516-21-107-CombinedDrawings-Final-Resend-LCHCC-EHRM-Upgrades- P2.pdf
PDF 31 MB Posted
- Attached to
- Y1DZ--516-21-107 EHRM Infrastructure Upgrades Construction Lee County VA Clinic (Cape Coral, FL)
- Solicitation number
- 36C77625B0007
About this file
The provided file contains technical architectural, mechanical, electrical, and telecommunications drawings for a VA infrastructure upgrade project at the Lee County Healthcare Center in Cape Coral, Florida. The drawings, dated 5/31/24, include multiple plan layouts and detailed schematics covering first floor plans, telecommunications room configurations, fiber optic cable riser diagrams, and rack stack details.
The associated federal contract opportunity (Solicitation Number: 36C77625B0007) involves constructing new IT infrastructure to support the VA's Electronic Health Record (EHR) migration. The project scope includes installing fiber optic network infrastructure, upgrading HVAC systems and controls, implementing security systems, and installing patch panels and rack sensors. The upgrades will impact three VA medical facilities: Lee County Healthcare Center, Sebring Community Outpatient Clinic, and Naples CBOC, with the primary goal of enhancing clinical information retrieval and supporting more efficient patient care by transitioning from the current CPRS platform to the new EHR platform.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/31/24
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
STAMP
tsteele Snapshot latim latim
| 516-21-107-Gen-ArchDrawings-Final-LCHCC-EHRM-Upgrades-TMM 2139 |
| G001 COVER SHEET |
| G002 LEGENDS, ABBREVIATIONS AND NOTES |
| AE-101 TELECOMMUNICATIONS ROOM PLANS |
| 516-21-107-MechanicalDrawings-Final-LCHCC-EHRM-Upgrades-TMM 2139 |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 516-21-107-ElectricalDrawings-Final-LCHCC-EHRM-Upgrades-TMM 2139 |
| 516-21-107-TelecomDrawings-Final-LCHCC-EHRM-Upgrades-TMM 2139 |
| TA101 FIRST FLOOR PLANS v3 Layout1 (1) |
| TA101 FIRST FLOOR PLANS v3 Layout A (1) |
| TA101 FIRST FLOOR PLANS v3 Layout B (1) |
| TA101 FIRST FLOOR PLANS v3 Layout C (1) |
| TA101 FIRST FLOOR PLANS v3 Layout D (1) |
| TA102 v3 Layout A (1) |
| TA102 v3 Layout B (1) |
| TA102 v3 Layout C (1) |
| TA102 v3 Layout1 (1) |
| TA103 v3 Layout B (1) |
| TA103 v3 Layout1 (1) |
| TA104 v3 Layout A (1) |
| TA104 v3 Layout1 (1) |
| TA-401 TELECOMMUNICATIONS LARGE SCALE ROOM PLANS V3 AE-101 TELE |
| TA701 FIBER OPTIC CABLE RISER DIAGRAM rev 082724 Layout1 (1) |
| TA801 DETAILS V3 RACK STACK (1) rev 082724 |
| TA803 DETAILS V3 FIBER DUCT & HDX (1) |
File details come from the government source that posted it. Updated .