36C26319B0009 S02_Submittal Schedule.pdf

View the file

Other files

File Type Posted
36C26319C0174-000.docx DOCX document
36C26319B0009-A00004001.pdf PDF
36C26319B0009-A00004000.docx DOCX document
36C26319B0009-A00003001.pdf PDF
36C26319B0009-A00003000.docx DOCX document
36C26319B0009-A00002000.docx DOCX document
36C26319B0009-A00002001.pdf PDF
36C26319B0009-006.docx DOCX document
36C26319B0009-005.docx DOCX document
36C26319B0009-A00001000.docx DOCX document
36C26319B0009-004.pdf PDF
36C26319B0009-002.pdf PDF
36C26319B0009-001.docx DOCX document
36C26319B0009-000.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nebraska, Western Iowa Health Care System Grand Island, NE

Air Cooled Chiller Addition Construction Document Submittal Schedule

April 2, 2019 MEI Project #: 18333

04-12

01 33 23 - 1

DEPARTMENT OF VETERANS

AFFAIRS

VA – Grand Island Air Cooled Chiller Addition

VHA MASTER SPECIFICATIONS “x” indicates a requir e submittal

Submittal List

Section Number

Section Name Required Submittal

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements OSHA Training Certif ication of all employees 01 00 00 General Requirements Fire Safety Plan and Protection Program 01 00 00 General Requirements Phasing Schedule of Material arrival on site 01 00 00 General Requirements As-Built Drawings 01 00 00 General Requirements Maintenance and Oper ational Manuals 01 00 00 General Requirements Instructions and Tra ining by Manufacturers’ Representative

01 33 23 Shop Drawings for Submittal NA

01 42 19 Reference Standards NA

01 91 00 General Commissioning

Requirements Proof of Certification

01 91 00 General Commissioning Requirements

Commissioning Plan (Preliminary and Final)

Section Number

Section Name Equipment/ Item Shop Drawing

Samples Product Data

Certifi cations / Test Results

Warranty O&M Manuals

01 91 00 General Commissioning Requirements

Pre-Functional Checklist

01 91 00 General Commissioning Requirements

Functional Performance Testing Schedule and Procedu res

01 91 00 General Commissioning Requirements

Test and Inspection Reports

01 91 00 General Commissioning Requirements

Commissioning Report (Preliminary and Final)

01 91 00 General Commissioning Requirements

Systems Manual

01 33 23 - 2

01 91 00 General Commissioning Requirements

Corrective Action Documents

DIVISION 05 – METALS

05 50 00 Metal Fabrications Steel x

DIVISION 09 – PAINTING

09 91 00 Painting Paint Materials x x x

Section Name Equipment/ Item Shop Drawing

Samples Product Data

Certifi cations / Test Results

Warranty O&M Manuals

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITI ONING (HVAC)

23 05 11 Common Work Results for HVAC Miscellaneous x x x x x 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment

Electric Motors x x x x

23 05 41 Noise and Vibration Control HVAC Piping and Equipment

Isolators x x

23 07 11 HVAC Insulation Insulation Materials x x x 23 07 11 HVAC Insulation Facings and Jackets x x 23 07 11 HVAC Insulation Accessory Materials x x 23 07 11 HVAC Insulation Manufacturer’s

Installation Instructions x

23 08 00 Commissioning of HVAC Systems x x x x x x

Section Name Equipment/ Item Shop Drawing

Samples Product Data

Certifi cations / Test Results

Warranty O&M Manuals

23 09 23 Direct Digital Control System for HVAC

Chiller and Pump Controls x x x x x

23 09 23 Direct Digital Control System for HVAC

Instrumentation and Control Panels x x x x x

23 09 23 Direct Digital Control System for HVAC

As-Built Logic and Wiring Diagrams x x x x x

01 33 23 - 3

23 09 11 Direct Digital Control System for HVAC

System Readiness Checklists x x x x x

23 21 13 Hydronic Piping Piping x x x 23 21 13 Hydronic Piping Pipe Fittings, Unions, Flanges x x x

23 21 13 Hydronic Piping Valves x x x x x 23 21 13 Hydronic Piping Strainers x x x 23 21 13 Hydronic Piping Flexible Connectors x x x 23 21 13 Hydronic Piping Pipe Support Systems x x x x 23 23 00 Refrigerant Piping Pipe Fittings x x x

23 23 00 Refrigerant Piping Valves x x x x x 23 23 00 Refrigerant Piping Accessories x x x x x

Section Number

Section Name Equipment/ Item Shop Drawing

Samples Product Data

Certifi cations / Test Results

Warranty O&M Manuals

23 64 00 Packaged Water Chillers Chiller x x x x 23 64 00 Packaged Water Chillers Chiller Performance

Data x x

23 64 00 Packaged Water Chillers Pretest Data x x x 23 64 00 Packaged Water Chillers System Readiness

Checklists x x

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical

Installations Circuit Breaker x x x x x

26 05 21 Low-Voltage Electrical Power Conductors and Cables (600 Volts and Below) x x

26 05 26 Grounding and Bonding for Electrical Systems x x

26 05 33 Raceway and Boxes for Electrical Systems x x

26 29 11 Motor Starters x x x x 26 52 00 Exterior Lighting x x x x

DIVISION 31 - EARTHWORK

31 20 00 Louvered Fences and Gates x x x x

DIVISION 32 – EXTERIOR IMPROVEMENTS

01 33 23 - 4

32 05 23 Concrete for Exterior Improvements x x x x

32 31 40 Louvered Fences and Gates x x x x 32 90 00 Planting x x x x

- - - END - - -