This federal contract opportunity notice is for infrastructure upgrades construction services at the Sheridan, Wyoming VA medical center. The Department of Veterans Affairs Technology Acquisition Center is soliciting proposals under solicitation number 36C77623B0073 for construction services to upgrade the EHRM infrastructure at the Sheridan VA location. Proposals are due by June 30, 2021 and the contract is expected to be awarded by September 15, 2021. The opportunity is set aside for verified service-disabled veteran-owned small businesses. The selected contractor will be responsible for upgrading and modernizing the electronic health records and related IT infrastructure to support healthcare operations and services for veterans.

View the file

Other files

File Type Posted
Addendum 1 2.14.24.pdf PDF
Technical Questions Tracking Spreadsheet - Sheridan IU Construction 2.20.24.pdf PDF
36C77623B0073 0007.docx DOCX document
36C77623B0073 Amendment 0006.docx DOCX document
Technical Questions Tracking Spreadsheet - Sheridan IU Construction.pdf PDF
Addendum 1.pdf PDF
36C77623B0073 Amendment 0005.docx DOCX document
VHA PCRA 31May2023-Final 700 PA 03JAN24.pdf PDF
36C77623B0073 0004.docx DOCX document
VHA PCRA 31May2023-Final 700 NPA 03JAN24.pdf PDF
Sign In Sheet - 1.11.24.pdf PDF
Wage Determination - Sheridan 1.12.24.pdf PDF
36C77623B0073 0003.docx DOCX document
04 M4.00thruE1-05-2.pdf PDF
07 E1-64-1thruE1-71N-2.pdf PDF
08 E1-71N-3thruE3.pdf PDF
36C77623B0073 Amendment 0002.docx DOCX document
04 M4.00thruE1-05-2.pdf PDF
10 TY-001thruTY-G-1.pdf PDF
08 E1-71N-3thruE3.pdf PDF
36C77623B0073 Amendment 0001.docx DOCX document
Notice for Price Schedule - 12-20-2023.docx DOCX document
07 E1-64-1thruE1-71N-2.pdf PDF
06 E1-11thruE1-61.pdf PDF
SCHEDULE Sheridan 12-20-2023.docx DOCX document
05 E1-06-1thruE1-09-3 (2).pdf PDF
36C77623B0073_1 12.19.23.docx DOCX document
Wage Determination - Sheridan 11.23.pdf PDF
Spec Combined Volume 1.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
36C77623B0073_1.docx DOCX document
Sheridan EHRM Infrastructure Upgrades - CFD Anaylsis Report FINAL.pdf PDF
01 G0-00thruCU114.pdf PDF
Site Visit Instructions.docx DOCX document
Spec Combined Volume 2 Revised 10 2 2023.pdf PDF
02 DT100thruA1-32.pdf PDF
HAZMAT_1.pdf PDF
Sheridan EHRM Finish Board.pdf PDF
03 A1-35thruM1.G.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

tim.cummins Text Box 165 230

OH1 ORDINARY HAZARD GROUP 1: PARAMETERS IN ACCORDANCE WITH NFPA 13, 250GPM HOSE STREAM

ORDINARY HAZARD GROUP 2: PARAMETERS IN ACCORDANCE WITH NFPA 13, 250GPM HOSE STREAM

LIGHT HAZARD: 0.10 GPM/SF OVER 1,500SF, 100GPM HOSE STREAM

HAZARD CLASSIFICATIONS (PER NFPA 13)

OH2

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

FIRE PROTECTION CONTRACTOR'S SCOPE OF WORK INCLUDES INSTALLATION OF A

STANDPIPE SYSTEM TIED INTO THE EXISTING 4" VALVE ASSEMBLY AND WET SPRINKLER

PROTECTION AT BASEMENT LEVEL AND FIRST LEVEL OF THE NEW ADDITION. LIMITED

REWORK WITHIN THE EXISTING BUILDING IS REQUIRED.

NEW ADDITION SHALL HAVE ENTIRELY NEW SPRINKLER ZONE SUPPLIED WITHIN NEW

STAIRWELL AS SHOWN ON DRAWINGS. THIS IS TO MAINTAIN CORRELATION OF NEW

SPRINKLER ZONES TO THE NEW SMOKE ZONE OF THE ADDITION.

ALL COMPONENTS OF THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH VA

DESIGN GUIDELINES, NFPA 13 (2019), NFPA 14 (2019) AND NFPA 25 (2020) EDITION. REFER

TO SPECIFICATION SECTIONS 21 08 00 & 21 13 13 FOR ADDITIONAL FIRE SPRINKLER

SYSTEM INFORMATION.

ALL PATIENT CARE AREAS ASSUME LIGHT HAZARD PROTECTION IN ACCORDANCE WITH

NFPA 13 (2019). PARKING, MECHANICAL/ELECTRICAL ROOMS ORDINARY HAZARD GROUP

1 PROTECTION IN ACCORDANCE WITH NFPA 13 (2019). STORAGE AREAS, LAUNDRY,

ORDINARY HAZARD GROUP 2 PROTECTION IN ACCORDANCE WITH NFPA 13 (2019).

EXIT STAIRWELL TO BE PROVIDED WITH PLUGGED/CAPPED 2 1/2" OUTLETS FOR

POTENTIAL FUTURE STANDPIPE SYSTEM. ZONE CONTROL VALVES WILL BE PROVIDED

AT EACH LEVEL.

CONFIRM 3" ZONE CONTROL/MAINS AND 1 1/2" BRANCHLINES FOR SPRINKLER SYSTEM

PIPE SIZING VIA HYDRAULIC CALCULATIONS.

PROVIDE ALL SYSTEM COMPONENTS NECESSARY FOR A COMPLETE INSTALLATION.

SYSTEM COMPONENTS SHALL INCLUDE BUT ARE NOT LIMITED TO DISTRIBUTION PIPING,

SPRINKLER PIPING, SPRINKLERS, PIPE SUPPORTS, ALARMS, DRAINS, TEST

CONNECTIONS, CONTROL VALVES AND CHECK VALVES.

SEMI RECESSED SPRINKLERS REQUIRED IN AREAS WITH FINISHED CEILINGS.

CONCEALED SPRINKLERS ARE NOT ALLOWED IN LIGHT HAZARD OCCUPANCIES PER VA

GUIDELINES. UPRIGHTS IN EXPOSED AREAS TO BE BRASS FINISH.

