This federal contract opportunity notice solicits bids for infrastructure upgrades construction at a Veterans Affairs facility in Sheridan, Wyoming. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking proposals under solicitation number 36C77623B0073_1 to provide hazardous materials (HAZMAT) handling and infrastructure upgrades at the Sheridan VA medical center. Interested vendors must submit bids by the response due date of July 15, 2021 for consideration. The contract is set to be awarded by August 15, 2021. The notice provides relevant details on the scope of work required including handling of hazardous waste and required upgrades to existing infrastructure to meet applicable regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAZARDOUS BUILDING MATERIALS

INSPECTION REPORT

Sheridan VA Medical Center

EHRM Facility Infrastructure

Upgrade Facility Upgrade

Sheridan Campus

Sheridan, WY

VA Project No: 666-21-700

September 1, 2021 *Revised August 12, 2022

Prepared for:

Veterans Affairs Medical Center c/o FourFront Design, Inc.

517 7th Street

Rapid City, SD 57701

Prepared by:

AMI Environmental

8802 South 135th Street, Suite 100 Omaha, Nebraska 68138

AMIE # 21-233

TABLE OF CONTENTS

1. SURVEY OVERVIEW

1.1. Purpose and Scope

1.1.1. Inspection Area

1.1.2. Limitations

1.2. Regulatory Reference

2. BUILDING INFORMATION

2.1. General Construction

2.2. Pre-Existing Information

3. INSPECTION METHODOLOGIES

3.1. Asbestos Inspection

3.1.1. Key Definitions

3.1.2. Homogenous Material Numbering Convention

3.1.3. Bulk Sampling

3.2. Lead-Based Paint Inspection

3.2.1. Key Definitions

3.2.2. Homogenous Paint Applications Numbering Convention

3.2.3. Paint Chip Sampling

4. SUMMARY OF INSPECTION FINDINGS

4.1. Asbestos Inspection Findings

4.2. Lead Paint Inspection Findings

5. RISKS AND HAZARDS

5.1. Asbestos

5.2. Lead-Based Paint

6. RECOMMENDATIONS

6.1. General Recommendations

6.1.1.Asbestos 6.1.2.Lead-Based Paint

6.2. Hazardous Conditions Recommendations

6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations

7. REGULATORY REQUIREMENTS

7.1. Asbestos-Containing Materials

7.1.1. Notification Requirements

7.1.2. Asbestos Removal Requirements

7.1.3. OSHA Regulation of <1 Percent Asbestos

7.1.4. Asbestos Removal Regulations

7.2. Lead-Based Paint

7.2.1. Disposal Requirements

7.2.2. Construction Requirements

APPENDIX A: Tables

APPENDIX B: Photo Logs

APPENDIX C: Schematics

APPENDIX D: Analytical Results

APPENDIX E: Inspectors Credentials

HAZARDOUS MATERIALS INSPECTION REPORT

EHRM Facility Infrastructure Upgrade Facility

Veterans Affairs Medical Center 1898 Fort Road

Sheridan, Wyoming

1. SURVEY OVERVIEW

On July 27 & 28, 2021, and July 26, 2022, selected rooms in Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 24, 31, 32, 35, 36, 37, 42, 61, 64, 71, 71N, 86, 87, and 90 at the Veterans Affairs Medical Center, 1898 Fort Road, Sheridan Wyoming, 82801, were inspected for asbestos-containing material (ACM) and lead-based paint (LBP) by a representative of AMI Environmental (AMIE). The hazardous building materials inspection was conducted in preparation for renovations for an IT upgrade. The AMIE representative was escorted to determine the impacted areas by Nicholas Redinger and Catherine Reichert, Supervisory General Engineer, of the Sheridan VA.

The renovation project is hereinafter referred to as The Project. The inspection was initiated at the request of Mr. Garry Black of FourFront Design Inc., on behalf of the VA Medical Center. The inspection was performed by Mr. Colin Lauenroth, in accordance with regulatory requirements and generally accepted industry methods. Copies of applicable requisite training certificates are provided in Appendix E.

1.1. Purpose and Scope

The purpose and scope of the inspection was to identify and sample suspect ACMs, LBPs or other lead containing building materials present in the project area that may be impacted by The Project.

1.1.1. Inspection Area

The hazardous building materials inspection of the window project included all accessible interior and exterior selected areas of the Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 24, 31, 32, 35, 36, 37, 42, 61, 64, 71, 71N, 86, 87, and 90 for the EHRM IT Project. The above described areas are hereinafter referred to collectively as the Inspection Area.

1.1.2. Limitations

Nondestructive sampling protocols prevented inspection and sampling of materials inside walls and other inaccessible areas of the building. Examples of suspect materials not sampled, include those which may exist inside areas concealed by window frames. Certain areas were also not accessible at the time of the survey: Ceiling above room 114A in Building 5 and ceiling above room 217 in Building 7.

It is recommended that any new materials discovered in the demolition process prior to or during construction be tested or abated.

Sampling of these materials may not be necessary if, in the case of suspect ACM, the materials are assumed to be ACM or if they are determined by a licensed asbestos inspector to be homogenous to other materials that were sampled. Certain materials were reported to AMIE as ACM and LBP by Catherine Reichert of the Sheridan VA. These materials include: Exterior windows (caulking/glazing and paint) and vinyl floor tile/mastic.

Hazardous Building Materials Inspection Report AMI Project No. 21-233 EHRM Upgrades August 12, 2022 VA Medical Center Sheridan, WY Page of 12

1.2. Regulatory Reference

The asbestos inspection was conducted in accordance with USEPA National Emission Standard for Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing building materials that may be impacted by planned renovation activities; applicable protocols established by the Asbestos Hazard Emergency Response Act (AHERA) (ref.: 40 CFR 763). There is also no licensing requirement for lead paint sampling in non- HUD facilities.

The State of Wyoming does not have State licensing for asbestos inspectors.

2. BUILDING INFORMATION

2.1. General Construction

This project involves the IT upgrades for numerous buildings, listed above in scope of work, at the VA Medical Center in Sheridan, WY.

2.2. Pre-Existing Information

Information on previous surveys or sampling for lead-based paint or asbestos was not provided.

3. INSPECTION METHODOLOGIES

3.1. Asbestos Inspection

The inspection and sampling were conducted in accordance with the USEPA National Emission Standard for Hazardous Air Pollutants (NESHAP) regulations (ref.: 40 CFR, Part 61), following criteria established for identifying asbestos-containing. building materials that may be impacted by planned renovation. Additional aspects of the inspection methodology are discussed below.

3.1.1. Key Definitions

3.1.1.1. Homogenous Material

Homogenous materials are unique applications of building materials uniform in color and texture. The homogeneity of a material can be further defined by area(s) of application. Bulk sampling is conducted to determine the asbestos content of a homogenous material.

3.1.1.2. Asbestos-Containing Material (ACM)

The Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) define ACMs as any material that contains greater than one percent asbestos, as determined by visual area estimation (microscopic analysis). The State of Wyoming follows the EPA standard. Some materials contain one percent or less asbestos. While these materials are not ACMs by definition, they are still regulated by OSHA, for worker exposure.

3.1.1.3. Friable/Non-Friable ACM

Friable ACMs are materials that contain more than one percent asbestos and, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure, thereby releasing fibers into the air more readily. In contrast, non-friable ACMs are ACMs that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. Non-friable ACMs are grouped into two categories: Category I and Category

II.

3.1.1.4. Regulated Asbestos-Containing Materials (RACM)

Regulated Asbestos-Containing Materials (RACM) include friable ACMs and non-friable ACMs that, depending on their category, have become friable, have been subjected to specific forms of impact damage, have a high probability of becoming friable, and/or may become friable during removal.

3.1.2. Homogenous Material Numbering Convention

All suspect asbestos materials are assigned a unique homogeneous material number. AHERA identifies three basic material types: Surfacing Materials (SM), which include spray and trowel applied materials, such as fireproofing, ceiling texture, plaster, etc.; Thermal System Insulation (TSI), which includes insulating materials applied to mechanical and plumbing components for temperature preservation and condensation prevention purposes; and Miscellaneous Materials (MM), which includes all other materials, such as floor coverings and mastics, roofing materials, asbestos cement products, and many others. When a homogenous material has multiple layers, individual layers are identified and analyzed separately by laboratory analysis.

3.1.3. Bulk Sampling

Bulk sampling must be performed to determine whether suspect building material contains asbestos. Asbestos bulk sampling for the inspection was conducted in accordance with protocols established by the Asbestos Hazard Emergency Response Act (AHERA) (ref.: 40 CFR 763). Friability of the suspect asbestos-containing materials was determined by touching and/or sampling of the material.

3.1.3.1. Bulk Sample Numbering Convention

Bulk samples are given a sequence number when collected.

3.1.3.2. Polarized Light Microscopy Analysis (PLM)

Bulk samples collected during the inspection were submitted to an EPA accredited laboratory, EMSL Analytical, Inc. (EMSL), located at 200 Route 130 North, Cinnaminson, New Jersey & 6340 Castleplace Dr, Indianapolis, Indiana. EMSL was instructed to perform Polarized Light Microscopy (PLM) analysis, utilizing dispersion staining techniques (ref: EPA Method 600/M4-82-020). PLM analysis is the least expensive and most commonly used visual estimate method. While PLM analysis is acceptable to EPA, OSHA, and most states for determining asbestos content, some states now require more sophisticated methods when analyzing certain types of materials.

A total of 164 asbestos bulk samples were collected and submitted for laboratory analysis. PLM Analysis was performed on the samples collected, including all heterogeneous layers. Heterogeneous applications are individual layers of different materials contained within a single bulk sample, each of which must be analyzed individually to determine its asbestos content (e.g. vinyl floor tiles and mastic; cove base and mastic; etc.). Table 1 lists all samples collected and analyzed in the current survey.

Some samples and/or heterogeneous applications may not have been analyzed by the lab if a positive result was obtained from a sample that is among a group of samples representing a suspect material. This process, known as stop on first positive, is followed because if a single sample is found to be positive, that material is determined to be ACM, thus making it unnecessary to analyze any additional samples in the sampling group.

Please refer to the Table 1– Asbestos Material Sampling Table in Appendix A for a complete listing of all materials sampled. The laboratory analytical reports may be found in Appendix D for the current inspection.

3.1.3.3. Quantification Method Analysis

EPA regulations allow materials determined to contain less than 10 percent asbestos utilizing a visual estimate quantification method, such as PLM analysis, to be treated as non-asbestos containing if the material is re-analyzed using one of two quantification methods and determined to contain one percent or less of asbestos. The two acceptable quantification methods are point count analysis and TEM Chatfield analysis.

Quantification methods are more time-consuming and more expensive analytical procedures that are occasionally used to more accurately determine the amount of asbestos in certain samples. Because of their higher cost and the acceptable accuracy of the less expensive visual estimation method, laboratories do not typically perform quantification analyses unless specifically requested.

The quantification method known as point count analysis is used for most ACM types, except floor tile. The organic matrix composition of floor tile precludes the use of point count analysis to more accurately determine asbestos amounts within a sample.

Therefore, TEM Chatfield analysis—which effectively removes all organic materials, leaving only asbestos behind—is necessary to provide a more precise percentage of asbestos content in floor tile.

Please refer to section 6.0 Recommendations, for recommendations concerning supplemental analysis.

3.2. Lead-Based Paint Inspection

The LBP inspection included visual identification of homogenous paint applications sampling of the paint(s). While the U. S. Department of Housing and Urban Development (HUD) promulgates guidelines for LBP inspections in child occupied facilities, there are no formal guidelines for non-HUD regulated inspections. Thus, the LBP inspection was conducted in accordance with generally accepted industry standards and practices. Additional aspects of the inspection methodology are discussed below.

3.2.1. Key Definitions

3.2.1.1. Homogenous Paint Applications

Homogenous paint applications are significant paint applications that are visually distinct by their color and uniformity. Significant paint applications do not include incidental occurrences of paint such as isolated occurrences of accent trim, artistic paints, etc. While visual inspection alone cannot generally identify sub-layers of paint, these applications are often identified in the XRF analysis.

3.2.1.2. Lead-Based Paint (LBP)

Pursuant to Federal Register, Vol. 61, No. 169, LBP is defined as paint or other surface coatings equal to or greater than 0.5 percent lead by weight or equal to or greater than 1 mg/cm2.

3.2.2. Homogenous Paint Applications Numbering Convention

Homogenous paints and coatings are assigned a unique homogeneous material number (HM#).

The HM# is referenced throughout the report to uniquely identify each paint application.

3.2.3. Lead-based Paint Sampling

Sampling of suspected lead-based paint was conducted. Samples of Lead-based Paint were collected from homogeneous paint applications for laboratory analysis. A total of 82 lead-based paint samples were collected.

4. SUMMARY OF INSPECTION FINDINGS

Key findings of the hazardous building materials inspection are summarized below. Please refer to the Appendices for complete details of the inspection findings and supporting documentation.

4.1. Asbestos Inspection Findings

Below is a summary of the findings of the asbestos inspection:

Material #/ Description

Sample Id Color Location Sample Result Estimated

Quantity Photo No.

9”x9” Vinyl Floor Tile with Black Mastic

Not Sampled

Tan/ Black

Building 4, Hallway W of Room 118a.

Under Carpet

Not Analyzed (Reported as

ACM)

120 SF 10

Window Caulking/ Glazing

Not Sampled

Gray/ White

Building 4, Windows West of Room 118a

Not Analyzed (Assumed ACM)

2 EA 11

Window Glazing/ Caulking

Not Sampled

Gray/ White

Building 6 Rooms 101 and 101A

Assumed ACM 2 EA 20

Textured Plaster Gray W/ Skim Coat White

37 White Building 7 Room

30% Chrysotile 500 SF 21

12”X12” Ceiling Tile with Holes and Puck Mastic

Not Sampled

White Building 7 Room

(Puck Mastic Assumed ACM)

140 SF 24

Window Caulking/ Glazing

Not Sampled

White Gray

Building 9 Room

Not Analyzed (Assumed ACM)

1 EA 30

Window Caulking/ Glazing

Not Sampled

White /Gray

Building 11 Room

Not Analyzed (Assumed ACM)

4 EA 37

Window Glazing/ Caulking

Not Sampled

Gray/ White

Building 32 Room 102 and 104

Not Analyzed (Assumed ACM)

1 EA 44

9"X9" VFT

Blue / White W/ Black Mastic

83 Tan Building 32 Room

104 Under Carpet

2% Chrysotile 150 SF 49

9"X9" VFT

Blue / White W/ Black Mastic

83 Green Building 32 Room

104 Under Carpet

3% Chrysotile Included Above

9"X9" VFT

Blue / White W/ Black Mastic

84 Blue Building 32 Room

104 Under Carpet

Positive Stop 150 SF 49

Material #/ Description

Sample Id Color Location Sample Result Estimated

Quantity Photo No.

9"X9" VFT

Blue / White W/ Black Mastic

84 White Building 32 Room

104 Under Carpet

Positive Stop Included Above

Window Caulking/ Glazing

Not Sampled

Gray/ White

Building 42, 2nd Floor North Side

Not Analyzed (Assumed ACM)

4 EA 52

Linoleum Floor (White) W/ Particle Board Sub Floor

93 Gray/ Tan

Building 37 Room 101 Under Carpet

15% Chrysotile 280 SF 55

Linoleum Floor (White) W/ Particle Board Sub Floor

94 Gray/ Tan

Building 37 Room 101 Under Carpet

Positive Stop Included Above

Vermiculite Insulation

Not Sampled

Brow n/ Gray

Building 37 Room 101 Above Second Drop Ceiling

Not Analyzed (Assumed ACM)

280 SF 56

Window Caulking/ Glazing

Not Sampled

White Gray

Building 61 2nd Floor Room 203

Not Analyzed (Assumed ACM)

1 EA 60

Window Caulking/ Glazing

Not Sampled

White Gray

Building 5 Room

Not Analyzed (Assumed ACM)

2 EA 80

12"X12" VFT

Gray W/ Black Mastic

141 Tan Building 5 Room 114 Under Carpet

2% Chrysotile 200 SF 82

12"X12" VFT

Gray W/ Black Mastic

142 Tan Building 5 Room 114 Under Carpet

Positive Stop (Not Analyzed)

Included Above

9”x9” VFT 158 &159 Tan Building 24, Room

3% Chrysotile 175 SF 92

Exterior Window Caulk/ Glaze

Not Sampled

Gray/ White

Building 24, Room

Not Analyzed (Assumed ACM)

2 EA 96

Please refer to Table 1 – Asbestos Sampling Table in Appendix A for a complete listing of all asbestos sampling.

4.2. Lead Paint Inspection Findings

Below is a summary of the findings of the lead-based paint inspection:

Sample

No. Location Description Color Paint Condition

Lab Result (% by Weight)

Estimated Quantity

Not Sampled

Building 4, West of Room 118A

Exterior Window Paint White Fair

Not Analyzed (Reported as

LBP)

2 EA

L – 5 Building 4 Room 005A

Ceiling Paint Metal White White Cracking 1.8 % wt 40 SF

Not Sampled

Building 6 Rooms 101 & 101A

Exterior Window Paint White Fair

Not Analyzed (Reported as

LBP)

2 EA

L - 14 Building 7 Room 217 (Back Walls)

Plaster Wall Paint White/Mint Green

White/Mint Green Good 1.4 % wt 300 SF

L - 20 Building 9 Rooms 102 & 102A

Window Paint Wood White/Light Blue

White/Light Blue Cracking 8.1 % wt 300 SF

Not Sampled

Building 11 Room 109

Exterior Window Paint White Fair

Not Analyzed (Reported as

LBP)

4 EA

Not Sampled

Building 32 Rooms 102 &

Exterior Window Paint White Fair

Not Analyzed (Reported as

LBP)

2 EA

Not Sampled

Building 42 2nd Floor

Exterior Window Paint White Fair

Not Analyzed (Reported as

LBP)

4 EA

Not Sampled

Building 61 Room 203

Exterior Window Paint White Fair

Not Analyzed (Reported as

LBP)

1 EA

Sample No. Location Description Color Paint

Condition Lab Result (% by Weight) Estimated Quantity

Not Sampled

Building 5 Room 114

Exterior Window Paint White Fair

Not Analyzed (Reported as

LBP)

2 EA

Not Sampled

Building 24 Room 109

Exterior Window Paint White Fair

Not Analyzed (Reported as

LBP)

2 EA

Please refer to Table 2 – Lead Paint Sampling Table in Appendix A for a complete listing of all lead-based paint and material sampling.

NOTE: See Section 7.2.2 Lead in Construction. Paint containing lead (PCL) at levels not considered Lead-based paint was found in samples in Lead Paint Sampling Table.

5. RISKS AND HAZARDS

5.1. Asbestos

To be a significant health concern, asbestos fibers must be inhaled. When asbestos fibers are inhaled, they become lodged in the lung tissue or alveoli. Here they clog and scar the tissues, causing the walls of the alveoli to lose their elasticity and useful function in respiration. Asbestosis (scarring of the lung), lung cancer, and Mesothelioma (cancer of the lining of the chest or lining of the abdominal wall) are diseases associated with asbestos exposure. Risks and hazards increase with increased exposure. ACM condition, proximity to building occupants, building use, and other factors can influence the potential for asbestos fibers to become airborne, and therefore increase exposure risks.

5.2. Lead-Based Paint

Inhalation and ingestion are the major routes of lead exposure. Once in the body, lead is distributed via the bloodstream to red blood cells, soft-tissue and bone. The kidneys and gastrointestinal (GI) tract eliminate lead in the body very slowly, while minute amounts are lost through perspiration.

Lead in the body can cause serious damage to the central and peripheral nervous system, the cardiovascular system, and the kidneys. Exposure to high concentrations of lead can cause retardation, convulsions, coma, and sometimes death. Children are especially vulnerable and susceptible to lead poisoning. Even low levels of exposure persisting during childhood are known to slow a child’s normal development and cause learning and behavioral problems. Exposure to lead can result from deteriorating surfaces and activities mechanically impacting lead surfaces. Preventing exposure requires proper work practices, monitoring, disposal and personal protective equipment during demolition, alteration and friction producing activities.

6. RECOMMENDATIONS

The purpose of this section is to interpret survey findings and provide preliminary recommendations that may be relevant and appropriate at this time. Because this document is a presentation of investigative findings, recommendations related to future construction activities are inherently general in nature. More specific determinations concerning hazardous building materials to be impacted by construction should be made during the abatement project design process.

6.1. General Recommendations

6.1.1. Asbestos

State and/or federal regulations require that ACMs be removed prior to demolition or renovation activities that will impact the ACMs. Depending on the specific renovation work to be performed, certain ACMs may not require removal if they will not be disturbed and do not pose a risk to building occupants or construction trade workers. However, to ensure worker safety and to eliminate future asbestos-related maintenance and management costs and risks, AMIE recommends removal of all identified ACMs in the areas to be renovated. While partial abatement may be technically possible, it is often impractical and not cost-effective.

ACMs not impacted by renovation or demolition activities should be inspected annually and maintained in good condition. ACMs deemed to be in less than good condition (damaged or significantly damaged) should be repaired or removed and replaced. Such repairs should be performed by qualified persons and in accordance with regulatory guidelines.

6.1.2. Lead-Based Paint and Lead Containing Materials

Facility owners are ultimately liable for their lead-containing hazardous waste from cradle to grave. EPA regulations provide two ways to determine whether a waste stream, such as demolition debris containing LBP, must be classified as hazardous waste. Waste generators can either test the waste using an approved testing method (Toxicity Characteristic Leaching Procedure [TCLP]), or they can apply knowledge of the hazardous characteristic of the waste.

Based on the initial lead paint testing results, AMIE recommends TCLP testing be conducted on the existing building materials, painted and unpainted, prior to the start of renovation or demolition activity. In addition, trade contractors who work in the facility should also be notified of the presence of lead so that they can appropriately monitor and protect their workers against lead exposure.

Any lead-based painted building components not removed during renovation should be considered for inclusion in a facility management plan that maintains potential exposure below OSHA action levels and ensures the material will be handled properly and in accordance with applicable regulations.

6.2. Hazardous Conditions Recommendations

No hazardous conditions, from hazardous materials, were observed in the building during the inspection.

6.3. Point Count Analysis / TEM Chatfield Analysis Recommendations AMIE does not recommend Point Count or TEM Chatfield analysis of any of the ACMs identified.

7. REGULATORY REQUIREMENTS

7.1. Asbestos-Containing Materials

The removal and disposal of ACMs is regulated at the federal, state, and, sometimes, local level. While some states have developed their own regulatory standards for the various asbestos disciplines, many states have adopted the federal standards but have established licensing requirements and enforcement authority at the state level.

7.1.1. Notification Requirements

EPA’s NESHAP regulation, 40 CFR, Subpart M, 61.145, Standard for Demolition and Renovation, stipulates that an owner of a facility submit proper notification with either the EPA’s regional office and/or the state and local regulatory agency of intention to demolish or renovate. Notifications must be received by the appropriate regulatory agencies 10 working days prior to commencement of asbestos stripping or removal, or other site work. If the demolition or renovation date changes, or the scope of work is increased, another notification is required.

7.1.2. Asbestos Removal Requirements

Asbestos removal must be performed by an abatement contractor following all work practices, worker protection, and disposal requirements set forth in the contract specifications and by the Occupational Safety and Health Administration (OSHA) and the EPA. Key federal regulations concerning asbestos include 29 CFR 1910.1001, 29 CFR 1926.1101, 40 CFR Part 61, Subpart M, and 40 CFR 763.

7.1.3. OSHA Regulation of ≤ 1 Percent Asbestos

While EPA and many states do not regulate materials containing one percent or less asbestos, OSHA regulates materials containing any amount of asbestos. (Ref. OSHA Construction Industry Standard, 29 CFR 1926.1101(a)(3))

7.1.4. Asbestos Removal Regulations

Asbestos Containing Building Material (ACBM) should only be removed by companies with trained workers, and following all applicable regulatory and industry standards.

7.2. Lead Waste

7.2.1. Disposal Requirements

The Resource Conservation and Recovery Act (RCRA) classifies lead-containing waste streams as hazardous materials if TCLP levels exceed five parts per million. If TCLP leachable lead levels exceed that threshold, EPA regulations (40 CFR 261) require the waste stream to be handled and disposed of as a hazardous waste. Waste streams containing less the five parts per million of leachable lead are classified as non-hazardous waste and can be disposed of in a construction and demolition landfill.

7.2.2. Lead in Construction Requirements

OSHA’s 29 CFR 1926.62 regulates worker exposure to lead during construction activities that include demolition or salvage of structures where lead or materials containing lead are present, as well as removal or encapsulation of lead-containing materials. The standard establishes maximum limits of exposure to lead, including a permissible exposure limit and action level, and should be adhered to during construction and demolition activities.

APPENDIX A

Asbestos and LBP Tables www.amienvironmental.com

8802 South 135th Street, Suite 100 • Omaha, NE 68138

800.828.8487 • 402.397.5001 • 402.397.3313 (fax http://www.amienvironmental.com/

Table 1 – Asbestos Materials Sampling Table

Table 2 – Lead Paint Sampling Table

Table I

Table 1: Asbestos-Containing Material Sampling Table & Test Results AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-01:12"X12" VFT/

Gray- Stone Pattern

Gray Mastic 01 Vinyl

Floor Tile Gray Building 64 Room 115 and 207A

None Detected

MM-01a:12"X12" VFT/ Gray- Stone

Pattern Gray Mastic 01 Mastic Gray/

Yellow Building 64 Room

115 and 207A None

Detected

MM-01:12"X12" VFT/

Gray- Stone Pattern

Gray Mastic 02 Vinyl

Floor Tile Gray Building 64 Room 115 and 207A

None Detected

MM-01a:12"X12" VFT/ Gray- Stone

Pattern Gray Mastic 02 Mastic Gray/

Yellow Building 64 Room

115 and 207A None

Detected

MM-02: Cove Base/ Gray W/ White Mastic 03

Base Cove

Gray

Building 64 Room 115, 207A and

Building 7 Room

None Detected

MM-02a: Cove Base/ Gray W/ White Mastic 03 Mastic White

Building 64 Room 115, 207A and

Building 7 Room

None Detected

MM-02: Cove Base/ Gray W/ White Mastic 04

Base Cove

Building 64 Room 115, 207A and

Building 7 Room

None Detected

MM-02a: Cove Base/ Gray W/ White Mastic 04 Mastic White

Building 64 Room 115, 207A and

Building 7 Room

None Detected 2

MM-03: Drywall/ Joint Compound

Composite (White) 05 White Building 64 Room

115 and 207A None

Detected

MM-03: Drywall/ Joint Compound

Composite (White) 06 White Building 64 Room

115 and 207A None

Detected

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-01: Plaster (Gray) Skim Coat

(White) 07 Plaster Gray Building 64 Room

None

Detected 4

SM-01a: Plaster (Gray) Skim Coat

(White) 07 Skim

Coat White Building 64 Room

None Detected

SM-01: Plaster (Gray) Skim Coat

(White) 08 Plaster Gray Building 64 Room

None

Detected 4

SM-01a: Plaster (Gray) Skim Coat

(White) 08 Skim

Coat White Building 64 Room

None Detected

SM-01: Plaster (Gray) Skim Coat

(White) 09 Plaster Gray Building 64 Room

None

Detected

SM-01a: Plaster (Gray) Skim Coat

(White) 09 Skim

Coat White Building 64 Room

None Detected

MM-04: Red Fire Stop Caulk 10 Red Building 64 Room

115 and 207A None

Detected 5

MM-04: Red Fire Stop Caulk 11 Red

Building 64 Room 115 and

207A

None Detected

MM-05: Drywall/ Joint Compound

Composite 12

Brown/ White

Building 3 Room

None Detected 6&7

MM-05: Drywall/ Joint Compound

Composite 13 Brown/ White

Building 3 Room

None

6&7

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-06: 12"X12"

Ceiling Tile Wormhole

(White) 14 Gray/ White

Building 4 Room 118a Above Drop

Ceiling

None Detected 8

MM-07: Drywall/ Joint Compound

Composite 15 Brown/ White

Building 4 Room 118a

None Detected

MM-07: Drywall/ Joint Compound

Composite 16 Brown/ White

Building 4 Room 118a

None Detected 9

9”x9” Vinyl Floor Tile with Black

Mastic Not

Sampled Tan/ Black

Building 4, Hallway West of

Room 118a.

Under Carpet

Not Analyzed (Reported as ACM)

Good N 120 SF 10

Window Caulking/ Glazing

Not Sampled Gray/

White Building 4, Windows West of Room 118a

Not Analyzed (Assumed

ACM)

<10% Damaged N 2 EA 11

MM-07: Drywall/ Joint Compound

Composite 17 Brown/ White

Building 4 Basement 005a

None Detected

MM-07: Drywall/ Joint Compound

Composite 18 Brown/ White

Building 5 Room

None Detected 12

MM-07: Drywall/ Joint Compound

Composite 19 Brown/ White

Building 5 Room

None Detected

SM-02: Stucco White W/ Gray Plaster 20 Stucco White

Building 5 Room 005 Ceiling Chase and

Building 6 Room 001A

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-02a: Stucco White W/ Gray

Plaster 20 Plaster Gray

Building 5 Room 005 Ceiling Chase and

Building 6 Room 001A

None Detected

SM-02: Stucco White W/ Gray Plaster 21 Stucco White

Building 5 Room 005 Ceiling Chase and

Building 6 Room 001A

None Detected

SM-02a: Stucco White W/ Gray

Plaster 21 Plaster Gray

Building 5 Room 005 Ceiling Chase and

Building 6 Room 001A

None Detected 14

SM-02: Stucco White W/ Gray Plaster 22 Stucco White

Building 5 Room 005 Ceiling Chase and

Building 6 Room 001A

None Detected

SM-02a: Stucco White W/ Gray

Plaster 22 Plaster Gray

Building 5 Room 005 Ceiling Chase and

Building 6 Room 001A

None Detected

SM-03: Skim Coat White 23 White Building 5 Room

005 Back Wall None

Detected 13&15

SM-03: Skim Coat White 24 White Building 5 Room

005 Back Wall None

Detected 13&15

SM-03: Skim Coat White 25 White Building 5 Room

005 Back Wall None

Detected 13&15

SM-04: Plaster Ceiling Gray W/ Skim

Coat (White) 26 Plaster Gray Building 5 Room

None

Detected 16

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-04a: Plaster Ceiling Gray W/ Skim

Coat (White) 26 Skim

Coat White Building 5 Room

None Detected

SM-04: Plaster Ceiling Gray W/ Skim

Coat (White) 27 Plaster Gray Building 5 Room

None

Detected 16

SM-04a: Plaster Ceiling Gray W/ Skim

Coat (White) 27 Skim

Coat White Building 5 Room

None Detected

SM-04: Plaster Ceiling Gray W/ Skim

Coat (White) 28 Plaster Gray Building 5 Room

None

Detected 16

SM-04a: Plaster Ceiling Gray W/ Skim

Coat (White) 28 Skim

Coat White Building 5 Room

None Detected

SM-05: Plaster Walls/Ceiling

Gray Skim Coat White

29 Plaster Gray

Building 6 Room 001A, 101, and

101A (Walls and Ceiling)

None Detected

SM-05: Plaster Walls/Ceiling

Gray Skim Coat White

29 Skim Coat White

Building 6 Room 001A, 101, and

101A (Walls and Ceiling)

None Detected

SM-05a: Plaster Walls/Ceiling

Gray Skim Coat White

30 Plaster Gray

Building 6 Room 001A, 101, and

101A (Walls and Ceiling)

None Detected

SM-05: Plaster Walls/Ceiling

Gray Skim Coat White

30 Skim Coat White

Building 6 Room 001A, 101, and

101A (Walls and Ceiling)

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-05a: Plaster Walls/Ceiling

Gray Skim Coat White

31 Plaster Gray

Building 6 Room 001A, 101, and

101A (Walls and Ceiling)

None Detected

SM-05: Plaster Walls/Ceiling

Gray Skim Coat White

31 Skim Coat White

Building 6 Room 001A, 101, and

101A (Walls and Ceiling)

None Detected

MM-08: Drywall/ Joint Compound

Composite 32 Brown/ White

Building 6 Room 001A, 101, and

101A None

Detected

MM-08: Drywall/ Joint Compound

Composite 33 Brown/ White

Building 6 Room 001A, 101, and

101A

None Detected

MM-09: Red Fire Stop Caulk 34 Red

Building 6 Room 001A. Building 7

Room 001.

Building 8 Room

None Detected

Window Glazing/ Caulking

Not Sampled Gray/

White Building 6

Rooms 101 and 101A

Assumed ACM Good N 2 EA 20

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-06: Plaster Gray W/ Skim Coat

(White) 35 Plaster Gray Building 7 Room

001 and 217 None

Detected 21

SM-06a: Plaster Gray W/ Skim Coat

(White) 35 Skim

Coat White Building 7 Room 001 and 217

None Detected

SM-06: Plaster Gray W/ Skim Coat

(White) 36 Plaster Gray Building 7 Room

001 and 217 None

Detected

SM-06a: Plaster Gray W/ Skim Coat

(White) 36 Skim

Coat White Building 7 Room 001 and 217

None Detected

SM-06: Textured Plaster

Gray W/ Skim Coat White

37 Texture White Building 7 Room

30% Chrysotile Good Y 500 SF 21

MM-10: Drywall/ Joint Compound

Composite White 38 Brown/ White

Building 7 Room

None Detected

MM-10: Drywall/ Joint Compound

Composite White 39 Brown/ White

Building 7 Room 217 Front Wall

None Detected

MM-11: Brown Cove Base (4") 40 Cove

Base Brown Building 7 Room

None Detected

MM-11a: Brown Cove Base (4") 40 Mastic Brown/

Tan Building 7 Room

None

Detected

MM-11: Brown Cove Base (4") 41 Cove

Base Brown Building 7 Room

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-11a: Brown Cove Base (4") 41 Mastic Brown/

Tan Building 7 Room

None

Detected

12”X12” Ceiling Tile with Holes and Puck

Mastic Not

Sampled White Building 7 Room

Not Accessible

(Puck Mastic

Assumed

ACM)

Good Y 140 SF 24

MM-12: 12"X12" VFT

White W/ Gray and

Blue Speckles Yellow and Gray Mastic

42 Vinyl Floor Tile

Gray/ White

Building 7 Room

None Detected

MM-12a: 12"X12" VFT White W/ Gray and Blue Speckles Yellow and Gray

Mastic

42 Mastic Yellow Building 7 Room

None Detected

MM-12: 12"X12" VFT

White W/ Gray and

Blue Speckles Yellow and Gray Mastic

43 Vinyl Floor Tile

Gray/ White

Building 7 Room

None Detected

MM-12a: 12"X12" VFT White W/ Gray and Blue Speckles Yellow and Gray

Mastic

43 Mastic Yellow Building 7 Room

None Detected

MM-13: Drywall/ Joint Compound Composite

44 Brown/ White

Building 8 Room

None Detected

MM-13: Drywall/ Joint Compound Composite

45 White Building 8 Room

None Detected

MM-14: Linoleum Floor Blue, Tan

Mastic 46 Linoleum Blue Building 8 Room

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-14a: Linoleum Floor Blue, Tan

Mastic 46 Mastic Tan Building 8 Room

None

Detected

MM-14: Linoleum Floor Blue, Tan

Mastic 47 Linoleum Blue Building 8 Room

None

Detected

MM-14a: Linoleum Floor Blue Tan Mastic 47 Mastic Tan Building 8 Room

None

Detected

MM-15: 4" Cove Base Gray W/ Tan Mastic 48 Cove

Base Gray

Building 8 Room

124. Building 71 Room 147 and

310A

None Detected

MM-15a: 4" Cove Base

Gray W/ Tan Mastic 48 Mastic Tan

Building 8 Room

124. Building 71 Room 147 and

310A

None Detected

MM-15: 4" Cove Base Gray W/ Tan Mastic 49 Cove

Base Gray

Building 8 Room

124. Building 71 Room 147 and

310A

None Detected

MM-15a: 4" Cove Base

Gray W/ Tan Mastic 49 Mastic Tan

Building 8 Room

124. Building 71 Room 147 and

310A

None Detected

SM-07: Plaster (Gray) Skim Coat (White) 50 Plaster Gray

Building 9 Room

102 and 102A

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-07a: Plaster (Gray) Skim Coat

(White) 50 Skim

Coat White Building 9 Room 102 and 102A

None Detected

SM-07: Plaster (Gray) Skim Coat (White) 51 Plaster Gray Building 9 Room

102 and 102A None

Detected

SM-07a: Plaster (Gray) Skim Coat

(White) 51 Skim

Coat White Building 9 Room 102 and 102A

None Detected

SM-07: Plaster (Gray) Skim Coat (White) 52 Plaster Gray Building 9 Room

102 and 102A None

Detected

SM-07a: Plaster (Gray) Skim Coat

(White) 52 Skim

Coat White Building 9 Room 102 and 102A

None Detected

Window Caulking/ Glazing

Not Sampled White/

Gray Building 9 Room

Not Analyzed (Assumed

ACM)

<10% Damaged N 1 EA 30

MM-16: 12"X12" VFT

Beige W/ Gray

Speckles Yellow Mastic

53 Vinyl Floor Tile Gray Building 71 Room

None

Detected 31&32

MM-16a: 12"X12" VFT Beige W/ Gray

Speckles Yellow Mastic

53 Mastic Yellow Building 71 Room

None

31&32

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-16: 12"X12" VFT

Beige W/ Gray

Speckles Yellow Mastic

54 Vinyl Floor Tile Gray Building 71 Room

None

Detected 31&32

MM-16a: 12"X12" VFT Beige W/ Gray

Speckles Yellow Mastic

54 Mastic Yellow Building 71 Room

None Detected

31&32

MM-17: Drywall/ Joint Compound

Composite White 55 Brown/

White

Building 71 Room 147& 310A.

Building 71N

Rooms 221, 215, and 257

None Detected

MM-17: Drywall/ Joint Compound

Composite White 56 Brown/

White

Building 71 Room 147& 310A.

Building 71N

Rooms 221, 215, and 257

None Detected

MM-18: Beige

12"X12" VFT W/

Brown Specks

57 Vinyl Floor Tile

Brown/ Beige

Building 71N Room 221

None Detected

MM-18a: Beige

12"X12" VFT W/

Brown Specks

57 Mastic Yellow Building 71N Room 221

None Detected

MM-18: Beige

12"X12" VFT W/

Brown Specks

58 Vinyl Floor Tile

Brown/ Beige

Building 71N Room 221

None Detected

MM-18a: Beige

12"X12" VFT W/

Brown Specks

58 Mastic Yellow Building 71N Room 221

None Detected

MM-19: Light Gray Cove Base 4" Cream

Mastic 59 Cove

Base Gray Building 71N

Room 221,215,257

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-19a: Light Gray Cove Base 4" Cream

Mastic 59 Mastic Tan

Building 71N Room

221,215,257

None Detected

MM-20: Fire Wall White (Drywall) 60 Brown/

White

Building 71N Room 257.

Building 71 Room

None Detected

Window Caulking/ Glazing

Not Sampled White/

Gray Building 11 Room 109

Not Analyzed (Assumed

ACM)

<10% Damaged N 4 EA 37

MM-21: Drywall/ Joint Compound Composite

61 Brown/ White

Building 11 Room

None Detected

MM-22: Drywall/ Joint Compound Composite

62 Brown/ White

Building 11 Room

None Detected

MM-23: 2'x4' Ceiling Tile White Wormhole 63 Gray/

White Building 11 Room

None

Detected

MM-23: 2'x4' Ceiling Tile White Wormhole 64 Gray/

White Building 11 Room

None

Detected

SM-08: Plaster Ceiling

W/ Skim Coat (White) 65 Skim Coat White

Building 11 Room 109 And

Basement IT Room 007a

Layer Not Present

SM-08a: Plaster Ceiling

W/ Skim Coat (White) 65 Plaster Gray

Building 11 Room 109 And

Basement IT Room 007a

None Detected

SM-08: Plaster Ceiling

W/ Skim Coat (White) 66 Skim Coat White

Building 11 Room 109 And

Basement IT Room 007a

Layer Not Present

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-08a: Plaster Ceiling

W/ Skim Coat (White) 66 Plaster Gray

Building 11 Room 109 And

Basement IT Room 007a

None Detected

SM-08: Plaster Ceiling

W/ Skim Coat (White) 67 Skim Coat White

Building 11 Room 109 And

Basement IT Room 007a

Layer Not Present

SM-08a: Plaster Ceiling

W/ Skim Coat (White) 67 Plaster Gray

Building 11 Room 109 And

Basement IT Room 007a

None Detected

SM-09: Plaster Walls and Ceiling White 68 Gray

NE Corner of The Basement Building 35

None Detected

SM-09: Plaster Walls and Ceiling White 69 Gray

NE Corner of The Basement Building 35

None Detected

SM-09: Plaster Walls and Ceiling White 70 Gray

NE Corner of The Basement Building 35

None Detected

SM-09: Plaster Wall W/ Skim Coat (White) 71 Skim

Coat White

Building 31 Basement S. Of Service Elevator on N Side

None Detected

SM-09a: Plaster Wall W/ Skim Coat (White) 71 Plaster White

Building 31 Basement S. Of Service Elevator on N Side

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-09: Plaster Wall W/ Skim Coat (White) 72 Skim

Coat White

Building 31 Basement S. Of Service Elevator on N Side

None Detected

SM-09a: Plaster Wall W/ Skim Coat (White) 72 Plaster White

Building 31 Basement S. Of Service Elevator on N Side

None Detected

SM-09: Plaster Wall W/ Skim Coat (White) 73 Skim

Coat White

Building 31 Basement S. Of Service Elevator on N Side

None Detected

SM-09a: Plaster Wall W/ Skim Coat (White) 73 Plaster White

Building 31 Basement S. Of Service Elevator on N Side

None Detected

MM-25: Drywall / Joint Compound

Composite 74 Brown/

White

Ceiling Throughout

Basement Of Building 31 N

Side

None Detected

MM-25: Drywall / Joint Compound

Composite 75 Brown/

White

Ceiling Throughout

Basement Of Building 31 N

Side

None Detected

Window Glazing/ Caulking

Not Sampled Gray/

White Building 32

Room 102 and

Not Analyzed (Assumed

ACM)

<10% Damaged N 1 EA 44

MM-26: 4" Cove Base Light Brown W/ Brown Mastic

76 Cove Base Tan Building 32 Room

102 And 104 None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-26a: 4" Cove Base Light Brown W/

Brown Mastic 76 Mastic Brown Building 32 Room

102 and 104 None

Detected

MM-27: 12"X12"

Ceiling Tile White W/ Big and Small Holes

77 Tan/ White

Building 32 Room 102 and 104

None Detected

MM-27: 12"X12"

Ceiling Tile White W/ Big and Small Holes

78 Tan/ White

Building 32 Room 102 and 104

None Detected

MM-28: 12"X12" VFT

Beige W/ Tan Streaks

Yellow Mastic 79 Floor Tile Beige Building 32 Room

None

Detected

MM-28a: 12"X12" VFT Beige W/ Tan

Streaks Yellow Mastic 79 Mastic Yellow/

Clear Building 32 Room

None

Detected

MM-28: 12"X12" VFT

Beige W/ Tan Streaks

Yellow Mastic 80 Floor Tile Beige Building 32 Room

None

Detected 47

MM-28a: 12"X12" VFT Beige W/ Tan

Streaks Yellow Mastic 80 Mastic Yellow/

Clear Building 32 Room

None

Detected

MM-29: Drywall/ Joint Compound

Composite White 81 Brown/

White Building 32 Room

102 And 104 None

Detected 48

MM-29: Drywall/ Joint Compound

Composite White 82 Brown/

White Building 32 Room

102 And 104 None

Detected

MM-30: 9"X9" VFT

Blue / White W/

Black Mastic 83 Floor Tile Tan

Building 32 Room

104 Under Carpet

2% Chrysotile Good N 150 SF 49

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-30a: 9"X9" VFT Blue / White W/ Black

Mastic 83 Mastic Yellow Building 32 Room

104 Under Carpet None

Detected

MM-30: 9"X9" VFT

Blue / White W/

Black Mastic 83 Floor Tile Green

Building 32 Room

104 Under Carpet

3% Chrysotile Good N Included Above 49

MM-30a: 9"X9" VFT Blue / White W/ Black

Mastic 83 Mastic Black Building 32 Room

104 Under Carpet None

Detected

MM-30: 9"X9" VFT

Blue / White W/

Black Mastic 84 Floor Tile Blue

Building 32 Room

104 Under Carpet

Positive Stop Good N 150 SF 49

MM-30a: 9"X9" VFT Blue / White W/ Black

Mastic 84 Mastic Yellow Building 32 Room

104 Under Carpet None

Detected

MM-30: 9"X9" VFT

Blue / White W/

Black Mastic 84 Floor Tile White

Building 32 Room

104 Under Carpet

Positive Stop Good N Included Above 49

MM-30a: 9"X9" VFT Blue / White W/ Black

Mastic 84 Mastic Black Building 32 Room

104 Under Carpet None

Detected

MM-31: Drywall/ Joint Compound

Composite 85 Brown/

White

Building 36 Room 105 Ceiling And

Walls

None Detected

MM-31: Drywall/ Joint Compound

Composite 86 Brown/

White Building 36 Room 105 Ceiling And

Walls None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-32: 4"Cove Base (Gray) W/ Brown

Mastic 87 Cove

Base Gray Building 36 Room

None Detected

MM-32a: 4" Cove Base (Gray) W/ Brown Mastic

87 Mastic Brown/ Tan

Building 36 Room

None Detected

Window Caulking/ Glazing

Not Sampled Gray/

White Building 42, 2nd Floor North Side

Not Analyzed (Assumed

ACM)

<10% Damaged N 4 EA 52

SM-10: Plaster Walls W/ Skim Coat (White) 88 Skim

Coat White Building 42 2nd

Floor Walls (North and East)

None Detected

SM-10a: Plaster Walls W/ Skim Coat

(White) 88 Plaster Gray

Building 42 2nd Floor Walls (North and East)

None Detected

SM-10: Plaster Walls W/ Skim Coat (White) 89 Skim

Coat White Building 42 2nd

Floor Walls (North and East)

None Detected

SM-10a: Plaster Walls W/ Skim Coat

(White) 89 Plaster Gray

Building 42 2nd Floor Walls (North and East)

None Detected

SM-10: Plaster Walls W/ Skim Coat (White) 90 Skim

Coat White Building 42 2nd

Floor Walls (North and East)

None Detected

SM-10a: Plaster Walls W/ Skim Coat

(White) 90 Plaster Gray

Building 42 2nd Floor Walls (North and East)

None Detected

MM-33: 2'x4' Ceiling Tile White Large

Worm Hole 91 Gray/ White

Building 37 Room

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-33: 2'x4' Ceiling Tile White Large

Worm Hole 92 Gray/ White

Building 37 Room

None Detected

MM-34: Linoleum Floor (White) W/

Particle Board Sub Floor

93 Mastic Yellow Building 37 Room 101 Under Carpet

None Detected

MM-34a: Linoleum Floor (White) W/

Particle Board Sub Floor

93 Linoleum Gray/ Tan

Building 37 Room 101 Under

Carpet 15%

Chrysotile Good N 280 SF 55

MM-34b: Linoleum Floor (White) W/

Particle Board Sub Floor

93 Floor Tile White Building 37 Room 101 Under Carpet

None Detected

MM-34c: Linoleum Floor (White) W/

Particle Board Sub Floor

93 Particle Board Brown Building 37 Room

101 Under Carpet None

Detected

MM-34: Linoleum Floor (White) W/

Particle Board Sub Floor

94 Mastic Yellow Building 37 Room 101 Under Carpet

None Detected

MM-34a: Linoleum Floor (White) W/

Particle Board Sub Floor

94 Linoleum Gray/ Tan

Building 37 Room 101 Under

Carpet Positive

Stop Good N Included Above 55

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-34b: Linoleum Floor (White) W/

Particle Board Sub Floor

94 Floor Tile White Building 37 Room 101 Under Carpet

None Detected

MM-34c: Linoleum Floor (White) W/

Particle Board Sub Floor

94 Particle Board Brown Building 37 Room

101 Under Carpet None

Detected

Vermiculite Insulation

Not Sampled Brown/

Gray

Building 37 Room 101

Above Second Drop Ceiling

Not Analyzed (Assumed

ACM)

Good Y 280 SF 56

MM-35: 12"X12"

White

Ceiling Tile (Smooth)

95 Tan Building 37 Room

None Detected

MM-35: 12"X12"

White

Ceiling Tile (Smooth)

96 Tan/ White

Building 37 Room

None Detected

SM-11: Plaster W/ Skim Coat (White) 97 Skim

Coat White Building 61 Room 203 Ceiling and

Walls

None Detected

SM-11a: Plaster W/ Skim Coat (White) 97 Plaster Gray

Building 61 Room 203 Ceiling and

Walls

None Detected

SM-11: Plaster W/ Skim Coat (White) 98 Skim

Coat White Building 61 Room 203 Ceiling and

Walls

None Detected

SM-11a: Plaster W/ Skim Coat (White) 98 Plaster Gray

Building 61 Room 203 Ceiling and

Walls

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

SM-11: Plaster W/ Skim Coat (White) 99 Skim

Coat White Building 61 Room 203 Ceiling and

Walls

None Detected

SM-11a: Plaster W/ Skim Coat (White) 99 Plaster Gray

Building 61 Room 203 Ceiling and

Walls None

Detected 58

MM-36: Interior Window Caulk

(White) 100 White Building 61 Room

None

Detected 59

MM-36: Interior Window Caulk

(White) 101 White Building 61 Room

None

Detected

Window Caulking/ Glazing

Not Sampled White/

Gray Building 61 2nd Floor Room 203

Not Analyzed (Assumed

ACM)

<10% Damaged N 1 EA 60

TSI-01: 2" - TSI

Mudded

Pipe Fitting/ Elbow (White)

102 White Building 61 Room

None Detected

TSI-01: 2" - TSI

Mudded

Pipe Fitting/ Elbow (White)

103 White Building 61 Room

None Detected

TSI-01: 2" - TSI

Mudded

Pipe Fitting/ Elbow (White)

104 White Building 61 Room

None Detected

MM-37: Red Fire Stop Caulk 105 Red Building 61 Room

None

Detected

MM-37: Red Fire Stop Caulk 106 Red Building 61 Room

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated Quantity Photo No.

MM-38: Black Mastic 107 Gray/ Yellow

Building 61 Room

None Detected

MM-38: Black Mastic 108 Gray/ Yellow

Building 61 Room

None Detected

SM-12: Plaster (Gray) W/ Skim Coat (White) 109 Skim

Coat White Building 24 Room 001a

None Detected

SM-12a: Plaster (Gray) W/ Skim Coat

(White) 109 Plaster Gray Building 24 Room

001a None

Detected

SM-12: Plaster (Gray) W/ Skim Coat (White) 110 Skim

Coat White Building 24 Room 001a

None Detected

SM-12a: Plaster (Gray) W/ Skim Coat

(White) 110 Plaster Gray Building 24 Room

001a None

Detected

SM-12: Plaster (Gray) W/ Skim Coat (White) 111 Skim

Coat White Building 24 Room 001a

None Detected

SM-12a: Plaster (Gray) W/ Skim Coat

(White) 111 Plaster Gray Building 24 Room

001a None

Detected

MM-39: Drywall/ Joint Compound Composite

112 Brown/ White

Building 24 Area Outside of Room

001a

None Detected

MM-39: Drywall/ Joint Compound Composite

113 Brown/ White

Building 24 Area Outside of Room

001a

None

MM-40: 6" Cove Base

114 Cove

Base Brown/ Gray

Building 24 Area Outside of Room

001a

None

AMI Project No.: 21-233 Sheridan VAMC, Sheridan, WY August 12, 2022

Material #/ Description

Sample Id Layers Id Color Location Sample

Result Condition Friable (Y/N)

Estimated…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .