COVER ALL OPENINGS IN DUCT, PIPING, EQUIPMENT,

AND ANY OTHER DEVICE FROM CONSTRUCTION DUST AND DEBRIS.

C. WHERE EQUIPMENT, DUCTWORK, OR PIPING IS TO BE REMOVED THAT IS IN-

SERVICE, CONTRACTOR SHALL GIVE NOTICE TO THE COR OF ANY

INTERRUPTIONS ANTICIPATED. IT IS THE RESPONSIBILITY OF THE

CONTRACTOR TO COORDINATE ALL SHUTDOWNS OR INTERRUPTIONS TO THE

SATISFACTION OF THE COR AND HOSPITAL STAFF.

A. CONTRACTOR SHALL PHASE ALL WORK AS REQUIRED TO MAINTAIN

CONTINUOUS OPERATION OF THE HOSPITAL.

B. HOSPITAL OPERATIONS SHALL NOT BE INTERRUPTED DUE TO THE WORK OF

THIS PROJECT EXCEPT FOR SCHEDULED SHUTDOWNS OF NO LONGER THAN

ONE HOUR. CONTRACTOR SHALL GIVE REASONABLE NOTICE TO COR

BEFORE ANY SUCH SHUTDOWN OR INTERRUPTION.

C. WHERE LONGER SHUTDOWNS ARE REQUIRED TO COMPLETE THE WORK

DESCRIBED IN THIS DOCUMENT, THE CONTRACTOR SHALL SCHEDULE THE

EVENT A MINIMUM OF 3 WEEKS PRIOR TO COMMENCING WORK. ALL SUCH

SHUTDOWNS AND INTERRUPTIONS SHALL BE MINIMIZED AND SHALL UTILIZE

WEEKENDS, FEDERAL HOLIDAYS, NIGHTS, AND OTHER TIMES WHEN HOSPITAL

OPERATIONS ARE MINIMIZED AND OTHER SUCH TIMES AGREEABLE TO THE

COR.

D. WHERE NECESSARY TO INTERRUPT CONTINUOUS OPERATION OF THE

HOSPITAL, THE CONTRACTOR SHALL DIVIDE WORK INTO PHASED

CONSTRUCTION THAT IS NOT NECESSARILY SHOWN ON THESE DOCUMENTS.

AS PART OF SCHEDULING AN INTERRUPTION OR SHUTDOWN, THE

CONTRACTOR SHALL PROVIDE THE COR WITH A DETAILED SHUTDOWN PLAN

INDICATING THE SYSTEMS AFFECTED, INCLUDING BUT NOT LIMITED TO

ARCHITECTURAL, ELECTRICAL, MECHANICAL, PLUMBING, FIRE PROTECTION,

AND OTHER SYSTEMS INVOLVED. THE PLAN SHALL INCLUDE THE WORK TO

BE PERFORMED, THE LENGTH OF INTERRUPTION, AND A DETAILED PHASING

AND MANNING DESCRIPTION. THE PLAN SHALL INCLUDE AND ADDRESS

CONTINGENCY FOR MITIGATING ANY DELAYS THAT MAY OCCUR IN THE

PLANNED WORK. PROVIDE THIS PLAN TO THE COR 5 WEEKS BEFORE THE

EVENT FOR APPROVAL.

E. CONTRACTOR SHALL WORK ABOVE THE CEILING TO ADD COMPONENTS,

SUCH AS PIPING, INSULATION, CONDUCTORS, CONDUITS, AND SUPPORTS.

THE CONTRACOR SHALL COORDINATE INSTALLATION WITH THE COR. THE

CONTRACTOR SHALL REMOVE, STORE, AND REINSTALL ALL CEILING AND

OTHER COMPONENTS ASSOCIATED WITH INSTALLATION. WHERE ITEMS TO BE

REINSTALLED ARE DAMAGED (ACCORDING TO THE COR) THE CONTRACTOR

SHALL REPLACE THE ITEM WITH NEW.

PHASING MECHANICAL NOTES

A. THE TEST AND BALANCE CONTRACTOR SHALL BE A SUBCONTRACTOR TO THE

PRIME CONTRACTOR AND NOT A SUBCONTRACTOR TO THE MECHANICAL OR

ANY OTHER SUBCONTRACTOR.

B. PRIOR STARTING WORK, THE CONTRACTOR SHALL PROVIDE A TEST REPORT

OF EXISTING SYSTEMS THAT IN THIS SCOPE OF WORK.

TEST AND BALANCE MECHANICAL NOTES

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER

DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS

SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.

A. DATA LINK COMMUNICATION IS ETHERNET (ISO 8802-3) AND BACNET/IP.

B. GROUND CABLE SHIELDS, DRAIN CONDUCTORS, AND EQUIPMENT TO

ELIMINATE SHOCK HAZARD AND TO MINIMIZE GROUND LOOPS, COMMON-

MODE RETURNS, NOISE PICKUP, CROSS TALK, AND OTHER IMPAIRMENTS.

C. CABLE CONDUCTORS SHALL PROVIDE PROTECTION AGAINST INDUCTION IN

CIRCUITS. CROSSTALK ATTENUATION WITHIN THE SYSTEM SHALL BE IN

EXCESS OF -80 DB THROUGHOUT ALL FREQUENCY RANGES USED.

D. CABLE RUNS: KEEP CABLE RUNS AS SHORT AS POSSIBLE. ALLOW EXTRA

LENGTH FOR CONNECTING TO THE TERMINAL BOARD. DO NOT BEND FLEXIBLE

COAXIAL CABLES IN A RADIUS LESS THAN TEN TIMES THE CABLE OUTSIDE

DIAMETER.