TAMPER SWITCHES AND FLOW SWITCHES ARE TO BE PROVIDED AND INSTALLED BY THE

FIRE PROTECTION CONTRACTOR AND WIRED PER SPECIFICATION - DIVISION 28.

TESTING OF SPRINKLER PIPING SHALL BE IN ACCORDANCE WITH NFPA 13 - 200 PSI FOR

2 HRS

SHOP DRAWINGS SHALL BE APPROVED BY THE OWNER'S DESIGNATED

REPRESENTATIVE AND THE AHJ PRIOR TO FABRICATION

HANG ALL PIPING PER NFPA 13 - CHAPTER 9. CONTRACTOR SHALL INDICATE ALL PIPE

SUPPORTS.

STEEL PIPING IS REQUIRED IN ALL AREAS .

UNLESS NOTED OTHERWISE ALL AREAS INCLUDE WET SPRINKLER SYSTEMS.

TEMPERATURES MAINTAINED GREATER THAN OR EQUAL TO 40 DEGREES FAHRENHEIT

AT ALL TIMES.

ALL PENETRATIONS AT FIRE BARRIERS OR OTHER RATED ASSEMBLIES ARE REQUIRED

TO BE SEALED IN ACCORDANCE WITH THE 2018 INTERNATIONAL BUILDING CODE OR

OTHER APPROVED MEANS.

COORDINATION IS REQUIRED WITH ALL TRADES. PROVIDE SPRINKLER PROTECTION

ABOVE AND BELOW ALL OBSTRUCTIONS.

16. COORDINATE SHUT DOWNS AND TIE IN WORK WITH AHJ AND GENERAL CONTRACTOR

AND VA FP ENGINEERING.

17. FLOW TEST PROVIDED FROM SUMMIT FIRE CONSULTING (SFC)

A. STATIC: 48 PSI

B. RESIDUAL: 39 PSI

C. FLOW: 809 GPM

D. DATE: 9/1/2021

E. EFFECTIVE POINT: WHERE THE NEW 6" FIRE MAIN TIES INTO THE EXISTING LOOP

MAIN SOUTH OF THE BUILDING.

F. HOSE ALLOWANCES SHALL BE TAKEN AT THE POINT OF CONNECTION TO THE

EXISTING LEAD-IN MAIN TO THE EXISTING OUTSIDE MAIN JUST WEST OF THE

EXISTING RISER.

8/ 1/

:0

7:

P M

95% CONSTRUCTION DOCUMENTS

06/05/23

SHEET INDEX, SYMBOLS,

LEGENDS, AND FIRE

PROTECTION GENERAL NOTES

FP0-00

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

Fire Protection General Notes:

FIRE PROTECTION SHEET INDEX

FP0-00

FP1-01 BLDG 1 1ST FLOOR PLANS

FP1-02 BLDG 2 FLOOR PLANS

FP1-03 BLDG 3 BSMT FLOOR PLANS

BLDG 5 1ST FLOOR PLANS

FP1-07-B BLDG 7 BSMT FLOOR PLANS

FP1-07-2 BLDG 7 2ND FLOOR PLANS

FP1-08-B BASEMENT DATA CENTER

FP1-08-1 BLDG 8 FLOOR PLANS

FP1-09 BLDG 9 FLOOR PLANS

FP1-11 BLDG 11 FLOOR PLANS

FP1-24 BLDG 24 FLOOR PLANS

FP1-31 BLDG 31 FLOOR PLANS

FP1-32 BLDG 32 FLOOR PLANS

FP1-35 BLDG 35 FLOOR PLANS

FP1-36 BLDG 36 FLOOR PLANS

FP1-37 BLDG 37 FLOOR PLANS

FP1-42 BLDG 42 FLOOR PLANS

FP1-61-2 BLDG 61 FLOOR PLANS

FP1-71-1 BLDG 71 1ST FLOOR PLANS

FP1-71-3 BLDG 71 3RD FLOOR PLANS

FP1-71N-1 BLDG 71N1 FLOOR PLANS

FP1-71N-2 BLDG 71N2 FLOOR PLANS

FP1-86-1 BLDG 86 1ST FLOOR PLANS

FP1-86-3 BLDG 86 3RD FLOOR PLANS

FP1-87 BLDG 87 FLOOR PLANS

SHEET INDEX, SYMBOLS, LEGENDS, & FIRE PROTECTION GENERAL NOTES

FP1-04 BLDG 2 FLOOR PLANS

FP1-05

FP1-06 BLDG 2 FLOOR PLANS

FP1-G GILLETTE FLOOR PLANS

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

100%

07/13/2023

666-21-700 tim.cummins

166 230

FEC

SUPERVISOR/

PROGRAM

MANAGER

OFFICE

CONFERENCE

ROOM

MEN'S ROOM

PRIVACY

OFFICER

WOMEN'S ROOM

LOBBY

CONSULT

CENTER

CORRIDORELEV.

ELEVATOR

LOBBY

IT CLOSET

STAIR

STAIR

C101E101

ST101

ST102

DN

Sheridan Wyoming VA Building 1 First Floor

Plan

DN

UP

UP

105 sf

FP1-01

FP1-01

N O

R

TH

EXISTING SPRINKLER

PIPE TO REMAIN

REMOVE EXISTING HEAD

IN DROP CEILING OIT

1-102

CRKP

EXISTING SPRINKLER

PIPE TO REMAIN

PROVIDE NEW UPRIGHT

HEAD

NORTH

TRUE

NORTH

PLAN

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

Department of Veterans Affairs

8/ 1/

:4

2:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 1 1ST FLOOR

FIRE PROTECTION

FP1-01

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 1

1/2" = 1'-0"2 1-102 - DEMOLITION PLAN

1/2" = 1'-0"3 1-102 - NEW CONSTRUCTION PLAN

8'-6"

SHEET NOTES:

1. EXISTING COPPER PIPING TO REMAIN AS-IS.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL

CONTRACTOR AND VA MANAGEMENT

3. REMOVE EXISTING PENDANT SPRINKLER AND

DROP PIPING FOR CEILING REMOVAL

4. INSTALL NEW UPRRIGHT AND NECESSARY PIPING

AS REQUIRED - WITHIN 12" OF CEILING/DECK

5. COORDINATE ALL SPRINKLER LOCATIONS WITH

ANY NEW MEP EQUIPMENT.

