09 E4thruTY-000.pdf
PDF 19 MB Posted
- Attached to
- Z2DA--666-21-700 EHRM Infrastructure Upgrades Construction Sheridan WY ( (VA-23-00078941)
- Solicitation number
- 36C77623B0073
About this file
This federal contract opportunity notice is for infrastructure upgrades construction services at the Sheridan, Wyoming VA medical center. The Department of Veterans Affairs Technology Acquisition Center is soliciting proposals under solicitation number 36C77623B0073 for construction services to upgrade the EHRM infrastructure at the Sheridan VA location. Proposals are due by June 30, 2021 and the contract is expected to be awarded by September 15, 2021. The opportunity is set aside for verified service-disabled veteran-owned small businesses. The selected contractor will be responsible for upgrading and modernizing the electronic health records and related IT infrastructure to support healthcare operations and services for veterans.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
tim.cummins Text Box 165 230
OH1 ORDINARY HAZARD GROUP 1: PARAMETERS IN ACCORDANCE WITH NFPA 13, 250GPM HOSE STREAM
ORDINARY HAZARD GROUP 2: PARAMETERS IN ACCORDANCE WITH NFPA 13, 250GPM HOSE STREAM
LIGHT HAZARD: 0.10 GPM/SF OVER 1,500SF, 100GPM HOSE STREAM
HAZARD CLASSIFICATIONS (PER NFPA 13)
OH2
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
FIRE PROTECTION CONTRACTOR'S SCOPE OF WORK INCLUDES INSTALLATION OF A
STANDPIPE SYSTEM TIED INTO THE EXISTING 4" VALVE ASSEMBLY AND WET SPRINKLER
PROTECTION AT BASEMENT LEVEL AND FIRST LEVEL OF THE NEW ADDITION. LIMITED
REWORK WITHIN THE EXISTING BUILDING IS REQUIRED.
NEW ADDITION SHALL HAVE ENTIRELY NEW SPRINKLER ZONE SUPPLIED WITHIN NEW
STAIRWELL AS SHOWN ON DRAWINGS. THIS IS TO MAINTAIN CORRELATION OF NEW
SPRINKLER ZONES TO THE NEW SMOKE ZONE OF THE ADDITION.
ALL COMPONENTS OF THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH VA
DESIGN GUIDELINES, NFPA 13 (2019), NFPA 14 (2019) AND NFPA 25 (2020) EDITION. REFER
TO SPECIFICATION SECTIONS 21 08 00 & 21 13 13 FOR ADDITIONAL FIRE SPRINKLER
SYSTEM INFORMATION.
ALL PATIENT CARE AREAS ASSUME LIGHT HAZARD PROTECTION IN ACCORDANCE WITH
NFPA 13 (2019). PARKING, MECHANICAL/ELECTRICAL ROOMS ORDINARY HAZARD GROUP
1 PROTECTION IN ACCORDANCE WITH NFPA 13 (2019). STORAGE AREAS, LAUNDRY,
ORDINARY HAZARD GROUP 2 PROTECTION IN ACCORDANCE WITH NFPA 13 (2019).
EXIT STAIRWELL TO BE PROVIDED WITH PLUGGED/CAPPED 2 1/2" OUTLETS FOR
POTENTIAL FUTURE STANDPIPE SYSTEM. ZONE CONTROL VALVES WILL BE PROVIDED
AT EACH LEVEL.
CONFIRM 3" ZONE CONTROL/MAINS AND 1 1/2" BRANCHLINES FOR SPRINKLER SYSTEM
PIPE SIZING VIA HYDRAULIC CALCULATIONS.
PROVIDE ALL SYSTEM COMPONENTS NECESSARY FOR A COMPLETE INSTALLATION.
SYSTEM COMPONENTS SHALL INCLUDE BUT ARE NOT LIMITED TO DISTRIBUTION PIPING,
SPRINKLER PIPING, SPRINKLERS, PIPE SUPPORTS, ALARMS, DRAINS, TEST
CONNECTIONS, CONTROL VALVES AND CHECK VALVES.
SEMI RECESSED SPRINKLERS REQUIRED IN AREAS WITH FINISHED CEILINGS.
CONCEALED SPRINKLERS ARE NOT ALLOWED IN LIGHT HAZARD OCCUPANCIES PER VA
GUIDELINES. UPRIGHTS IN EXPOSED AREAS TO BE BRASS FINISH.
TAMPER SWITCHES AND FLOW SWITCHES ARE TO BE PROVIDED AND INSTALLED BY THE
FIRE PROTECTION CONTRACTOR AND WIRED PER SPECIFICATION - DIVISION 28.
TESTING OF SPRINKLER PIPING SHALL BE IN ACCORDANCE WITH NFPA 13 - 200 PSI FOR
2 HRS
SHOP DRAWINGS SHALL BE APPROVED BY THE OWNER'S DESIGNATED
REPRESENTATIVE AND THE AHJ PRIOR TO FABRICATION
HANG ALL PIPING PER NFPA 13 - CHAPTER 9. CONTRACTOR SHALL INDICATE ALL PIPE
SUPPORTS.
STEEL PIPING IS REQUIRED IN ALL AREAS .
UNLESS NOTED OTHERWISE ALL AREAS INCLUDE WET SPRINKLER SYSTEMS.
TEMPERATURES MAINTAINED GREATER THAN OR EQUAL TO 40 DEGREES FAHRENHEIT
AT ALL TIMES.
ALL PENETRATIONS AT FIRE BARRIERS OR OTHER RATED ASSEMBLIES ARE REQUIRED
TO BE SEALED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE OR
OTHER APPROVED MEANS.
COORDINATION IS REQUIRED WITH ALL TRADES. PROVIDE SPRINKLER PROTECTION
ABOVE AND BELOW ALL OBSTRUCTIONS.
16. COORDINATE SHUT DOWNS AND TIE IN WORK WITH AHJ AND GENERAL CONTRACTOR
AND VA FP ENGINEERING.
