AtchASOWAtch7MinneapolisVABIMManagementPlanWorksheetForm3pages.pdf

PDF 127 KB Posted

Attached to
C1DZ--618-20-111, Renovate Bldg 223 for Pandemic Storage *DESIGN-BUILD*
Solicitation number
36C26321R0043
Issued by

About this file

This document provides details for a two-phase design-build contract solicitation for renovating Building 223 at the Minneapolis VA Health Care System in Minnesota. The project involves completely renovating the interior and exterior of the 13,000 square foot building to provide semi-conditioned storage space for Facilities Engineering, conditioned storage space for Logistics, and conditioned storage and pandemic supply storage. The renovation will include windows, doors, roofing, and grounds work. The pre-solicitation notice estimates releasing the Phase I solicitation on February 12, 2021 with a June 30, 2021 award date. The opportunity is set aside 100% for Service-Disabled Veteran Owned Small Businesses. The project magnitude is estimated between $2-5 million. The Department of Veterans Affairs Network Contracting Office 23 will issue the two-phase solicitation and evaluate Phase I and II proposals in accordance with FAR Subpart 36.3 for design-build selection.

View the file

Other files

File Type Posted
852.219-10 NOV 2020 DEVIATION -tk.docx DOCX document
AtchASOWAtch12aSHPORequestforProjectReview.pdf PDF
Atch B - Contractor Safety and EMR (2 pages).pdf PDF
Atch ASOWAtc 6A BarrierFreeDesignStandard7pages.pdf PDF
AtchASOWAtch10 MinneapolisSpecificStandards.zip ZIP file
Atch AScope of Work SOWFINAL 282021 14 pages.pdf PDF
Atch C - PPQ (3 pages).pdf PDF
AtchASOWAtch9MplsVADesignStandards10pages.pdf PDF
Atch A SOW Atch 1 Fort Snelling West District Report 40 pages.pdf PDF
Atch D - VA6500.6 Appendix C 2 3a-5h-6a-7a-7d-9, Appendix D (7 pages).pdf PDF
BID-INFO.docx DOCX document
SOLICITATION COVER PAGE.docx DOCX document
Atch ASOWAtch5bConvertBuilding220223Pictures.pdf PDF
AtchASOWAtch11 MplsDetailDrawings.zip ZIP file
Atch ASOW Atch 4 Bldg 223 Final LEAD Report 22 pages.pdf PDF
ATTACHMENTS HEADER.docx DOCX document
Atch ASOW Atch 3 Building 222 Roads and Grounds 23 pages.pdf PDF
Atch F - Wage Determination SCA 2015-4945 12.21.2021 (12 pages).pdf PDF
AtchASOWAtch8MinneapolisVARevitModelStandards V115pages.pdf PDF
36C26321R0043_1.docx DOCX document
Atch ASOW Atch 5aConvert Building220223 Concept Plans 9pages.pdf PDF
Atch E - Wage Determination Davis Bacon MN20210107 01.01.2021 (7 pages).pdf PDF
Atch ASOW Atch 2 Bldg 222 Build Out Package 54 pages.pdf PDF
36C26321R0043.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Minneapolis VA BIM Management Plan Worksheet

Date: _______________________

Project Information:

List project name and number provided by VA.

Project Name: __________________________

Project Number: __________________________

Designate BIM Team Members:

The individuals listed here are expected to remain engaged for the entirety of the project.

Design Team BIM Manager

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Discipline Lead BIM Coordinators

Architectural

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Mechanical

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Electrical

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Structural

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Interior Design

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Civil

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Other

Name: ______________________________ Title: ___________________________

Firm: ______________________________ Phone: __________________________

Email: ______________________________

Software Checking this box indicates the design team with use the approved software and version.

This project will be developed natively using Autodesk Revit 2015.

Clash Detection List the project milestones in which Clash Detection reports will be provided (95% & 100% required).

95% 100%

BIM Uses List ways in which your firm will leverage the BIM for advanced scheduling, analysis, design, etc.

Required by VA Yes Lighting analysis

Mechanical Systems Analysis (e.g. heating and cooling loads) Walking Distances Sightlines Photorealistic imagery Other: ________________________

File Sharing How and when will files be shared between disciplines.

• How will files be shared: ______________________________ (n/a for multi-discipline firm) Data Security: Files will only be accessible to relevant design team.

• How often will files be shared: _____________________________

Return Model Procedure Checking this box indicates that you are familiar with the Return Model Procedure outlined in the Minneapolis VA Revit Model Standards document.

Returned Revit model(s) will be properly processed, or cleaned, according to the Minneapolis VA BIM Standards.

Date:
Project Name:
Project Number:
How will files be shared:
How often will files be shared:
DT BIM Mgr Name:
DT BIM Mgr Title:
DT BIM Mgr Firm:
DT BIM Mgr Phone:
DT BIM Mgr Email:
Arch Name:
Arch Title:
Arch Firm:
Arch Phone:
Arch Email:
Mech Name:
Elec Name:
Mech Title:
Mech Firm:
Mech Phone:
Mech Email:
Struct Name:
Struct Title:
Struct Firm:
Struct Phone:
Struct Email:
ID Title:
ID Firm:
ID Phone:
ID Email:
ID Name:
Civ Name:
Civ Title:
Civ Firm:
Civ Phone:
Civ Email:
Other Name:
Other Title:
Other Firm:
Other Phone:
Other Email:
Clash Other:
Bim Use Other:
Software: Off
Clash 95: Off
Clash 100: Off
Clash Other Check: Off
Light Check VA: Off
Light Check Yes: Off
Mech Check VA: Off
Mech Check Yes: Off
Walk Check VA: Off
Walk Check Yes: Off
Sightline VA: Off
Sightline Yes: Off
Photo VA: Off
Photo Yes: Off
Other Check VA: Off
Other Check Yes: Off
Return Model: Off
Security: Off

File details come from the government source that posted it. Updated .