6. USE OF STEEL PIPING REQUIRES INSTALLATION OF

DIELECTRIC UNION TO CONNECT TO COPPER

PIPING.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

95%

06/05/2023

100%

07/13/2023

666-21-700 tim.cummins

167 230

103B

ST101

OFFICE

EXERCISE

UNISEX

ENTRY

UNISEX

LOUNGE

HAC

STAIR

EDUCATION

2-102

FP1-02

OIT

2-104

86 sf

STG

2-102AFP1-02

N O

R

TH

11'-0"

EXISTING SPRINKLER

PIPE TO REMAIN

REMOVE EXISTING HEAD

EXISTING SPRINKLER HEAD

TO REMAIN

OIT

2-104STG

2-102A

KP CR PROVIDE NEW UPRIGHT

SPRINKLER HEAD

PROVIDE NEW UPRIGHT

SPRINKLER HEAD

PROVIDE NEW

SPRINKLER PIPE

PROVIDE NEW

SPRINKLER PIPE

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

Department of Veterans Affairs

8/ 1/

:4

2:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 2 FIRE PROTECTION

FP1-02

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 2

1/2" = 1'-0"2 2-104 - DEMOLITION PLAN

1/2" = 1'-0"3 2-104 - NEW CONSTRUCTION PLAN

SHEET NOTES:

1. EXISTING STEEL PIPING TO REMAIN AS-IS.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL

CONTRACTOR AND VA MANAGEMENT

3. REMOVE EXISTING PENDANT SPRINKLER AND

DROP PIPING FOR CEILING REMOVAL

4. INSTALL NEW PIPING AND UPRRIGHT AS REQUIRED

- WITHIN 12" OF CEILING/DECK

5. COORDINATE ALL SPRINKLER LOCATIONS WITH

ANY NEW MEP EQUIPMENT

6. COORDINATE PAINTING OF PIPE WHITE WITH

ARCHITECT AND/VA MANAGEMENT.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

168 230

ST001

003 E-1

COMM.

STORAGE

MECHANICAL

WORK ROOM

STAIR

BREAK ROOM

WOMEN

JAN.

CORR.

MEN

MECHANICAL

CORR.

ELE. EQ.

STOR ELEV

MECHANICAL CRAWLSPACE

Sheridan Wyoming VA Building 3 Basement Floor Plan

37 sf

FP1-03

31 sf

FP1-03

NORTH

7'-10"

OIT

3-002

OIT

3-003

CR

KP

CR

KP

EXISTING SPRINKLER

PIPE TO REMAIN

EXISTING SPRINKLER

HEADS TO REMAIN

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

Department of Veterans Affairs

8/ 1/

:4

3:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 3 BSMT FLOOR

FIRE PROTECTION

FP1-03

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 3

1/2" = 1'-0"3 3-002/003 - NEW CONSTRUCTION PLAN

1/2" = 1'-0"2 3-002/003 - DEMOLITION PLAN

SHEET NOTES:

1. ALL EXISTING SPRINKLER PIPE AND

SPRINKLER HEADS TO REMAIN.

2. CONFIRM NO MODIFICATIONS TO MEP

EQUIPMENT AT CEILING.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

169 230

REMOVE ALL SPRINKLER

HEADS IN ROOM

REMOVE SPRINKLER

HEAD IN HALLWAY

EXISTING SPRINKLER

PIPE TO REMAIN OIT

4-118AC

R

C R

KP

PROVIDE NEW UPRIGHT

SPRINKLER HEADS IN ROOM

TRAMWAYTRAMWAY

E101

ELEVATOR

HUMAN

RESOURCES

DN

UP

UP

UP

DN

DN

UP

DN

DN

FRONT LOBBY

118SOCIAL WORK

GROUP ROOM

SOCIAL WORK

AO

SUICIDE

PREVENTION

CHIEF OF

SOCIAL WORK

INTERVIEW

ROOM

INTERVIEW

ROOM

INTERVIEW

ROOM

EMPLOYEE

BREAK ROOM

CORR

C101

EXTERIOR

STAIR

ST103

HAC

UNISEX

RR

UNISEX RR

HUD/VASH

SOCIAL WORK

OFFICE

SOCIAL WORK

OFFICE

112A

REAR

LOBBY

118C

TCM/VJO

MFH/HBPC

PORCH

P101

STAIR

ST101

CPAC

OFFICE

HBPC

SUPERVISOR

UNISEX

RR

115B

STORAGE

115A

STAIR

ST102

LOBBY

VENDING

STOR

131A

TOUCHDOWN

SPACE

HUMAN

RESOURCES

RESTROOM

EXTERIOR

STAIR

ST104

HR STAFF

HR STAFF

CORR

C102

STORAGE

RESTROOM

HAC

STOR

HR LEAD

ER/LR

BREAKROOM

STOR

120B

KITCHENETTE

120A

ER

HBPC

118B

IT CLOSET

118A

136 sf

FP1-04

FP1-04

NORTH

10'-5"

FP1-04

FP1-04

REMOVE

SPRINKLER HEADS

EXISTING SPRINKLER

PIPE TO REMAIN

REMOVE

SPRINKLER HEADS

REMOVE EXISTING

SPRINKLER PIPE

OFFICE

4-117

OPEN OFFICE

4-117A

4-

PROVIDE NEW CONCEALED

PENDENT SPRINKLER HEADS

PROVIDE NEW CONCEALED

PENDENT SPRINKLER HEADS

PROVIDE NEW

SPRINKLER PIPE

PROVIDE NEW CONCEALED

PENDENT SPRINKLER HEADS

IN CENTER OF CEILING TILE

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

3:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 4 FIRE PROTECTION

FP1-04

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

3/8" = 1'-0"1 4-118A - DEMOLITION PLAN

3/8" = 1'-0"2 4-118A - NEW CONSTRUCTION PLAN

1/8" = 1'-0"6 Floor Plan - Building 4

3/8" = 1'-0"3 BLDG 4 OFFICE DEMOLITION PLAN

3/8" = 1'-0"4 BLDG 4 OFFICE FLOOR PLAN

3/8" = 1'-0"5

BLDG 4 OFFICE REFLECTED CEILING

PLAN

SHEET NOTES:

1. ALL EXISTING COPPER PIPING TO REMAIN AS-IS IN OIT ROOM.

PIPING TO BE REMOVED AS NOTED FOR OFFICE.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL CONTRACTOR

AND VA MANAGEMENT

3. REMOVE EXISTING SPRINKLERS AS NOTED.

4. INSTALL NEW UPRRIGHTS IN OIT ROOM AND NECESSARY PIPING

AS REQUIRED - WITHIN 12" OF CEILING/DECK.

5. INSTALL NEW CONCEALED HEADS IN CEILING OF OFFICE.

6. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW MEP

EQUIPMENT.

7. USE OF STEEL PIPING REQUIRES INSTALLATION OF DIELECTRIC

UNION TO CONNECT TO COPPER PIPING.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

100% C0NSTRUCTION DOCUMENTS

07/13/2023

666-21-700 tim.cummins

170 230

ST102

105 110

C101

116A

115A

ST101

C102

118A

C103

121A

C104

ST103

TRAMWAYTRAMWAY

RR

CONFERENCE

ROOM

EXTERIOR

STAIR

WAITING

MENTAL

HEALTH

PROVIDER

OFFICE

MENTAL

HEALTH

INTERNS CONF/

BREAKROOM

PHARMACY

OFFICE

HOUSEKEEPING

BREAKROOM

OFFICE

HSKPG

STORAGE

HSKPG

FOREMAN

HSKPG

SUPPORT

HAC

STOR

MAILROOM

STORAGE

LACTATION

ROOM

INTERIOR DESIGN/

EMERGENCY

MANAGEMENT

EXTERIOR

STAIR

CORR.

CORR.

CORR.

CORR.

HAC

STAIR

PORCH

WOOD

PORCH

HAC

STRATEGIC PLANNING

OFFICER

SOCIAL

WORK

OFFICE

GPM

OFFICE

COPY

ROOM

SINKRR-WOMEN

RR-MEN

RR

MENTAL

HEALTH

PROVIDER

OFFICE

UP

DN

DN

UP

UP

UPUP

FP1-05

OIT

5-114A

143 sf

FP1-05

FP1-05

FP1-05

NORTH

9'-4"

Z-100

OIT

5-114AC

R

PROVIDE NEW UPRIGHT

SPRINKLER HEADS IN ROOM

REMOVE EXISTING SPRINKLER

HEAD IN ROOM

EXISTING SPRINKLER PIPE

TO REMAIN

OFFICE

5-121A

5-

1A

FP1-05

CR

PROVIDE NEW CONCEALED

PENDENT SPRINKLER HEAD

REMOVE EXISTING SPRINKLER

HEADS IN ROOM

EXISTING SPRINKLER

PIPE TO REMAIN

EXISTING LOW POINT

DRAIN TO REMAIN

CLG @ 9'-6"

PROVIDE NEW CONCEALED

PENDENT SPRINKLER HEAD

IN CENTER OF CEILING TILE

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

4:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 5 1ST FLOOR FIRE

PROTECTION

FP1-05

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 5.1

1/2" = 1'-0"3 5-114A - NEW CONSTRUCTION PLAN

1/2" = 1'-0"7 5-121A - DEMOLITION PLAN

1/2" = 1'-0"6 5-121A - NEW CONSTRUCTION PLAN

1/2" = 1'-0"2 5-114A - DEMOLITION PLAN

1/2" = 1'-0"5 5-121A REFLECTED CEILING PLAN

SHEET NOTES:

1. EXISTING STEEL PIPING TO REMAIN AS-IS.

2. COORDINATE ALL SHUT DOWNS WITH

GENERAL CONTRACTOR AND VA

MANAGEMENT

3. REMOVE EXISTING PENDANT SPRINKLER AND

DROP PIPING FOR CEILING REMOVAL IN OIT

ROOM.

4. REMOVE EXISITNG SPRINKLER IN OFFICE.

RELOCATE BASED ON NEW CEILING LOCATION

& PROVIDE NEW CONCEALED PENDENT HEAD.

5. INSTALL NEW PIPING AND UPRRIGHT IN OIT

ROOM AS REQUIRED - WITHIN 12" OF

CEILING/DECK

6. COORDINATE ALL SPRINKLER LOCATIONS

WITH ANY NEW MEP EQUIPMENT.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

171 230

C102 C101

100A

ST103

ST102

107 108

111A

118A 119A

117A

103 116

100B

ST101

E101

PORCH

PORCH

ELEV

CORRIDOR

LOBBY STOR.

CORRIDOR

HAC

CLOS.

LAUNDRY

CLASSROOM

CLOSET

CLOSET

CLOSET

REAR LOBBY

STAIR

STAIR

STAIR

TRAMWAY

UNISEX

RR

MEN'S RR

UNISEX

RR

FRONT DESK/

RECEPTION

DAY ROOM

CONCRETE

PAD

GROUP ROOM

STOR.

(OXY)

MECH CHASE

PSYCHOLOGIST

SOCIAL WORK OFFICE

INTAKE ROOM

VOCATIONAL

REHABILITATION

COUNSELOR/

SPECIALIST

UNISEX RR

OFFICES

VACANT

OFFICE

MED

ROOM

INTERVIEW ROOM

Sheridan Wyoming VA Building 6 First Floor Plan

UP

DN

DN

UP

DN

DN

DN

DN

UP

IT

6-101A

140 sf

FP1-06

NORTH

7'-11"

REMOVE EXISTING SPRINKLER

HEADS IN CEILING.

REMOVE EXISTING SPRINKLER

HEADS IN CEILING.

EXISTING SPRINKLER HEADS

IN HALLWAY TO REMAIN.

EXISTING SPRINKLER PIPE

IN HALLWAY TO REMAIN.

EXISTING SPRINKLER

PIPE TO REMAIN.

DEMO EXISTING

SPRINKLER PIPE.

OFFICE

6-100

OFFICE

6-102

OIT

6-101

FP1-06

OFFICE

6-104

IT

6-101A

CRKP CGCG

CG

CG

PROVIDE NEW UPRIGHT

SPRINKLER HEAD IN IT ROOM

PROVIDE NEW UPRIGHT

SPRINKLER HEAD IN OIT ROOM

PROVIDE NEW PENDENT

SPRINKLER HEAD IN NEW

CEILING.

SEE REFLECTED CEILING PLAN.PROVIDE NEW

SPRINKLER PIPE TO

OFFICES.

