36C77621R0077 0001.docx
DOCX document 19 KB Posted
- Attached to
- Y1MG--654-19-3-6360-0025, Construction, 654-19-914, Solar Panels New Parking Garage, (VA-19-00049803)
- Solicitation number
- 36C77621R0077
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 8 - Wage Determination SCA - WASHOE - 12-21-20.txt | TXT text file | |
| Attachment 9 - Wage Determination DBA - WASHOE - 2-12-21.txt | TXT text file | |
| Attachment 7 - EP401 ENLARGED ELECTRICAL PLANS.pdf | ||
| Attachment 6 - EP101 POWER _ SIGNAL PLANS - LEVEL 1.pdf | ||
| 36C77621R0077_1.docx | DOCX document | |
| Attachment 3 - SI001 - GENERAL NOTES -STRUCTURAL.pdf | ||
| Attachment 2 - Specs.zip | ZIP file | |
| Attachment 4 - Contractor Safety and Environmental Record Evaluation Form.docx | DOCX document | |
| Attachment 1 - SOW - Reno Solar Array DB.docx | DOCX document | |
| Attachment 5 - Release of Claims.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 36C776 Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131 00076 Department of Veterans Affairs Department of Veterans Affairs 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131 To all Offerors/Bidders
36C77621R0077
X X X
The purpose of this amendment is to provide answers to vendor questions.
The due date for Phase I porposals is NOT extended.
Andrea Fink
CONTINUATION PAGE
Pre-Solicitation 36C77621R0077 Amendment A0001 Reno Solar Array Design-Build Answer to Vendor Questions
1. Will there be a site visit scheduled for this project?
Answer: Yes, a site visit will be scheduled for Phase II.
2. Are Offerors permitted to submit Key Subcontractor experience for Factor 2: Design-Build Experience?
Answer: No. Subcontractor Key Personnel Experience may be submitted as detailed in Phase I, Factor 2. a). Subcontractor Experience may not be submitted for Phase I, Factor 2. b) Design- Build Team Experience.
3. The RFP details three Volumes to be submitted: Volume I Non-Price, Volume II Price and Volume III Administrative. Please confirm which Volumes should be submitted for Phase I.
Answer: Volume I
4. Confirm email attachment limit is 5MB.
Answer: The email attachment limitation is 10 MB.
5. Please confirm the minimum number of projects to be submitted for Factor 2 – page 12 paragraph (b.) states both a minimum of 3 and then a minimum of 1.
Answer: A minimum of 3 projects the D-B team has done together as the prime, at least one (1) of which must have involved designing and constructing a solar array.
Phase I, Factor 2. b) Design- Build Team Experience has been edited for clarity as reflected below:
0. b. Design-Build Team Experience: The evaluation team will assess the offerors experience with construction conducted within an active healthcare setting, including previous means and methods employed to reduce the risk of infection in healthcare facilities. The offeror will be assessed for its prior history to manage interim life safety measures during construction including alternate routing, signage, and provision of devices to ensure the healthcare facility is always compliant with Fire Life Safety code. The Design-Build team will be assessed for its prior design-build experience as the prime. The prime will provide a list of a minimum of three (3) to a maximum of five (5) contracts that are similar in scope and magnitude and within five (5) years of project completion. A minimum of one (1) of the contracts submitted must involve designing and constructing a solar array similar in scope and magnitude to this project. If submitting as a teaming arraignment the prime will provide number of years and projects they’ve completed together.
0.
0. Offerors response shall include:
• Approximate building footprint for completed parking garage projects
• Provide the Project Title and Description, Project Location (Physical Address); Contract Type (Example: Design-Build, Design-Bid-Build).
• Provide the project owner’s name and telephone number of the owners contact per-son.
• State if offeror was working as a prime or subcontractor and the actual work completed.
End of Document
File details come from the government source that posted it. Updated .