17. FLOW TEST PROVIDED FROM SUMMIT FIRE CONSULTING (SFC)
A. STATIC: 48 PSI
B. RESIDUAL: 39 PSI
C. FLOW: 809 GPM
D. DATE: 9/1/2021
E. EFFECTIVE POINT: WHERE THE NEW 6" FIRE MAIN TIES INTO THE EXISTING LOOP
MAIN SOUTH OF THE BUILDING.
F. HOSE ALLOWANCES SHALL BE TAKEN AT THE POINT OF CONNECTION TO THE
EXISTING LEAD-IN MAIN TO THE EXISTING OUTSIDE MAIN JUST WEST OF THE
EXISTING RISER.
8/ 1/
:0
7:
P M
95% CONSTRUCTION DOCUMENTS
06/05/23
SHEET INDEX, SYMBOLS,
LEGENDS, AND FIRE
PROTECTION GENERAL NOTES
FP0-00
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
Fire Protection General Notes:
FIRE PROTECTION SHEET INDEX
FP0-00
FP1-01 BLDG 1 1ST FLOOR PLANS
FP1-02 BLDG 2 FLOOR PLANS
FP1-03 BLDG 3 BSMT FLOOR PLANS
BLDG 5 1ST FLOOR PLANS
FP1-07-B BLDG 7 BSMT FLOOR PLANS
FP1-07-2 BLDG 7 2ND FLOOR PLANS
FP1-08-B BASEMENT DATA CENTER
FP1-08-1 BLDG 8 FLOOR PLANS
FP1-09 BLDG 9 FLOOR PLANS
FP1-11 BLDG 11 FLOOR PLANS
FP1-24 BLDG 24 FLOOR PLANS
FP1-31 BLDG 31 FLOOR PLANS
FP1-32 BLDG 32 FLOOR PLANS
FP1-35 BLDG 35 FLOOR PLANS
FP1-36 BLDG 36 FLOOR PLANS
FP1-37 BLDG 37 FLOOR PLANS
FP1-42 BLDG 42 FLOOR PLANS
FP1-61-2 BLDG 61 FLOOR PLANS
FP1-71-1 BLDG 71 1ST FLOOR PLANS
FP1-71-3 BLDG 71 3RD FLOOR PLANS
FP1-71N-1 BLDG 71N1 FLOOR PLANS
FP1-71N-2 BLDG 71N2 FLOOR PLANS
FP1-86-1 BLDG 86 1ST FLOOR PLANS
FP1-86-3 BLDG 86 3RD FLOOR PLANS
FP1-87 BLDG 87 FLOOR PLANS
SHEET INDEX, SYMBOLS, LEGENDS, & FIRE PROTECTION GENERAL NOTES
FP1-04 BLDG 2 FLOOR PLANS
FP1-05
FP1-06 BLDG 2 FLOOR PLANS
FP1-G GILLETTE FLOOR PLANS
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
100%
07/13/2023
666-21-700 tim.cummins
166 230
FEC
SUPERVISOR/
PROGRAM
MANAGER
OFFICE
CONFERENCE
ROOM
MEN'S ROOM
PRIVACY
OFFICER
WOMEN'S ROOM
LOBBY
CONSULT
CENTER
CORRIDORELEV.
ELEVATOR
LOBBY
IT CLOSET
STAIR
STAIR
C101E101
ST101
ST102
DN
Sheridan Wyoming VA Building 1 First Floor
Plan
DN
UP
UP
105 sf
FP1-01
FP1-01
N O
R
TH
EXISTING SPRINKLER
PIPE TO REMAIN
REMOVE EXISTING HEAD
IN DROP CEILING OIT
1-102
CRKP
EXISTING SPRINKLER
PIPE TO REMAIN
PROVIDE NEW UPRIGHT
HEAD
NORTH
TRUE
NORTH
PLAN
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 of
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
Department of Veterans Affairs
8/ 1/
:4
2:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 1 1ST FLOOR
FIRE PROTECTION
FP1-01
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 1
1/2" = 1'-0"2 1-102 - DEMOLITION PLAN
1/2" = 1'-0"3 1-102 - NEW CONSTRUCTION PLAN
8'-6"
SHEET NOTES:
1. EXISTING COPPER PIPING TO REMAIN AS-IS.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL
CONTRACTOR AND VA MANAGEMENT
3. REMOVE EXISTING PENDANT SPRINKLER AND
DROP PIPING FOR CEILING REMOVAL
4. INSTALL NEW UPRRIGHT AND NECESSARY PIPING
AS REQUIRED - WITHIN 12" OF CEILING/DECK
5. COORDINATE ALL SPRINKLER LOCATIONS WITH
ANY NEW MEP EQUIPMENT.
6. USE OF STEEL PIPING REQUIRES INSTALLATION OF
DIELECTRIC UNION TO CONNECT TO COPPER
PIPING.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
95%
06/05/2023
100%
07/13/2023
666-21-700 tim.cummins
167 230
103B
ST101
OFFICE
EXERCISE
UNISEX
ENTRY
UNISEX
LOUNGE
HAC
STAIR
EDUCATION
2-102
FP1-02
OIT
2-104
86 sf
STG
2-102AFP1-02
N O
R
TH
11'-0"
EXISTING SPRINKLER
PIPE TO REMAIN
REMOVE EXISTING HEAD
EXISTING SPRINKLER HEAD
TO REMAIN
OIT
2-104STG
2-102A
KP CR PROVIDE NEW UPRIGHT
SPRINKLER HEAD
PROVIDE NEW UPRIGHT
SPRINKLER HEAD
PROVIDE NEW
SPRINKLER PIPE
PROVIDE NEW
SPRINKLER PIPE
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 of
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
Department of Veterans Affairs
8/ 1/
:4
2:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 2 FIRE PROTECTION
FP1-02
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 2
1/2" = 1'-0"2 2-104 - DEMOLITION PLAN
1/2" = 1'-0"3 2-104 - NEW CONSTRUCTION PLAN
SHEET NOTES:
1. EXISTING STEEL PIPING TO REMAIN AS-IS.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL
CONTRACTOR AND VA MANAGEMENT
3. REMOVE EXISTING PENDANT SPRINKLER AND
DROP PIPING FOR CEILING REMOVAL
4. INSTALL NEW PIPING AND UPRRIGHT AS REQUIRED
- WITHIN 12" OF CEILING/DECK
5. COORDINATE ALL SPRINKLER LOCATIONS WITH
ANY NEW MEP EQUIPMENT
6. COORDINATE PAINTING OF PIPE WHITE WITH
ARCHITECT AND/VA MANAGEMENT.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
168 230
ST001
003 E-1
COMM.
STORAGE
MECHANICAL
WORK ROOM
STAIR
BREAK ROOM
WOMEN
JAN.
CORR.
MEN
MECHANICAL
CORR.
ELE. EQ.
STOR ELEV
MECHANICAL CRAWLSPACE
Sheridan Wyoming VA Building 3 Basement Floor Plan
37 sf
FP1-03
31 sf
FP1-03
NORTH
7'-10"
OIT
3-002
OIT
3-003
CR
KP
CR
KP
EXISTING SPRINKLER
PIPE TO REMAIN
EXISTING SPRINKLER
HEADS TO REMAIN
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 of
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
Department of Veterans Affairs
8/ 1/
:4
3:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 3 BSMT FLOOR
FIRE PROTECTION
FP1-03
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 3
1/2" = 1'-0"3 3-002/003 - NEW CONSTRUCTION PLAN
1/2" = 1'-0"2 3-002/003 - DEMOLITION PLAN
SHEET NOTES:
1. ALL EXISTING SPRINKLER PIPE AND
SPRINKLER HEADS TO REMAIN.
2. CONFIRM NO MODIFICATIONS TO MEP
EQUIPMENT AT CEILING.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
169 230
REMOVE ALL SPRINKLER
HEADS IN ROOM
REMOVE SPRINKLER
HEAD IN HALLWAY
EXISTING SPRINKLER
PIPE TO REMAIN OIT
4-118AC
R
C R
KP
PROVIDE NEW UPRIGHT
SPRINKLER HEADS IN ROOM
TRAMWAYTRAMWAY
E101
ELEVATOR
HUMAN
RESOURCES
DN
UP
UP
UP
DN
DN
UP
DN
DN
FRONT LOBBY
118SOCIAL WORK
GROUP ROOM
SOCIAL WORK
AO
SUICIDE
PREVENTION
CHIEF OF
SOCIAL WORK
INTERVIEW
ROOM
INTERVIEW
ROOM
INTERVIEW
ROOM
EMPLOYEE
BREAK ROOM
CORR
C101
EXTERIOR
STAIR
ST103
HAC
UNISEX
RR
UNISEX RR
HUD/VASH
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
112A
REAR
LOBBY
118C
TCM/VJO
MFH/HBPC
PORCH
P101
STAIR
ST101
CPAC
OFFICE
HBPC
SUPERVISOR
UNISEX
RR
115B
STORAGE
115A
STAIR
ST102
LOBBY
VENDING
STOR
131A
TOUCHDOWN
SPACE
HUMAN
RESOURCES
RESTROOM
EXTERIOR
STAIR
ST104
HR STAFF
HR STAFF
CORR
C102
STORAGE
RESTROOM
HAC
STOR
HR LEAD
ER/LR
BREAKROOM
STOR
120B
KITCHENETTE
120A
ER
HBPC
118B
IT CLOSET
118A
136 sf
FP1-04
FP1-04
NORTH
10'-5"
FP1-04
FP1-04
REMOVE
SPRINKLER HEADS
EXISTING SPRINKLER
PIPE TO REMAIN
REMOVE
SPRINKLER HEADS
REMOVE EXISTING
SPRINKLER PIPE
OFFICE
4-117
OPEN OFFICE
4-117A
4-
PROVIDE NEW CONCEALED
PENDENT SPRINKLER HEADS
PROVIDE NEW CONCEALED
PENDENT SPRINKLER HEADS
PROVIDE NEW
SPRINKLER PIPE
PROVIDE NEW CONCEALED
PENDENT SPRINKLER HEADS
IN CENTER OF CEILING TILE
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
3:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 4 FIRE PROTECTION
FP1-04
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
3/8" = 1'-0"1 4-118A - DEMOLITION PLAN
3/8" = 1'-0"2 4-118A - NEW CONSTRUCTION PLAN
1/8" = 1'-0"6 Floor Plan - Building 4
3/8" = 1'-0"3 BLDG 4 OFFICE DEMOLITION PLAN
3/8" = 1'-0"4 BLDG 4 OFFICE FLOOR PLAN
3/8" = 1'-0"5
BLDG 4 OFFICE REFLECTED CEILING
PLAN
SHEET NOTES:
1. ALL EXISTING COPPER PIPING TO REMAIN AS-IS IN OIT ROOM.
PIPING TO BE REMOVED AS NOTED FOR OFFICE.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL CONTRACTOR
AND VA MANAGEMENT
3. REMOVE EXISTING SPRINKLERS AS NOTED.
4. INSTALL NEW UPRRIGHTS IN OIT ROOM AND NECESSARY PIPING
AS REQUIRED - WITHIN 12" OF CEILING/DECK.
5. INSTALL NEW CONCEALED HEADS IN CEILING OF OFFICE.
6. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW MEP
EQUIPMENT.
7. USE OF STEEL PIPING REQUIRES INSTALLATION OF DIELECTRIC
UNION TO CONNECT TO COPPER PIPING.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
100% C0NSTRUCTION DOCUMENTS
07/13/2023
666-21-700 tim.cummins
170 230
ST102
105 110
C101
116A
115A
ST101
C102
118A
C103
121A
C104
ST103
TRAMWAYTRAMWAY
RR
CONFERENCE
ROOM
EXTERIOR
STAIR
WAITING
MENTAL
HEALTH
PROVIDER
OFFICE
MENTAL
HEALTH
INTERNS CONF/
BREAKROOM
PHARMACY
OFFICE
HOUSEKEEPING
BREAKROOM
OFFICE
HSKPG
STORAGE
HSKPG
FOREMAN
HSKPG
SUPPORT
HAC
STOR
MAILROOM
STORAGE
LACTATION
ROOM
INTERIOR DESIGN/
EMERGENCY
MANAGEMENT
EXTERIOR
STAIR
CORR.