PROVIDE NEW PENDENT

SPRINKLER HEAD IN CENTER

OF NEW CEILING TILE.

PROVIDE NEW PENDENT

SPRINKLER HEAD IN CENTER

OF NEW CEILING TILE.

PROVIDE NEW PENDENT

SPRINKLER HEAD IN CENTER

OF NEW CEILING TILE.

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

4:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 6 FIRE PROTECTION

FP1-06

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 6

3/8" = 1'-0"2 6-101 DEMOLITION PLAN

3/8" = 1'-0"3 6-101 NEW CONSTRUCTION PLAN

3/8" = 1'-0"4 6-100-102-104 REFLECTED CLG PLAN

SHEET NOTES:

1. EXISTING STEEL PIPING TO REMAIN AS-IS IN HALLWAY &

NEW OIT ROOMS. BRANCHLINES INTO NEW OFFICE

SPACE TO BE REMOVED.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL

CONTRACTOR AND VA MANAGEMENT

3. REMOVE EXISTING SPRINKLERS AND ASSOCIATED

PIPING FOR CEILING REMOVAL. SPRINKLERS IN HALLWAY

TO REMAIN.

4. INSTALL NEW PIPING AND SPRINKLERS AS REQUIRED

5. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW

MEP EQUIPMENT.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

172 230

C002

C004

002A

015B

013B

C003

003A

C001

ST002

ST001

E001

015A

003B

013A

009C

009H

007A

012A

012B 009D

C005

E002

010A

007B

CORRIDOR

CORRIDOR

CORRIDOR

VEST

ALCOVE

ALCOVE

HAC

ELEV EQUIP

DRESSING

DATA

MECHANICAL CLOSET

CORRIDOR

UTIL

MECH/ELEC

FAN UNIT FAN UNIT

STAIR STAIR

ELEVATOR

MEN'S RR

SECURE

PHARMACY

CACHE

STORAGE

CORR

COVERED DOCK

ELEV

LOBBY

DOCK

ELEV

CAN WASH

ASSISTANT CHIEF ACQ & LOGISTICS

MED

SUPPLY

OFFICE

RAMP

MED

SUPPLY

OFFICE

MED

SUPPLY

OFFICE

SHIPPING & RECEIVING

MECHANICAL / ELECTRICAL

CONFERENCE ROOM

SPD -

BULK

STORAGE

NUTRITION BREAKROOM

WAREHOUSE SOUTH

WAREHOUSE NORTH

MECH/

ELEC/

FIRE

FIRE

SPRINKLER

MEDICAL

SUPPLY

BREAK

OUT ROOM

MEN'S

LOCKERS

WOMEN'S LOCKERS

WOMEN'S RR

MEDICAL

SUPPLY

CLEAN

STORAGE

SPD -

BREAK

OUT

ROOM

U P

UP UP

Sheridan Wyoming VA Building 7 Basement Floor Plan

55 SF

FP1-07-B

FP1-07-B

NORTH

EXISTING SPRINKLER PIPE

TO REMAIN.

DEMO EXISTING SIDEWALL

SPRINKLER HEAD & SPRINKLER

PIPE THROUGH WALL

OIT

7-001

CR KP

PROVIDE NEW SIDEWALL

SPRINKLER HEAD.

PROVIDE NEW SPRINKLER

PIPE THROUGH WALL

ABOVE NEW DOOR

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

5:

P M

CONSTRUCTION DOCUMENTS

9/2//2022

BLDG 7 BSMT FLOOR FIRE

PROTECTION

FP1-07-B

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 7.B

1/2" = 1'-0"2 7-001 - DEMOLITION PLAN

1/2" = 1'-0"3 7-001 - NEW CONSTRUCTION PLAN

SHEET NOTES:

1. PROVIDE NEW PIPE AND SIDEWALL SPRINKLER HEAD

THROUGH WALL ABOVE NEW DOOR IN OIT ROOM.

2. CONFIRM PIPE ELEVATION WITH NEW DOOR.

3. CONFIRM NO NEW MEP OBSTRUCTIONS AT CEILING.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

NEW SIDEWALL SPRINKLER HEAD

DEMO SIDEWALL SPRINKLER HEAD

EXISTING SIDEWALL SPRINKLER HEAD TO

REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

173 230

DNDN

UP

UP

DN DN

Sheridan Wyoming VA Building 7 Second Floor Plan

ST-3

ST-2

ST-4

ST-1

E-1

C201

201A

C203 C204

217A

HAC

HAC

HAC

STOR

STAIR

STAIR

STAIR

STAIR

ELEVATOR

CORR.

STORAGE

CLO.

CORR

CORR

HAC RESTROOM

IT CLOSET

VOCATIONAL REHAB OFFICEBEHAVIORAL HEALTH OFFICE

VACANT OFFICE

RADIO/

CONTROL

ROOM

VETERAN RESOURCE CENTER

VOCATIONAL REHAB OFFICE

VOCATIONAL REHAB WORK ROOM

EEO

OFFICE

COMPUTER TRAINING

WOMEN'S RR

MEN'S RR

CONFERENCE ROOM

SUPPLY ROOM

MECHANICAL ROOM

CONFERENCE ROOM

72 sf

A1-07-2

A1-07-2

NORTH

EXISTING SPRINKLER HEADS

IN TRAINING ROOM TO REMAIN.

EXISTING SPRINKLER HEAD

IN CLOSET TO REMAIN.

EXISTING SPRINKLER PIPE

TO REMAIN.

OIT

7-217A

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

5:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 7 2ND FLOOR FIRE

PROTECTION

FP1-07-2

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 7.2

1/2" = 1'-0"2 7-217A - DEMOLITION PLAN

1/2" = 1'-0"3 7-217A - NEW CONSTRUCTION PLAN

SHEET NOTES:

1. ALL EXISTING SPRINKLER PIPE & SPRINKLER HEADS TO

REMAIN.

2. CONFIRM NO NEW MEP OBSTRUCTIONS AT CEILING.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

174 230

024025

C001011

001002 003A

005A 005B

008007

S001

S002

S003

E001

C003

C002

C00

005C

ELEV.

WOMEN'S

BIOMED

RESTROOM

RR

MECH/BIOMED/OIT

STORAGE

STAIR

STAIR

STAIR

OIT STORAGEMECH/FIRE

SERVER ROOM

OFFICE

FMS STOR.

