36C26319B0009-003.pdf
PDF 497 KB Posted
- Solicitation number
- 36C26319B0009
About this file
36C26319B0009 S02_Submittal Schedule.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26319C0174-000.docx | DOCX document | |
| 36C26319B0009-A00004001.pdf | ||
| 36C26319B0009-A00004000.docx | DOCX document | |
| 36C26319B0009-A00003001.pdf | ||
| 36C26319B0009-A00003000.docx | DOCX document | |
| 36C26319B0009-A00002000.docx | DOCX document | |
| 36C26319B0009-A00002001.pdf | ||
| 36C26319B0009-006.docx | DOCX document | |
| 36C26319B0009-005.docx | DOCX document | |
| 36C26319B0009-A00001000.docx | DOCX document | |
| 36C26319B0009-004.pdf | ||
| 36C26319B0009-002.pdf | ||
| 36C26319B0009-001.docx | DOCX document | |
| 36C26319B0009-000.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nebraska, Western Iowa Health Care System Grand Island, NE
Air Cooled Chiller Addition Construction Document Submittal Schedule
April 2, 2019 MEI Project #: 18333
04-12
01 33 23 - 1
DEPARTMENT OF VETERANS
AFFAIRS
VA – Grand Island Air Cooled Chiller Addition
VHA MASTER SPECIFICATIONS “x” indicates a requir e submittal
Submittal List
Section Number
Section Name Required Submittal
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements OSHA Training Certif ication of all employees 01 00 00 General Requirements Fire Safety Plan and Protection Program 01 00 00 General Requirements Phasing Schedule of Material arrival on site 01 00 00 General Requirements As-Built Drawings 01 00 00 General Requirements Maintenance and Oper ational Manuals 01 00 00 General Requirements Instructions and Tra ining by Manufacturers’ Representative
01 33 23 Shop Drawings for Submittal NA
01 42 19 Reference Standards NA
01 91 00 General Commissioning
Requirements Proof of Certification
01 91 00 General Commissioning Requirements
Commissioning Plan (Preliminary and Final)
Section Number
Section Name Equipment/ Item Shop Drawing
Samples Product Data
Certifi cations / Test Results
Warranty O&M Manuals
01 91 00 General Commissioning Requirements
Pre-Functional Checklist
01 91 00 General Commissioning Requirements
Functional Performance Testing Schedule and Procedu res
01 91 00 General Commissioning Requirements
Test and Inspection Reports
01 91 00 General Commissioning Requirements
Commissioning Report (Preliminary and Final)
01 91 00 General Commissioning Requirements
Systems Manual
01 33 23 - 2
01 91 00 General Commissioning Requirements
Corrective Action Documents
DIVISION 05 – METALS
05 50 00 Metal Fabrications Steel x
DIVISION 09 – PAINTING
09 91 00 Painting Paint Materials x x x
Section Name Equipment/ Item Shop Drawing
Samples Product Data
Certifi cations / Test Results
Warranty O&M Manuals
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITI ONING (HVAC)
23 05 11 Common Work Results for HVAC Miscellaneous x x x x x 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment
Electric Motors x x x x
23 05 41 Noise and Vibration Control HVAC Piping and Equipment
Isolators x x
23 07 11 HVAC Insulation Insulation Materials x x x 23 07 11 HVAC Insulation Facings and Jackets x x 23 07 11 HVAC Insulation Accessory Materials x x 23 07 11 HVAC Insulation Manufacturer’s
Installation Instructions x
23 08 00 Commissioning of HVAC Systems x x x x x x
Section Name Equipment/ Item Shop Drawing
Samples Product Data
Certifi cations / Test Results
Warranty O&M Manuals
23 09 23 Direct Digital Control System for HVAC
Chiller and Pump Controls x x x x x
23 09 23 Direct Digital Control System for HVAC
Instrumentation and Control Panels x x x x x
23 09 23 Direct Digital Control System for HVAC
As-Built Logic and Wiring Diagrams x x x x x
01 33 23 - 3
23 09 11 Direct Digital Control System for HVAC
System Readiness Checklists x x x x x
23 21 13 Hydronic Piping Piping x x x 23 21 13 Hydronic Piping Pipe Fittings, Unions, Flanges x x x
23 21 13 Hydronic Piping Valves x x x x x 23 21 13 Hydronic Piping Strainers x x x 23 21 13 Hydronic Piping Flexible Connectors x x x 23 21 13 Hydronic Piping Pipe Support Systems x x x x 23 23 00 Refrigerant Piping Pipe Fittings x x x
23 23 00 Refrigerant Piping Valves x x x x x 23 23 00 Refrigerant Piping Accessories x x x x x
Section Number
Section Name Equipment/ Item Shop Drawing
Samples Product Data
Certifi cations / Test Results
Warranty O&M Manuals
23 64 00 Packaged Water Chillers Chiller x x x x 23 64 00 Packaged Water Chillers Chiller Performance
Data x x
23 64 00 Packaged Water Chillers Pretest Data x x x 23 64 00 Packaged Water Chillers System Readiness
Checklists x x
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical
Installations Circuit Breaker x x x x x
26 05 21 Low-Voltage Electrical Power Conductors and Cables (600 Volts and Below) x x
26 05 26 Grounding and Bonding for Electrical Systems x x
26 05 33 Raceway and Boxes for Electrical Systems x x
26 29 11 Motor Starters x x x x 26 52 00 Exterior Lighting x x x x
DIVISION 31 - EARTHWORK
31 20 00 Louvered Fences and Gates x x x x
DIVISION 32 – EXTERIOR IMPROVEMENTS
01 33 23 - 4
32 05 23 Concrete for Exterior Improvements x x x x
32 31 40 Louvered Fences and Gates x x x x 32 90 00 Planting x x x x
- - - END - - -