This document outlines a Quality Assurance and Surveillance Plan (QASP) for a Tele-ICU Enterprise Turn Key IDIQ contract opportunity with the Department of Veterans Affairs. The contract requires providing 99.9% uptime reliability for proprietary software, interfaces, hardware and video capabilities. It establishes six Performance Requirement Standards addressing uptime reliability, issue resolution, invoicing, training compliance, reporting and documentation. Acceptable performance thresholds, surveillance methods and remedies for missed deadlines or errors are defined for each standard. Late deliverables may incur penalties if revisions are needed after the fifth attempt.
36C77620R0002 ATTACHMENT C - QASP.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77620R0002-0002001.docx | DOCX document | |
| 36C77620R0002-0002000.docx | DOCX document | |
| 36C77620R0002-0001000.docx | DOCX document | |
| 36C77620R0002-047.docx | DOCX document | |
| 36C77620R0002-041.docx | DOCX document | |
| 36C77620R0002-043.doc | DOC document | |
| 36C77620R0002-038.docx | DOCX document | |
| 36C77620R0002-045.docx | DOCX document | |
| 36C77620R0002-037.docx | DOCX document | |
| 36C77620R0002-039.docx | DOCX document | |
| 36C77620R0002-042.doc | DOC document | |
| 36C77620R0002-048.docx | DOCX document | |
| 36C77620R0002-044.doc | DOC document | |
| 36C77620R0002-046.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C – Quality Assurance and Surveillance Plan The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success:
| Performance Objective (The Service required— usually a shall statement) |
| Standard |
| Performance Threshold |
(This is the maximum error rate. It could possibly be “Zero deviation from standard”) Method of Surveillance
PRS # 1
99.9% Uptime Reliability The prime contractor shall provide 99.9% uptime reliability for all propriety software, interfaces, hardware and other proprietary capabilities to include all required sub-licenses and sub-contracted capabilities on a fully integrated basis to include all video capabilities as part of the terms and conditions of this contract which pertains to the continued integrated connectivity of all products and services.
The requirement for 99.9% uptime reliability shall include the prime contractor’s intellectual property to and all required sub-licenses, hardware, and interfacing with the prime contractor intellectual property to include the proprietary video capability which shall be fully integrated under this contract with unit pricing as required by Federal law as prescribed in the Federal Acquisition Regulation.
The requirement for 99.9% uptime reliability shall also apply to all in- room equipment and/or hardware purchased under this contract in accordance with the standard commercial business practices of the prime contractor. The prime contractor shall be responsible for all sub-contractors for each VHA site requiring the installation of Tele ICU intellectual property and proprietary systems from the prime contractor to include all proprietary sub-licenses and sub-contracted video capabilities.
99.9%
No more than one unresolved incident, outstanding longer than five (5) business days, reported per 30 days.
100% Inspection and Validated Customer Complaint.
Contracting Officer’s Representative (COR) will work with the Biomedical Equipment Support Specialist and Chief Health Informatics Officer to receive customer complaints, evaluate deviations from 99.9% and quantitatively determine reasons for the lapse in standard prior to addressing the Contracting Officer or prime contractor.
PRS # 2
Project and Sub-Contractor Management
| The contractor shall provide all necessary project and sub-contractor management for the Tele-ICU Command Center and all participating beds as appropriate to include all required sub-licensed, sub-contracted, and/or third-party vendors to resolve reported issues to ensure a 99.9% uptime reliability level for the proprietary capability. |
| 100% |
| 100% Inspection and Validated Customer Complaint. |
Contracting Officer’s Representative will work with the Biomedical Equipment Support Specialist and Chief Health Informatics Officer to receive customer complaints, evaluate deviations from 99.9% and quantitatively determine reasons for the lapse in standard prior to addressing the Contracting Officer or prime contractor.
PRS #3
Timeliness
| Reported issues, not immediately resolved, will be addressed with a plan for resolution within 24 hours of report |
| 90% |
| The COR will work with the Command Center Chief Health Information Officer to review customer complaints and pursue appropriate action |
(User Survey)
PRS #4
Invoicing/Billing
| The contractor shall invoice in accordance with the terms and conditions established in this contract. |
| 100% |
| COR will review invoice prior to submission to payment and compare against contract. |
(Periodic Inspection)
PRS #5
TMS Compliance All staff to complete and submit training certificates for required TMS 10176, TMS 10203 and all other training requirement by the Department of Veterans Affairs as appropriate.
| 100% |
| The COR will provide periodic inspection of the contractor personnel files maintained with the contract. |
PRS #6
Reports/Documentation
| All reports shall be provided to the COR and Tele ICU Command Center Personnel on a monthly basis unless otherwise agreed upon timeframe is documented |
| 100% |
| The COR will report any late or missing reports on a quarterly basis |
Late Deliverables and/or Significant Errors or Omissions shall be handled in the following manner:
| 1st Attempt |
| Meets or exceeds all acceptable quality levels and expectations of task/ deliverable |
| 2nd Attempt |
| Does not meet all acceptable quality levels and expectations of task/ deliverable: 5 days to remedy and resubmit. |
| 3rd Attempt |
| Does not meet all acceptable quality levels and expectations of task/ deliverable: 3 days to remedy and resubmit with 5% deduction off line item price |
| 4th Attempt |
| Does not meet all acceptable quality levels and expectations of task/ deliverable: 1 day to remedy and resubmit with 10% off line item price |
| 5th Attempt |
| Does not meet all acceptable quality levels and expectations of task/ deliverable: The Government may not accept a deliverable that does not meet all acceptable quality levels and expectations of task/ deliverable after the 5th round of revisions from a Contractor. The contract in whole or part may be terminated for cause for failure to perform. |
The above QASP is only a sample and may change based on what the Contractor submits in their proposed Performance Work Statement (PWS).
Late deliverables:
1. Deliverables must be provided on the dates specified. Any changes to the delivery date must have prior approval (in writing) by the PM/CO or designate at least five business days prior to the deliverable due date
1. If the deliverable cannot be provided within the scheduled time frame, the Vendor is required to contact the Project Manager/Contract Manager in writing with a reason for the delay and the proposed revised schedule. The request for a revised schedule must include the impact on related tasks and the overall project
1. A request for a revised schedule must be reviewed and approved by the PM/CO before placed in effect. Contract Terms and Conditions may dictate penalties, costs, and other actions based on the facts related to the request for a revised schedule
Note 1: Significant errors or omissions are defined as deliverables not meeting the intent of the task and the work considered to be within scope of this order.
Note 2: Continued repetitive errors may result in an unacceptable rating on performance report to be used as part of the evaluation criteria on future order competition.