36C26319B0009-A00003000.docx
DOCX document 22 KB Posted
- Solicitation number
- 36C26319B0009
About this file
36C26319B0009 A00003 36C26319B0009 A00003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26319C0174-000.docx | DOCX document | |
| 36C26319B0009-A00004001.pdf | ||
| 36C26319B0009-A00004000.docx | DOCX document | |
| 36C26319B0009-A00003001.pdf | ||
| 36C26319B0009-A00002000.docx | DOCX document | |
| 36C26319B0009-A00002001.pdf | ||
| 36C26319B0009-006.docx | DOCX document | |
| 36C26319B0009-005.docx | DOCX document | |
| 36C26319B0009-A00001000.docx | DOCX document | |
| 36C26319B0009-004.pdf | ||
| 36C26319B0009-002.pdf | ||
| 36C26319B0009-001.docx | DOCX document | |
| 36C26319B0009-003.pdf | ||
| 36C26319B0009-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) A00003 06-26-2019 636-19-4-5975-0001 636-18-113 36C636 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha
NE
68102-2077 36C636 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 111 South 18th Plaza, Suite C38 Omaha
NE
68102-2077 To all Offerors/Bidders
36C26319B0009 06-06-2019
X X X
July 9, 2019 at 2:00 PM
636-3690162-5975-854200-3220 23 NR8WA25
X Project: 636-18-113, Install Air Cooled Chiller, Grand Island, Nebraska VA Contracting POC: Sharon Spohn, phone: 402-599-2152, email: sharon.spohn@va.gov
A. This amendment addresses questions.
B. The questions/answers are attached.
C. The sketch for the pole light base detail, 18333 E1A, is attached.
Sharon A. Spohn NCO 23 Contracting Officer
NCO2315L3-0644
Solicitation Questions and Answers
| # |
| SOW Reference |
| Question |
| Answer |
| 1. |
| Site Visit |
| Please provide a pole light base detail. |
| See Attached Sketch |
2.
| Is it known where the pole light is fed from and if it feeds other pole lights as we will have to pull new wire to not have any splice points? |
| Site documents indicate that it is at the end of the run and is fed from a handhole located to the east of the building. |
3.
| Where is the main BMS panel located that is referenced on sheet E1, Note 2? There were 2 Johnson Control panels in the chiller plant room 208 and 2 Johnson Control panels located in the lower level. |
| Consult Resident Engineer or COR to schedule coordination of destination with controls contractor. |
4.
| Note 3 on E1 says provide a weatherproof box with-in the existing man-hole but the drawings do not reference any work in the manhole. Not sure what the box is being added for. |
| Design intent is to replace existing damaged box located in manhole. |
5.
| Note 6 on E1 says provide a 1” conduit for power and a 1” conduit for controls. Where does the control conduit need to go once inside the building? |
| Consult Resident Engineer or COR to schedule coordination of destination with controls contractor. |
6.
Sheet M1 show the refrigerant piping entering the building where there is currently chemical feed piping equipment and an Emergency eye wash.
· Are these going to be relocated by the government?
· Do we figure moving them?
· Where are they to be relocated to?
Design intent as shown on the drawings is for the refrigerant piping to enter the building above this equipment and drop down the outside wall to the chiller (see sheet M1).
· No
· No
· They are not going to be relocated.
7.
| Currently at the location where the EVP is shown to be hung from the structure there are two lights. One for sure and possibly both will be in the way and will need to be relocated. This is not shown on the electrical plans. Will the lights be relocated as part of this project? |
| Relocate as necessary to allow installation. |
8.
| Is the chilled water system drained during the winter months? When does that usually take place? |
| No, hot taps are required. |
9.
| If the projects performance period is 180 days and the chilled water system is drained during the winter months, can the chilled water tie ins as shown per detail 1 on sheet M2 be provided after the system is drained in lieu of a Hot Taps? |
| No, hot taps are required. |
10.
The location shown on sheet M1 for the CWS tie in, currently has two temperature control sensors mounted on the top of the pipe. With limited amount of space above the pipe, the tie in will be on the side of the pipe.
· Will this affect the sensors?
· Will the sensors need to be relocated? If so where?
· It should not affect the sensors.
· No, the sensors do not need to be relocated.
11.
The man hole is in the path of the outside pad footing.
· Should the footing be boxed around the manhole and left at its current elevation?
· Should the manhole be extended to the pad surface and boxed around at the new elevation?
Extend to match concrete elevation.
12.
| Please advise where the gate is to be located as there is conflicting information between sheets SP1 and M1. |
| Please follow SP-1. |
13.
| Detail 6/M2 shows the “ENCLOSURE PAD EDGE SECTION” to have a concrete grade beam continuous around the enclosure. Looking at the site it looks like we will need an actual footing and poured wall that is formed so we can back fill inside the area up to the required elevation. Please clarify the height/depth and width. |
| Section 6/M2 is applicable to the enclosure pad outside the limits of the chiller pad footing. The exterior face of the turn down grade beam will need to be formed at some areas based on site grading. The concrete grade beam should be a minimum of 8 inches wide and 24 inches deep below adjacent grade. The grade beam concrete may be placed separately from the slab concrete to allow for back fill to be placed inside the area. The #4 bent bar should extend across the construction joint. |
14.
| Detail 3/M2 calls out a 16” x 48” TRENCH FOOTINGS on all sides of the pad. Does this dimension apply to detail 6/M2? Also, with this size of continuous footing is the SCREEN WALL able to be plated and epoxy anchored to the concrete surface; centered above the 16” x 48” TRENCH FOOTING? This method would replace the detail 1/SP-1. |
| No, Detail 3 on M2 only applies to the chiller pad directly under the chiller. Screen wall supports to be installed per detail 1 on sheet SP-1. |
See attached document: 18333 E1a.