SCHEDULE Sheridan 12-20-2023.docx
DOCX document 33 KB Posted
- Attached to
- Z2DA--666-21-700 EHRM Infrastructure Upgrades Construction Sheridan WY ( (VA-23-00078941)
- Solicitation number
- 36C77623B0073
About this file
This document is a price schedule for infrastructure upgrades to support electronic health record modernization at VA medical facilities in Sheridan, Wyoming. It outlines work items and quantities for construction and renovation projects at multiple buildings on the Sheridan VA campus and the Gillette VA community-based outpatient clinic. Projects include installing fiber optic cabling, upgrading electrical and HVAC systems, renovating space for new IT closets, and abating hazardous materials. The period of performance is 480 calendar days from notice to proceed. The related federal contract opportunity is solicitation number 36C77623B0073 for the EHRM infrastructure upgrades construction project at the Sheridan VA, with a total estimated value of $10 million to be awarded by the Department of Veterans Affairs Technology Acquisition Center in Austin.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
?.## PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0.00 |
| JB |
| __________________ |
| __________________ |
ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes a construction project to upgrade the facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements. This includes all data closets on campus, including outlying buildings, the main server room and the Gillette, WY Community Based Outreach Clinic (CBOC) which is owned by the Sheridan WY VAMC. The project shall include, but is not limited to, upgrading facility fiber throughout the buildings to each IT closet, provide a redundant fiber run throughout the facility to each IT closet, provide redundant fiber mains to the demarcation room from the provider point, installation of IT outlets and electrical outlets throughout the facility, provide additional outlets in each IT closet, upgrade facility power distribution as required, upgrade facility HVAC distribution as required, physical security assessment and upgrades and hazardous material abatement. The Period of Performance is 480 calendar days from issuance of the Notice to Proceed.
Contract Period: Base
0001AA
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 1
Hazardous Materials: N/A
Civil: Install buried fiber optic line to the exterior foundation of Building 1. The new run of fiber optic line will require the removal and replacement of sidewalk and road crossings. There will be concrete manhole junction structures associated with this run of fiber.
Architectural: Existing flooring, wall base, ceiling, door and frame to be removed. Patch floor. Install new flooring, and new door and frame. Paint walls.
Mechanical: Tele Com 1-102: Existing mini-split evaporator to be relocated above new door, refrigerant and condensate piping to be modified and reconnected.
Electrical: Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to existing Tele Com Room in Building 1 and provide new fiber patches on each end. Provide new temperature sensors within existing racks and provide monitoring of sensors.
Fire Protection: Demo and provide new head(s)
Telecomm Security: Modification of final connection point for cameras and PACS system to campus telecommunications networks.
0001AB
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 2
Civil: Install buried fiber optic line to the exterior foundation of Building 2. The new run of fiber optic line will require the removal and replacement of sidewalk.
Architectural: Existing wall, wall base, door & frame to be removed. Patch floor. Build new walls. Install new flooring, doors and frames, and plywood wallcovering. Paint walls.
Mechanical: Tele Com 2-104: New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room. Provide power for new mini-split unit. Provide new communications channel rack with associated power and accessories in new Tele Com room. Provide new cable tray in new Tele Com room. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 2 and provide new fiber patches on each end. Provide new temperature sensors within new rack and provide monitoring of sensors.
Fire Protection: Demo and provide new head(s)
Telecomm Security: Installation of new camera and PACS system.
0001AC
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 3
Civil: No associated civil work for Building 3.
Architectural: Existing flooring, doors & frames, and wall to be removed. Patch floor. Build new wall. Install new flooring, doors and frames, and plywood wallcovering. Paint walls.
Mechanical: Tele-Com 3-002: Remove existing louvers and ducting, cap and seal remaining ducts. New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed. Tele-Com 3-003: New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room. Provide power for two new mini-split units. Provide new communications channel rack with associated power and accessories in new Tele Com room. Provide new cable tray in new Tele Com room. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 3 and provide new fiber patches on each end. Provide new temperature sensors within new rack and provide monitoring of sensors.
Fire Protection: Existing to remain.
0001AD
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 4
Hazardous Materials: First-floor front lobby, abatement is needed 9x9 vinyl floor tile with black mastic containing asbestos. Also, Windows were reported to have asbestos containing caulking and lead-based paint. Will require remediation if disturbed.
Civil: No associated civil work for Building 4.
Architectural: Existing walls, doors & frames, and ceilings to be removed. Build new walls. Install new flooring, doors & frames, ceilings, plywood wallcovering, steel gate, and window security. Paint walls.
Mechanical: Office 4-117 and 4-117A: Remove existing supply diffuser and return grille. Install new supply diffusers and return grilles from existing ducting. Tele-Com 4-118A: Remove existing disconnected duct and diffuser. Existing mini-split evaporator to remain in place.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate expansion of existing Tele Com room and lighting, power and signal changes to nearby office spaces. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to revised Tele Com Room in Building 4 and provide new fiber patches on each end. Provide new temperature sensors within existing racks and provide monitoring of sensors. Make modifications to emergency electrical distribution system.
Fire Protection: Dem and provide new head(s)
Telecomm Security: Modification of existing Camera and PACS System.
0001AE
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 5
Civil: No associated civil work for Building 5.
Architectural: Existing flooring, wall base, walls, doors & frames, ceilings, and window to be removed. Patch floor. Build new walls. Install new flooring, doors & frames, plywood wallcovering, ceiling, and window security. Paint walls.
Mechanical: Tele-Com 5-114A: Remove existing radiators, cap and seal existing piping. New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and gravity condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room and modification to additional office spaces. Provide power for new mini-split unit. Provide new communications channel rack with associated power and accessories in new Tele Com room. Provide new cable tray in new Tele Com room. Replace all telecommunications/ data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 5 and provide new fiber patches on each end. Provide new temperature sensors within new rack and provide monitoring of sensors.
Fire Protection: Demo and provide new head(s)
0001AF
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 6
Hazardous Materials: Room 114- 12"x12" VFT with black mastic containing asbestos requires abatement. Windows were reported to have asbestos containing caulking and lead-based paint. Will require remediation if disturbed.
Civil: No associated civil work for Building 6.
Architectural: Existing flooring, wall base, walls, doors & frames, ceilings, casework, and window to be removed. Patch floor. Build new walls. Install new flooring, doors & frames, plywood wallcovering, ceiling, and window security. Paint walls.
Mechanical: Tele-Com 6-101 and surrounding area: Disconnect and remove supply duct from existing supply diffusers, cap at trunk ducts. Install new supply ducting from existing supply trunks, reconnect to existing supply diffusers. Install new fire dampers in existing duct in Tele-Com 6-101 walls.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room and lighting, power and signal changes to nearby office spaces. Provide new communications channel rack with associated power and accessories in new Tele Com room. Provide new cable tray in new Tele Com room. Replace all telecommunications/ data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 6 and provide new fiber patches on each end. Provide new temperature sensors within new rack and provide monitoring of sensors.
Fire Protection: Demo and provide new head(s) and associated piping.
0001AG
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 7
Hazardous Materials: Room 001 - Asbestos-containing textured plaster to be abated. Room 217A will require asbestos abatement of ceiling tile puck adhesive. Room 217A will also require lead remediation of plaster wall paint.
Civil: No associated civil work for Building 7.
Architectural: Basement & 2nd floor. Existing flooring, wall base, walls, doors and frames to be removed. Patch floor. Install new flooring, doors and frames, and plywood wallcovering. Paint walls.
Mechanical: Tele-Com 7-001: Remove existing fan and ducting. Existing minisplit evaporator to remain in place, re-route condensate to HAC 7-018. Relocate existing mini-split thermostat. Tele-Com 7-217A: Remove existing fan, ducting, and grille. Existing mini-split evaporator to remain in place.
Electrical: Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to both existing Tele Com Rooms in Building 7 and provide new fiber patches on each end. Provide new fiber between the two existing Tele Com rooms within this building and provide new fiber patches on each end. Provide new temperature sensors within existing racks of both existing Tele Com Rooms and provide monitoring of sensors.
Fire Protection: Demo and provide new head(s) and associated piping.
0001AH
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 8
Civil: Install buried fiber optic line to the exterior foundation of Building 8. The new run of fiber optic line will require road crossing.
Architectural: Existing flooring, wall base, wall, door and frame to be removed. Patch floor. Install new flooring, door and frame, and plywood wallcovering. Paint walls.
Mechanical: Tele-Com 8-124: Existing mini-split evaporator to be relocated above new door, refrigerant and condensate piping to be modified and reconnected.
Electrical: Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to existing Tele Com Room in Building 8 and provide new fiber patches on each end.
Fire Protection: Demo and provide new head(s) and associated piping and Clean Agent system with detectors.
0001AI
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 9
Hazardous Materials: Room 102- Windows were reported to have asbestos containing caulking and lead-based paint. Will require remediation if disturbed.
Civil: No associated civil work for Building 9.
Architectural: Existing wall, door & frame to be removed. Patch floor. Install new flooring, door and frame, plywood wallcovering, and window security. Paint walls.
Mechanical: Tele-Com 9-102: Install new fire dampers in existing duct in Tele-Com 9-102 walls.
Electrical: Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to the existing Tele Com Room in Building 9 and provide new fiber patches on each end. Provide new temperature sensors within the existing rack of existing Tele Com Rooms and provide monitoring of sensors.
Fire Protection: Confirm existing with new mechanical.
0001AJ
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 11
Hazardous Materials: Room 109- Windows were reported to have asbestos containing caulking and lead-based paint. Will require remediation if disturbed.
Civil: Install buried fiber optic line to the exterior foundation of Building 11. The new run of fiber optic line will require the removal and replacement of sidewalk.
Architectural: Existing walls, wall base, door & frame, and ceiling to be removed. Patch floor. Build new walls. Install new flooring, door and frame, plywood wallcovering, and window security. Paint walls.
Mechanical: Tele-Com 11-109: Remove existing baseboard heaters, cap and seal piping. New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room. Provide power for new mini-split unit. Provide new communications channel rack with associated power and accessories in new Tele Com room. Provide new cable tray in new Tele Com room. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 11 and provide new fiber patches on each end. Provide new temperature sensors within new rack and provide monitoring of sensors.
Fire Protection: Demo and provide new head(s) and associated piping.
0001AK
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 24
Hazardous Materials: Room 108 - abatement of 9"x9" asbestos-containing vinyl floor tile. In Room 109, windows have been identified with asbestos containing caulking and lead-based paint; remediation will be necessary if these windows are disturbed.
Civil: Install buried fiber optic line to the exterior foundation of Building 24. The new run of fiber optic line will require the removal and replacement of sidewalk.
Architectural: Existing flooring, walls, doors & frames, and ceilings to be removed. Patch floor. Install new flooring, door and frame, plywood wallcovering, and window security. Paint walls.
Mechanical: Tele-Com 24-109: New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room. Provide power for new mini-split unit. Provide new communications channel rack with associated power and accessories in new Tele Com room. Provide new cable tray in new Tele Com room. Provide new fiber from Building 8 Fiber Room to new Tele Com Room in Building 24 and provide new fiber patches on each end. Provide new temperature sensors within new rack and provide monitoring of sensors. Provide modifications to electrical distribution system.
Fire Protection: Confirm existing and coordinate with any MEP.
0001AL
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 31
Civil: Install buried fiber optic line to the exterior foundation of Building 31. The new run of fiber optic line will require the removal and replacement of sidewalk and road crossings. There will be concrete manhole junction structures associated with this run of fiber.
Architectural: Existing changing room walls and casework to be removed. Patch floor. Install new plywood wallcovering. Paint wall.
Mechanical: Seamstress 31-201: New mini-split exterior condensing unit, interior evaporator, and thermostat to be installed. New refrigerant and gravity condensate piping to be installed.
Electrical: Provide power for new mini-split unit. Provide new communications cabinet with associated power and accessories in new Tele Com space within existing Sewing Room. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Provide new fiber from Building 8 Fiber Room to new Tele Com space in Building 31 and provide new fiber patches on each end. Provide new temperature sensors within new cabinet and provide monitoring of sensors. Provide modifications to electrical distribution system.
Fire Protection: Confirm existing and coordinate with any MEP.
Telecomm Security: Installation of new camera.
0001AM
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 32
Hazardous Materials: Room 104- 9"x9" vinyl floor tile with black mastic that requires abatement. Additionally, the window in this room has been identified with asbestos-containing caulking and lead-based paint. Remediation will be needed if the window is disturbed.
Civil: Install buried fiber optic line to the exterior foundation of Building 24.
Architectural: Existing wall, door & frame to be removed. Patch floor. Build new wall. Install new flooring, door and frame, plywood wallcovering, and window security. Paint walls.
Mechanical: Tele-Com 32-104: Remove existing ceiling fan. New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room. Provide power for new mini-split unit. Provide new communications channel rack with associated power and accessories in new Tele Com room. Provide new cable tray in new Tele Com room. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Provide new fiber from Building 8 Fiber Room to new Tele Com Room in Building 32 and provide new fiber patches on each end. Provide new temperature sensors within new rack and provide monitoring of sensors. Provide modifications to electrical distribution system.
Fire Protection: Confirm existing provide new head(s) and coordinate with any MEP.
0001AN
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 35
Civil: Install buried fiber optic line to the exterior foundation of Building 35. The new run of fiber optic line will require the removal and replacement of sidewalk and road crossings.
Architectural: Patch floor. Build new walls. Install new flooring, door and frame, and plywood wallcovering. Paint walls.
Mechanical: Tele-Com 35-002: New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room. Provide power for new mini-split unit. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 35 and provide new fiber patches on each end. Provide new temperature sensors within existing cabinet rack and provide monitoring of sensors. Provide modifications to electrical distribution system.
Fire Protection: Demo and provide new head(s) and associated piping.
0001AO
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 36
Civil: Install buried fiber optic line to the exterior foundation of Building 36.
Architectural: Existing wall, platform floor, ladder, and guardrail to be removed. Patch floor. Build new wall. Install new flooring, door and frame, plywood wallcovering, and window security. Paint walls. Reinstall existing ladder. Install new guardrail.
Mechanical: Tele-Com 36-104: Remove existing cabinet unit heater, cap and seal piping. New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room. Provide power for new mini-split unit. Provide new communications channel rack with associated power and accessories in new Tele Com room. Provide new cable tray in new Tele Com room. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Provide new fiber from Building 8 Fiber Room to new Tele Com Room in Building 36 and provide new fiber patches on each end. Provide new temperature sensors within new rack and provide monitoring of sensors.
Fire Protection: Coordinate with any new MEP equipment.
0001AP
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 37
Hazardous Materials: Room 101- asbestos-containing linoleum flooring and vermiculite insulation above ceiling will need to be abated.
Civil: Install buried fiber optic line to the exterior foundation of Building 37.
Architectural: Existing wall, door & frame, ceiling, and a/c unit to be removed. Patch floor. Build new walls. Install new flooring, door and frame, plywood wallcovering, and infill exterior wall opening. Paint walls.
Mechanical: Tele-Com 37-101A: Remove existing window AC unit. New mini-split exterior condensing unit, interior evaporator, and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room. Provide power for new mini-split unit. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 37 and provide new fiber patches on each end. Provide new temperature sensors within existing cabinet and provide monitoring of sensors.
Fire Protection: Confirm existing provide new piping and head(s) and coordinate with any new MEP equipment.
0001AQ
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 42
Hazardous Materials: Room 200- Windows have been identified with asbestos-containing caulking and lead-based paint; remediation will be necessary if these windows are disturbed.
Civil: Install buried fiber optic line to the exterior foundation of Building 42. The new run of fiber optic line will require the removal and replacement of sidewalk and road crossings. There will be concrete manhole junction structures associated with this run of fiber.
Architectural: Install new plywood wallcovering. Paint wallcovering.
Mechanical: Garage Office 42-100: New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide power for new mini-split unit. Provide new communications cabinet with associated power and accessories in new Tele Com space within existing Garage Office. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 42 and provide new fiber patches on each end. Provide new temperature sensors within new cabinet and provide monitoring of sensors.
Fire Protection: Modify existing
0001AR
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 61
Hazardous Materials: Rooms 203, 202, and 201- Windows have been identified with asbestos-containing caulking and lead-based paint; remediation will be necessary if these windows are disturbed.
Civil: Install of buried fiber optic line to the exterior foundation of Building 61.
Architectural: Existing flooring, walls, doors & frames, stair, toilet and lavatory to be removed. Patch floor. Build new walls. Install new flooring, doors and frames, plywood wallcovering, ceilings, window security, and stairs and handrails. Paint walls.
Structural: Install new concrete footing for steel tube column that will help support existing floor. Add steel channels to support the existing floor. Install new steel stair, with steel channel stringers, steel pan treads and risers, with concrete tread infills, and concrete landing on metal deck.
Mechanical: Restroom 61-201A: Remove existing water closet, lavatory, and associated piping for installation of new stairs. Tele-Com 61-203: New mini-split exterior condensing unit, interior evaporator and thermostat to be installed. New refrigerant and pumped condensate piping to be installed.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room and new stair. Provide power for new mini-split unit. Provide new communications channel rack with associated power and accessories in new Tele Com room. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 61 and provide new fiber patches on each end. Provide new temperature sensors within new rack and provide monitoring of sensors.
Fire Protection: Demo and new piping and heads
0001AS
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 64
Hazardous Materials: N/A.
Civil: N/A
Architectural: N/A.
Mechanical: N/A
Electrical: Replace select telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to both of the existing Tele Com Rooms in Building 64 and provide new fiber patches on each end. Provide new fiber between the two existing Tele Com rooms within this building and provide new fiber patches on each end.
Fire Protection: N/A
Telecomm Security: N/A
0001AT
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 71
Civil: No associated civil work for Building 71.
Architectural: 1st & 3rd floors. Existing flooring, wall, wall base, doors & frames, ceilings, and casework to be removed. Patch floor. Build new walls. Install new flooring, doors and frames, plywood wallcovering, window security, ceiling, and casework. Paint walls.
Mechanical: Tele-Com 71-162A: Remove existing supply duct to existing supply diffuser. Install new VAV, supply duct, fire damper and thermostat. Connect new supply duct to existing diffuser. Tele-Com 71-310A: Existing mini-split evaporator to be relocated, refrigerant and condensate piping to be modified and reconnected. Clean Storage 71-344 and 71-344A: Remove existing supply diffusers and duct. Cap and seal at trunk duct. Install new VAV, supply duct, diffusers, and thermostat. Install new return grille and duct. Relocate existing sink, modify and extend existing plumbing piping to new sink location.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate the two new Tele Com rooms. Provide miscellaneous electrical modifications for renovated spaces related to Clean Storage and Day Room spaces. Provide new communications channel rack with associated power and accessories in each of the new Tele Com rooms. Provide new cable tray in new first floor Tele Com room. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Provide new fiber from Building 8 Fiber Room to two new Tele Com Rooms in Building 71 and provide new fiber patches on each end. Provide new temperature sensors within both new racks and provide monitoring of sensors.
Fire Protection: Demo existing and install new piping and head(s). Coordinate with MEP equipment.
0001AU
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 71N
Civil: No associated civil work for Building 71N.
Architectural: 1st & 2nd floors. Existing walls, wall base, door & frame, flooring and wall base to be removed. Patch floor. Build new walls. Install new flooring, door and frame, plywood wallcovering, and ceiling. Paint walls.
Mechanical: Tele-Com 71N-147: Remove existing fan, duct and grille. Existing mini-split evaporator to remain in place. Tele-Com 71N-221: Remove existing supply and return grilles and duct, cap at trunk ducts. Existing mini-split evaporator to remain. Install new fire damper in existing duct in Tele-Com 71N-221 wall. Clean Storage 71N-225: Remove existing piping back to mains and cap. Re-balance existing exhaust grille, install new supply diffuser and duct from existing supply duct.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room. Provide miscellaneous electrical modifications for construction of new Clean Storage room on second floor. Provide two new communications channel rack with associated power and accessories in new Tele Com room. Provide modifications as noted to the three existing Tele Com rooms. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Provide new fiber from Building 8 Fiber Room to all 4 of the Tele Com Rooms in Building 71N and provide new fiber patches on each end. Provide new fiber between each of the four Tele Com rooms within this building and provide new fiber patches on each end. Provide new temperature sensors within all the racks and provide monitoring of sensors. Provide electrical distribution changes on third floor.
Fire Protection: New heads and piping, coordinate existing with new MEP equipment.
0001AV
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 86
Civil: Install buried fiber optic line to the exterior foundation of Building 86. The new run of fiber optic line will require the removal and replacement of sidewalk and road crossings.
Architectural: 1st & 3rd floors. Existing walls, wall base, doors & frames, and ceilings to be removed. Patch floors. Build new walls. Install new flooring, doors and frames, and plywood wallcovering. Paint walls.
Mechanical: Tele-Com 86-102A: Remove existing sink, cap and seal water piping below floor. Remove sanitary back below floor for extension to new condensate drain from relocated existing minisplit evaporator. Existing mini-split evaporator to be relocated and refrigerant piping to be modified and reconnected. Core drill floor and install new sanitary standpipe from existing sanitary below the floor. Extend new vent from new sanitary standpipe into ceiling and connect to existing vent. Install new gravity condensate drain from relocated mini-split evaporator to new standpipe drain. Tele-Com 86-322: Existing mini-split evaporator to be relocated, refrigerant and condensate piping to be modified and reconnected.
Electrical: Provide miscellaneous electrical modifications for renovated spaces to accommodate new Tele Com room on first floor. Provide new communications channel rack with associated power and accessories in new Tele Com room on first floor. Provide modifications as noted to four existing Tele Com rooms. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Provide new fiber from Building 8 Fiber Room to three of the Tele Com Rooms in Building 86 and provide new fiber patches on each end. Provide new fiber between each of the three Tele Com rooms within this building and provide new fiber patches on each end. Provide new temperature sensors within all the racks and provide monitoring of sensors.
Fire Protection: New heads and piping, coordinate existing with new MEP equipment.
0001AW
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 87
Civil: No associated civil work for Building 87.
Architectural: Existing flooring, wall, wall base, door & frame, and ceiling to be removed. Patch floor. Build new wall. Install new flooring, door and frame, and plywood wallcovering. Paint walls.
Mechanical: No mechanical work.
Electrical: Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to the existing Tele Com Room in Building 87 and provide new fiber patches on each end. Provide new temperature sensors within existing rack and provide monitoring of sensors.
Fire Protection: New heads and piping, coordinate existing with new MEP equipment.
0001AX
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 90
Civil: Install 413 lineal feet of buried fiber optic line to the exterior foundation of Building 90. The new run of fiber optic line will require 101 lineal feet of road crossing. There will be one concrete manhole junction structure associated with this run of fiber.
Architectural: Attach plywood wallcovering. Paint wallcovering.
Mechanical: No mechanical work.
Electrical: Provide power for new mini-split unit. Provide new communications cabinet with associated power and accessories in new Tele Com space within existing Office. Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Update fiber from Building 8 Fiber Room to new Tele Com Room in Building 87 and provide new fiber patches on each end. Provide new temperature sensors within new cabinet and provide monitoring of sensors.
0001AY
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building Gillette
Civil: No associated civil work for Gillette Building.
Architectural: Existing wall, door & frame to be removed. Patch floor. Build new wall. Install new flooring, door and frame, and plywood wallcovering. Paint walls.
Mechanical: Tele-Com G-129: Install new thermostat and humidity sensor.
Electrical: Replace all telecommunications/data cabling with new CAT 6A cable and provide new CAT 6A patch panels. Provide new temperature sensors within existing racks and provide monitoring of sensors.
Fire Protection: Modify existing to avoid MEP equipment.
0001AZ
| 1.00 |
| JB |
| __________________ |
| __________________ |
Building 8 Data Center
Civil: No associated civil work for Data Center.
Architectural: Existing walls, doors & frames, ramp, and ceiling to be removed. Build new walls. Install new ramp, door and frame, and air curtain. Paint ramp.
Mechanical: Server Room 8-003: Remove existing computer room air conditioner (CRAC), exterior chiller and chilled water piping Remove exterior secondary air handler and ducting. Install new CRAC, exterior condensing unit and refrigerant piping. Install new exterior secondary air handler and ducting. Install new floor supply tiles. Install new return grilles and ducting.
Electrical: The UPS system is being replaced and electrical distribution from the UPS system is being updated for the Server Room. The air conditioning systems for the server room are being replaced. The power to these air conditioning systems is also being updated. All fiber from the Fiber Room is being replaced and redundant fiber optic cable being added to serve the entire campus. New racks are being installed with associated power and accessories. All new and existing racks will have temperature and humidity sensors installed that will also be monitored.
| GRAND TOTAL |