Final Questions and Answers.docx

DOCX document 18 KB Posted

Attached to
R425--RFQ AMENDMENT | POSTING Q&A'S | SBAR APPROVED | Fire Sprinkler Inspection, Maintenance & Repairs
Solicitation number
36C26226Q1206
Issued by

About this file

This is a Final Questions and Answers document for RFQ 36C26226Q1206, a Fire Sprinkler Inspection, Maintenance & Repairs solicitation issued by the Department of Veterans Affairs Network Contracting Office 7 for the San Diego VA Medical Center in San Diego, California. The document addresses contractor inquiries regarding prevailing wage requirements, work scheduling, and fire pump testing procedures. Contractors must comply with Service Contract Act requirements under WD #2015-5635, REV. 30, PUB. 05/12/2026, utilizing prevailing wage rates for California's San Diego County. The solicitation requires annual fire pump inspections to be performed both after hours and on weekends, with specific procedural guidance provided for test header utilization.

The Q&A clarifies that contractors must submit outage forms and methods of procedure in advance for approval by the VA, which then submits requests to the city. Two testing methodologies are permitted: if dechlor tabs and hay snakes are city-approved, work may be scheduled on weekends; if not approved, work must be scheduled on weekdays with 100 percent water capture requirements. Contractors are instructed to provide pricing for both methodologies to enable apples-to-apples bid comparison. Historical context indicates the test header was last utilized during an annual fire pump test performed in October 2024, while a flow meter was used during an annual test performed in October 2025. This document serves as clarification guidance for quotation preparation and does not establish solicitation terms beyond providing answers to contractor inquiries.

View the file

Other files

File Type Posted
36C26226Q1206 0001_1.docx DOCX document
S02 - RFQ - 36C26226Q1206 - Fire Sprinkler.pdf PDF
36C26226Q1206 - Questions and Answers.pdf PDF
VA10091.pdf PDF
W-9 Form.pdf PDF
FMS Vendor File Update Request Form.pdf PDF
36C26226Q1206_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Sprinkler Inspection 36C26226Q1206 Final Questions & Answers

Prevailing wage requirements and what rates are we to use? Service Contract Act WD #: 2015-5635, REV. 30, PUB. 05/12/2026 https://sam.gov/search/?index=sca&page=1&pageSize=25&sort=-modifiedDate&sfm%5Bstatus%5D%5Bis_active%5D=true&sfm%5BwdLocationWrapper%5D%5BwdStates%5D%5B0%5D%5Bkey%5D=CA&sfm%5BwdLocationWrapper%5D%5BwdStates%5D%5B0%5D%5Bvalue%5D=California&sfm%5BwdLocationWrapper%5D%5BwdCounty%5D%5B0%5D%5Bkey%5D=16353&sfm%5BwdLocationWrapper%5D%5BwdCounty%5D%5B0%5D%5Bvalue%5D=San%20Diego

Will any inspections need to be performed after hours?

Yes, the annual fire pump inspection.

Will any inspections need to be performed weekends?

Yes, the annual fire pump inspection.

What are the steps for performing the annual fire pump test when utilizing the test header? Are we to capture water 100% or are we to utilize dechlor tabs & hay snakes? Please explain in detail for apples-to-apples bids from all parties.

Price for both work. The contractor will put in the outage forms (including method of procedure) and schedule ahead of time. VA submits the request to the city for approval. If dechlor tabs and hay snakes are approved, the work should be scheduled for weekend work. If the dechlor tabs and hay snakes aren’t approved, the work should be scheduled for weekdays and 100% of the water needs to be captured.

When was the test header utilized for an annual fire pump test?

During the annual performed October 2024.

When was the flow meter last utilized for an annual fire pump test?

During the annual performed October 2025.

File details come from the government source that posted it. Updated .