Task Breakdown Worksheet.docx

DOCX document 17 KB Posted

Attached to
W065--Mobile CT Scanner Lease - VA IOWA CITY
Solicitation number
36C26326Q0928
Issued by

About this file

This is a Task Breakdown Worksheet for the Grand Island VA Medical Center Pipe Replacement Procurement under Solicitation 36C26326Q0786. The worksheet is a template designed to track work completion percentages between a prime vendor and subcontractor across eight defined task categories. The specific tasks include penetrations of floors and walls, removal of pipes, removal of dead legs, installation of new pipes, installation of traps, repair of floor and walls, identifying removed pipe and traps, and inspection and certification of work, with additional line items for project management and invoicing. All tasks currently display zero completion percentages for both prime and subcontractor columns, indicating this is a blank template awaiting completion data.

The worksheet serves as a project management and accountability tool, requiring vendors to document the percentage of work completed by each party for transparent invoicing and progress tracking. This template would typically be used throughout the project lifecycle to monitor task progress, ensure proper work allocation between prime and subcontractor entities, and validate billing submissions based on actual work completion.

View the file

Other files

File Type Posted
36C26326Q0928 0004.docx DOCX document
36C26326Q0928 0003.docx DOCX document
36C26326Q0928 0002.docx DOCX document
Mobile_CT_Task_Breakdown_Worksheet.docx DOCX document
CONTOURS Model.pdf PDF
SITE PLAN of UTILITIES.pdf PDF
36C26326Q0928 0001.docx DOCX document
P07 - Wage Determination No. 2015-4983.pdf PDF
36C26326Q0928.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grand Island VA Medical Center Pipe Replacement Procurement Solicitation 36C26326Q0786 Prime Vendor:

Subcontractor:

Task Breakdown Worksheet

Task
Prime Completed
Subcontractor Completed
Penetrations of floors and walls
0
0
Removal of Pipes
0
0
Removal of “dead legs”
0
0
Installation of new pipes
0
0
Installation of Traps
0
0
Repair of floor and walls
0
0
Identifying pipe and traps that are removed
0
0

Inspection and certification of work

Project Management

Invoicing

Please identify the percentage of work being completed by each,