E. LABEL SYSTEM’S CABLES ON EACH END. TEST AND CERTIFY CABLES IN

WRITING TO THE VA BEFORE CONDUCTING PROOF-OF-PERFORMANCE

TESTING. MINIMUM CABLE TEST REQUIREMENTS ARE FOR IMPEDANCE

COMPLIANCE, INDUCTANCE, CAPACITANCE, SIGNAL LEVEL COMPLIANCE,

OPENS, SHORTS, CROSS TALK, NOISE, AND DISTORTION, AND SPLIT PAIRS ON

ALL CABLES IN THE FREQUENCY RANGES USED. MAKE AVAILABLE ALL CABLE

INSTALLATION AND TEST RECORDS AT THE DEMONSTRATION TO THE VA.

F. POWER WIRING SHALL NOT BE RUN IN CONDUIT WITH COMMUNICATIONS

TRUNK WIRING OR SIGNAL OR CONTROL WIRING OPERATING AT 100 VOLTS

OR LESS.

G. PROVIDE NEMA 4 ENCLOSURE FOR EXTERIOR LOCATIONS.

H. PROVIDE BACNET-COMPLIANT ROUTER, BRIDGE, SWITCH, HUB, MODEM,

GATEWAY, INTERFACE, AND SIMILAR COMMUNICATION EQUIPMENT TO

INTEGRATE INTO THE EXISTING SYSTEM.

I. FIT ALL EQUIPMENT CONTAINED IN CABINETS OR PANELS WITH SERVICE

LOOPS, EACH LOOP BEING AT LEAST 300 MM (12 INCHES) LONG. EQUIPMENT

FOR FIBER OPTICS SYSTEM SHALL BE RACK MOUNTED, AS APPLICABLE, IN

VENTILATED, SELF-SUPPORTING, CODE GAUGE STEEL ENCLOSURE. CABLES

SHALL BE SUPPORTED FOR MINIMUM SAG.

J. OPTICAL DIGITAL COMMUNICATION FIBER, IF USED, SHALL BE MULTIMODE OR

SINGLE MODE FIBER, 50/125 MICRON FOR MULTIMODE OR 10/125 MICRON FOR

SINGLE MODE MICRON WITH SC OR ST CONNECTORS AS SPECIFIED IN

TIA-568-C.1. TERMINATIONS, PATCH PANELS, AND OTHER HARDWARE SHALL

BE COMPATIBLE WITH THE SPECIFIED FIBER. FIBER-OPTIC CABLE SHALL BE

SUITABLE FOR USE WITH THE 100BASE-FX OR THE 100BASE-SX STANDARD (AS

APPLICABLE) AS DEFINED IN IEEE STD 802.3.

GENERAL CONTROL ELEMENT REQUIREMENT

A. THE MONITORING SYSTEM SHALL BE MANUFACTURED BY

MEDICALRESOURCES MODEL CHECKPOINT G2 SYSTEM, IT SHALL BE

WIRELESS, OPERATE IN THE 900 MHZ ISM FREQUENCY RANGE, AND COMPLY

WITH FCC REGULATIONS. IT SHALL UTILIZE A SELF-HEALING MESH NETWORK

FOR RELIABLE 2-WAY COMMUNICATION AMONG SENSORS, REPEATERS,

RECEIVERS, AND ETHERBASES. THE SYSTEM SHALL BE BATTERY-POWERED,

WATER-RESISTANT SENSORS AND SHALL CONTINUOUSLY TRANSMIT DATA AT

PROGRAMMED INTERVALS. IT SHALL HAVE A DEDICATED VISUAL BASICS

SOFTWARE RUNNING ON A PC WITH MODEST HARDWARE REQUIREMENTS.

BASE STATION TRANSMITTER SPECIFICATION

P R

O

FESS I ONA L ENG

I N E

E R

JE

REM

Y M. KNOWLESL I C E NS E

F L O R I D A

NEURO. SCI

1A-170

NEURO. SCI

1A-172

CAST

1A-174

MED.

SUP./MEDIC.

1A-168

EXAM

1A-150

NEURO

1A-171

NEURO

1A-169

EXAM

1A-152

EXAM

1A-154

HAC

1A-166

STAFF TLT

1A-167

PROC.

1A-149

EXAM

1A-151

EXAM

1A-153

MED. SUP. /

MEDIC.

1A-144

EXAM

1A-146

STORAGE

1A-148

C&P EXAM

1A-129

C & P EXAM

1A-147

C & P EXAM

1A-145

C&P EXAM

1A-131

C&P EXAM

1A-133

HAC

1A-142

STAFF TLT

1A-143

EXAM

1A-132

EXAM

1A-130

TLT

1A-106

MED. EQ.

1A-108

SOCIAL

1A-102

CLEAN

1A-103

SOIL

1A-105

OBS.

1A-107

OBS.

1A-109

OBS.

1A-111

OBS.

1A-112

BASIC

SERVICE

1A-104

PHARMD

1A-134

TRIAGE

1A-136

TLT

1A-100

TLT

1A-101

C&P CLERK

1A-135

NURSES

STATION

1A-140

CHECK-IN/OUT

1A-137

ELEC.

1A-158

CLEAN

1A-156

SOIL

1A-157

PHARMD

1A-159

PHARMD

1A-160

CASE

1A-164

STORAGE

1A-165

TLT

1A-161

TLT

1A-162

HAS

SUPER.

1A-179

CHECK-IN/OUT

1A-180

SERVICE

OFFICE

1A-192

SERVICE

OFFICE

1A-194

SERVICE

OFFICE

1A-196

SERVICE

OFFICE

1A-19…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .