This solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin is seeking proposals for the Z2DA--666-21-700 EHRM Infrastructure Upgrades Construction project at Sheridan, Wyoming. Offerors are invited to submit proposals by July 15, 2022 for upgrading infrastructure including installing new servers, storage, and network equipment to modernize the electronic health records management system. The base period of performance is from date of award through September 30, 2023 with two optional one-year renewal periods. Pricing shall be fixed for the base period and optional renewal periods. This is a small business set-aside reserved for small business concerns only. The incumbent contractor is not named. Proposals shall include qualifications and experience providing similar IT infrastructure upgrade services and systems integration for healthcare organizations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HAZMAT_1.PDF | ||
| Wage Determination - Sheridan 11.23.pdf | ||
| Sheridan EHRM Infrastructure Upgrades - CFD Anaylsis Report FINAL.pdf | ||
| Sheridan EHRM Finish Board.pdf | ||
| S02 - Limitations on Subcontracting - Construction.docx | DOCX document | |
| Spec Combined Volume 2 Revised 10 2 2023.pdf | ||
| Spec Combined Volume 1.pdf | ||
| 03 A1-35thruM1.G.pdf | ||
| 02 DT100thruA1-32.pdf | ||
| Site Visit Instructions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
55110
41 42
23 24
71N
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
/1
/2
:1 :5
P
M
100% CONSTRUCTION DOCUMENTS
07/13/2023
COVER SHEET
G0-00
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
AuthorChecker
1898 FORT ROAD
SHERIDAN,WY 82801--
666-21-700
ARCHITECT
FOURFRONT DESIGN INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PHONE (605) 342-9470
PROJECT NO. 666-21-700
SHERIDAN VA MEDICAL CENTER
1898 FORT ROAD
SHERIDAN, WYOMING 82801
U.S DEPARTMENT OF VETERAN'S AFFAIRS
VETERAN'S HEALTH ADMINISTRATION
ELECTRICAL ENGINEER
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 348-7455
ENVIRONMENTAL CONSULTANT
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
FIRE PROTECTECTION
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVENUE
WEST ST. PAUL, MINNESOTA 55103
PHONE (612) 387-7050
1/2" = 1'-0"
CAMPUS MAP
karl.person Text Box karl.person Text Box
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
/1
/2
:1 :0
P
M
100% CONSTRUCTION DOCUMENTS
07/13/2023
SHEET INDEX
G0-01
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
AuthorChecker
1898 FORT ROAD
SHERIDAN,WY 82801--
666-21-700
SHEET INDEX
E1-71N-1 BUILDING #71N ELECTRICAL PLANS
E1-71N-2 BUILDING #71N ELECTRICAL PLANS
E1-71N-3 BUILDING #71N ELECTRICAL PLANS
E1-86-1A BUILDING #86 ELECTRICAL PLAN
E1-86-1B BUILDING #86 ELECTRICAL PLAN
E1-86-2 BUILDING #86 ELECTRICAL PLAN
E1-86-3 BUILDING #86 ELECTRICAL PLANS
E1-87-1A BUILDING #87 ELECTRICAL PLANS
E1-87-1B BUILDING #87 ELECTRICAL PLANS
E1-90 BUILDING #90 ELECTRICAL PLANS
E1-G-1 GILLETTE CBOC ELECTRICAL PLAN
E2 ELECTRICAL DETAILS
E3 ELECTRICAL DETAILS
E4 ELECTRICAL DETAILS & SCHEDULES
FIRE PROTECTION
FP0-00 SHEET INDEX, SYMBOLS, LEGENDS, AND FIRE PROTECTION GENERAL NOTES
FP1-01 BLDG 1 1ST FLOOR FIRE PROTECTION
FP1-02 BLDG 2 FIRE PROTECTION
FP1-03 BLDG 3 BSMT FIRE PROTECTION
FP1-04 BLDG 4 FIRE PROTECTION
FP1-05 BLDG 5 1ST FLOOR FIRE PROTECTION
FP1-06 BLDG 6 FIRE PROTECTION
FP1-07-B BLDG 7 BSMT FLOOR FIRE PROTECTION
FP1-07-2 BLDG 7 2ND FLOOR FIRE PROTECTION
FP1-08-B BASEMENT DATA CENTER FIRE PROTECTION
FP1-08-1 BLDG 8 FIRE PROTECTION
FP1-09 BLDG 9 FIRE PROTECTION
FP1-11 BLDG 11 FIRE PROTECTION
FP1-24 BLDG 24 FIRE PROTECTION
FP1-31 BLDG 31 FIRE PROTECTION
FP1-32 BLDG 32 FIRE PROTECTION
FP1-35 BLDG 35 FIRE PROTECTION
FP1-36 BLDG 36 FIRE PROTECTION
FP1-37 BLDG 37 FIRE PROTECTION
FP1-42 BLDG 42 FIRE PROTECTION
FP1-61-2 BLDG 61 FIRE PROTECTION
FP1-71-1 BLDG 71 1ST FLOOR FIRE PROTECTION
FP1-71-3 BLDG 71 3RD FLOOR FIRE PROTECTION
FP1-71N-1 BLDG 71N1 FLOOR FIRE PROTECTION
FP1-71N-2 BLDG 71N2 FLOOR FIRE PROTECTION
FP1-86-1 BLDG 86 1ST FLOOR FIRE PROTECTION
FP1-86-3 BLDG 86 3RD FLOOR FIRE PROTECTION
FP1-87 BLDG 87 FIRE PROTECTION
FP1-G GILLETTE FIRE PROTECTION
TELECOMMUNICATIONS SECURITY
TY-000 ELECTRICAL LEGENDS AND ABBREVIATIONS
TY-001 SITE ELECTRICAL/SECURITY NOTES
TY-002 DATA INFRASTRUCTURE SINGLE LINE - PART 1 OF 4
TY-003 DATA INFRASTRUCTURE SINGLE LINE - PART 2 OF 4
TY-004 DATA INFRASTRUCTURE SINGLE LINE - PART 3 OF 4
TY-005 DATA INFRASTRUCTURE SINGLE LINE - PART 4 OF 4
TY-006 SECURITY DETAILS
TY-1-1 BUILDING 1 TR SECURITY
TY-2-1 BUILDING 2 TR SECURITY
TY-3-B BUILDING 3 TR SECURITY
TY-4-1 BUILDING 4 TR SECURITY
TY-5-1 BUILDING 5 TR SECURITY
TY-6-1 BUILDING 6 TR SECURITY
TY-7-2 BUILDING 7 LEVEL 2 TR SECURITY
TY-7-B BUILDING 7 BASEMENT TR SECURITY
TY-8-1 BUILDING 8 LEVEL 1 TR SECURITY
TY-8-B BUILDING 8 BASEMENT TR SECURITY
TY-9-1 BUILDING 9 TR SECURITY
TY-11-1 BUILDING 11 TR SECURTY
TY-24-1 BUILDING 24 TR SECURITY
TY-31-2 BUILDING 31 TR SECURITY
TY-32-1 BUILDING 32 TR SECURITY
TY-35-B BUILDING 35 TR SECURITY
TY-36-1 BUILDING 36 TR SECURITY
TY-37-1 BUILDING 37 TR SECURITY
TY-42-1 BUILDING 42 TR SECURITY
TY-61-2 BUILDING 61 TR SECURITY
TY-71-1 BUILDING 71 LEVEL 1 TR SECURITY
TY-71-3 BUILDING 71 LEVEL 3 TR SECURITY
TY-71N-1 BUILDING 71N LEVEL 1 TR SECURITY
TY-71N-2 BUILDING 71N LEVEL 2 TR SECURITY
TY-86-1 BUILDING 86 LEVEL 1 TR SECURITY
TY-86-3 BUILDING 86 LEVEL 3 TR SECURITY
TY-87-1 BUILDING 87 LEVEL 1 TR SECURITY
TY-90-1 BUILDING 90 LEVEL 1 TR SECURITY
TY-G-1 GILLETTE CBOC TR SECURITY
SHEET INDEX
STRUCTURAL
S1-61-1 STRUCTURAL GENERAL NOTES
S1-61-2 IBC INSPECTION TABLES
S1-61-3 STAIR OPENING FND AND FRAMING PLANS & DETAILS
S1-61-4 STAIR FRAMING PLANS & DETAILS
MECHANICAL
M0.00 ABBREVIATIONS, SYMBOLS, LEGENDS AND MECHANICAL GENERAL NOTES
M1.01.1 BLDG 1 1ST FLOOR PLANS
M1.02 BLDG 2 FLOOR PLANS
M1.03.B BLDG 3 BSMT FLOOR PLANS
M1.04 BLDG 4 PLANS
M1.05.1 BLDG 5 1ST FLOOR PLANS
M1.06 BLDG 6 FLOOR PLANS
M1.07.B BLDG 7 BSMT FLOOR PLANS
M1.07.2 BLDG 7 2ND FLOOR PLANS
M1.08B BLDG 8 BASEMENT DATA CENTER
M1.08 BLDG 8 FLOOR PLANS
M1.09 BLDG 9 FLOOR PLANS
M1.11 BLDG 11 FLOOR PLANS
M1.24 BLDG 24 FLOOR PLANS
M1.31 BLDG 31 FLOOR PLANS
M1.32 BLDG 32 FLOOR PLANS
M1.35 BLDG 35 FLOOR PLANS
M1.36 BLDG 36 FLOOR PLANS
M1.37 BLDG 37 FLOOR PLANS
M1.42 BLDG 42 FLOOR PLANS
M1.61 BLDG 61 FLOOR PLANS
M1.71.1 BLDG 71 1ST FLOOR PLANS
M1.71.3 BLDG 71 3RD FLOOR PLANS
M1.71N.1 BLDG 71N1 FLOOR PLANS
M1.71N.2 BLDG 71N2 FLOOR PLANS
M1.86.1 BLDG 86 1ST FLOOR PLANS
M1.86.3 BLDG 86 3RD FLOOR PLANS
M1.87 BLDG 87 FLOOR PLANS
M1.G GILLETTE FLOOR PLANS
M4.00 MECHANICAL SCHEDULES
M5.00 MECHANICAL DETAILS
M6.00 CONTROL DIAGRAMS 1
M6.01 CONTROL DIAGRAMS 2
PLUMBING
P1.71.3 BLDG 71 3RD FLOOR PLUMBING PLANS
ELECTRICAL
E0-01 OVERALL ELECTRICAL SITE PLAN - AREA A
E0-02 ELECTRICAL SITE PLAN - AREA B
E0-03 A-SIDE FIBER BACKBONE ONE LINE DIAGRAM
E0-04 B-SIDE FIBER BACKBONE ONE LINE DIAGRAM
E1-01 BUILDING #1 ELECTRICAL PLANS
E1-02 BUILDING #2 ELECTRICAL PLANS
E1-03 BUILDING #3 ELECTRICAL PLANS
E1-04-B BUILDING #4 ELECTRICAL PLAN
E1-04-1 BUILDING #4 ELECTRICAL PLANS
E1-04-2 BUILDING #4 ELECTRICAL PLAN
E1-05-1 BUILDING #5 ELECTRICAL PLANS
E1-05-2 BUILDING #5 ELECTRICAL PLANS
E1-06-1 BUILDING #6 ELECTRICAL PLANS
E1-06-2 BUILDING #6 ELECTRICAL PLANS
E1-07-B BUILDING #7 ELECTRICAL PLANS
E1-07-1 BUILDING #7 ELECTRICAL PLANS
E1-07-2 BUILDING #7 ELECTRICAL PLANS
E1-08-B1 BUILDING #8 EXISTING BASEMENT ELECTRICAL PLAN
E1-08-B2 BUILDING #8 NEW CONSTRUCTION BASEMENT ELECTRICAL PLANS
E1-08-1 BUILDING #8 ELECTRICAL PLANS
E1-08-2 BUILDING #8 ELECTRICAL PLAN
E1-09-1 BUILDING #9 ELECTRICAL PLANS
E1-09-3 BUILDING #9 ELECTRICAL PLANS
E1-11 BUILDING #11 ELECTRICAL PLANS
E1-24 BUILDING #24 ELECTRICAL PLANS
E1-31 BUILDING #31 ELECTRICAL PLANS
E1-32 BUILDING #32 ELECTRICAL PLANS
E1-35 BUILDING #35 ELECTRICAL PLANS
E1-36 BUILDING #36 ELECTRICAL PLANS
E1-37 BUILDING #37 ELECTRICAL PLANS
E1-42 BUILDING #42 ELECTRICAL PLANS
E1-61 BUILDING #61 ELECTRICAL PLANS
E1-64-1 BUILDING #64 ELECTRICAL PLANS
E1-64-2 BUILDING #64 ELECTRICAL PLANS
E1-71-1 BUILDING #71 ELECTRICAL PLANS
E1-71-3 BUILDING #71 ELECTRICAL PLANS
SHEET INDEX
GENERAL
G0-00 COVER SHEET
G0-01 SHEET INDEX
G0-02 ABBREVIATIONS, SYMBOLS, LEGENDS AND ARCHITECTURE GENERAL NOTES
G0-03 INFECTION CONTROL RISK ASSESSMENT
G0-04 PARTITION FRAMING DETAILS
HAZAROUS MATERIALS
HA1.04 BLDG 4 HAZARDOUS MATERIALS - ASBESTOS
HA1.05.1 BLDG 5 HAZARDOUS MATERIALS - ASBESTOS
HA1.06 BLDG 6 HAZARDOUS MATERIALS - ASBESTOS
HA1.07.2 BLDG 7 HAZARDOUS MATERIALS - ASBESTOS
HA1.07.B BLDG 7 HAZARDOUS MATERIALS - ASBESTOS
HA1.09 BLDG 9 HAZARDOUS MATERIALS - ASBESTOS
HA1.11 BLDG 11 HAZARDOUS MATERIALS - ASBESTOS
HA1.24 BLDG 24 HAZARDOUS MATERIALS - ASBESTOS
HA1.32 BLDG 32 HAZARDOUS MATERIALS - ASBESTOS
HA1.37 BLDG 37 HAZARDOUS MATERIALS - ASBESTOS
HA1.42 BLDG 42 HAZARDOUS MATERIALS - ASBESTOS
HA1.61 BLDG 61 HAZARDOUS MATERIALS - ASBESTOS
HL1.04 BLDG 4 HAZARDOUS MATERIALS - LEAD-BASED PAINT
HL1.05.1 BLDG 5 HAZARDOUS MATERIALS - LEAD-BASED PAINT
HL1.06 BLDG 6 HAZARDOUS MATERIALS - LEAD-BASED PAINT
HL1.07.2 BLDG 7 HAZARDOUS MATERIALS - LEAD-BASED PAINT
HL1.09 BLDG 9 HAZARDOUS MATERIALS - LEAD-BASED PAINT
HL1.11 BLDG 11 HAZARDOUS MATERIALS - LEAD-BASED PAINT
HL1.24 BLDG 24 HAZARDOUS MATERIALS - LEAD-BASED PAINT
HL1.32 BLDG 32 HAZARDOUS MATERIALS - LEAD-BASED PAINT
HL1.42 BLDG 42 HAZARDOUS MATERIALS - LEAD-BASED PAINT
HL1.61 BLDG 61 HAZARDOUS MATERIALS - LEAD-BASED PAINT
CIVIL
CG100 GENERAL NOTES AND QUANTITIES
CU100 PLAN VIEW
CU101 BUILDING 11 – PLAN AND PROFILE
CU102 BUILDING 24,64 – PLAN AND PROFILE
CU103 BUILDING 31 – PLAN AND PROFILE
CU104 BUILDING 42 MAIN (1) - PLAN AND PROFILE
CU105 BUILDING 42 MAIN (2) – PLAN AND PROFILE
CU106 BUILDING 42 MAIN (3) – PLAN AND PROFILE
CU107 N-S MAIN (1) – PLAN AND PROFILE
CU108 N-S MAIN (2) – PLAN AND PROFILE
CU109 N-S MAIN (3) – PLAN AND PROFILE
CU110 BUILDING 35-37-90-PP – PLAN AND PROFILE
CU111 E-W MAIN (1) – PLAN AND PROFILE
CU112 E-W MAIN (2) - PLAN AND PROFILE
CU113 BUILDING 86 MAIN (1) - PLAN AND PROFILE
CU114 BUILDING 86 MAIN (2) - PLAN AND PROFILE
DT100 DETAILS
ARCHITECTURAL
A1-00 WALL TYPES
A1-01 BLDG 1 1ST FLOOR PLANS
A1-02 BLDG 2 FLOOR PLANS
A1-03 BLDG 3 BSMT FLOOR PLANS
A1-04 BLDG 4 FLOOR PLANS
A1-05 BLDG 5 1ST FLOOR PLANS
A1-06 BLDG 6 FLOOR PLANS
A1-07-B BLDG 7 BSMT FLOOR PLANS
A1-07-2 BLDG 7 2ND FLOOR PLANS
A1-08-B BASEMENT DATA CENTER
A1-08-1 BLDG 8 FLOOR PLANS
A1-09 BLDG 9 FLOOR PLANS
A1-11 BLDG 11 FLOOR PLANS
A1-24 BLDG 24 FLOOR PLANS
A1-31 BLDG 31 FLOOR PLANS
A1-32 BLDG 32 FLOOR PLANS
A1-35 BLDG 35 FLOOR PLANS
A1-36 BLDG 36 FLOOR PLANS
A1-37 BLDG 37 FLOOR PLANS
A1-42 BLDG 42 FLOOR PLANS
A1-61-1 BLDG 61 FLOOR PLANS
A1-61-2 NEW STAIR SECTIONS AND DETAILS
A1-71-1 BLDG 71 1ST FLOOR PLANS
A1-71-3 BLDG 71 3RD FLOOR PLANS
A1-71N-1 BLDG 71N1 FLOOR PLANS
A1-71N-2 BLDG 71N2 FLOOR PLANS
A1-86-1 BLDG 86 1ST FLOOR PLANS
A1-86-3 BLDG 86 3RD FLOOR PLANS
A1-87 BLDG 87 FLOOR PLANS
A1-90 BLDG 90 FLOOR PLANS
A1-G GILLETTE FLOOR PLAN
A5.00 ROOM FINISH SCHEDULE, SIGNAGE SCHEDULE & DETAILS
A6-00 DOOR SCHEDULE, ELEVATIONS AND DETAILS
karl.person Text Box karl.person
# POUND OR NUMBER
& AND
@ AT
AB ANCHOR BOLT
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
AFF ABOVE FINISH FLOOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALUM ALUMINUM
ANOD ANODIZED
ASD ALTERNATE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
AWS AMERICAN WELDING SOCIETY
BD BOARD
BLK BLOCK
BM BEAM
B.O. BOTTOM OF
BOT BOTTOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BLDG BUILDING
BYND BEYOND
CAB CABINET
CER CERAMIC
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMPR COMPRESSIBLE
CONC CONCRETE
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CPT CARPET
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CT CERAMIC TILE
DBL DOUBLE
DEMO DEMOLISH OR DEMOLITION
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DIR DIRECTION
DN DOWN
DR DOOR
DWG DRAWING
EA EACH
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR OR ELEVATION
EPDM ETHYLENE PROPYLENE DIENE M-CLASS
(ROOFING)
EQ EQUAL
ES EACH SIDE
EXIST EXISTING
EXP Bolt EXPANSION BOLT
EXP JT EXPANSION JOINT
EXT EXTERIOR
FD FLOOR DRAIN OR FIRE DEPARTMENT
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FM FILLED METAL
FND FOUNDATION
F.O. FACE OF
FT FOOT OR FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GP GUSSET PLATE
GR GRADE
GYP GYPSUM
HC HOLLOW CORE
HDR HEADER
HEF HORIZONTAL EACH FACE
HI HIGH
HIF HORIZONTAL INSIDE FACE
HM HOLLOW METAL
HOF HORIZONTAL OUTSIDE FACE
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
ICBO INTERNATIONAL CONFERENCE OF BUILDING
OFFICIALS
ID INSIDE DIAMETER
ILO IN LIEU OF
IN INCH
INCL INCLUDE
INSUL INSULATED OR INSULATION
INT INTERIOR
INV INVERT
IRGWB IMPACT RESISTANT GYPSUM WALL BOARD
JST JOIST
JT JOINT
K KIP (1000 POUNDS)
LLV LONG LEG VERTICAL
LP LOW POINT
LVL LEVEL
LW LIGHT WEIGHT
LWC LIGHT WEIGHT CONCRETE
ABBREVIATIONS
R RADIUS
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE RIGHT END
REINF REINFORCED
REF REFERENCE
REQD REQUIRED
RET RETURN
RETG RETAINING
RM ROOM
R.O. ROUGH OPENING
ROW RIGHT OF WAY
SC SOLID CORE
SDI STEEL DECK INSTITUTE
SECT SECTION
SF STEP FOOTING OR SQUARE FOOT
SHT SHEET
SIM SIMILAR
SL SPLICE LENGTH
SLV SHORT LEG VERTICAL
SOG SLAB ON GRADE
SPEC SPECIFIED OR SPECIFICATION
SPK SPRINKLER OR SPEAKER
SQ SQUARE
SSTL STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIFF STIFFENER
STL STEEL
STR STAIR
STRUCT STRUCTURE OR STRUCTURAL
SUP SUPPORT
SYM SYMMETRICAL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
T/D TELEPHONE/DATA
TEL TELEPHONE
TEMP TEMPERATURE
THK THICK OR THICKNESS
THRD THREADED
TLT TOILET
T.O. TOP OF
T.O.C TOP OF CONCRETE
T.O.F TOP OF FRAMING
T.O.S TOP OF STEEL/STUD
T.O.W TOP OF WALL
TPD TOILET PAPER DISPENSER
TYP TYPICAL
U/S UNDERSIDE
UNO UNLESS NOTED OTHERWISE
US UNDERSIDE
VB VAPOR BARRIER
VCT VINYL COMPOSITE TILE
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERIFY IN FIELD
VOF VERTICAL OUTSIDE FACE
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W/ WITH
WD WOOD
WDW WINDOW
WP WORKING POINT
WRB WEATHER RESISTANT BARRIER
WWF WELDED WIRE FABRIC
MAS MASONRY
MAX MAXIMUM
MCB METAL CORNER BEAD
MECH MECHANICAL
MEMBR MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURED
MIN MINIMUM
MO MASONRY OPENING
MRGWB MOISTURE-RESISTANT GYPSUM
WALL BOARD
MTL METAL
NF NEAR FACE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OZ OUNCE
PC PILE CAP
PCC PRE-CAST CONCRETE
PL PLATE
P.LAM PLASTIC LAMINATE
PLUMB PLUMBING
PLY PLYWOOD
PORC PORCELAIN
PNL PANEL
PNT PAINT OR PAINTED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PT POINT
PR PAIR
PROP PROPERTY
PVC POLYVINYL CHLORIDE
STEEL/METAL
WOOD (ROUGH) BLOCKING OR SHIM
BRICK
GRAVEL
EARTH/ENGINEERED FILL
CONCRETE MASONRY
PLAN AND SECTION
WOOD (ROUGH)
ACOUSTIC CEILING TILE
GYPSUM BOARD
CEILING
CONCRETE
ELEVATION
CENTER LINE
LINE SYMBOLS
GRID LINE
PROPERTY LINE
CUT LINE
BATT INSULATION
WOOD SUBSTRATE
RIGID INSULATION
MATERIAL LEGEND
WM - WALK OFF MAT
EF - EPOXY FLOORING (TROWELED)
FLOORING
BID ALTERNATE
CPT - CARPET
CONC - CONCRETE
PT - PORCELAIN TILE
FIBER CEMENT PANEL SIDING
CORRUGATED METAL PANEL
STANDING SEAM METAL ROOF/
SIDING PANEL
Room name
1t
VIEW NAME
1/8" = 1'-0"1 DRAWING TITLE
SCALE
BUILDING SECTION
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
WALL SECTION
DETAIL CUT
A101
DETAIL CALLOUT
A101
A101
A101
A101
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
INTERIOR ELEVATION
DRAWING NUMBER
DIRECTION OF SIGHT
SHEET NUMBER
ROOM TAG
ROOM NAME
ROOM NUMBER
KEYNOTE TAG
5-04 KEYNOTE DESIGNATION
DOOR TAG
DOOR NUMBER
PARTITION TAG
WALL DESIGNATION
WINDOW TAG
WINDOW DESIGNATION
ELEVATION MARKER
HEIGHT
NORTH ARROW
TRUE NORTH
PLAN NORTH
ARCHITECTURAL SYMBOLS
M3A
V.A. SYMBOLS
FIRE RESISTIVE RATED LINE, 1 HOUR
FIRE RESISTIVE RATED LINE, 2 HOUR
FIRE RESISTIVE RATED LINE, 3 HOUR
FIRE RESISTIVE RATED LINE, 4 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR
V V ITEM - VA SUPPLIED AND INSTALLED
VC ITEM - VA SUPPLIED AND CONTRACTOR INSTALLED
CC ITEM - CONTRACTOR SUPPLIED AND INSTALLED
A
COLUMN GRID
DIMENSION LINE
NORTH ARROW
CL CENTER LINE
N
1. THESE LEGENDS ARE COMPOSED OF STANDARD
SYMBOLS AND ARE PERTINENT TO THE CONDITIONS ON
THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE.
2. ADDITIONAL LEGENDS AND/OR OTHER LEGENDS MAY
APPEAR IN THIS SET OF DRAWINGS TO INDICATE SPECIFIC
CONDITIONS IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.
LEGEND NOTES:
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
/1
/2
:2
:4
A
M
100% CONSTRUCTION DOCUMENTS
07/13/2023
ABBREVIATIONS, SYMBOLS, LEGENDS
AND ARCHITECTURE GENERAL NOTES
G0-02
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
AuthorChecker
1898 FORT ROAD
SHERIDAN,WY 82801--
666-21-700 karl.person Text Box karl.person
INFECTION CONTROL RISK ASSESSMENT
STEP ONE:
USING THE FOLLOWING TABLE, IDENTIFY THE TYPE OF CONSTRUCTION PROJECT ACTIVITY (TYPE A-D)
TYPE D
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES.
INCLUDES, BUT IS NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION ONLY, E.G., LIMITED TO 1 TILE PER 50
SQUARE FEET.
• PAINTING (BUT NOT SANDING).
• WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO
NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER
THAN FOR VISUAL INSPECTION.
TYPE B
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST
INCLUDES, BUT IS NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
• ACCESS TO CHASE SPACE.
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
TYPE C
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION
OR REMOVAL OF OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.
INCLUDES, BUT IS NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING.
• REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK.
• NEW WALL CONSTRUCTION.
• MINOR DUCT WORK OR E1ECU?CA? WORK ABOVE CEILINGS.
• MAJOR CABLING ACTIVITIES.
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.
TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT IS NOT LIMITED TO:
• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS
• REQUIRES HEAVY DEMOLITION ON REMOVAL OF A COMPLETE CABLING SYSTEM
• NEW CONSTRUCTION
STEP TWO: HIGHEST RISK
USING THE FOLLOWING TABLE, IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE AFFECTED. IF
MORE THAN ONE RISK GROUP WILL BE AFFECTED, SELECT THE HIGHER RISK GROUP
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREA • CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCOPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY / MRI
• RESPIRATORY THERAPY
• CCU
• EMERGENCY ROOM
• LABOR AND DELIVERY
• LABORATORIES (SPECIMEN)
• MEDICAL UNITS
• NEWBORN NURSERY
• OUTPATIENT SURGERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE
UNIT
• SURGICAL UNITS
• ANY AREA CARING FOR
IMMUNOCOMPROMISED
PATIENTS
• BURN UNITS
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNIT
• NEGATIVE PRESSURE
ISOLATION ROOMS
• ONCOLOGY
• OPERATING ROOMS
INCLUDING C SECTION
ROOMS
STEP THREE:
MATCH THE PATIENT RISK GROUP (LOW, MEDIUM, HIGH, HIGHEST) WITH THE PLANNED ...
CONSTRUCTION PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX, TO FIND THE ...
CLASS OF PRECAUTIONS ( I, II, III OR IV) OR LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.
CLASS I - IV OR COLOR-CODED PRECAUTIONS ARE DELINEATED ON THE FOLLOWING PAGE.
IC MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
CONSTRUCTION PROJECT TYPE
PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP I II II III / IV
MEDIUM RISK GGROUP I II III IV
HIGH RISK GROUP I II III / IV IV
HIGHEST RISK GROUP II III / IV III / IV IV
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND
RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
STEP THREE: CLASS IV
DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS
UPON COMPLETION OF PROJECTDURING CONSTRUCTION PROJECT
CLASS I
1. EXECUTE WORK BY METHODS TO MINIMIZE
RAISING DUST FROM CONSTRUCTION
OPERATIONS
2. IMMEDIATELY REPLACE A CEILING TILE
DISPLACED FOR VISUAL INSPECTION
1. CLEAN WORK AREA UPON COMPLETION OF
TASK.
CLASS II
1. PROVIDE ACTIVE MEANS TO PREVENT
AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE
2. WATER MIST WORK SURFACE TO CONTROL
DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT
OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
1. WIPE WORK SURFACES WITH CLEANER /
DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND / OR VACUUM WITH HEPA
VACUUM BEFORE LEAVING WORK AREA.
4. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED
CLASS III
1. REMOVE OR ISOLATE HVAC SYSTEM IN
AREA WHERE WORK I.E. BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E.
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED
CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT)
BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID LID.
1. DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY
DEPARTMENT AND INFECTION PREVENTION
AND CONTROL DEPARTMENT AND
THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
4. WET MOP AREA WITH CLEANER /
DISINFECTANT.
5. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED
CLASS IV
1. ISOLATE HVAC SYSTEM IN AREA WHERE
WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E.
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED
CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT)
BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND
PUNCTURES.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM
SO THEY CAN BE VACUUMED USING A HEPA
VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME
THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING THE WORK
SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED
EACH TIME THE WORKER EXITS THE WORK
AREA.
1. DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY
DEPARTMENT AND INFECTION PREVENTION
AND CONTROL DEPARTMENT AND
THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPT.
2. REMOVE BARRIER MATERIAL CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID LID.
5. VACUUM WORK AREA WITH I-IEPA
FILTERED VACUUMS.
6. WET MOP AREA WITH CLEANER /
DISINFECTANT.
7. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED
1 HOUR SMOKE RATED
TEMPORARY CONSTRUCTION
PARTITION
TEMPORARY CONSTRUCTION BARRIER
PROJECT SCOPE
UNDERSIDE OF EXISTING
DECK
EXISTING FLOOR
A B
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
AIRTIGHT GASKET SEAL
BETWEEN PANEL AND
EXISTING CEILING,
CONTINUOUS
UNDERSIDE OF EXISTING
DECK
EXISTING CEILING SYSTEM
1 HR SMOKE RATED
PARTITION; ASTM E-84 CLASS
A RATED. EXCEEDS ICRA
CLASS IV REQUIREMENTS.
STARC REALWALL PANEL
SYSTEM TO EXTEND TO
UNDERSIDE OF EXISTING CEILING
EXISTING FLOOR
AIRTIGHT DUAL GASKET SEAL
BETWEEN PANEL AND EXISTING
FLOOR, CONTINUOUS; PER
MANUFACTURER
CEILING GRID ATTACHMENT,
PER REALWALL
MANUFACTURER
3 3/4"
3 3/4"
AIRTIGHT GASKET SEAL
BETWEEN PANEL AND
EXISTING CEILING,
CONTINUOUS
1 HR SMOKE RATED
PARTITION; ASTM E-84 CLASS
A RATED. EXCEEDS ICRA
CLASS IV REQUIREMENTS.
STARC REALWALL PANEL
SYSTEM TO EXTEND TO
UNDERSIDE OF EXISTING DECK
AIRTIGHT DUAL GASKET SEAL
BETWEEN PANEL AND EXISTING
FLOOR, CONTINUOUS; PER
MANUFACTURER
3 3/4"
CEILING BRACE AT CEILINGS
THAT EXCEED STANDARD
REALWALL PANEL HEIGHT,
PER REALWALL
MANUFACTURER
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN
RUNNING TO KEEP
DUST OUT
COVER ALL RETURNS AT
THE GRATE/DIFFUSERS
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
SUSPENDED PLASTIC
ZIPPER WALL CURTAIN
BARRIER
FIRE PULL
STATION WITH
AUDIO / VISUAL
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
F L E
X D
U C
T
2' - 11 7/16"
A P
P R
O X
A .F
.F
POST ICRA,
ILSM, FIRE
INSPECTION
SHEETS VISIBLE
TO PUBLIC
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
/1
/2
:2 :5
P
M
100% CONSTRUCTION DOCUMENTS
07/13/2023
INFECTION CONTROL RISK
ASSESSMENT
G0-03
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
AuthorChecker
1898 FORT ROAD
SHERIDAN,WY 82801--
666-21-700
GENERAL NOTES:
A. THE ONE-HOUR FIRE-RATED CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
B. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR OCCUPIED AREAS OF THE FLOOR.
C. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREA; REVIEW WITH COR AND VA SAFETY GROUP.
D. CONTRACTOR SHALL PROVIDE FIRE WATCH FOR ALL HOT WORK ACTIVITIES AND WHEN FIRE ALARM OR SPRINKLER SYSTEMS
ARE OFFLINE MORE THAN 4HOURS IN A 24 HOUR PERIOD.
E. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL TIMES (24/7), WHETHER OCCUPIED OR NOT, THROUGHOUT DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION UNITS.
F. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
G. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE CONSTRUCTION AREA.
H. REDIRECT ALL MEDICAL CENTER PERSONNEL, PATIENTS, AND VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION AREA THAT RED: "CONSTRUCTION AREA -DO NOT
ENTER".
I. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP A CURRENT HOT WORK PERMIT ON SITE.
J. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE
THEY REMAIN EFFECTIVE.
K. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEMS.
L. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.
M. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEM.
N. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR
IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT0 BEFORE
CONSTRUCTION BEGINS.
O. AFTER COMPLETION OF WORK AND BETWEEN PHASES; VACUUM CONSTRUCTION AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL), PATCH OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL, AND REMOVE ISOLATION OF HVAC SYSTEM. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED.
P. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND/OR CONDUITS APPROPRIATELY AND IMMEDIATELY TO
MAINTAIN DUCT PROTECTION AND NEGATIVE AIR PRESSURE.
Q. CONSTRUCT ANTEROOM ART ENTRANCES TO CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH THIS ROOM TO BEVACUUMED WITH A HEPA VACUUM CLEANER PRIOR TO LEAVING THE SITE OR THEY CAN WEAR
CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.
Q.A. CONSTRUCTION WORKERS WILL NOT BE ENTERING ANY OCCUPIED VA SPACES.
Q.B. DIRECT ACCESS TO OUT THROUGH ANTEROOM(EXIT/ENTRANCE)
R. ALL PERSONNEL ENTERING WORK SITE (ONLY IF ENTERING VA SPACE) ARE REQUIRED TO WEAR SHOE COVERING.
S. CONSTRUCTION BARRIERS SHALL NOT BE REMOVED UNTIL PROJECT IS COMPLETED AND INSPECTION BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
T. REMOVE BARRIERS MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT
RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
INFECTION CONTROL NOTES - CLASS IV
CONSTRUCITON:
1/4" = 1'-0"
ICRA SCHEDULE
3/4" = 1'-0"
ICRA BARRIER WALL TYPES
1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
1/2" = 1'-0"
ROOM ELEVATION (TYPICAL)
1/2" = 1'-0"
CROSS SECTION 'A'
12" = 1'-0"
ILSM TEMPORARY BARRIER TAG
karl.person Text Box karl.person
1" X 20 GAUGE METAL
STRAP AT 3'-6" O.C.,
EACH SIDE
DOUBLE 20 GAUGE
METAL STUDS AT
BOTH JAMBS
20 GAUGE MINIMUM
METAL TRACK
AT FLOOR
TYPE C
MIN 20 GAUGE METAL STUDS
FACING OPPOSITE
DIRECTIONS TO ALLOW
MOUNTING PLATE
ATTACHMENT
8" MINIMUM, DEEPER IF
REQUIRED
6" MINIMUM, DEEPER IF
REQUIRED
TYPE B
20 GAUGE METAL RUNNER
TRACK - CLIP FLANGES
TO FIT OVER STUDS
TYPE A
M O
U N
T
IN
G H
E I G
H T
S
R E
F E
R E
N C
E T
Y P
IC
A
L M
O U
N T
IN
G
H E
I G H
T S
R E
F E
R E
N C
E T
Y P
IC
A
L M
O U
N T
IN
G
H E
I G H
T S
R E
F E
R E
N C
E T
Y P
IC
A
L
GENERAL NOTES:
1. CONTRACTOR SHALL
COORDINATE LOCATIONS
OF HORIZONTAL
FASTENERS. PLAN
WALL FINISH
VERTICAL WALL STUDS
AT 16" [406mm] OR 24" [610mm] O.C.
CUT HORIZONTAL
FASTENER FROM
STUD
FASTEN AT BOTH ENDS
WITH MINIMUM 4 TAPPING
SCREWS.
20 GAUGE METAL TOP TRACK (TYPICAL
UNLESS NOTED OTHERWISE)
ABOVE CEILING
OPENING
PROVIDE DIAGONAL BRACING (AT
45° TYPICAL) OF TOP TRACK AT 48°
O.C. MAX BETWEEN FULL HEIGHT
STUDS
UNDERSIDE OF SLAB,
FLOOR OR ROOF DECK
CEILING LINE
OPENING ABOVE CEILING
WHICH INTERRUPTS LOWER
OPENING JAMB STUDS.
DOUBLE STUDS
DOOR
OPENING
25 GAUGE MINIMUM
BOTTOM TRACK (TYPICAL)
FLOOR LINE
LARGE BELOW
CEILING OPENING
BELOW
CEILING
OPENING
DOUBLE DOOR OPENING
DOOR
OPENING
DOOR
OPENING
NOTES:
1. ALL STUDS ARE SPACED 16" OC MAXIMUM.
2. ALL STUDS SHALL BE "C" STUDS WITH 1/4"
RETURN FLANGE MINIMUM.
3. INDICATES SHELVING OR
CABINETRY.
4. DOUBLE STUDS AT SIDES OF OPENING
SHALL NOT BE CUT FOR DUCT WORK OR
ANY OTHER MECHANICAL SYSTEMS.
5. REFER TO _A-500_ FOR MOUNTING TYPE
DETAILS.
6. PROVIDE PARTITION BRACING AT ALL
ASSEMBLIES OVER 16'-0" IN HEIGHT,
UNLESS NOTED OTHERWISE.
MOUNTING DETAIL
TYPE B
20 GAUGE MINIMUM STUDS
AT WALL MOUNTED
ARCHITECTURAL
CABINETS/MILLWORK/
ATTACHED SHELVING.
DOUBLE
STUDS
4' 6" MAX
DOUBLE STUDS
8' 6" MAX 4' 6" MAX 8' 6" MAX
ALL STUDS ARE TO BE 20 GAUGE
IF GREATER THAN 8' 6"
8' 6" MAX 4' 6" MAX
8' 6" MAX
LARGE ABOVE CEILING
OPENING
ADDITIONAL NOTES:
1. BUILDING CODE REQUIRES THAT "SMOKE PARTITIONS" BE
SEALED TO STRUCTURE AS INDICATED TO SUCCESSFULLY
"LIMIT THE PASSAGE OF SMOKE".
2. CONDITIONS INDICATED TO SHOW DESIGN INTENT, AND NOT
INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY
SIMILAR UL-APPROVED CONTROL JOINTS DESIGNS THAT ARE
APPROPRIATE FOR THE SPECIFIC CONDITION. JOINTS TO BE
SIZED TO ACCOMMODATE MOVEMENT CAPABILITIES OF
FIRESTOP ASSEMBLY.
3. SEE WALL TYPES AND PLAN FOR LOCATIONS OF RATED
WALLS.
CONTROL JOINT,
BOTH SIDES
PARTITION AS
SCHEDULED
CONTROL JOINT,
BOTH SIDES
2 LAYERS OF 5/8"
GYPSUM WALLBOARD
PARTITION AS
SCHEDULED
1 HOUR FIRE RATED
WHI-647-3024
SEALANT BOTH SIDES,
REFERENCE SPECS FOR TYPE
L-BEAD
PARTITION AS
SCHEDULED
CONCRETE, MASONRY OR
STEEL CHANGE IN
CONSTRUCTION
CHANGE IN
CONSTRUCTION
PARTITION AS
SCHEDULED
LC-BEAD
SEALANT, REFERENCE
SPECS FOR TYPE
GYPSUM WALLBOARD
SUSPENDED
CEILING SYSTEM
CONTROL JOINT
CONTROL JOINT,
BOTH SIDES
2 LAYERS OF 5/8" GYPSUM
WALLBOARD
PARTITION AS
SCHEDULED
2 HOUR FIRE RATED
WHI-651-0318.1
SEALANT
1/2" MAX
24' MAX 24' MAX
1/2" MAX
24' MAX
1 1/2"
1/2" MAX
1 1/2"
24' MAX 24' MAX
1/2" MAX
1/2" MAX
1/2" MAX
24' MAX 24' MAX
20 GAUGE MINIMUM
METAL TRACK
20 GAUGE MINIMUM
METAL TRACK
/4
METAL STUD TRACK; MATCH
GAUGE AND SIZE TO STUD.
BASE, SEE FINISH SCHEDULE
SEALANT AND BACKER ROD,
EACH SIDE
PARTITION AS SCHEDULED.INSTALL GWPS A
MINIMUM OF 1/4" ABOVE
SUB FLOOR.
NOTE: PROVIDE CONTINUOUS SMOKE SEALANT AT SMOKE PARTITIONS.
CONCRETE BASE
CONCRETE SLAB
SPECIFIED BASE
LOCKER
RESINOUS BASE
METAL STUD OR WOOD
BLOCKING FOR WALL MOUNTED
ITEMS SUCH AS CABINETS, TELEVISION
BRACKETS, COUNTERS, WHITE BOARDS,
AND SIMILAR ITEMS. COORDINATE
REQUIREMENTS WITH ITEM TO BE MOUNTED
FINE, NEAT SEALANT BEAD AT
PERIMETER.
FIRE EXTINGUISHER CABINET, VERIFY
DIMENSIONS WITH MFR.
NOTE:
INSTALL PER MANUFACTURER'S REQUIREMENTS.
PARTITION AS SCHEDULED, SEE LIFE
SAFETY PLAN FOR RATED
PARTITIONS.
DOOR, SEE SCHEDULE
HOLLOW METAL FRAME
SEALANT AT FRAME PERIMETER,
EACH SIDE
METAL STUD WALL, SEE WALL
TYPES
5/8" GYPSUM BOARD
T Y
P
ADJACENT WALL
S E
E W
A L
L T
Y P
E
SEE WALL TYPE
FIRE TREATED WOOD
BLOCKING
SEE TOP OF WALL DETAILS SHEET A-010
1/2" SEE
NOTE 1
E Q
E Q
E Q
E Q
"D
M A
X
V A
R
IE
S
AA
1/2"
CONST.
JOINT
RUNNER BET.
STUDS
VARIES
SEE DOOR SCHEDULE
MET. DOOR
FRAME
SHIM AS
REQ'D
DETAIL C
/2
/4
M
IN
/2
[1 m m
[1 m m
/2
/4
M
IN
[1 m m
STUD
W
IDTH
STUDW
IDTH
JAMB DEPTH
MINUS 3/16"
[15mm]
FRAME FACE
MIN
US 3/16
[5mm]
12"M
IN
. [1 3mm]
5/8"M
AX. [1
6mm]
FRAME FACE
MIN
US 3/16
[5mm]
JAMB ANCHORS
(FURNISHED WITH FRAMES)
DETAIL D
1/2" MIN.
[13mm]
PROVIDE SOUND
DEADENING WHERE
REQ'D.
SECTION B
DETAIL CSECTION AELEVATION AT DOOR FRAME ISOMETRIC OF CONSTR. JT.
DOUBLE STUDS
JAMB ANCHOR
SANITARY STOP
SHIM AS REQ'D.
METAL ANCHOR
CLIP
METAL DOOR
FRAME
CONTROL JOINT
GYPSUM WALLBD.
PANELS
DETAIL D
CRIPPLE STUD DO NOT
ANCHOR TO BEARING STUD
VERTICAL STUDS AT 2'-0" [610MM]
MAX. W/GYPSUM WALLBD. 1'-4"
W/GYPSUM LATH AND PLASTER
DOUBLE STUDS FOR SUPPORTING
CONC. BACKER BOARD.
PROVIDE CONTINUOUS BRACING
WHEN STUDS EXCEED 10'-0" AND
ARE FINISHED BOTH SIDES.
JAMB ANCHOR CLIPS 3 PER SIDE -
COORDINATE W/HINGE
REINFORCEMENT.
NOTE 1: OMIT BRACE WHEN "D"
DIMENSION IS LESS THAN 2'-0"
FOR GYP. WALLBD. OR 16" FOR
PLASTER PARTITION.
FLOOR/ROOF STRUCTURE
*NOTE: CONTROL JOINTS ON EACH SIDE OF DOOR, BOTH SIDES, AS REQUIRED; REVIEW LOCATIONS IN THE FIELD.
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
/1
/2
:5
:2
A
M
100% CONSTRUCTION DOCUMENTS
07/13/2023
PARTITION FRAMING DETAILS
G0-04
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
AuthorChecker
1898 FORT ROAD
SHERIDAN,WY 82801--
666-21-700
1/4" = 1'-0"
TYPICAL INTERIOR PARTITION FRAMING
3" = 1'-0"
GYPSUM WALLBOARD CONTROL JOINT DETAILS
1" = 1'-0"
OPEN HEADER
1" = 1'-0"
DOOR OPENING JAMB STUDS
1" = 1'-0"
DOOR OPENING HEADER
1" = 1'-0"
SMOKE PARTITION - WALL DETAILS
1 1/2" = 1'-0"
LOCKER BASE
1/4" = 1'-0"
FRAMING ELEVATION
1" = 1'-0"
FIRE EXTINGISHER CABINET SP METAL STUD
1" = 1'-0"
DOOR DETAIL TYPE
1" = 1'-0"
METAL BACKIG DETAILS FOR ACCESSORIES AND EQUIPMENT
3/8" = 1'-0"
PARTITION FRAMING DETAILS
1" = 1'-0"
DETAIL - ANCHORAGE - GRAB BARS AND CABINETS
karl.person Text Box karl.person
Sheridan Wyoming VA Building 4 First Floor Plan
FLOOR GSF: 11,174
BUILDING GSF: 33,628
SCALE:
1/16"=1'-0"
TRAMWAYTRAMWAY
E101
ELEVATOR
HUMAN
RESOURCES
DN
UP
UP
UP
DN
DN
UP
DN
DN
FRONT LOBBY
118SOCIAL WORK
GROUP ROOM
SOCIAL WORK
AO
SUICIDE
PREVENTION
CHIEF OF
SOCIAL WORK
INTERVIEW
ROOM
INTERVIEW
ROOM
INTERVIEW
ROOM
EMPLOYEE
BREAK ROOM
CORR
C101
EXTERIOR
STAIR
ST103
HAC
UNISEX
RR
UNISEX RR
HUD/VASH
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
112A
REAR
LOBBY
118C
TCM/VJO
MFH/HBPC
PORCH
P101
STAIR
ST101
CPAC
OFFICE
HBPC
SUPERVISOR
UNISEX
RR
115B
STORAGE
115A
STAIR
ST102
LOBBY
VENDING
STOR
131A
TOUCHDOWN
SPACE
HUMAN
RESOURCES
RESTROOM
EXTERIOR
STAIR
ST104
HR STAFF
HR STAFF
CORR
C102
STORAGE
RESTROOM
HAC
STOR
HR LEAD
ER/LR
BREAKROOM
STOR
120B
KITCHENETTE
120A
ER
HBPC
118B
IT CLOSET
118A
N O R
TH
IT
118A
8/
/2
:1 6:
A
M
BLDG 4 HAZARDOUS MATERIALS -
ASBESTOS
HA1.04
METCL
1/8" = 1'-0"1 Floor Plan - Building 4
1/8" = 1'-0"2 Building 4 DEMOLITION PLAN
1/8" = 1'-0"3 Building 4 NEW CONSTRUCTION PLAN
IT CLOSET STAYS IN CURRENT LOCATION.
EXPANDS INTO ADJACENT SPACE.
TOTAL AREA WILL BE 136 SF.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
KEY NOTE DESCRIPTION FRIABLE QTY HATCHING
1 9x9 VINYL FLOOR TILE WITH BLACK MASTIC NF 120 SF
2 WINDOW CAULKING / GLAZING NF 2 EA
3 WINDOW CAULKING / GLAZING NF 4 EA
4 TEXTURED PLASTER GRAY WITH SKIM COAT
WHITE NF 300 SF
5 12"X12" CEILING TILE WITH HOLES AND PUCK
MASTIC NF 140 SF
6 WINDOW CAULKING / GLAZING NF 1 EA
7 WINDOW CAULKING / GLAZING NF 4 EA
8 WINDOW CAULKING / GLAZING NF 1 EA
9 9"X9" VFT BLUE / WHITE WITH BLACK MASTIC NF 150 SF
10 WINDOW CAULKING / GLAZING NF 4 EA
11 LINOLEUM FLOOR (WHITE) NF 280 SF
12 VERMICULITE INSULATION F 280 SF
13 WINDOW CAULKING / GLAZING NF 3 EA
14 WINDOW CAULKING / GLAZING NF 2 EA
15 12"X12" VFT GRAY WITH BLACK MASTIC NF 200 SF
16 9x9 VINYL FLOOR TILE NF 175 SF
17 WINDOW CAULKING / GLAZING NF 2 EA
2 2
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
1898 FORT ROAD
SHERIDAN,WY 82801
ASBESTOS NOTES
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL LOCATIONS AND REMOVAL
QUANTITIES, AND EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO RENOVATION OF THE PROJECT AREAS. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS; PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE PROJECT. NO ADDITIONAL
COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED SEPTEMBER 1, 2021 (REVISED ON AUGUST 12, 2022), FOR MORE INFORMATION ABOUT
ACMS IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS. COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY DEMOLITION MAY BE REQUIRED
TO DETERMINE IF CONCEALED ACM IS PRESENT.
3. IF SUSPECT ACM IS DISCOVERED IN CONSTRUCTION, STOP WORK AND CONTACT GENERAL CONTRACTOR, VA
REPRESENTATIVES AND VPIH.
4. GASKETS AND PACKINGS ARE CONCEALED IN VALVES, EQUIPMENT, STEAM TRAPS, BOILERS AND FLUES AND ARE INACCESSIBLE FOR SAMPLING. GASKETS AND PACKINGS ARE ASSUMED AS ACM UNLESS SAMPLED, ANALYZED, AND DETERMINED TO BE
NON-ASBESTOS.
5. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11, TRADITIONAL ASBESTOS ABATEMENT; SEC 02 82 13-19, ASBESTOS
FLOOR TILE AND MASTIC ABATEMENT.
6. FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND
PHASING REQUIREMENTS.
7. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR, OWNER'S
REPRESENTATIVE, AND VPIH, IF NEEDED.
8. NOTE: ASBESTOS-CONTAINING MATERIALS HAVE BEEN REPORTED IN THE GLAZING/ CAULKING ASSOCIATED WITH THE WINDOW SYSTEMS THROUGHOUT THE CAMPUS. DURING RENOVATIONS, IT IS RECOMMENDED TO AVOID DISTURBING THESE MATERIALS WHENEVER POSSIBLE TO MINIMIZE THE RISK OF ASBESTOS EXPOSURE. IN THE EVENT THAT THE REMOVAL OF THESE MATERIALS BECOMES NECESSARY, IT IS MANDATORY THAT ASBESTOS ABATEMENT PROCEDURES, AS STIPULATED IN THE
PROJECT SPECIFICATIONS, BE STRICTLY ADHERED TO.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED.
PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY OPERATIONS.
666-21-700
100% CONSTRUCTION DOCUMENTS
7/13/2023 karl.person Text Box karl.person
A1.05.1
IT
114A
IT
114A
8/
/2
:1 9:
A
M
HA1.05.1--
1/8" = 1'-0"1 Floor Plan - Building 5.1
1/4" = 1'-0"2 Building 5 NEW CONSTRUCTION PLAN
14 14
14 14
MET
BLDG 5 HAZARDOUS MATERIALS -
ASBESTOS
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
1898 FORT ROAD
SHERIDAN,WY 82801
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C. CL
ASBESTOS NOTES
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL LOCATIONS AND REMOVAL
QUANTITIES, AND EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO RENOVATION OF THE PROJECT AREAS. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS; PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE PROJECT. NO ADDITIONAL
COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED SEPTEMBER 1, 2021 (REVISED ON AUGUST 12, 2022), FOR MORE INFORMATION ABOUT
ACMS IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS. COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY DEMOLITION MAY BE REQUIRED
TO DETERMINE IF CONCEALED ACM IS PRESENT.
3. IF SUSPECT ACM IS DISCOVERED IN CONSTRUCTION, STOP WORK AND CONTACT GENERAL CONTRACTOR, VA
REPRESENTATIVES AND VPIH.
4. GASKETS AND PACKINGS ARE CONCEALED IN VALVES, EQUIPMENT, STEAM TRAPS, BOILERS AND FLUES AND ARE INACCESSIBLE FOR SAMPLING. GASKETS AND PACKINGS ARE ASSUMED AS ACM UNLESS SAMPLED, ANALYZED, AND DETERMINED TO BE
NON-ASBESTOS.
5. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11, TRADITIONAL ASBESTOS ABATEMENT; SEC 02 82 13-19, ASBESTOS
FLOOR TILE AND MASTIC ABATEMENT.
6. FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND
PHASING REQUIREMENTS.
7. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE.