About this file

36C26319B0009 S02_Drawings.pdf

View the file

Other files

File Type Posted
36C26319C0174-000.docx DOCX document
36C26319B0009-A00004001.pdf PDF
36C26319B0009-A00004000.docx DOCX document
36C26319B0009-A00003001.pdf PDF
36C26319B0009-A00003000.docx DOCX document
36C26319B0009-A00002000.docx DOCX document
36C26319B0009-A00002001.pdf PDF
36C26319B0009-006.docx DOCX document
36C26319B0009-005.docx DOCX document
36C26319B0009-A00001000.docx DOCX document
36C26319B0009-002.pdf PDF
36C26319B0009-001.docx DOCX document
36C26319B0009-003.pdf PDF
36C26319B0009-000.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

CONSTRUCTION

DOCUMENTS

Robert Venner

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

POC: Bob Ryckman

Mechanical, Electrical, Plumbing:

4940 N 118th Street Omaha, NE 68164 Phone: (402) 491-4144

Grand Island, Nebraska

Project Director

Revisions: Date: POC: Ron Feuerbach

Architectural:

3705 N 200th Street Omaha, NE 68022 Phone: (402) 291-6941

Calvin L. Hinz Architects, P.C.

Install Air Cooled Chiller -Grand Island 636A4-18-113

APRIL 2, 2019

4/2/19 CS

DATE:APRIL 2, 2019

CONSTRUCTION DOCUMENTS

PROJECT NO.: 18333

Drawing Index

SP1SITE PLAN

NEBRASKA, WESTERN IOWA HEALTH CARE SYSTEM

AIR COOLED CHILLER ADDITION

2201 N BROADWELL AVE

GRAND ISLAND, NE 68803

M1FLOOR PLAN - MECHANICAL

M2MECHANICAL DETAILS AND SCHEDULES

E1FLOOR PLAN - ELECTRICAL

COVER SHEET

CSCOVER SHEET

AutoCAD SHX Text E-5195

AutoCAD SHX Text

FEUERBACH

AutoCAD SHX Text

RONALD

TR

AN

SF

OR

ME

R

TR

AN

SF

OR

ME

R

CHILLER

SCREEN WALL

MANUFACTURERS

RECOMMENDED

SERVICE

CLEARANCES

EXISTING MANHOLE

EXISTING CHILLER PLANT

EXISTING MANHOLE

NEW AIR COOLED

CHILLER

CH-4

CONCRETE PAD

SEE DETAIL 3 ON SHEET M2

6 #6 REBARS VERT. WITH

#4 REBARS 12" O.C. HORIZ.

LOUVERED SCREEN WALL POST

N

T S

SCREEN WALL FOOTING DETAIL

NO SCALE

SP-1

CONCRETE BASE

ROUND POURED18"

ANCHOR BOLTS FURNISHED

WITH POLE

3/4" CHAMFER

POST CONNECTION TO PIER

BY SCREEN WALL SUPPLIER

96 ' TALL LOUVERED SCREEN FENCING

3/8" EXPANSION JOINT

WITH SEALANT

FLOOR ELEVATION = 1866.5'

ENCLOSURE PAD

ELEVATION = 1866.5'

PROVIDE SCREENWALL POSTS AS

REQUIRED BY MANUFACTURER

SEE DETAIL 1 ON SHEET SP-1

SEE SPECIFICATION SECTION 323140

QUANTITY AS REQUIRED BY MANUFACTURER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

Robert Venner

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

POC: Bob Ryckman

Mechanical, Electrical, Plumbing:

4940 N 118th Street Omaha, NE 68164 Phone: (402) 491-4144

Grand Island, Nebraska

Project Director

Revisions: Date: POC: Ron Feuerbach

Architectural:

3705 N 200th Street Omaha, NE 68022 Phone: (402) 291-6941

Calvin L. Hinz Architects, P.C.

Install Air Cooled Chiller -Grand Island 636A4-18-113

APRIL 2, 2019

4/2/19 SP1

SITE PLAN

1" = 10'-0"

N

AutoCAD SHX Text

6 SPACES

AutoCAD SHX Text

7 SPACES

AutoCAD SHX Text

27 SPACES

AutoCAD SHX Text

22 SPACES

AutoCAD SHX Text

BOLLARD SEE - 5F (TYP)

AutoCAD SHX Text

CONCRETE PAD

AutoCAD SHX Text

LINE OF COOLING TOWER PLATFORM ABOVE

AutoCAD SHX Text E-5195

AutoCAD SHX Text

FEUERBACH

ELECTRICAL

ROOM

CHILLER

PLANT

CORRIDOR

METER ROOM

VFD-1 VFD-2 VFD-3

6" CWR

ISOLATION VALVE

EVP

REFRIGERANT

PIPING

CHILLER SUPPORT FOOTING SEE

EXISTING CWS

EXISTING CWS

DROP PIPE DOWN TO 12"

ABOVE GRADE AND SUPPORT

FROM WALL EVERY 6'-0"

SLEEVE FOR PIPING. SEAL

WEATHER TIGHT

STRAINER

SUPPORT EVAPORATOR

FROM STRUCTURE

SEE DETIAL

M2

28'-0"

CHECK VALVE

MOTORIZED 2-WAY VALVE

6" CWS

CHILLER SCREEN WALL

CH-4

SEE DETAIL

M2

FOR CHILLER PIPING DETAIL

M2

ISOLATION VALVE

(TYPICAL)

EXISTING CHILLED WATER

PIPING SERVING CHILLERS

SEE DETIAL

M2

MANUFACTURER RECOMMENDED

SERVICE CLEARANCES

1'-4" WIDE x 4'-0" DEEP

FOOTING, ALL SIDES OF

CHILLER PAD

40' - 6"

5" THICK CONCRETE SLAB

TO LIMITS OF SCREEN WALL

5" THICK CONCRETE SLAB

TO LIMITS OF SCREEN WALL

M2

MECHANICAL GENERAL NOTES

MECHANICAL FLAG NOTES

1. DO NOT ROUTE DUCTWORK, PIPING OR LOCATE EQUIPMENT ABOVE ELECTRICAL PANELS. MAINTAIN ALL

CODE REQUIRED CLEARANCES.

3. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO NEW WORK. MECHANICAL CONTRACTOR SHALL BE

RESPONSIBLE FOR ADJUSTING PIPING AS NECESSARY TO AVOID CONFLICTS WITH EXISTING

STRUCTURE .

2. ALL ITEMS SHOWN LIGHT OR INDICATED ON PLAN AS (E) ARE EXISTING.

ALL ITEMS SHOWN DARK ARE NEW. NOT ALL MECHANICAL ITEMS ARE SHOWN.

INSTALL VFD IN ACCESSIBLE LOCATION. MAINTAIN 36" CLEARANCE IN FRONT OF

VFD. COORDINATE POWER WIRING WITH ELECTRICAL CONTRACTOR.

CONNECT NEW PIPE TO EXISTING. VERIFY SIZE AND LOCATION OF EXISTING.

MAINTAIN MANUFACTURER'S REQUIRED CLEARANCES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

Robert Venner

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

POC: Bob Ryckman

Mechanical, Electrical, Plumbing:

4940 N 118th Street Omaha, NE 68164 Phone: (402) 491-4144

Grand Island, Nebraska

Project Director

Revisions: Date: POC: Ron Feuerbach

Architectural:

3705 N 200th Street Omaha, NE 68022 Phone: (402) 291-6941

Calvin L. Hinz Architects, P.C.

Install Air Cooled Chiller -Grand Island 636A4-18-113

APRIL 2, 2019

4/2/19

FLOOR PLAN - MECHANICAL

1/4" = 1'-0"

M1

N

FLOOR PLAN - MECHANICAL

AutoCAD SHX Text

DN

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text

AIR

AutoCAD SHX Text

SEP.

AutoCAD SHX Text

DHW

AutoCAD SHX Text 1 1/4"

AutoCAD SHX Text

AV

AutoCAD SHX Text

PH

AutoCAD SHX Text

IA

AutoCAD SHX Text

IA

AutoCAD SHX Text E-5195

AutoCAD SHX Text

FEUERBACH

AIR COOLED CHILLER SCHEDULE

REMARKS

ELECTRICAL

REMARKS

MAXIMUM FUSE SIZE (AMPS)

PHASE

VOLTS

GENERAL

WATER

MODEL NUMBER

MAXIMUM WEIGHT (LBS.)

MAXIMUM SIZE (LxWxH) (IN.)

WATER FLOW (GPM)

ENTERING WATER TEMPERATURE (ºF)

CONFIGURATION

SERVES

MANUFACTURER

PLAN TAG

CHILLED

-SORS

COMPRES-

LEAVING WATER TEMPERATURE (ºF)

PRESSURE DROP (FEET)

HP (EACH)

TYPE

QUANTITY

MIN. STEPS UNLOADING

ACCESSORIES

ANCE DATA

PERFORM-

MAXIMUM DPLV

MINIMUM EER

MAXIMUM APLV

NOMINAL TONNAGE

REFRIGERANT

MINIMUM CIRCUIT AMPACITY

CH-4

DAIKIN

AGZ241E

EVP

AIR COOLED

328 x 88 x 99

R410A

(1)

54.0

44.0

10.1

SCROLL

10.24

16.43

525.5

(2) (3) (4)

REMARKS

ELECTRICAL

VARIABLE FREQUENCY DRIVE SCHEDULE

GENERAL

REMARKS

VOLTAGE

CONNECTED MOTOR HP

MOTOR TYPE

PHASE

MAX. DRIVE OUTPUT CURRENT (AMPS)

SERVES

LOCATION

MARK

VFD-1

P-1

SEE PLANS

14.5

ODP

1. VARIABLE FREQUENCY DRIVES SHALL BE SUITABLE FOR HVAC APPLICATIONS. DRIVE SHALL HAVE

STANDARD FEATURES PLUS FOLLOWING: DISCONNECT, EMI, RFI FILTERS, INPUT AC LINE REACTORS AND

AUTOMATIC RESET UPON LOSS OF POWER. SEE SPECIFICATION SECTION 230960 "VARIABLE FREQUENCY

DRIVES".

2. VARIABLE FREQUENCY DRIVE SHALL BE FURNISHED BY THE MECHANICAL CONTROL CONTRACTOR AND

INSTALLED BY THE ELECTRICAL CONTRACTOR.

3. PROVIDE DRIVES WITH BUILT-IN COMMUNICATION TO ALLOW FOR INDICATED SEQUENCE OF OPERATION.

COORDINATE WITH TEMPERATURE CONTROL CONTRACTOR.

BELOW

SEE

6" CONCRETE SLAB WITH #4 AT 12" ON CENTER EACH WAY

S L A

B

T

O

E

X T

E N

D

T

O

L I M

I T

S

O

F

S C

R E

E N

W

A L L

16"x48" TRENCH FOOTINGS (TYPICAL ALL SIDES)

6" CONCRETE SLAB ELEVATION 1865.00'

#4 AT 12" ON CENTER EACH WAY

1'-4" 1'-4"

PAD TO EXTEND TO DIMENSIONS

OF CHILLER BASE EACH DIRECTION.

3" CLEAR

3" CLEAR

#4 AT 12" ON CENTER WITH 2'-0" LEGS

(TYPICAL ALL SIDES)

TRENCH FOOTING WITH

2-#5 TOP AND BOTTOM AND

#4 TIES AT 48" ON CENTER

(TYPICAL ALL SIDES)

1" CLEAR

6" VOID FORM

NEW CONCRETE PAD FOOTING TO BE INSTALLED ADJACENT

TO EXISTING BUILDING WALL FOOTING. FIELD VERIFY EXACT

SIZE, LOCATION, AND DEPTH OF EXISTING FOOTING.

CHILLER PAD SECTION

NO SCALE

M2

PIPING DETAIL FOR BRAZED PLATE HEAT EXCHANGER (EVP)

NO SCALE

M2

MECHANICAL SYMBOLS

SYMBOLSYMBOL DESCRIPTION

TYPICAL PIPING

DESCRIPTION

ELBOW DN / ELBOW UP

PIPE TEE / PIPE ELBOW

DTD

GATE VALVE

ISOLATION VALVE (BALL OR BUTTERFLY)

BALANCING VALVE

GLOBE VALVE

PRESSURE/TEMPERATURE TEST PORT

UNION

STRAINER WITH BLOWDOWN

CHECK VALVE (ARROW INDICATES FLOW)

AUTOMATIC CONTROL VALVE TWO-WAY / THREE WAY

PRESSURE REGULATING VALVE (PRV)

PRESSURE GAUGE

THERMOMETER

P.T.T.

CHILLED WATER SUPPLY PIPING

HOT WATER RETURN PIPING

CONDENSER WATER RETURN PIPING

CHILLED WATER RETURN PIPING

CONDENSER WATER SUPPLY PIPING

HOT WATER SUPPLY PIPING

HYDRONIC HVAC PIPING

HWS

HWR

CWR

CWS

CR

CS

COIL CONDENSATE DRAIN (SLOPE TO DRAIN)CD

AIR VENT

GWR

GWS

HPLR

HPLS

GLYCOL WATER RETURN PIPING

GLYCOL WATER SUPPLY PIPING

HEAT PUMP LOOP RETURN PIPING

HEAT PUMP LOOP PIPING SUPPLY PIPING

SOLENOID VALVE

THERMOSTATIC EXPANSION VALVE (TXV)

SIGHT GLASS

REFIGERATION PIPING

REFRIGERANT HOT GAS DISCHARGE LINE

REFRIGERANT SUCTION LINE

REFIGERANT LIQUID LINE

RS

RL

RD

INLET

OUTLET

AIR VENT

DRAIN

FLOW SWITCH

FLEXIBLE CONNECTION

FLEXIBLE CONNECTION

EVAPORATOR

(EVP)

FUSIBLE PLUG

HGBP

VALVE

SCHRADER

VALVE

FILTER DRIER

SCHRADER

VALVE

INLET

OUTLET

6" CWR

6" CWS

LIQUID

PIPING

SUCTION

PIPING

1. PROVIDE WITH REMOTE BRAZED PLATE EVAPORATOR MODEL AGZ241 (EVP).

2. PROVIDE WITH SINGLE POINT POWER CONNECTION WITH INTEGRAL FACTORY DISCONNECT.

3. PROVIDE WITH BACnet INTERFACE FOR CONNECTION TO BUILDING BAS.

4. PROVIDE FLOW SWITCH FOR EVAPORATOR PIPING CONNECTION.

2 5/8"

1 5/8"

AIR

COOLED

CHILLER

CH-4

EVP

P-1 P-2 P-3

DP

DP

DP

EXISTING

CHILLED WATER

PUMP P-1

EXISTING

CHILLED WATER

PUMP P-2

EXISTING

CHILLED WATER

PUMP P-3

8" CWR

8" CWR

8" CWR

8" CWR8" CWR 10" CWR 10" CWR

10" CWS

8" BYPASS

10" CWS

NEW 6" CWR

NEW 6" CWR

TO SECONDARY CHILLED WATER PUMPS

FROM BUILDING

CHILLED WATER PIPING DETAIL

NO SCALE

M2

FLEX CONNECTION (TYP)

CONNECT NEW TO EXISTING

CONNECT NEW TO EXISTING

(TWO REQUIRED)

(TWO REQUIRED)

ISOLATION VALVE (TYP)

EXPANSION VALVE (TWO REQUIRED)

SITE GLASS

P.T.T. (TYP)

STRAINER

BLOW DOWN VALVE

HOSE END CONNECTION

THERMOMETER (TYP)

ISOLATION VALVE (TYP)

REDUCER (TYP)

EXISTING PRESSURE GAUGE (TYP)

EXISTING DIFFERENTIAL

PRESSURE SENSOR (TYP)

EXISTING ROOF ASSEMBLY

ISOLATION VALVE (TYP)

STRAINER

TWO-POSITION AUTOMATIC VALVE

CHECK VALVE

1/2"

WELDED PIPE CONNECTIONS ARE NOT ALLOWED

BETWEEN STRAINER AND EVAPORATOR.

VFD-2

P-2

SEE PLANS

14.5

ODP

VFD-3

P-3

SEE PLANS

14.5

ODP

TEMPERATURE CONTROL SEQUENCE

A. GENERAL: Temperature control work shall be performed by the building controls contractor

Johnson Controls Inc. Modify the existing DDC system as required to provide the specified sequence of control. Provide all sensors, switches, relays, electrical wiring , panels, and programming etc. required for a complete operating system. Submit shop drawings with temperature control wiring diagram, points list, and sequences of control.

B. Sequence of Control - CH-4:

1. CHILLER CH-4 is an air cooled chiller to be used in shoulder seasons to generate chilled water for building cooling.

2. START UP: When enabled through the DDC system based on operator selection, the chiller iso;ation valve shall open and the designated lead primary chilled water pump shall ramp to the set speed through the pump VFD and run continuously to maintain 530 GPM

(differential pressure of 4.5 psig) through the chiller evaporator. Once flow status has been confirmed (DI point) chiller CH-4 shall be enabled.

3. Chilled Water Temperature Control: Once enabled the chiller leaving water temperature shall be controlled through the internal chiller controls to maintain a leaving water temperature of 45 degrees F.

4. The existing chiller sequences for CH-1, 2 and 3 shall remain as programmed.

C. BAS Shall Generate the Following Alarms:

· Loss of CH-4 status is detected

· Loss of chilled water flow through the evaporator is detected

· Any chiller fault is detected.

D. Minimum Points List: Provide the following minimum points for chiller CH-4 as well as additional points required to provide the above sequence of control:

· CH-4 chiller enable (BO)

· CH-4 chiller status (BI)

· Chiller staging (AO)

· Chiller evaporator differential pressure (AI)

· Chiller evaporator water isolation valve (BO)

· Chiller chilled water supply temperature (AI)

· Chiller chilled water return temperature (AI)

· Pumps P-1, P-2, and P-3 speed (AO)

AIR

COOLED

CHILLER

CH-4

EVP-1

P-1 P-2 P-3

DP

DP

DP

EXISTING

CHILLED WATER

PUMP P-1

EXISTING

CHILLED WATER

PUMP P-2

EXISTING

CHILLED WATER

PUMP P-3

8" CWR

8" CWR

8" CWR

8" CWR8" CWR 10" CWR 10"

10" CWS

8" BYPASS

10"

NEW 6" CWR

NEW 6" CWR

TO SECONDARY CHILLED WATER PUMPS

FROM BUILDING

CHILLLER CONTROL SCHEMATIC

NO SCALE

M2

EXISTING PRESSURE GAUGE (TYP)

EXISTING DIFFERENTIAL

PRESSURE SENSOR (TYP)

TWO-POSITION AUTOMATIC VALVE

VFD-1 VFD-2 VFD-3

BI BO BO

NOTE 7

NOTE 8

NOTE 9

AO T

OPAO

AO

AI

AO

AI

AO

AI

NOTE 2

NOTE 3

NOTE 2

NOTE 3

NOTE 2

NOTE 3

NOTE 4

NOTE 5

AO

T

NOTE 6

NOTES:

1. ALL EXISTING CONTROL POINT AND SEQUENCES FOR PUMPS P-1, P-2, AND P-3 TO

REMAIN

2. VFD CONTROL INPUT 0-10 VOLTS

3. VFD FAULT OUTPUT

4. CHILLED WATER RETURN TEMPERATURE OUTPUT

5. EVAPORATOR DIFFERENTIAL PRESSURE OUTPUT

6. CHILLED WATER SUPPLY TEMPERATURE OUTPUT

7. CHILLER ENABLE INPUT

8. CHILLER STATUS OUTPUT

9. CHILLER FAULT OUTPUT

EVAPORATOR SUPPORT DETAIL

NO SCALE

M2

EVAPORATOR

OPERATING

WEIGHT 1000 LBS

EXISTING BAR JOIST (TYP)

SPAN MINIMUM 3 BAR JOISTS

DOUBLE NUT HANGER ROD

" THREADED ROD

3" x 3" x

" ANGLE IRON SUPPORT

DOUBLE NUT HANGER ROD (TYP)

3" x 3" x

" ANGLE IRON SUPPORT

TWO SUPPORTS REQUIRED (FRONT AND BACK)

SLAB TO EXTEND TO LIMITS OF SCREEN

WALL ENCLOSURE 40' - 6"

WELD OR CLAMP L3x3 ANGLES

TO JOIST BOTTOM CHORDS

CHILLER PAD OUTLINE WITHIN SCREENWALL ENCLOSURE

1/2"

PRESSURE GAUGE

NOTE: NEW CHILLED WATR COONECTIONS TO EXISITNG

PIPING MUST BE HOT TAPPED DURING OFF HOURS.

NOTES:

1. MAINTAIN MANUFCATURER

RECOMMENDED CLEARANCES.

SIZE AND INSTALL REFRIGERANT PIPING PER

MANUFACTURER RECOMMENDATIONS.

SIZE AND INSTALL REFRIGERANT PIPING PER

MANUFACTURER RECOMMENDATIONS.

5" THICK CONCRETE SLAB

TO LIMITS OF SCREEN WALL

5" THICK CONCRETE SLAB

TO EXISTING SLAB

PROVIDE FILL AS REQUIRED

#4 BENT BAR AT 18 ON CENTER

2 #4 BAR

ENCLOSURE PAD EDGE SECTION

NO SCALE

M2

SLAB TO EXTEND TO LIMITS OF

SCREEN WALL ENCLOSURE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i t h

CONSTRUCTION

DOCUMENTS

Robert Venner

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

POC: Bob Ryckman

Mechanical, Electrical, Plumbing:

4940 N 118th Street Omaha, NE 68164 Phone: (402) 491-4144

Grand Island, Nebraska

Project Director

Revisions: Date: POC: Ron Feuerbach

Architectural:

3705 N 200th Street Omaha, NE 68022 Phone: (402) 291-6941

Calvin L. Hinz Architects, P.C.

Install Air Cooled Chiller -Grand Island 636A4-18-113

APRIL 2, 2019

4/2/19 M2

MECHANICAL DETAILS

AND SCHEDULES

AutoCAD SHX Text E-5195

AutoCAD SHX Text

FEUERBACH

File details come from the government source that posted it.