This document contains technical questions and responses related to a solicitation for construction of a new 11,115 square foot hospice cottage at the Sioux Falls VA Medical Center. Key details include specifications for various building systems and components such as metal roofing, windows, doors, hardware, ceilings, and medical equipment. Responses address questions about materials, warranties, equivalencies, and design intent. The solicitation number is 36C77621B0016 and responses were provided between September 1-14, 2021. The completed project will be owned and operated by the Department of Veterans Affairs.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #36C77621B0016 Construct CLC Cottage – Sioux Falls
Technical Questions and VA Response Tracking Sheet
ITEM
NO.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
1. 9-1-21 9-8-21 Is this project tax-exempt? If yes, please issue the Tax Exemption number for bidding purposes. If not, what is the percentage of tax?
No, this is not exempt of sales tax. Contractors are required to pay sales and excise tax. Offerors shall include all applicable taxes in accordance with FAR by Reference Clause 52.229-3 “Federal, State and Local Taxes.” Percentage of tax information is the responsibility of the offeror.
2. 9-1-21 9-14-21 Has Sioux Falls Engineering incorporated winter conditions for this project? Has additional time been added to the performance period of the project to account for the lack of work that will be able to be performed during the winter? Can submittals be provided in the winter and then the project start-up in the spring?
Winter conditions have not been incorporated for this project. The period of performance has included a time period for the winter months. The VA would like to start the site work on the project prior to ground freezing and adjust period of performance if necessary.
3. 9-1-21 9-13-21 Is there a soils report for the CLC Cottage project? Yes, dated 9/1/2016. Reference attachment titled - Geotechnical Report - 9-1-2016
4. 9-1-21 9-13-21 I was wondering if you would approve a substitution request for EcoStar Synthetic Slate in place of the Edco Arrowline Metal Slate. The metal roof tile is specified in section 07 31 14.
The technical information, which was submitted with your request, is insufficient to provide a reasonable response. There are a number of suggested component changes (underlayment, recommended flashing type, etc.) that are not sufficiently vetted in the request, which would require multiple changes within the specs to accommodate.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
5. 9-7-21 9-13-21 Due to non-compliance of the FIPS encryption/cybersecurity regulations to safeguard patient information, the Rauland Responder 5 has been listed as a DIVEST product status by the VA Office of Information and Technology. (VA Technical Reference Model v 21.7). In lieu of this, will the hospital accept a nurse call system that is equal to or greater in functionality than the listed nurse call specifications, but is FIPS and OI&T compliant? For reference, see following link:
https://www.oit.va.gov/Services/TRM/ToolPage.aspx?ti d=9735#
The Sioux Falls VA is not using Responder Enterprise which is a DIVEST product. The Sioux Falls VA is using Responder 5, version T17 which is not a DIVEST product.
6. 9-7-21 9-14-21 Should the hospital determine that using “stand alone” Rauland 5 supplied servers allows for the use of the Rauland 5 system (despite VA Technical Reference Model v 21.7), does the hospital still intend to connect existing mobile and Vocera phones to the Rauland 5 system?
Yes. Currently the VA has virtual servers running Responder 5 system including Vocera phones.
7. 9-7-21 9-14-21
If hospital intends to connect mobile devices and Vocera phones to the Rauland 5 servers (for visibility to alerts and basic alarms) via a middleware system, then it seems the entire system of Rauland 5/Middleware/Vocera phones becomes non-compliant because of the connectivity to the non-compliant Rauland 5 system (per VA Technical Reference Model v 21.7). In lieu of this, will the hospital accept a nurse call system that is equal to or greater in functionality than the listed nurse call specifications, but is FIPS and OI&T compliant?
See answer to #5.
https://www.oit.va.gov/Services/TRM/ToolPage.aspx?tid=9735 https://www.oit.va.gov/Services/TRM/ToolPage.aspx?tid=9735
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
8. 9-7-21 9-14-21 As a back up to the VA FIPS Encryption Regulations, should the nurse call vendor also have ATO-C and RMF Certification for added security to patient information?
See answer to #5.
9. 9-7-21 9-14-21 For ACUTE care patient rooms with medical/ICU beds/labor beds, do the staff expect to plug the bed into a bed connector for the bed exit alarm to alert the nurse call system?
Yes. The system needs to have the option to connect to bed exit alarm.
10. 9-7-21 9-14-21 For ACUTE care patient rooms, there are smart bed safety data points that are currently being transmitted by hospital owned beds. Does the nursing staff want the extra bed data to be displayed on any monitors via the nurse call system? (ex. Is the bed in its low safest position? Is the bed exit alarm on? Is the bed plugged in?
etc.)
Yes. The nursing staff want the option to add the data points to display monitors through the nurse call system.
11. 9-7-21 9-13-21 Please find the attached documents for the prior approval request for Tubelite for sections 084113 & 084413.
The technical information, which was submitted with your request, is insufficient to provide a reasonable response. Neither the provided aluminum entrance data or the provided curtain wall data address the specific blast resistance criteria set forth in the specifications. Somewhat related data was provided, but either was unclear or tested at a much farther stand-off distance that doesn’t apply to this project.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
12. 9-7-21 9-13-21 All details for elevations W1-W9 show curtainwall as the system being used. I see there is both a storefront spec (084113) and a curtainwall spec (084413) and wanted to clarify if all these windows are in fact curtainwall or if they are to be storefront? Please clarify if there is both storefront and curtainwall on this job or only one or the other.
Specification 08 41 13 only includes Aluminum- Framed Entrances, as explain in Paragraph 1.1.
13. 9-7-21 9-13-21 The finish on the aluminum for windows W1-W9 is called out in the storefront and curtainwall specs as dark bronze anodized. The storefront spec (084113) calls out a painted finish warranty of 20 years but does not call out an anodized finish warranty. Please indicate the anodized finish warranty desired if storefront systems are being utilized. Note that the maximum anodized finish warranty is 10 years.
Specification 08 41 13 Paragraph 2.3.A.2 explains the finish to be Dark Bronze Anodized.
14. 9-7-21 9-13-21 Please indicate the glass type for door 032 which is listed in the door schedule on AS301 as a hollow metal type NV door.
G3
15. 9-7-21 9-13-21 Please indicate the glass type for door 100F-54 which is listed in the door schedule on AS301 as an aluminum type FG door.
G2
16. 9-7-21 9-13-21 Door 117.2-54 calls for an F1 frame type but on the first floor plan per AS101, it appears that 117.2-54 has a sidelite as well. Can you clarify if this sidelite is supposed to be there, and if so, can you please provide an elevation for this type?
See 1/AS402.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
17. 9-7-21 9-13-21 Door 117.1-54 calls for glass type G-1, however, frame W9 that this door goes into is all type G2. Do you want the door glass type G-1 and frame glass type G-2 or all the same glass type?
Change the glass type for Door 117.1-54 to G2 to match the surrounding curtain wall glazing.
18. 9-7-21 9-13-21 Can you please give U-factor and SHGC values for glass type GL-1? The glazing spec (088000) gives these values for a sealed insulated laminated unit (GL-2) but not for an insulated low-e unit like G-1.
Please meet or exceed the performance values of
GL-2.
19. 9-7-21 Can you please provide a list of general contractors who will be bidding on this project?
I regret to inform you that no such list exists.
There is a list of vendors that attended the site visit. The list has been posted to the website where we advertise the solicitation. No further information will be provided.
20. 9-7-21 9-13-21 What does the “S” label stand for in the door schedule? Smoke rated.
21. 9-7-21 9-14-21 I also have a request for an Auto Operator. We would like to use Stanley Magic Force Heavy Duty single swing door operators. Would these be acceptable? If not, what operators would be acceptable?
The Stanley Magic Force heavy Duty single swing door operators are an approved operator.
22. 9-7-21 9-13-21 I also wanted to verify if the recycled content listed in section 087113 is required? I have not seen a recycled content listed for auto operators before, so I wanted to verify this part.