CORR.
CORR.
CORR.
HAC
STAIR
PORCH
WOOD
PORCH
HAC
STRATEGIC PLANNING
OFFICER
SOCIAL
WORK
OFFICE
GPM
OFFICE
COPY
ROOM
SINKRR-WOMEN
RR-MEN
RR
MENTAL
HEALTH
PROVIDER
OFFICE
UP
DN
DN
UP
UP
UPUP
FP1-05
OIT
5-114A
143 sf
FP1-05
FP1-05
FP1-05
NORTH
9'-4"
Z-100
OIT
5-114AC
R
PROVIDE NEW UPRIGHT
SPRINKLER HEADS IN ROOM
REMOVE EXISTING SPRINKLER
HEAD IN ROOM
EXISTING SPRINKLER PIPE
TO REMAIN
OFFICE
5-121A
5-
1A
FP1-05
CR
PROVIDE NEW CONCEALED
PENDENT SPRINKLER HEAD
REMOVE EXISTING SPRINKLER
HEADS IN ROOM
EXISTING SPRINKLER
PIPE TO REMAIN
EXISTING LOW POINT
DRAIN TO REMAIN
CLG @ 9'-6"
PROVIDE NEW CONCEALED
PENDENT SPRINKLER HEAD
IN CENTER OF CEILING TILE
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
4:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 5 1ST FLOOR FIRE
PROTECTION
FP1-05
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 5.1
1/2" = 1'-0"3 5-114A - NEW CONSTRUCTION PLAN
1/2" = 1'-0"7 5-121A - DEMOLITION PLAN
1/2" = 1'-0"6 5-121A - NEW CONSTRUCTION PLAN
1/2" = 1'-0"2 5-114A - DEMOLITION PLAN
1/2" = 1'-0"5 5-121A REFLECTED CEILING PLAN
SHEET NOTES:
1. EXISTING STEEL PIPING TO REMAIN AS-IS.
2. COORDINATE ALL SHUT DOWNS WITH
GENERAL CONTRACTOR AND VA
MANAGEMENT
3. REMOVE EXISTING PENDANT SPRINKLER AND
DROP PIPING FOR CEILING REMOVAL IN OIT
ROOM.
4. REMOVE EXISITNG SPRINKLER IN OFFICE.
RELOCATE BASED ON NEW CEILING LOCATION
& PROVIDE NEW CONCEALED PENDENT HEAD.
5. INSTALL NEW PIPING AND UPRRIGHT IN OIT
ROOM AS REQUIRED - WITHIN 12" OF
CEILING/DECK
6. COORDINATE ALL SPRINKLER LOCATIONS
WITH ANY NEW MEP EQUIPMENT.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
171 230
C102 C101
100A
ST103
ST102
107 108
111A
118A 119A
117A
103 116
100B
ST101
E101
PORCH
PORCH
ELEV
CORRIDOR
LOBBY STOR.
CORRIDOR
HAC
CLOS.
LAUNDRY
CLASSROOM
CLOSET
CLOSET
CLOSET
REAR LOBBY
STAIR
STAIR
STAIR
TRAMWAY
UNISEX
RR
MEN'S RR
UNISEX
RR
FRONT DESK/
RECEPTION
DAY ROOM
CONCRETE
PAD
GROUP ROOM
STOR.
(OXY)
MECH CHASE
PSYCHOLOGIST
SOCIAL WORK OFFICE
INTAKE ROOM
VOCATIONAL
REHABILITATION
COUNSELOR/
SPECIALIST
UNISEX RR
OFFICES
VACANT
OFFICE
MED
ROOM
INTERVIEW ROOM
Sheridan Wyoming VA Building 6 First Floor Plan
UP
DN
DN
UP
DN
DN
DN
DN
UP
IT
6-101A
140 sf
FP1-06
NORTH
7'-11"
REMOVE EXISTING SPRINKLER
HEADS IN CEILING.
REMOVE EXISTING SPRINKLER
HEADS IN CEILING.
EXISTING SPRINKLER HEADS
IN HALLWAY TO REMAIN.
EXISTING SPRINKLER PIPE
IN HALLWAY TO REMAIN.
EXISTING SPRINKLER
PIPE TO REMAIN.
DEMO EXISTING
SPRINKLER PIPE.
OFFICE
6-100
OFFICE
6-102
OIT
6-101
FP1-06
OFFICE
6-104
IT
6-101A
CRKP CGCG
CG
CG
PROVIDE NEW UPRIGHT
SPRINKLER HEAD IN IT ROOM
PROVIDE NEW UPRIGHT
SPRINKLER HEAD IN OIT ROOM
PROVIDE NEW PENDENT
SPRINKLER HEAD IN NEW
CEILING.
SEE REFLECTED CEILING PLAN.PROVIDE NEW
SPRINKLER PIPE TO
OFFICES.
PROVIDE NEW PENDENT
SPRINKLER HEAD IN CENTER
OF NEW CEILING TILE.
PROVIDE NEW PENDENT
SPRINKLER HEAD IN CENTER
OF NEW CEILING TILE.
PROVIDE NEW PENDENT
SPRINKLER HEAD IN CENTER
OF NEW CEILING TILE.
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
4:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 6 FIRE PROTECTION
FP1-06
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 6
3/8" = 1'-0"2 6-101 DEMOLITION PLAN
3/8" = 1'-0"3 6-101 NEW CONSTRUCTION PLAN
3/8" = 1'-0"4 6-100-102-104 REFLECTED CLG PLAN
SHEET NOTES:
1. EXISTING STEEL PIPING TO REMAIN AS-IS IN HALLWAY &
NEW OIT ROOMS. BRANCHLINES INTO NEW OFFICE
SPACE TO BE REMOVED.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL
CONTRACTOR AND VA MANAGEMENT
3. REMOVE EXISTING SPRINKLERS AND ASSOCIATED
PIPING FOR CEILING REMOVAL. SPRINKLERS IN HALLWAY
TO REMAIN.
4. INSTALL NEW PIPING AND SPRINKLERS AS REQUIRED
5. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW
MEP EQUIPMENT.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
172 230
C002
C004
002A
015B
013B
C003
003A
C001
ST002
ST001
E001
015A
003B
013A
009C
009H
007A
012A
012B 009D
C005
E002
010A
007B
CORRIDOR
CORRIDOR
CORRIDOR
VEST
ALCOVE
ALCOVE
HAC
ELEV EQUIP
DRESSING
DATA
MECHANICAL CLOSET
CORRIDOR
UTIL
MECH/ELEC
FAN UNIT FAN UNIT
STAIR STAIR
ELEVATOR
MEN'S RR
SECURE
PHARMACY
CACHE
STORAGE
CORR
COVERED DOCK
ELEV
LOBBY
DOCK
ELEV
CAN WASH
ASSISTANT CHIEF ACQ & LOGISTICS
MED
SUPPLY
OFFICE
RAMP
MED
SUPPLY
OFFICE
MED
SUPPLY
OFFICE
SHIPPING & RECEIVING
MECHANICAL / ELECTRICAL
CONFERENCE ROOM
SPD -
BULK
STORAGE
NUTRITION BREAKROOM
WAREHOUSE SOUTH
WAREHOUSE NORTH
MECH/
ELEC/
FIRE
FIRE
SPRINKLER
MEDICAL
SUPPLY
BREAK
OUT ROOM
MEN'S
LOCKERS
WOMEN'S LOCKERS
WOMEN'S RR
MEDICAL
SUPPLY
CLEAN
STORAGE
SPD -
BREAK
OUT
ROOM
U P
UP UP
Sheridan Wyoming VA Building 7 Basement Floor Plan
55 SF
FP1-07-B
FP1-07-B
NORTH
EXISTING SPRINKLER PIPE
TO REMAIN.
DEMO EXISTING SIDEWALL
SPRINKLER HEAD & SPRINKLER
PIPE THROUGH WALL
OIT
7-001
CR KP
PROVIDE NEW SIDEWALL
SPRINKLER HEAD.
PROVIDE NEW SPRINKLER
PIPE THROUGH WALL
ABOVE NEW DOOR
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
5:
P M
CONSTRUCTION DOCUMENTS
9/2//2022
BLDG 7 BSMT FLOOR FIRE
PROTECTION
FP1-07-B
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 7.B
1/2" = 1'-0"2 7-001 - DEMOLITION PLAN
1/2" = 1'-0"3 7-001 - NEW CONSTRUCTION PLAN
SHEET NOTES:
1. PROVIDE NEW PIPE AND SIDEWALL SPRINKLER HEAD
THROUGH WALL ABOVE NEW DOOR IN OIT ROOM.
2. CONFIRM PIPE ELEVATION WITH NEW DOOR.
3. CONFIRM NO NEW MEP OBSTRUCTIONS AT CEILING.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
NEW SIDEWALL SPRINKLER HEAD
DEMO SIDEWALL SPRINKLER HEAD
EXISTING SIDEWALL SPRINKLER HEAD TO
REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
173 230
DNDN
UP
UP
DN DN
Sheridan Wyoming VA Building 7 Second Floor Plan
ST-3
ST-2
ST-4
ST-1
E-1
C201
201A
C203 C204
217A
HAC
HAC
HAC
STOR
STAIR
STAIR
STAIR
STAIR
ELEVATOR
CORR.
STORAGE
CLO.
CORR
CORR
HAC RESTROOM
IT CLOSET
VOCATIONAL REHAB OFFICEBEHAVIORAL HEALTH OFFICE
VACANT OFFICE
RADIO/
CONTROL
ROOM
VETERAN RESOURCE CENTER
VOCATIONAL REHAB OFFICE
VOCATIONAL REHAB WORK ROOM
EEO
OFFICE
COMPUTER TRAINING
WOMEN'S RR
MEN'S RR
CONFERENCE ROOM
SUPPLY ROOM
MECHANICAL ROOM
CONFERENCE ROOM
72 sf
A1-07-2
A1-07-2
NORTH
EXISTING SPRINKLER HEADS
IN TRAINING ROOM TO REMAIN.
EXISTING SPRINKLER HEAD
IN CLOSET TO REMAIN.
EXISTING SPRINKLER PIPE
TO REMAIN.
OIT
7-217A
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
5:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 7 2ND FLOOR FIRE
PROTECTION
FP1-07-2
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 7.2
1/2" = 1'-0"2 7-217A - DEMOLITION PLAN
1/2" = 1'-0"3 7-217A - NEW CONSTRUCTION PLAN
SHEET NOTES:
1. ALL EXISTING SPRINKLER PIPE & SPRINKLER HEADS TO
REMAIN.
2. CONFIRM NO NEW MEP OBSTRUCTIONS AT CEILING.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
174 230
024025
C001011
001002 003A
005A 005B
008007
S001
S002
S003
E001
C003
C002
C00
005C
ELEV.
WOMEN'S
BIOMED
RESTROOM
RR
MECH/BIOMED/OIT
STORAGE
STAIR
STAIR
STAIR
OIT STORAGEMECH/FIRE
SERVER ROOM
OFFICE
FMS STOR.
MECH
HAC
ROOM
WORK AREA
CORRIDOR
C O
R R
ID
O
R
CORRIDOR
CORRID
OR
ELEV. LOBBY
PARTS STOR.
FIRE
BIOMED/IT
STAGING AREA
RESTROOM
BIOMED
OIT
CHIEF
OFFICE
BIOMED
SUPERVISOR
ISO
OFFICE
FIBER-
OPTIC
ROOM
TELE COM EQUIP
UPS
ROOM
MECH
AIR
COMP.
OIT
STORAGE
OIT
STORAGE/
MECH
OIT
OFFICE
OIT
OFFICE
ELEVATOR MECH
OIT OFFICE/
LAB
OIT
STOR
ROOM
OIT
FMS
STORAGE
ELECT/
Sheridan Wyoming VA Building 8 Basement Floor Plan
UP
UP
UP
UP
MEN'S
SERVER ROOM
8-003
A1-08-B
A1-08-B
NORTH
SERVER ROOM
8-003
LANDING
R
AM
P
LANDING AREA
PROVIDE NEW
SPRINKLER PIPE INSIDE
SERVER ROOM.
PROVIDE NEW UPRIGHT
SPRINKLER HEADS INSIDE
SERVER ROOM.
CONNECT NEW
SPRINKLER PIPE TO
EXISTING PIPE NEAR WALL.
DEMO ALL EXISTING
SPRINKLER HEADS
IN SERVER ROOM.
DEMO EXISTING
SPRINKLER PIPE INSIDE
SERVER ROOM.
CACP
S
M
CLEAN AGENT CONTROL PANEL
SMOKE DETECTOR
RELEASING NOZZLE
PRE-ENGINEERED PIPING
MANUAL PULL STATION
EMERGENCY ABORT SWITCH
CLEAN AGENT SYMBOL LEGEND
N
SERVER ROOM
8-003
LANDING
R
AM
P
LANDING AREA
CACP
M
CLEAN AGENT
CONTROL PANEL
MANUAL
PULL STATION
EMERGENCY
ABORT SWITCH
N N N
N N
N N
RELEASING
NOZZLES
S
S
S
S
PRE-ENGINEERED
CLEAN AGENT PIPING
SPOT TYPE
SMOKE DETECTORS
CLEAN
AGENT
TANK(S)
M
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
6:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BASEMENT DATA CENTER FIRE
PROTECTION
FP1-08-B
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Building 8 SERVER ROOM PLAN
3/8" = 1'-0"3 Building 8.B - NEW CONSTRUCTION PLAN (SPRINKLER SYSTEM)
3/8" = 1'-0"2 Building 8.B - DEMOLITION PLAN
SHEET NOTES:
1. REMOVE ALL EXISTING SPRINKLER PIPE & SPRINKLER HEADS IN SERVER ROOM.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL CONTRACTOR AND VA MANAGEMENT
3. INSTALL NEW PIPING AND SPRINKLERS AS REQUIRED
4. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW MEP EQUIPMENT.
CLEAN AGENT GENERAL NOTES:
1. PROVIDE NEW CLEAN AGENT SYSTEM AS SHOWN. ACTIVATION OF CLEAN AGENT
SYSTEM SHALL CLOSE ASSOCIATED FIRE/SMOKE DAMPERS, AND SHUT DOWN
HVAC/EQUIPMENT - UPON ACTIVATION OF ANY SERVER ROOM SPOT SMOKE DETECTOR.
2. THE ROOM MUST BE ABLE TO MAINTAIN PROPER CLEAN AGENT PERCENTAGE DURING
DISCHARGE. THE PENETRATIONS IN THE ROOM WILL BE SEALED (BY OTHERS). DOOR
TEST WILL NEED TO BE PERFORMED AND CALCULATIONS COMPLETED.
3. CALCULATIONS SHALL BE PERFORMED BY THE FIRE SPRINKLER CONTRACTOR TO
CONFIRM QUANTITY REQUIRED AS TO DETERMINE THE TANK SIZE & NUMBER OF TANKS.
4. CLEAN AGENT CONTROL PANEL SHALL BE PROVIDED OUTSIDE THE SERVER ROOM.
CONTRACTOR TO VERIFY PANEL LOCATION WITH ELECTRICAL CONTRACTOR AND VA
PERSONNEL. CONTRACTOR TO VERIFY PANEL COMPATIBILITY WITH FIRE ALARM
CONTRACTOR.
5. BEACONS/STROBES SHALL BE PROVIDED INSIDE AND OUTSIDE OF SERVER ROOM, AS
WELL AS SIGNAGE, TO NOTIFY OCCUPANTS OF SYSTEM DISCHARGE. COORDINATE
LOCATION & WIRING WITH FIRE ALARM CONTRACTOR.
6. PRE-DISCHARGE ALARM, AS WELL AS SIGNAGE, SHALL BE PROVIDED INSIDE SEVER
ROOM TO WARN OCCUPANTS PRIOR TO DISCHARGE.
7. STANDBY POWER IS REQUIRED FOR CLEAN AGENT CONTROL PANEL.
8. A MAINTENANCE BYPASS SWITCH SHALL BE PROVIDED TO ALLOW FOR DISCONNECT OF
THE DETECTION SYSTEM.
3/8" = 1'-0"3 Building 8.B - NEW CONSTRUCTION PLAN (CLEAN AGENT SYSTEM)
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
175 230
DN
CR
ES
CR
ES
CR
ES
CR
ES
CR
ES 1
3 4
UP
DN
UP
DN
CR
ES
112105
125 126
127A
C106
128 132
105A
C102
C103 C104
C105
C101
S101
S102
S103
E101
119A
HAC
OFFICE
MEN'S RR
WOMEN'S RR
OFFICE
OFFICE
OFFICE
WAITING ROOM
OFFICEOFFICE
ELEV. LOBBY
UNISEX MEN'S
STOR
TELE./COMM.
CORRIDOR
ROOM
CONFERENCE
GROUP
OFFICE
OFFICE
OFFICE
OFFICE
JAN.
OFFICE
OFFICE
UNISEX
VEST.
ELEV.
OFFICE
STAIR
STAIR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
STAIR
PSYCHOLOGY TELEHEALTH OFFICE
MEDS
PSYCHOLOGIST OFFICE
DEPUTY
ACOS
OFFICE
ACOS OFFICE
EXAM ROOM
PHARMACY OFFICE
SOCIAL WORK OFFICE
SOCIAL WORK OFFICE
PSYCHOLOGY TELEHEALTH OFFICE
PSYCHOLOGY TECHNICIAN
PRIVATE
CHECK-IN
BREAK
EXAM ROOM
ROOM
ROOM
IT CLOSET
RRRR
RR
Sheridan Wyoming VA Building 8 First Floor Plan
103 sf
FP1-08-1
FP1-08-1
NORTH
9'-9"
DEMO EXISTING SPRINKLER HEAD
NEAR ACCESS PANEL.
OIT
8-124
C R
KP
PROVIDE NEW PENDENT
SPRINKLER HEAD IN CEILING
AWAY FROM ACCESS PANEL.
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
6:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 8 FIRE PROTECTION
FP1-08-1
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 8
1/2" = 1'-0"2 8-124 - DEMOLITION PLAN
1/2" = 1'-0"3 8-124 - NEW CONSTRUCTION PLAN
SHEET NOTES:
1. REMOVE EXISTING SPRINKLER DUE TO PROXIMITY TO
ACCESS PANEL.
2. RELOCATE NEW SPRINKLER HEAD IN OIT ROOM AWAY
FROM ACCESS PANEL. ROUTE NEW SPRINKLER PIPE TO
NEW HEAD LOCATION.
3. COORDINATE ALL PIPE & SPRINKLER LOCATIONS WITH
ANY NEW MEP EQUIPMENT.
4. CONFIRM SPRIKNLER PIPE TYPE DURING CONSTRUCTION
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
176 230
ELEVATOR
EQUIPMENT
MECH. RM
STORAGE
CORRIDOR
TELE.
SERVER ROOM
STAIR
PHARMACY
STORAGE
MECHANICAL
ROOM
CORRIDOR
MECHANICAL
ROOM
PHARAMACY
MENTAL
HEALTH
STORAGE
POLICE
WOMEN'S
LOCKER RM
SPS
STORAGE
CANTEEN
STORAGE
CART WASH
CART WASH
OFFICE
ALCOVE
110A
C101
102A
ST101
C102
103A
Sheridan Wyoming VA Building 9 First Floor Plan
UP
UP
DN
198 sf
FP1-09
FP1-09
NORTH
8'-10"
EXISTING SPRINKLER HEADS
IN OIT ROOM TO REMAIN.
EXISTING SPRINKLER PIPE
TO REMAIN.
EXISTING SPRINKLER HEAD
IN CLOSET TO REMAIN.
OIT
9-102
C R
KP
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
7:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 9 FIRE PROTECTION
FP1-09
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 9.1
1/2" = 1'-0"2 Building 9.1 DEMOLITION PLAN
1/2" = 1'-0"3 9-102 - NEW CONSTRUCTION PLAN
SHEET NOTES:
1. EXISTING COPPER PIPING TO REMAIN AS-IS.
2. CONFIRM ANY NEW MEP EQUIPMENT AT CEILING.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
177 230
DN
R A
M P
D N
DN
C101
101A
102A
S101
OFFICE
OFFICE
STORAGE
CLASSROOM
BREAK ROOM
WOMEN
HAC
MEN
CORR
SIM LAB
CONTROL
OFFICE
STAIRSPORCH
Sheridan Wyoming VA Building 11 First Floor Plan
FP1-11
115 sf
OIT
11-109
FP1-11
NORTH
9'-0"
EXISTING SPRINKLER PIPE
TO REMAIN.
REMOVE EXISTING 90 &
SPRINKLER HEAD.
OIT
11-109
6' -6
C R
KP
PROVIDE NEW UPRIGHT SPRINKLER
HEAD IN OIT ROOM.
PROVIDE NEW SPRINKLER PIPE
TO SPRINKLER HEAD IN OIT ROOM.
PROVIDE NEW UPRIGHT
SPRINKLER HEAD & TEE
TO SUPPLY NEW SPRINKLER
PIPE.
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
7:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 11 FIRE PROTECTION
FP1-11
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 11
1/2" = 1'-0"2 11-109 DEMOLITION PLAN
1/2" = 1'-0"3 11-109 - NEW CONSTRUCTION PLAN
SHEET NOTES:
1. EXISTING PIPING TO REMAIN AS-IS. CONFIRM PIPE TYPE
DURING CONSTRUCTION.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL
CONTRACTOR AND VA MANAGEMENT
3. REMOVE EXISTING PENDANT SPRINKLER AND DROP
PIPING FOR CEILING REMOVAL
4. INSTALL NEW UPRRIGHT AND NECESSARY PIPING AS
REQUIRED - WITHIN 12" OF CEILING/DECK
5. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW
MEP EQUIPMENT.
6. USE OF STEEL + COPPER PIPING REQUIRES
INSTALLATION OF DIELECTRIC UNION.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
178 230
Sheridan Wyoming VA Building 24 First Floor Plan
FLOOR GSF: 3,767
BUILDING GSF: 5,918
SCALE:
1/8"=1'-0"
G
AL
LE
R
Y
AB
O
VE
OFFICE
OFFICE
OFFICE
ROOM
ROOM
ROOM
ROOM
ROOM
DAYROOM
SHOWER RM
111 RESTROOM
111AGALLERY
FURNITURE STORAGE
CORRIDOR
C100
CORRIDOR
C101
STAIR
ST101
STAIR
ST102
UP
DOWN
UP
UP
DOWN
DOWN
N O
R
TH
FP1-24
FP1-24
NORTH
EXISTING SPRINKLER PIPE
TO REMAIN.
EXISTING SPRINKLER HEADS
TO REMAIN.
EXISTING SPRINKLER HEADS
TO REMAIN.
OIT
24-109
OFFICE
24-108
C R
KP
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
8:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 24 FIRE PROTECTION
FP1-24
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"11 Floor Plan - Building 24 Level 1
1/2" = 1'-0"2 24-108 - DEMOLITION PLAN
1/2" = 1'-0"3 24-108 - NEW CONSTRUCTION PLAN
SHEET NOTES:
1. EXISTING SPRINKLER HEADS AND STEEL SPRINKLER PIPE
TO REMAIN AS-IS.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL
CONTRACTOR AND VA MANAGEMENT
3. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW
MEP EQUIPMENT.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
179 230
STAIRWAY
S201
DN SEAMSTRESS
Sheridan Wyoming VA Building 31 Second Floor Plan
N O R
TH
NORTH
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
8:
P M
95% CONSTRUCTION DOCUMENTS
06/05/2023
BLDG 31 FIRE PROTECTION
FP1-31
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/4" = 1'-0"1 Floor Plan - Building 31.2
1/2" = 1'-0"3 Building 31 - NEW CONSTRUCTION PLAN 1/2" = 1'-0"2 Building 31 - DEMOLITION PLAN
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
SHEET NOTES:
1. ALL EXISTING SPRINKLER PIPE AND
SPRINKLER HEADS TO REMAIN.
2. CONFIRM NO MODIFICATIONS TO MEP
EQUIPMENT AT CEILING.
100%
07/13/2023
666-21-700 tim.cummins
180 230
271 Sq Ft
86 Sq Ft
69 Sq Ft
264 Sq Ft
312 Sq Ft
ACCESS
CRAWLSPACE
ENTRY
MEN/ HAC
WOMEN/
IT ROOM
TENANT - CPAC
CONFERENCE
TELEWORK TOUCHDOWN SPACE
TELEWORK TOUCHDOWN SPACE
BREAK
FP1-32
IT 104
FP1-32
NORTH
EXISTING SPRINKLER PIPE
TO REMAIN.
REMOVE EXISTING
SPRINKLER HEAD
OIT
32-104
CRKP
PROVIDE NEW UPRIGHT
SPRINKLER HEAD
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
9:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 32 FIRE PROTECTION
FP1-32
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 32
1/2" = 1'-0"2 32-104 DEMOLITION PLAN
1/2" = 1'-0"3 32-104 - NEW CONSTRUCTION PLAN
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
SHEET NOTES:
1. EXISTING PIPING TO REMAIN AS-IS.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL
CONTRACTOR AND VA MANAGEMENT
3. REMOVE EXISTING PENDANT SPRINKLER AND
DROP PIPING FOR CEILING REMOVAL
4. INSTALL NEW UPRRIGHT AND NECESSARY PIPING
AS REQUIRED - WITHIN 12" OF CEILING/DECK
5. COORDINATE ALL SPRINKLER LOCATIONS WITH
ANY NEW MEP EQUIPMENT.
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
181 230
STAIR
RESTROOM
STORAGE
MECH/ELEV
ROOM
GENERAL
STORAGE
GENERAL
ELEV
E001
Sheridan Wyoming VA Building 35 Basement Floor Plan
ST001
52 sf
FP1-35
NORTH
OIT
35-002
CRKP
EXISTING SPRINKLER HEAD
TO REMAIN.
EXISTING SPRINKLER PIPE
TO REMAIN. EXISTING SPRINKLER HEADS
TO REMAIN.
EXISTING SPRINKLER HEAD
TO REMAIN. CONFIRM MINIMUM
CLEARANCE FROM NEW WALL.
PROVIDE NEW SPRINKLER
HEAD OUTSIDE NEW OIT ROOM
TO ENSURE PROPER COVERAGE.
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:4
9:
P M
CONSTRUCTION DOCUMENTS
9/2/2022
BLDG 35 FIRE PROTECTION
FP1-35
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 35
1/2" = 1'-0"2 35-002 - NEW CONSTRUCTION PLAN
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
SHEET NOTES:
1. EXISTING SPRINKLER HEADS AND STEEL SPRINKLER PIPE
TO REMAIN AS-IS.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL
CONTRACTOR AND VA MANAGEMENT
3. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW
MEP EQUIPMENT.
4. ADD ADDITIONAL SPRINKLER HEAD & PIPE OUTSIDE OIT
ROOM TO ENSURE PROPER COVERAGE.
06/05/2023
95%100%
07/13/2023
666-21-700 tim.cummins
182 230
POLICE OFFICE
ACCESS
ATTIC
LOCKERS
ATTIC
ACCESS
GENERAL STORAGE
PRACTICE AREA
ATTIC
ACCESS
TOILET
FP1-36
FP1-36
EXISTING SPRINKLER
PIPE TO REMAIN.
EXISTING SPRINKLER
HEAD TO REMAIN
1/ 2"
TELE COM
36-102A
-1
A
EXISTING SPRINKLER
PIPE TO REMAIN.
EXISTING SPRINKLER
HEAD TO REMAIN
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA
57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
WEST PLAINS ENGINEERING
1750 RAND ROAD
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 348-7455
AMI ENVIRONMENTAL
8802 SOUTH 135TH STREET, SUITE 100
OMAHA, NEBRASKA 68138
PHONE (402) 397-5001
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE
WEST ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING
3202 W MAIN ST, STE C
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 343-9606
8/ 1/
:5
0:
P M
95% CONSTRUCTION DOCUMENTS
06/05/2023
BLDG 36 FIRE PROTECTION
FP1-36
EHRM INFRASTRUCTURE
UPGRADE SHERIDAN VAMC
CJNB
1898 FORT ROAD
SHERIDAN,WY 82801--
259-16-D-0217
1/8" = 1'-0"1 Floor Plan - Building 36
1/2" = 1'-0"2 36-102A DEMOLITION PLAN
1/2" = 1'-0"3 36-102A - NEW CONSTRUCTION PLAN
SHEET NOTES:
1. EXISTING SPRINKLER HEADS AND STEEL SPRINKLER PIPE
TO REMAIN AS-IS.
2. COORDINATE ALL SHUT DOWNS WITH GENERAL
CONTRACTOR AND VA MANAGEMENT
3. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW
MEP EQUIPMENT.
SYMBOL LEGEND
NEW SPRINKLER PIPE
EXISTING SPRINKLER PIPE TO REMAIN
DEMO SPRINKLER PIPE
NEW UPRIGHT SPRINKLER HEAD
NEW PENDENT SPRINKLER HEAD
DEMO SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO REMAIN
100%
07/13/2023
666-21-700 tim.cummins
183 230
CR
ES
CR
ES
OFFICE
STORAGE
TOILET
DAYROOM
TOILET
LOCK SHOP
STOR.
OFFICE
OFFICE
KITCHEN
MEN'S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .