Attachment 2-PRS r2.pdf

PDF 88 KB Posted

Attached to
Q517--Staffing Service for Murfreesboro CMOP
Solicitation number
36C77022R0003
Issued by

About this file

This document is a Performance Requirements Summary (PRS) for a Staffing Service contract at the Murfreesboro CMOP (Consolidated Mail Outpatient Pharmacy) for the Department of Veterans Affairs. The PRS outlines specific performance objectives, standards, and surveillance methods for key contract requirements, including staffing, employee training, reporting, and productivity.

The document details five primary performance objectives: maintaining 97% of contracted positions filled per shift, ensuring 100% of employees have current training files, providing timely reporting, meeting VA productivity standards for pharmacy technicians and pharmacists, and maintaining shipper/packer performance standards at 80% productivity across auto, semi-auto, and manual packing areas. The government reserves the right to conduct comprehensive compliance surveillance beyond these specified performance objectives, with methods including 100% inspection of contractor records and visual surveillance of the production floor.

View the file

Other files

File Type Posted
Attachment 12 Performance Standards.pdf PDF
36C77022R0003 0008.pdf PDF
Attachment 5 Staff Matrix.xlsx XLSX spreadsheet
Attachment 11 Murfreesboro Solicitation Amendment Questions.pdf PDF
Attachment 3 WD 2015-4647 Rev 28 06-04-2025.pdf PDF
36C77022R0003 0007.pdf PDF
Attachment 1 PWS r3.docx DOCX document
36C77022R0003 0006.pdf PDF
Attachment 4-Solicitation Questions.docx DOCX document
Attachment 1 PWS r2 .docx DOCX document
Attachment 6 - Business Associate Agreement.docx DOCX document
36C77022R0003 0005 Conformed.pdf PDF
Attachment 2-PRS r1.docx DOCX document
Attachment 3 - WD 2015-4647 Rev 25 05-08-2024.pdf PDF
Attachment 5 - Past Performance r2.docx DOCX document
Attachment 5 - Staff Matrix r1.xlsx XLSX spreadsheet
Attachment 10 - Murfreesboro Site Visit Attendees.xlsx XLSX spreadsheet
Attachment 11 - Murfreesboro Questions and Answers.xlsx XLSX spreadsheet
Attachment 2 - PRS r1.docx DOCX document
Attachment 1 - PWS r1.docx DOCX document
36C77022R0003 0004.docx DOCX document
Attachment 9 - Business Associate Agreement.docx DOCX document
Attachment 3 - WD 2015-4647 Rev 22 12-27-2022.pdf PDF
36C77022R0003 0003.docx DOCX document
Attachment 6 - Past Performance r1.docx DOCX document
36C77022R0003 0002.docx DOCX document
36C77022R0003 0001.docx DOCX document
Attachment 2 - PRS.docx DOCX document
Attachment 4 - VHA Supplemental Contract Requirements for Combatting COVID-19.docx DOCX document
Attachment 7 - Site Visit Request Form 764.docx DOCX document
Attachment 3 - WD 2015-4647 Rev 21 20220826.pdf PDF
Attachment 8 - Site Visit Request Form 764A.docx DOCX document
Attachment 6 - Past Performance.docx DOCX document
Attachment 5 - Staff Matrix.xlsx XLSX spreadsheet
Attachment 1 - PWS.docx DOCX document
36C77022R0003.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/15/2024

Attachment 2 Murfreesboro CMOP Staffing Service Performance Requirements Summary

Performance Objective (Include

PWS Ref) Performance Standard Performance

Threshold Method of Surveillance

9.3 Contracted numbers of

positions filled

A minimum of 97% per shift for each CLIN

100% inspection of contractor records; visual surveillance of production floor.

9.6 All Employees have a

current training file. 100%

Periodic inspection of current personnel; 100% inspection of new personnel

9.8, 9.15, 10, 15.1 Provide timely reporting as per performance work statement

100% 100% inspection of contractor reports and records.

11.3.1

Contract pharmacy technicians and pharmacists must meet VA employee standards of productivity.

100%

Periodic inspection of contractor records; visual surveillance of production floor.

11.3.2

Shipper/Packer performance standards will be based on the expected productivity in each assigned area (auto packing, semi-auto packing and manual packing).

80% Periodic inspection of contractor records; visual surveillance of production floor.

Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.

File details come from the government source that posted it. Updated .