Recycled content is not required.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
23. 9-8-21 9-13-21 Please refer to the Spec Manual, 090600-8, C. Section 095423, Linear Metal Ceilings- Please clarify the color of the Metalworks Effects. I will attach the data sheet with the colors for the Architect to choose from. Please note that the "Effects Classic" will be the less expensive option of color lines. We will need the color clarified in order to get accurate pricing.
a. Please refer to the Trim and Accessory data sheet. Will the Linear Metal Ceilings require any trim? If so, please clarify the size and color of the trim.
b. Please refer to the data sheet, the unperforated #7160 will not have any noise reduction. Please verify this is what the Architect would like to proceed with.
A. Colors to be selected from metalworks effects subtle line. Color to be coordinated with the VA.
B. Ceilings are surrounded by Gyp for trim.
C. Please use Microperforated panels.
24. 9-8-21 9-13-21 Please tell me the rooms that will need the Linear Metal Ceilings installed. From my understanding the following rooms will need the Linear Metal Ceilings Installed; 126- 54, 124-54, 119-54, 118-54, 115-54, 105-54, 107-54, 109-54, 114-54, 116-54. Please clarify and please let me know if I have missed any areas.
115-54, 113-54, All resident rooms. 125-54 was missed here.
25. 9-8-21 9-13-21 Sheet AS601, Dining 113-54; is the ceiling in this area a cloud? Please see the attached sheet- I have circled the area I am referring to. If this ceiling is a cloud please clarify the size and color of the trim.
There is not a cloud in this area; ceiling terminates to gyp surround. See Sheet AS203.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
26. 9-8-21 9-13-21 Sheet AS601, Living 115-54; does the wood ceiling in this room require any trim? Or is this recessed in gypsum? Please clarify the design intent for this area.
a. If the wood ceiling in this room requires trim please tell me the trim size and color (refer to the trim and accessories data sheet.)
b. Sheet AS601, Living 115-54; will the lights in this room be hanging lights or will they need to be trimmed out?
A. This ceiling is recessed in Gypsum.
B. N/A C. Per section 2/AS203 these lights are hanging.
27. 9-8-21 9-14-21 Please see the attached data sheets for Armstrong Cortega #704 and USG Radar #2220. Radar #2220 is the equivalent to Armstrong Cortega #704. Will you accept USG as an equivalent?
Arnstrong Cortega #704A is a non-direction ceiling tile that is a standard of the Sioux Falls VA. Radar ceiling tile will not be accepted.
28. 9-8-21 9-14-21 Refer to Spec Section 01 35 26, paragraph 1.7 “SITE
SAFETY AND HEALTH OFFICER” (SSHO) AND
“COMPETENT PERSON” (CP):
Can the project superintendent also perform the role of
SSHO?
Per specification section 01 00 00 The competent person and the SSHO cannot be the same person.
29. 9-8-21 9-14-21 Will the VA provide all utility locates? The VA will not provide utility locates. The VA will provide a up to date map with known underground utilities. SD One Call will mark the
ROW.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
30. 9-8-21 9-13-21 Video Management System (CCTV):
Per the Camera General Notes referenced on Sheet EY101, regarding Camera types/models, shall the models and mounting styles be consistent with other recent projects (i.e. mental health)? Multi-sensor cameras on the exterior corner locations and fixed vari-focal elsewhere?
Yes.
31. 9-8-21 9-13-21 Video Management System (CCTV):
Per the Camera General Notes referenced on Sheet EY101, a new recording server will be required, JCI is assuming this will factor continuous archiving at twelve
(12) fps with ninety (90) days of video retention to match existing design. The recording server will reside in the Building 5 MDF closet.
Please confirm and/or clarify if different.
Yes.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
32. 9-8-21 9-13-21 Video Management System (CCTV):
Per Sheet EY602, Detail 4, to match existing deployment as the campus VMS resides on a dedicated network backbone and IT infrastructure, within IT Room 203-52, a JCI provided Network POE Switch would be required while interconnected to the JCI Fiber Switch (provided under separate contract) located within the Building 5 MDF closet. Given the isolated network backbone, a dedicated fiber would be required to interconnect these two switches.
Please confirm and/or clarify if different.
Please specify the fiber if/as required to match current fiber runs or VA requirements.
Correct
Match existing fiber already called out on planes.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
33. 9-8-21 9-13-21
Video Management System (CCTV):
Per Sheet EY101, regarding the camera located on the East side of Door 100B-54 (wall mount)
i. Does this entail an A/V intercom? Please clarify.
ii.
Covers entry into stair. Can be single camera covering stairway door and corridor doors if coverage is doable.
34. 9-8-21 9-13-21 Patient Wandering System:
As referenced within the electrical drawings, this system is assumed to be standalone serving only the CLC. Please confirm if otherwise.
System to be stand alone, with future ability to connect to campus wide system being implemented.
35. 9-8-21 9-13-21 Patient Wandering System: Per Sheet EY602, regarding the work room annunciator are LED (specific to each door) & Piezo alerts sufficient or is a graphical display requested? Please clarify.
Intent is a centralized graphic display and control (similar to Accutech LS2400 Keypad w/Display)
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
36. 9-8-21 9-13-21 Div 08 Hardware schedule: Group SDO-102 references an intercom on door 117.2-54 but there isn’t a product reference.
a. Is an Aiphone IX series solution sufficient, point-to-point audio with a recessed wall-mount door station at the door?
b. Regarding workroom 120-54, is a recessed wall-mount or desktop station preferred?
c. I did not see any rough-in notes on Sheet EY101.
Please clarify.
See specification 28 13 00.
37. 9-8-21 9-13-21 Div 08 Hardware schedule: Group SDO-103 references public address / mass notification as a system that would be expanded upon or monitored by. Please explain.
See specification 27 51 16.
38. 9-8-21 9-13-21 Refer to the Door Schedule on Sheet AS301, there are openings with “Blast Rated” in the Remarks Column, but a specification was not provided. Please provide a specification for the required Blast Rated openings.
Blast resistance criteria is explained in Section 08 41 13 for aluminum entrances. Blast resistance performance characteristics have already been handled within Section 08 11 13 for hollow metal doors and frames.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
39. 9-8-21 9-13-21 Refer to the Door Schedule on Sheet AS301, Door Remarks Note #1 is unclear. Please provide a wall/door elevation depicting the framing/configuration of the “Patient Lift Track” pass through.
Please use this more accurate door and frame elevation for the Patient Lift Tracks passing through the Restroom doors. The distance between the top of door panel to frame head shall be coordinated and verified with the ceiling lift manufacturer.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
40. 9-8-21 9-13-21 Refer to the Door Schedule on Sheet AS301, some doors have an “S” in the Door Label column. Please provide clarification of the “S” Label.
Smoke rated.
41. 9-8-21 9-14-21 Refer to Specification Section 08 71 00 Door Hardware, page 28 Security Door Openings lists door hardware product numbers as “Proprietary”, but no product is specified. Please provide product numbers for each required door hardware items.
Door hardware for security door openings are a PACS (Physical Access Control Systems) by Johnson Controls Inc.
42. 9-8-21 9-13-21 Refer to Specification Section 08 71 00 Door Hardware, Set SDO-102 lists (1) Intercom. The Intercom should be provided in Division 28, not Division 08. Please specify any required intercom system in Division 28 documents and remove from the hardware schedule.
The hardware schedule will remain as-is to assure the intercom(s) are installed with the correct doors.
43. 9-8-21 9-13-21 Refer to Specification Section 08 71 00 Door Hardware, Set SDO-102 lists (1) Card Reader. The Card Reader should be provided in Division 28, not Division 08.
Please specify any required Card Reader in Division 28 documents and remove from the hardware schedule
The hardware schedule will remain as-is to assure the card readers are installed with the correct doors.
44. 9-8-21 9-13-21 Refer to Specification Section 09 06 00, Section 08 14 00 Interior Wood Doors specifies Marshfield, Choice Laminate but, no Color is specified. Please provide a color selection for accurate pricing.
The color shall be selected from the full range of manufacturer’s colors.
45. 9-8-21 9-13-21 Refer to Specification Section 08 71 00 Door Hardware, specifies LSDA locksets. The campus standard are Falcon locksets. Please confirm the VA wants LSDA locksets.
The campus standard has been clarified to be LSDA locksets by VA staff.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
46. 9-8-21 9-13-21 Refer to Specification Section 08 14 00 Interior Wood Doors, specifies Marshfield Aspiro Series as the Basis of Design. The campus standard wood doors are Acrovyn impact doors. Please confirm the VA wants Marshfield Aspiro impact doors.
The Basis-of-Design is simply the choice selected for specification. Equals can be considered for product substitution.
47. 9-8-21 9-13-21 Please refer to the Spec Manual, 09 06 00-8, C. Section 09 54 23, Linear Metal Ceilings. Please clarify the color of the Metalworks Effects, attached is the data sheet with the colors. Please note that the "Effects Classic" will be the less expensive option of color lines. We will need the color clarified in order to get accurate pricing.
See answer to #23.
48. 9-8-21 9-13-21 Please refer to the Specification Section 09 54 23, 1.1 A3 Accessories. Please clarify the size and color of the trim for accurate pricing.
See answer to #23.
49. 9-8-21 9-13-21 Please refer to the Spec Manual, 09 06 00-8, C. Section 09 54 23, Linear Metal Ceilings. The specified Strip Face Size, 6” Unperforated 96 X 6 X 5/8” will not have any “noise reduction” as specified in Section 09 54 23. Please confirm noise reduction is not required.
Please provide Microperforated at the same size.
50. 9-8-21 9-13-21 Refer to Sheet AS601, the Ceiling Legend refers to “Wood Ceiling”. Please confirm this should indicate the locations of the “Linear Metal Ceilings”.
Yes, wood ceiling to be Linear metal ceilings in Armstrong metalworks linear effects subtle.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
51. 9-8-21 9-14-21 Refer to Spec 095100, Acoustical Ceilings: ATC-1 is calling for Armstrong Cortega #704. Please see the attached data sheets for Armstrong Cortega #704 and USG Radar #2220. Radar #2220 is the equivalent to Armstrong Cortega #704. Please confirm USG Radar #2220 will be accepted as an equivalent to the specified Armstrong Cortega #704?
See answer to question #27.
52. 9-8-21 9-13-21 Refer to Specification Section 12 24 00 Window Shades and 09 06 00 Division 12 Furnishings. The Room Schedule does Window Shades/Motorized locations.
Please provide locations of desired window shades and motorized window shades.
All locations are explained in Paragraph 3.1.B.
53. 9-8-21 9-13-21 Refer to Sheet AS301, the Room Finish Schedule includes a column Room Sign but no specification or detail was provided for Room Signs. Please provide a detail/specification for any required Room Signs.
Room signage is owner provided / owner installed.
54. 9-8-21 9-14-21
Refer to Sheet AS301, the Equipment Schedule lists Ceiling Lifts as Owner Furnished/Contractor Installed.
No manufacturer or structural support design was included in the documents. Please provide the Ceiling Lift manufacturer and structural support system design.
Equipment list shall change to owner furnished owner installed.
55. 9-8-21 9-14-21 Refer to Sheet AS301, the Equipment Schedule lists TV Mount as Contractor Furnished/Contractor Install but, no specification was provided. Please provide a specification for the TV Mounting system required.
TV Mount shall be articulating and support a 24 -
36” TV.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
56. 9-8-21 9-13-21 Refer Sheet AS404, Detail 8/AS404 notes a ACM Panel facia. No specification/product manufacturer was provided with the documents. Please provide a specification and correct section details for any ACM Panels required.
There is not a Basis-Of-Design for the ACM Panels.
57. 9-8-21 9-13-21 Refer to the Asbestos Report provided with the solicitation. The report indicated that all asbestos has been abated in the area of the link connection. Please confirm no asbestos abatement is required with this solicitation.
All existing construction that is slated to be demolished will always have the possibility of asbestos-containing materials, due to the age of the building.
58. 9-8-21 9-13-21 Refer to Sheet AS301, the Ceiling Lifts listed on the Equipment Schedule do not match the lifts shown on Sheet AS601 RCP. Please update the Equipment Schedule to match the Reflected Ceiling Plans.
Ceiling lifts are to be provided at all locations shown in the Drawings.
59. 9-8-21 9-13-21 Refer to sheet EY601, Detail #1 depicts (2) two FAAP panels coming out of Panel FACP. Are these local annunciators to serve only the CLC FACP or are these to be network annunciators capable of displaying campus wide information? Please advise.
Annunciators can serve only the CLC.
60. 9-8-21 9-13-21 Refer to sheet EY601, Detail #1. Can the fiber shown between FACPs be substituted with copper? So long as the copper is placed within conduit, does not exceed 1,800’ and is separated from primary power, this may be a cheaper and better outcome while also consistent with the remaining campus fire alarm network. Please advise.
Fiber was requested for the connection. Panel may need to be installed as network node, based on VA decision for existing panel (upgrade/upsize).
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
61. 9-8-21 9-13-21 Refer to Specification 09 06 00, Section 09 54 23 Linear Metal Ceilings, specifies “Metalworks Linear Classics”.
The Armstrong Technical Representative has indicated these panels can not be installed vertically/parallel the slope as shown on Sheet AS601. Please confirm the specified panels can be install perpendicular to the sloped ceiling.
The panel orientation must be vetted with the Architect and Technical Representative during the submittal process.
62. 9-8-21 9-13-21 Refer to Sheet AS102, Detail 8/AS102 Bath 114A-54 does not include an interior elevation symbol. The Toilet Accessories have not been specified for the Resident Room C (Bariatric). Please specify any required Toilet Accessories for Bath 114A-54.
Toilet accessories for resident room c to match resident room A.
63. 9-8-21 9-14-21 Refer to Sheet AS301, Equipment Schedule. Equipment E-108-54a “Tub” CF/CI. Please provide specifications and any required connections for the tub.
PACIFIC SPA model # 360022-X
64. 9-8-21 9-13-21 Refer to Sheet AS301, Equipment Schedule. Equipment E-109-54d “Fireplace” CF/CI. Please provide specifications and any required connections for the fireplace.
Please submit per Drawings with front-venting capabilities.
65. 9-8-21 9-14-21 Refer to Sheet AS301, Equipment Schedule. Equipment E-109-54e “Adjustable Wall-Mounted Computer Arm” CF/CI. Please provide specifications and any required connections for the Adjustable Wall-Mounted Computer Arm.
Wall Mounted Computer Station with foldable keyboard arm. SKU#772480
Or Approved Equal
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
66. 9-8-21 9-13-21 Refer to Sheet AS301, Equipment Schedule. Equipment E-109-54i “Medicine Cabinet” CF/CI. Please provide specifications and any required connections for the Medicine Cabinet.
Per Schedule Note #5, see Specification 10 28 00.
No connections are required.
67. 9-8-21 9-13-21 Refer to Sheet AS301, Equipment Schedule. Equipment E-109-54j, E-109-54k, & E-109-54l do not have an Equipment Name. Please provide name, specification, and required connections.
Those are medicine cabinets.
68. 9-8-21 9-13-21 Refer to Sheet AS301, Equipment Schedule. Equipment E-112-54b “Hood” CF/CI. This Hood should come with the Owner Furnished Range? Please provide specifications and any required connections for the Hood.
No. See sheet MS601 for hood schedule.
69. 9-8-21 9-13-21 Refer to Sheet AS301, Equipment Schedule. Equipment E-127-54c “Lockers” CF/CI. Please provide specifications and any required connections for the Lockers.
Please provide per design shown on 14/AS502.
70. 9-8-21 9-13-21 Refer to Sheet AS301, Equipment Schedule. Owner Furnished/Contractor Installed Items. Please provide specifications and any required connections for all of the equipment furnished by the Owner required to be installed by the contractor.
Please submit per Drawings with front-venting capabilities.
71. 9-8-21 9-13-21 Do the data racks in room 204-54 need to be 2-post open racks, 4-post open racks or server enclosures?
Min 24” wide, 30” deep, 4-post deep channel floor mounted racks.
ITEM