This addendum pertains to a solicitation for expanding an emergency department at the Lake Nona VA Medical Center in Orlando, Florida. It revises the construction drawings to remove six mechanical drawings that are not part of the project scope, and updates the drawing index accordingly. The Department of Veterans Affairs is the contracting agency, with an anticipated award date of April 2022. The minor construction project involves expanding the emergency department and includes demolition, new expansion, site work, and mechanical, electrical, and plumbing systems. Relevant details are provided regarding the scope of work, drawings, and general construction notes.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 01
Date: April 21, 2022
Project: 675-901
Expand Emergency Deparment at Lake Nona
Orlando VA Healthcare System
13800 Veterans Way
Orlando, FL 32827
To: Kevin Glover, VA COR
Elizabeth Romero, VA CO
This Addendum supplements and amends the original Drawings and Specifications for the above referenced project. This Addendum shall be forwarded to all Prime Bidders and all appropriate building code authorities. This Addendum shall be taken into account in the preparation of bids and shall become a part of the Contract Documents.
Receipt of this Addendum must be acknowledged on the Bid Form.
This addendum consists of the following items:
Drawings
1. Sheet G001 – Cover Sheet – Reissued.
a. Mechanical drawings sheets M-111, M-112, MD121, MD122, MH113 & MH114 are not part of the construction bid documents.
i. These (6) drawings pertain to a portion of the existing building that was removed from the project scope of work.
b. The Drawing Index has been revised to remove these sheets.
End of Addendum No. 01
N O
P A R K
IN
G
N O
P A R K
IN
G
ROPE
COURSE
ROPE
COURSE
MER
GE
ONLYONLY ONLY
O NL Y O NL Y
ONLYONLY
ONL Y
ONL Y
PROJECT AREA
N
Existing Building
New Expansion
N
(561) 270-0178 Delray Beach, FL. 33445
601 N. CONGRESS AVE. SUITE 106A
Florida P.E. 83972 Pennoni Project No. RDCJP20005
Florida Coa 7819 Jeremy M. Case, P.E.
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
ABOVE GROUP, INC.
MECHANICAL ELECTRICAL PLUMBING
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
RDC / JOHN POE ARCHITECTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PENNONI ASSOCIATES, INC.
CIVIL & STRUCTURAL
2555 NURSERY ROAD, SUITE 101
CLEARWATER, FL 33764
727.325.1246 P
/2
/2
:5
:2
A
M
Expand Emergency Department at Lake Nona
08/13/2021
COVER SHEET
G001
NSKR
675-901
Orlando, Florida
Expand Emergency Department at Lake Nona 5201 Raymond Street Orlando, Florida 32803 PROJECT #: 675-901
Kevin Glover - COR
CONSTRUCTION
DOCUMENTS
20016.00
G001 COVER SHEET
G100 CODE DATA
CS-021 EXISTING CONDITIONS PLAN
CS-051 DEMOLITION PLAN
CS-052 EROSION CONTROL NOTES AND DETAILS
CS-101 SITE PLAN
CS-151 GRADING AND UTILITY PLAN
AD101 DEMOLITION PLAN
AD102 DEMO SECTIONS
A001 WALL TYPES
A101-D DIMENSION PLAN
A101-N NOTE PLAN
A102 ROOF PLAN
A121 REFLECTED CEILING PLAN
A201 EXTERIOR ELEVATIONS
A301 BUILDING SECTIONS
A311 WALL SECTIONS
A401 TOILET ROOM PLANS & ELEVATIONS
A402 INTERIOR ELEVATIONS
A511 CASEWORK SECTIONS & DETAILS
A601 DOOR SCHEDULE & DETAILS
A602 WINDOW DETAILS
AF101-F FLOOR FINISH PLAN
AF101-W WALL FINISH PLAN
AF601 FINISH LEGEND
AS101 SIGNAGE PLAN
IF101 FF&E
S001 STRUCTURAL GENERAL NOTES
S002 WIND TABLES & SCHEDULES
S101 FOUNDATION PLAN
S102 ROOF FRAMING PLAN
S501 FOUNDATION DETAILS
S510 COMPOSITE FRAMING DETAILS
S511 FRAMING DETAILS
S901 ISOMETRIC VIEW
FP001 FIRE PROTECTION LEGENDS, SYMBOLS, & GENERAL NOTES
FD111 FIRE PROTECTION DEMO PLAN - LEVEL 1
FP111 FIRE PROTECTION OVERALL PLAN
FP121 FIRE PROTECTION INTERSTITIAL PLAN
FP501 FIRE PROTECTION DETAILS
P-001 PLUMBING LEGENDS, SYMBOLS, & GENERAL NOTES
PS111 PLUMBING GRAVITY OVERALL PLAN
PS121 PLUMBING GRAVITY PLAN - LEVEL 1 ROOF
PP111 PLUMBING PRESSURE OVERALL PLAN
PP121 PLUMBING PRESSURE PLAN - LEVEL 1 INTERSTITIAL
PG111 PLUMBING MED GAS OVERALL PLAN
PG121 PLUMBING MED GAS PLAN - LEVEL 1 INTERSTITIAL
P-401 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-601 PLUMBING GRAVITY ISOMETRICS
P-602 PLUMBING PRESSURE ISOMETRICS
P-603 PLUMBING MED GAS ISOMETRICS
P-801 PLUMBING SCHEDULES
M-001 MECHANICAL LEGENDS, SYMBOLS, & GENERAL NOTES
MD111 MECHANICAL HVAC DEMO PLAN - LEVEL 1
MH111 MECHANICAL DUCTWORK PLAN - LEVEL 1
MH112 MECHANICAL HVAC PLAN - LEVEL 1 ROOF
MP111 MECHANICAL PIPING PLAN - LEVEL 1
MP112 MECHANICAL PIPING PLAN - LEVEL 1 INTERSTITIAL
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-701 MECHANICAL CONTROLS
M-801 MECHANICAL SCHEDULES
E-001 ELECTRICAL LEGENDS
E-002 ELECTRICAL GENERAL NOTES
ED111 ELECTRICAL - OVERALL DEMO
E-111 ELECTRICAL OVERALL PLAN
EL111 ELECTRICAL - EXPANSION LIGHTING PLAN
EP111 ELECTRICAL - EXPANSION POWER PLAN
EP121 ELECTRICAL - EXPANSION ROOF POWER PLAN
E-401 ELECTRICAL ENLARGED PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 ELECTRICAL - PARTIAL ONE-LINE DIAGRAM
E-801 ELECTRICAL SCHEDULES
E-802 ELECTRICAL PANEL SCHEDULES - EXISTING
E-803 ELECTRICAL PANEL SCHEDULES - NEW WORK
T-001 TELECOM LEGEND AND ABBREVIATIONS
TD111 TELECOM - OVERALL DEMO
T-101 TELECOM - OVERALL
TN111 TELECOM - EXPANSION VOICE/DATA
T-501 TELECOM - DETAILS AND DIAGRAMS
FA001 FIRE ALARM LEGEND AND ABBREVIATION
FD111 FIRE ALARM - OVERALL DEMO
FA111 FIRE ALARM - EXPANSION PLAN
FA501 FIRE ALARM DETAILS
FA601 FIRE ALARM DIAGRAMS
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND
DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13
WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,
HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS
AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL
WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. iF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE
THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF
THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO
AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER
RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS
IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY
FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
DRAWING INDEXVICINITY MAP
KEY PLAN
Revisions Date
1 Addendum 01 04/21/2022
RECORDS MANAGEMENT LANGUAGE FOR CONTRACTS (NARA)
The following standard items relate to records generated in executing the contract and should be included in a typical Electronic Information Systems (EIS) procurement contract:
1. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29, 31 and 33; Freedom of Information Act (5 U.S.C.
552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.
2. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records.
4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.
5. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.
6. The Government Agency owns the rights to all data/records produced as part of this contract.
7. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.
8. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].
9. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.
10. Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.
G001