This is an Amendment/Modification to a Request for Proposal (RFP) for construction services at the Sioux Falls VA Health Care System. The solicitation (36C26326R0027) is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside issued by the Department of Veterans Affairs Network Contracting Office 23 in Omaha, Nebraska. The project, PN 438-22-600 "Improve Campus Bldg. Exteriors (SF)," involves building roof replacement and exterior improvement work at 2501 W 22nd Street, Sioux Falls, SD 57105, with a maximum performance period of 700 calendar days after Notice to Proceed. The amendment corrects the requisition number from 438-26-3916-0001 to 438-26-4-3916-0018 and provides the "Instructions to Bidders" document that was not previously posted.

Proposals must be submitted via email to Michael.Freeman3@va.gov as PDF files no later than the deadline specified in SF1442 Block 13.A (subject to amendment). The government will evaluate proposals using a Lowest Price Technically Acceptable (LPTA) approach, with evaluation based on four factors: (1) Technical/Schedule (non-price), (2) Experience—minimum three to five building roof replacement projects valued at $10,000,000 or above completed within the last five years (non-price), (3) Key Personnel Experience—Project Manager, Site Supervisor, Safety Manager, and Quality Manager with collective experience on projects valued at $10,000,000 or above (non-price), and (4) Price (evaluated for reasonableness). Required submittals include signed SF1442, VETS-4212 verification, current SBA Veteran Small Business Certification, Limitation of Subcontracting Certificate of Compliance, technical proposal (30-page maximum), experience documentation (20-page maximum), key personnel resumes (20-page maximum), bid bond, and detailed price proposal with breakdown. A pre-proposal site visit is scheduled for July 23, 2026, at 10:00 AM CT, and the technical question cut-off is August 10, 2026, at 10:00 AM CT. All offerors must be registered in SAM at proposal submission and award, verified in the SBA Small Business Search at both offer and award times, and compliant with CPARS registration requirements for contracts exceeding $900,000.

View the file

Other files

File Type Posted
S06_36C26326R0027 0005_08.19.2026.docx DOCX document
S06_Attachment 0_09113.01 - Addenda.pdf PDF
S06_Solicitation Questions v2026.xlsx XLSX spreadsheet
36C26326R0027 0004.pdf PDF
36C26326R0027 0003.docx DOCX document
36C26326R0027 0002.docx DOCX document
S06_Site Visit Sign in sheet_.pdf PDF
S02_SOW_05.29.26.docx DOCX document
S02 TMS 20939 VA Privacy Training - 3 Pages.pdf PDF
S02_Drawings_133 Pages.pdf PDF
S02_Construction Documents_596 Pages.pdf PDF
S02_WDOL_7 Pages.pdf PDF
S02_VA6500 Appendix C 1 - 1 page.pdf PDF
36C26326R0027.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

07-08-2026

438-26-4-3916-0018

438-22-600 36C263

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 23

111 SOUTH 18TH PLAZA, SUITE C125

Omaha NE 68102

36C263

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING OFFICE 23

Michael W. Freeman

111 SOUTH 18TH PLAZA, SUITE C125

OMAHA NE 68102

To all Offerors/Bidders

36C26326R0027

X

438-3660162-3916-854200-3220 23NR2WA24

POC: Michael W. Freeman, Michael.Freeman3@va.gov PROJECT NUMBER: 438-22-600, Improve Campus Bldgs. Exteriors (SF) Project Location: Sioux Falls VA Health Care System, 2501 W 22nd St, Sioux Falls, SD 57105

The purpose of this amendment is answer vendors RFI and Questions.

- Block 4: The 2237 number is hereby changed from 438-26-3916-0001 to now read 438-26-4-3916-0018.

- The instructions to bidders did not post and is now included in this amendment.

Jennifer Johnson Contracting Officer

SAOC16L3-0537

***** Begin Inserted Word Document - ' INSTRUCTIONS TO BIDDERS' *****

BIDDERS/OFFERORS

1. AVAILABILITY OF SOLICITATION DOCUMENTS

All solicitation related documents will be published on the Contract Opportunities website at https://sam.gov.

2. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

3. SDVOSB SET-ASIDE

This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Offers received from other than Service-Disabled Veteran-Owned Small Business concerns will NOT be considered. All SDVOSBs must be listed as verified in the Small Business Search at https://search.certifications.sba.gov/ at TIME OF SUBMISSION OF OFFERS, as well as at TIME OF AWARD. Failure to be BOTH visible and verified at the time of offer and time of award will result in the offeror’s proposal being deemed unacceptable and ineligible for award.

4. SELECTION PROCEDURES

This is a Request for Proposal in accordance with RFO Part 15. The Government will award a contract resulting from this solicitation to the offeror whose offer conforming to the solicitation is determined by the Source Selection Authority to provide the best overall value to the Government utilizing the Lowest Price Technically Award (RFO 15.103-2) method of evaluation. It is the intent of the Government to award without discussion; however, the Government reserves the right to engage in discussions. If the Contracting Officer decides that discussions are in the Government’s best interest, they will be conducted in accordance with RFO 15.306.

5. PRE-PROPOSAL SITE VISIT

A pre-proposal site visit will be conducted July 23, 2026, at 10:00 AM CT in the Engineering Conference room. The POC is Miles Bowen and telephone number is (605) 336-3230 6034 and his email address is miles.bowen@va.gov

6. TECHNICAL QUESTIONS

Questions of a technical nature must be provided in writing and must be submitted by the prospective offerors to Michael W. Freeman, Contract Specialist. Questions must be submitted only via email to: Michael.Freeman3@VA.GOV The subject line should read: 36C26326R0027, PN: 438-22-600, Improve Campus Bldg. Exteriors (SF) – Technical Questions. Oral questions of a technical nature are not acceptable. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS August 10, 2026, at 10:00 AM (CT).

7. AMENDMENTS

Amendments to this solicitation will be posted to Contract Opportunities at https://sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential Offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.

8. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

9. DETERMINATION OF RESPONSIBILITY

A Determination of Responsibility will be conducted for the apparent “awardee” prior to award of the project. The required information from the proposal, along with other information obtained from Government systems, such as, but not limited to the OSHA and EPA online inspection history databases, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility may make the Offeror ineligible for award.

10. VETS 4212

Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at: https://www.dol.gov/agencies/vets/programs/vets4212. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.

11. SYSTEM FOR AWARD MANAGEMENT (SAM)

Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Offerors are required to be registered at the time of proposal submission and at time of award. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their proposal.

12. REVIEW REQUIRED REGISTRATION WITH CONTRACTOR

Contractor Performance Assessment Reporting System (CPARS): As prescribed in RFO Part 42.1102(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $900,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The RFO requires that the contractor be provided with an opportunity to comment on evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information. Each contractor whose contract award is estimated to exceed $900,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help with registering can be obtained by contacting Customer Support Desk DSN: 684-1690 or COMM: 207- 438-1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor’s registered representative. For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer. Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.

13. BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS

All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform the statement of work is: Low Risk. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.

14. SPECIAL NOTES REGARDING RFO 52.229-3: FEDERAL, STATE, AND LOCAL TAXES

Offerors are hereby notified that all state and local sales or use taxes for construction materials must be included in their bid or proposal price. It is solely the responsibility of the offeror to include all other applicable taxes in their bid or proposal price as well. The Government has determined that for this acquisition it cannot take advantage of any sales or use tax exemptions that may be available to it under applicable state law. Under no circumstances will any Contractor be designated as an agent of the Government for purposes of any tax exemption, nor will the Government authorize any Contractor’s use of any tax exemption directly applicable to the Government under this procurement.

15. REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”

16. STATEMENT OF WORK (SOW)

See attachment – Final SOW

1. PROPOSAL PREPARATION INSTRUCTION

1.1. The submission of the signed SF 1442 and Block 17 will constitute the Offeror’s acceptance of the terms and conditions of the RFP, including attachments and any issued amendments.

1.2. To ensure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.

2. PROPOSAL SUBMISSION

2.1. All proposals shall be submitted by the Prime Contractor no later than (NLT) closing date and time specified in SF1442, Block 13.A. (subject to amendment) via email at Michael.Freeman3@va.gov. NO OTHER FORMS OF SUBMISSION WILL BE ACCEPTED.

2.2. Due to email server constraints, your proposal shall be submitted as portable data files (pdf) and documents submitted must be smaller than ten (10) Mega Bytes (MB) in size. Send documents in separate files as necessary. The offeror is responsible for verifying that the Government has received the proposals.

2.3. Undeliverable emails due to an offeror’s proposal size, using wrong email address, or otherwise, is not the responsibility of the Government.

3. SELECTION AND EVALUATION PROCEDURES

3.

3.1. Proposals will be subject to an initial screening for compliance with proposal preparation instructions. Failure to comply will result in a proposal being excluded from competition without further evaluation of the proposal beyond the initial screening.

4. PROPOSAL REQUIREMENTS AND FORMATTING

4.1 Proposals shall be typewritten, with fonts no smaller than 10 points, with page layout no smaller than ½” top, bottom and ½” side margins, single space, paginated, portrait mode or letter size paper; except charts may be displayed in landscape mode.

4.2 Solicitation forms requiring to be completed shall be typewritten with fonts no smaller than 9 points.

4.3 No hyperlinks or electronic media will be allowed or considered.

4.4 Any conceptual drawings, renderings, product data sheets, one-line diagrams, etc. included in your proposal, shall be submitted as portable data files (pdf).

4.5 Format your technical proposal factor by factor, as listed in the solicitation. Stick to the page limits.

4.6 Proposals which merely restate the requirement or state that the requirement will be met, without providing supporting rationale, are not sufficient and will not be considered an appropriate response. It is the offeror’s responsibility to ensure the completeness of the proposal.

4.7 Proprietary Data: See RFO 52.215-1

5. TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS

1. TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s proposal:

VOLUME I:

(a) Cover Page with: Solicitation Number, Project Title and Project Number, Company Information (Principal points of contact, email, address, phone numbers (including area code), Unique Entity Identifier (UIE) number, Cage code)

(b) Table of Contents

(c) Signed SF 1442 by the SDVOSB, with Blocks 14-20C completed including acknowledgement of any Amendments issued.

(d) Verification of the annual form VETS-4212, Federal Contractor Veterans’ Employment Report.

(e) Copy of current Veteran Small Business Certification (SBA).

(f) Completed Mandatory (LOS) Certification clause – Per VAAR 819.7004, VAAR 852.219-75 VA Notice of Limitations on Subcontracting – Certificate of Compliance for Services and Construction must be completed, signed, and returned with the offeror’s Bid/quotation/proposal. The Government will not consider offers for award from offerors that do not provide the certification with their bid/quotation/proposal, and all such responses will be deemed ineligible for evaluation and award.

VOLUME II (TECHNICAL PROPOSAL):

(a) Cover Page with: Solicitation Number, Project Title and Project Number, Company Information (Principal points of contact, email, address, phone numbers (including area code), Unique Entity Identifier (UIE) number, Cage code, etc.)

(b) Table of Contents

(c) Required Submittals for Factor 1 as specified below – Technical Approach (30 pages max.)

(d) Required Submittals for Factor 2 as specified below – Experience (Min.3 projects, and Max 5 projects; 20 pages max.)

(e) Required Submittals for Factor 3 as specified below – Key Personnel Experience (20 pages max.)

6. PRICE PROPOSAL PREPARATION INSTRUCTIONS

1. PRICE PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s technical proposal:

PRICE PROPOSAL

(a) Cover Page with: Solicitation Number, Project Title and Project Number, Company Information (Principal points of contact, email, address, phone numbers (including area code), Unique Entity Identifier (UIE) number, Cage code, etc.)

(b) Table of Contents

(c) Bid Bond-SF24 “legible scan copy in pdf format”

(d) Completed Price Schedule

(e) Price Proposal Breakdown to support price proposed.

a. Provide a detailed divisional price breakdown for the purpose of evaluating price. The breakdown shall be separately at a minimum but not limited to (this is not an all-inclusive breakdown list, DO NOT limit your breakdown to this list) include the following cost elements: Labor (Direct & Indirect), Material Markups, Material Overhead, Equipment, Subcontractor Cost, Other Direct Costs, Overhead Expenses, Indirect Cost, General & Administrative (G&A) expenses, and Profit. While developing your price proposal please make sure to include all applicable taxes, and government stamps cost.

2. NOTE: Price breakdown must be indicative of showing at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns in accordance with VAAR 852.219-73.

7. EVALUATION FACTORS AND BASIS FOR AWARD

Proposals will be subject to an initial screening for compliance with proposal preparation instructions. Failure to comply will result in a proposal being excluded from competition without further evaluation of the proposal beyond the initial screening.

It is the Government’s intent to award one (1) firm-fixed price contract resulting from this solicitation to the responsible offeror whose offer, conforming to the solicitation, is fair and reasonable, and has been determined to be the most advantageous to the Government, price and other factors considered. The Government will use the lowest price technically acceptable source selection approach (RFO 15.103-2) to evaluate proposals and award the contract. An award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the requirements for acceptability on all non-price factors.

Proposals will be subject to an initial screening for compliance with proposal preparation instructions. Failure to comply will result in a proposal being excluded from competition without further evaluation of the proposal beyond the initial screening. The CO will conduct a “proposal compliance review” for determination of basic proposal adequacy.

Proposal adequacy refers to the baseline state where a proposal is complete, accurate, compliant with all solicitation instructions, and supported by enough data to justify the proposed price and technical approach.

The following factors should be used to evaluate offers:

1. Technical Evaluation Factors/Schedule (non-price factor).

2. Experience (non-price factor).

3. Key Personnel Experience (non-price factor).

4. Price

Factor 1 – Schedule (non-price factor) The Offeror shall provide a draft project schedule for construction that adheres to the period of performance of this project. Each Offeror’s construction schedule shall address the following:

1. Be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work period.

2. Construction period milestones, phasing, and timeframes.

3. Sufficient information to indicate full understanding of the project scope.

4. Identification of long lead materials/equipment

5. Consideration of work delays due to seasonal weather The Government will evaluate the extent to which the draft project schedule includes all requirements above and demonstrates the offeror’s understanding of and ability to perform all required elements of the project in the timeframe specified with limited impact to the Sioux Falls VA Health Care System (SFVAHCS). The draft project schedule must include the activities which are consistent with those described within the project drawings, specifications, and Scope of Work documents and must not exceed the Governments maximum allowable performance period. The period of performance for this project is 700 calendar days after the Notice to Proceed. For scheduling purposes, assume an estimated award date of 28 May 2026, and that the Notice to Proceed will be issued fourteen (14) calendar days after the award date, 28 May 2026. The Offeror shall prepare and submit a reasonable construction schedule showing all necessary work elements to complete the project identified under this solicitation. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. The submitted schedule must be developed using project scheduling software such as MS Project, Primavera, or any other comparable form. These items must be submitted and to be considered the standard for technical acceptability.

.Factor 2 - Experience (non-price factor):

The offeror shall submit a minimum of three (3) and a maximum of five (5) Building roof replacement projects completed within the last 5 years valued at $10,000,000.00 or above. The offeror shall explain how the scope of the provided projects is relevant to this current project and the projects selected should clearly demonstrate the construction capabilities of the Offeror. The offeror should also provide the start and completion dates (original and actual) for each project provided.

In order to be rated as technically acceptable, the offeror’s proposal must include at least three building improvement exterior projects that meets the requirement in the established timeframe.

Factor 3 – Key Personnel Experience/Team Qualifications (non-price factor) The Offeror shall provide a resume for each of the following key construction personnel: Project Manager, Site Supervisor, Safety Manager, and Quality Manager. For each resume, include company name; name of individual; relevant listing of experience; qualifications such as specialized training, and education. Each member of the key personnel should possess construction experience that add up to at least $10,000,000.00 in monetary value.

In order to be rated as technically acceptable, the offeror must provide a resume for each key construction personnel listed above with the required content. In addition, each member must possess experience working on construction projects that are valued at $10,000,000.00 or above.

Factor 4: Price Price will be evaluated to determine the lowest priced technically acceptable vendor.

The offeror’s proposed price will be evaluated for price reasonableness. Price reasonableness will be established using any necessary price/cost analysis techniques in RFO 15.404-1, including but not limited to price competition information and the Independent Government Cost Estimate (IGCE).

The Price Breakdown Schedule - will it factor into the LPTA analysis and also it will be used to determine price reasonableness.

An award cannot be made if the lowest priced, technically acceptable offeror’s proposal exceeds available funding or cost limitations, if applicable.

8.0 EVALUATION PROCEDURES

During the source selection process, disclosure of proprietary or source selection information will be governed by RFO 3.104-4 and 15.3. Each proposal received by the Contracting Office will be identified, marked, and secured. Proposals will be accepted via email only. The subject line for all electronic correspondence involving the source selection process, including offers, will include “For Official Use Only”. The individual proposals and evaluation worksheets will be controlled by the Contracting Office and issued to the evaluators for their review. Source Selection Sensitive Information will always be secured.

The Contracting Officer shall award a contract to the successful offeror by furnishing the executed contract or other notice of award to the company that submitted the lowest priced offer that is also found technically acceptable. The Contracting Officer shall also post an Award Notice to https://sam.gov and make any required Congressional Notifications for awards over $5.5 million per RFO 5.302 (a) unless an exception exists.

The Contracting Officer shall also send unsuccessful offeror letters to each offeror whose proposal was not selected for award, within three days after contract award. Debriefings will be provided to unsuccessful offerors who submit timely requests in accordance with RFO 15.505 and RFO 15.506.

The TEB is going to evaluate all proposals and then identify the lowest for award (provided the pricing is fair and reasonable

Intent for No Discussions: Offerors are hereby advised that the Government intends to evaluate proposals and award a contract without conducting discussions with offerors. However, the Government reserves the right to contact Offerors and/or hold discussions if the Contracting Officer determines them to be necessary. Offerors are cautioned that discussions may not be conducted, and Offerors should not assume that they will have an opportunity to revise their proposals after submission.