This document is a contract amendment for solicitation 36C26324R0057, titled "Z2DA-- 618-23-102 Correct Electrical Deficiencies - MPLS Design-Build". The amendment provides responses to questions and clarifications, and confirms the Phase I proposal due date of May 27, 2024 at 10:00 AM CT is unchanged.
The solicitation is for design, pre-construction, construction, and post-construction commissioning services related to correcting electrical deficiencies at a Department of Veterans Affairs facility. The principal NAICS code is 238210 - Electrical Contractors and Other Wiring Installation Contractors, and the product/service code is Z2DA - Repair or Alteration of Hospitals and Infirmaries. Pricing is not required for Phase I proposals, but will be submitted during Phase II. The amendment includes attachments with additional technical details and an updated Past Performance Questionnaire form.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
5/14/2024
618-23-102 36C263 Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
Dwayne Brauch, Contract Specialist 316 Robert Street N. STE. 506 St. Paul MN 55101
Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
Dwayne Brauch, Contract Specialist 316 Robert Street N. STE. 506 St. Paul MN 55101 To all Offerors/Bidders
36C26324R0057 05-14-2024
X
X
X
May 27, 2024, at 10:00am (CT) See CONTINUATION Page
POC: Dwayne Brauch, Contract Specialist, dwayne.brauch@va.gov
The purpose of this amendment is as follows:
1. Provide responses to questions, clarifications, and/or requests for information.
2. The Phase I proposal due date is unchanged; proposals are due May 27, 2024, at 10:00 AM (CT).
See attachment for details.
Eric Reis VA-VHA-RPOC-2023-0101 Contracting Officer
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
NOTE: pricing is not required for Phase I proposals. Pricing is to be submitted during Phase II.
Design & Construction Documents: Work includes all labor, material, equipment and supervision to furnish the required documents for construction, including drawings, specifications, and other documents as needed.
PRINCIPAL NAICS CODE: 238210 - Electrical Contractors and Other Wiring Installation Contractors PRODUCT/SERVICE CODE: Z2DA - Repair or Alteration of Hospitals and Infirmaries
| 1.00 |
| JB |
| __________________ |
| __________________ |
Pre-Construction: Execution of management and logistical services required to prepare for the construction of the project.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Construction: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Post-Construction Commissioning and Close-Out: Execution of post-construction services required for appropriate close-out and final commissioning of the project.
| GRAND TOTAL |
| __________________ |
See attached document: ATTACHMENTS HEADER.
See attached document: 36C26324R0057 618-23-102 Correct Electrical Deficiencies Technical Questions.
See attached document: Atch C - Updated PPQ Form.
xxx
File details come from the government source that posted it. Updated .