MECH

HAC

ROOM

WORK AREA

CORRIDOR

C O

R R

ID

O

R

CORRIDOR

CORRID

OR

ELEV. LOBBY

PARTS STOR.

FIRE

BIOMED/IT

STAGING AREA

RESTROOM

BIOMED

OIT

CHIEF

OFFICE

BIOMED

SUPERVISOR

ISO

OFFICE

FIBER-

OPTIC

ROOM

TELE COM EQUIP

UPS

ROOM

MECH

AIR

COMP.

OIT

STORAGE

OIT

STORAGE/

MECH

OIT

OFFICE

OIT

OFFICE

ELEVATOR MECH

OIT OFFICE/

LAB

OIT

STOR

ROOM

OIT

FMS

STORAGE

ELECT/

Sheridan Wyoming VA Building 8 Basement Floor Plan

UP

UP

UP

UP

MEN'S

SERVER ROOM

8-003

A1-08-B

A1-08-B

NORTH

SERVER ROOM

8-003

LANDING

R

AM

P

LANDING AREA

PROVIDE NEW

SPRINKLER PIPE INSIDE

SERVER ROOM.

PROVIDE NEW UPRIGHT

SPRINKLER HEADS INSIDE

SERVER ROOM.

CONNECT NEW

SPRINKLER PIPE TO

EXISTING PIPE NEAR WALL.

DEMO ALL EXISTING

SPRINKLER HEADS

IN SERVER ROOM.

DEMO EXISTING

SPRINKLER PIPE INSIDE

SERVER ROOM.

CACP

S

M

CLEAN AGENT CONTROL PANEL

SMOKE DETECTOR

RELEASING NOZZLE

PRE-ENGINEERED PIPING

MANUAL PULL STATION

EMERGENCY ABORT SWITCH

CLEAN AGENT SYMBOL LEGEND

N

SERVER ROOM

8-003

LANDING

R

AM

P

LANDING AREA

CACP

M

CLEAN AGENT

CONTROL PANEL

MANUAL

PULL STATION

EMERGENCY

ABORT SWITCH

N N N

N N

N N

RELEASING

NOZZLES

S

S

S

S

PRE-ENGINEERED

CLEAN AGENT PIPING

SPOT TYPE

SMOKE DETECTORS

CLEAN

AGENT

TANK(S)

M

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

6:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BASEMENT DATA CENTER FIRE

PROTECTION

FP1-08-B

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Building 8 SERVER ROOM PLAN

3/8" = 1'-0"3 Building 8.B - NEW CONSTRUCTION PLAN (SPRINKLER SYSTEM)

3/8" = 1'-0"2 Building 8.B - DEMOLITION PLAN

SHEET NOTES:

1. REMOVE ALL EXISTING SPRINKLER PIPE & SPRINKLER HEADS IN SERVER ROOM.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL CONTRACTOR AND VA MANAGEMENT

3. INSTALL NEW PIPING AND SPRINKLERS AS REQUIRED

4. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW MEP EQUIPMENT.

CLEAN AGENT GENERAL NOTES:

1. PROVIDE NEW CLEAN AGENT SYSTEM AS SHOWN. ACTIVATION OF CLEAN AGENT

SYSTEM SHALL CLOSE ASSOCIATED FIRE/SMOKE DAMPERS, AND SHUT DOWN

HVAC/EQUIPMENT - UPON ACTIVATION OF ANY SERVER ROOM SPOT SMOKE DETECTOR.

2. THE ROOM MUST BE ABLE TO MAINTAIN PROPER CLEAN AGENT PERCENTAGE DURING

DISCHARGE. THE PENETRATIONS IN THE ROOM WILL BE SEALED (BY OTHERS). DOOR

TEST WILL NEED TO BE PERFORMED AND CALCULATIONS COMPLETED.

3. CALCULATIONS SHALL BE PERFORMED BY THE FIRE SPRINKLER CONTRACTOR TO

CONFIRM QUANTITY REQUIRED AS TO DETERMINE THE TANK SIZE & NUMBER OF TANKS.

4. CLEAN AGENT CONTROL PANEL SHALL BE PROVIDED OUTSIDE THE SERVER ROOM.

CONTRACTOR TO VERIFY PANEL LOCATION WITH ELECTRICAL CONTRACTOR AND VA

PERSONNEL. CONTRACTOR TO VERIFY PANEL COMPATIBILITY WITH FIRE ALARM

CONTRACTOR.

5. BEACONS/STROBES SHALL BE PROVIDED INSIDE AND OUTSIDE OF SERVER ROOM, AS

WELL AS SIGNAGE, TO NOTIFY OCCUPANTS OF SYSTEM DISCHARGE. COORDINATE

LOCATION & WIRING WITH FIRE ALARM CONTRACTOR.

6. PRE-DISCHARGE ALARM, AS WELL AS SIGNAGE, SHALL BE PROVIDED INSIDE SEVER

ROOM TO WARN OCCUPANTS PRIOR TO DISCHARGE.

7. STANDBY POWER IS REQUIRED FOR CLEAN AGENT CONTROL PANEL.

8. A MAINTENANCE BYPASS SWITCH SHALL BE PROVIDED TO ALLOW FOR DISCONNECT OF

THE DETECTION SYSTEM.

3/8" = 1'-0"3 Building 8.B - NEW CONSTRUCTION PLAN (CLEAN AGENT SYSTEM)

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

175 230

DN

CR

ES

CR

ES

CR

ES

CR

ES

CR

ES 1

3 4

UP

DN

UP

DN

CR

ES

112105

125 126

127A

C106

128 132

105A

C102

C103 C104

C105

C101

S101

S102

S103

E101

119A

HAC

OFFICE

MEN'S RR

WOMEN'S RR

OFFICE

OFFICE

OFFICE

WAITING ROOM

OFFICEOFFICE

ELEV. LOBBY

UNISEX MEN'S

STOR

TELE./COMM.

CORRIDOR

ROOM

CONFERENCE

GROUP

OFFICE

OFFICE

OFFICE

OFFICE

JAN.

OFFICE

OFFICE

UNISEX

VEST.

ELEV.

OFFICE

STAIR

STAIR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

STAIR

PSYCHOLOGY TELEHEALTH OFFICE

MEDS

PSYCHOLOGIST OFFICE

DEPUTY

ACOS

OFFICE

ACOS OFFICE

EXAM ROOM

PHARMACY OFFICE

SOCIAL WORK OFFICE

SOCIAL WORK OFFICE

PSYCHOLOGY TELEHEALTH OFFICE

PSYCHOLOGY TECHNICIAN

PRIVATE

CHECK-IN

BREAK

EXAM ROOM

ROOM

ROOM

IT CLOSET

RRRR

RR

Sheridan Wyoming VA Building 8 First Floor Plan

103 sf

FP1-08-1

FP1-08-1

NORTH

9'-9"

DEMO EXISTING SPRINKLER HEAD

NEAR ACCESS PANEL.

OIT

8-124

C R

KP

PROVIDE NEW PENDENT

SPRINKLER HEAD IN CEILING

AWAY FROM ACCESS PANEL.

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

6:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 8 FIRE PROTECTION

FP1-08-1

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 8

1/2" = 1'-0"2 8-124 - DEMOLITION PLAN

1/2" = 1'-0"3 8-124 - NEW CONSTRUCTION PLAN

SHEET NOTES:

1. REMOVE EXISTING SPRINKLER DUE TO PROXIMITY TO

ACCESS PANEL.

2. RELOCATE NEW SPRINKLER HEAD IN OIT ROOM AWAY

FROM ACCESS PANEL. ROUTE NEW SPRINKLER PIPE TO

NEW HEAD LOCATION.

3. COORDINATE ALL PIPE & SPRINKLER LOCATIONS WITH

ANY NEW MEP EQUIPMENT.

4. CONFIRM SPRIKNLER PIPE TYPE DURING CONSTRUCTION

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

176 230

ELEVATOR

EQUIPMENT

MECH. RM

STORAGE

CORRIDOR

TELE.

SERVER ROOM

STAIR

PHARMACY

STORAGE

MECHANICAL

ROOM

CORRIDOR

MECHANICAL

ROOM

PHARAMACY

MENTAL

HEALTH

STORAGE

POLICE

WOMEN'S

LOCKER RM

SPS

STORAGE

CANTEEN

STORAGE

CART WASH

CART WASH

OFFICE

ALCOVE

110A

C101

102A

ST101

C102

103A

Sheridan Wyoming VA Building 9 First Floor Plan

UP

UP

DN

198 sf

FP1-09

FP1-09

NORTH

8'-10"

EXISTING SPRINKLER HEADS

IN OIT ROOM TO REMAIN.

EXISTING SPRINKLER PIPE

TO REMAIN.

EXISTING SPRINKLER HEAD

IN CLOSET TO REMAIN.

OIT

9-102

C R

KP

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

7:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 9 FIRE PROTECTION

FP1-09

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 9.1

1/2" = 1'-0"2 Building 9.1 DEMOLITION PLAN

1/2" = 1'-0"3 9-102 - NEW CONSTRUCTION PLAN

SHEET NOTES:

1. EXISTING COPPER PIPING TO REMAIN AS-IS.

2. CONFIRM ANY NEW MEP EQUIPMENT AT CEILING.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

177 230

DN

R A

M P

D N

DN

C101

101A

102A

S101

OFFICE

OFFICE

STORAGE

CLASSROOM

BREAK ROOM

WOMEN

HAC

MEN

CORR

SIM LAB

CONTROL

OFFICE

STAIRSPORCH

Sheridan Wyoming VA Building 11 First Floor Plan

FP1-11

115 sf

OIT

11-109

FP1-11

NORTH

9'-0"

EXISTING SPRINKLER PIPE

TO REMAIN.

REMOVE EXISTING 90 &

SPRINKLER HEAD.

OIT

11-109

6' -6

C R

KP

PROVIDE NEW UPRIGHT SPRINKLER

HEAD IN OIT ROOM.

PROVIDE NEW SPRINKLER PIPE

TO SPRINKLER HEAD IN OIT ROOM.

PROVIDE NEW UPRIGHT

SPRINKLER HEAD & TEE

TO SUPPLY NEW SPRINKLER

PIPE.

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

7:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 11 FIRE PROTECTION

FP1-11

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 11

1/2" = 1'-0"2 11-109 DEMOLITION PLAN

1/2" = 1'-0"3 11-109 - NEW CONSTRUCTION PLAN

SHEET NOTES:

1. EXISTING PIPING TO REMAIN AS-IS. CONFIRM PIPE TYPE

DURING CONSTRUCTION.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL

CONTRACTOR AND VA MANAGEMENT

3. REMOVE EXISTING PENDANT SPRINKLER AND DROP

PIPING FOR CEILING REMOVAL

4. INSTALL NEW UPRRIGHT AND NECESSARY PIPING AS

REQUIRED - WITHIN 12" OF CEILING/DECK

5. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW

MEP EQUIPMENT.

6. USE OF STEEL + COPPER PIPING REQUIRES

INSTALLATION OF DIELECTRIC UNION.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

178 230

Sheridan Wyoming VA Building 24 First Floor Plan

FLOOR GSF: 3,767

BUILDING GSF: 5,918

SCALE:

1/8"=1'-0"

G

AL

LE

R

Y

AB

O

VE

OFFICE

OFFICE

OFFICE

ROOM

ROOM

ROOM

ROOM

ROOM

DAYROOM

SHOWER RM

111 RESTROOM

111AGALLERY

FURNITURE STORAGE

CORRIDOR

C100

CORRIDOR

C101

STAIR

ST101

STAIR

ST102

UP

DOWN

UP

UP

DOWN

DOWN

N O

R

TH

FP1-24

FP1-24

NORTH

EXISTING SPRINKLER PIPE

TO REMAIN.

EXISTING SPRINKLER HEADS

TO REMAIN.

EXISTING SPRINKLER HEADS

TO REMAIN.

OIT

24-109

OFFICE

24-108

C R

KP

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

8:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 24 FIRE PROTECTION

FP1-24

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"11 Floor Plan - Building 24 Level 1

1/2" = 1'-0"2 24-108 - DEMOLITION PLAN

1/2" = 1'-0"3 24-108 - NEW CONSTRUCTION PLAN

SHEET NOTES:

1. EXISTING SPRINKLER HEADS AND STEEL SPRINKLER PIPE

TO REMAIN AS-IS.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL

CONTRACTOR AND VA MANAGEMENT

3. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW

MEP EQUIPMENT.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

179 230

STAIRWAY

S201

DN SEAMSTRESS

Sheridan Wyoming VA Building 31 Second Floor Plan

N O R

TH

NORTH

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

8:

P M

95% CONSTRUCTION DOCUMENTS

06/05/2023

BLDG 31 FIRE PROTECTION

FP1-31

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/4" = 1'-0"1 Floor Plan - Building 31.2

1/2" = 1'-0"3 Building 31 - NEW CONSTRUCTION PLAN 1/2" = 1'-0"2 Building 31 - DEMOLITION PLAN

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

SHEET NOTES:

1. ALL EXISTING SPRINKLER PIPE AND

SPRINKLER HEADS TO REMAIN.

2. CONFIRM NO MODIFICATIONS TO MEP

EQUIPMENT AT CEILING.

100%

07/13/2023

666-21-700 tim.cummins

180 230

271 Sq Ft

86 Sq Ft

69 Sq Ft

264 Sq Ft

312 Sq Ft

ACCESS

CRAWLSPACE

ENTRY

MEN/ HAC

WOMEN/

IT ROOM

TENANT - CPAC

CONFERENCE

TELEWORK TOUCHDOWN SPACE

TELEWORK TOUCHDOWN SPACE

BREAK

FP1-32

IT 104

FP1-32

NORTH

EXISTING SPRINKLER PIPE

TO REMAIN.

REMOVE EXISTING

SPRINKLER HEAD

OIT

32-104

CRKP

PROVIDE NEW UPRIGHT

SPRINKLER HEAD

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

9:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 32 FIRE PROTECTION

FP1-32

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 32

1/2" = 1'-0"2 32-104 DEMOLITION PLAN

1/2" = 1'-0"3 32-104 - NEW CONSTRUCTION PLAN

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

SHEET NOTES:

1. EXISTING PIPING TO REMAIN AS-IS.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL

CONTRACTOR AND VA MANAGEMENT

3. REMOVE EXISTING PENDANT SPRINKLER AND

DROP PIPING FOR CEILING REMOVAL

4. INSTALL NEW UPRRIGHT AND NECESSARY PIPING

AS REQUIRED - WITHIN 12" OF CEILING/DECK

5. COORDINATE ALL SPRINKLER LOCATIONS WITH

ANY NEW MEP EQUIPMENT.

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

181 230

STAIR

RESTROOM

STORAGE

MECH/ELEV

ROOM

GENERAL

STORAGE

GENERAL

ELEV

E001

Sheridan Wyoming VA Building 35 Basement Floor Plan

ST001

52 sf

FP1-35

NORTH

OIT

35-002

CRKP

EXISTING SPRINKLER HEAD

TO REMAIN.

EXISTING SPRINKLER PIPE

TO REMAIN. EXISTING SPRINKLER HEADS

TO REMAIN.

EXISTING SPRINKLER HEAD

TO REMAIN. CONFIRM MINIMUM

CLEARANCE FROM NEW WALL.

PROVIDE NEW SPRINKLER

HEAD OUTSIDE NEW OIT ROOM

TO ENSURE PROPER COVERAGE.

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:4

9:

P M

CONSTRUCTION DOCUMENTS

9/2/2022

BLDG 35 FIRE PROTECTION

FP1-35

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 35

1/2" = 1'-0"2 35-002 - NEW CONSTRUCTION PLAN

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

SHEET NOTES:

1. EXISTING SPRINKLER HEADS AND STEEL SPRINKLER PIPE

TO REMAIN AS-IS.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL

CONTRACTOR AND VA MANAGEMENT

3. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW

MEP EQUIPMENT.

4. ADD ADDITIONAL SPRINKLER HEAD & PIPE OUTSIDE OIT

ROOM TO ENSURE PROPER COVERAGE.

06/05/2023

95%100%

07/13/2023

666-21-700 tim.cummins

182 230

POLICE OFFICE

ACCESS

ATTIC

LOCKERS

ATTIC

ACCESS

GENERAL STORAGE

PRACTICE AREA

ATTIC

ACCESS

TOILET

FP1-36

FP1-36

EXISTING SPRINKLER

PIPE TO REMAIN.

EXISTING SPRINKLER

HEAD TO REMAIN

1/ 2"

TELE COM

36-102A

-1

A

EXISTING SPRINKLER

PIPE TO REMAIN.

EXISTING SPRINKLER

HEAD TO REMAIN

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA

57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COMFOURFRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

WEST PLAINS ENGINEERING

1750 RAND ROAD

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 348-7455

AMI ENVIRONMENTAL

8802 SOUTH 135TH STREET, SUITE 100

OMAHA, NEBRASKA 68138

PHONE (402) 397-5001

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE

WEST ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING

3202 W MAIN ST, STE C

RAPID CITY, SOUTH DAKOTA 57702

PH: (605) 343-9606

8/ 1/

:5

0:

P M

95% CONSTRUCTION DOCUMENTS

06/05/2023

BLDG 36 FIRE PROTECTION

FP1-36

EHRM INFRASTRUCTURE

UPGRADE SHERIDAN VAMC

CJNB

1898 FORT ROAD

SHERIDAN,WY 82801--

259-16-D-0217

1/8" = 1'-0"1 Floor Plan - Building 36

1/2" = 1'-0"2 36-102A DEMOLITION PLAN

1/2" = 1'-0"3 36-102A - NEW CONSTRUCTION PLAN

SHEET NOTES:

1. EXISTING SPRINKLER HEADS AND STEEL SPRINKLER PIPE

TO REMAIN AS-IS.

2. COORDINATE ALL SHUT DOWNS WITH GENERAL

CONTRACTOR AND VA MANAGEMENT

3. COORDINATE ALL SPRINKLER LOCATIONS WITH ANY NEW

MEP EQUIPMENT.

SYMBOL LEGEND

NEW SPRINKLER PIPE

EXISTING SPRINKLER PIPE TO REMAIN

DEMO SPRINKLER PIPE

NEW UPRIGHT SPRINKLER HEAD

NEW PENDENT SPRINKLER HEAD

DEMO SPRINKLER HEAD

EXISTING SPRINKLER HEAD TO REMAIN

100%

07/13/2023

666-21-700 tim.cummins

183 230

CR

ES

CR

ES

OFFICE

STORAGE

TOILET

DAYROOM

TOILET

LOCK SHOP

STOR.

OFFICE

OFFICE

KITCHEN

MEN'S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .