About this file

This is a VA San Diego Maintenance & Operations (M&O) Utility System Outage Request Form used to coordinate planned utility shutdowns for facility maintenance and repairs.

The form documents a full system steam outage scheduled for July 26, 2026, from 0800-1630 hours in the Basement/Tunnel/5th Center core area, with backup dates of August 2 and August 9, 2026. The outage requestor is CMI (Computerized Maintenance Inc.), with Bernard Johnson designated as the VA Employee representative present during the work. The outage requires assistance from the Plumbing Shop and involves three coordinated activities: steam filter installation in Building 171B SPS performed by CMI, main steam valve replacement on the 5th floor performed by Centerline plumbing, and gate valve with steam trap replacement performed by the plumbing shop. The outage affects multiple building systems including domestic hot water, temperature controls, sterilizers/autoclaves, and trash compactor operations. Contact personnel include Stephen Cooper (858-220-1851), Micah Cottrell (619-807-0925), and Fernando Parra (619-742-6931). Required approvals include a Work Plan (approved), with ILSM/ICRA, Activity Hazard Analysis, and Crane Lift Plan marked as N/A. VASDHS required signatures are from Plumbing Lead Joe Notary, Maintenance Manager Mike Zinga, Chief M&O Joe Dobbins, and Chief of Engineering Brandon Montoya. The job site walkthrough was completed with system verification, no trial run was deemed necessary, and the outage does not affect life safety systems.

View the file

Other files for this federal contract opportunity

Other files attached to J012--Fire Sprinkler Repairs, newest first.
File Type Posted
a. Fire Alarm Outage Request Blank.docx DOCX document
S06 36C26226Q0654 0003 Amendment Fire Sprinkler Repairs.docx DOCX document
d. VHA PCRA 2024_1.1_Final.Template_Fillable.pdf PDF
c. VHA ICRA-1.5 (July 2 2026) Fillble PDF.pdf PDF
S06 36C26226Q0654 0002 Amendment Fire Sprinkler Repairs.docx DOCX document
S06 36C26226Q0654 0001 Amendment Fire Sprinkler Repairs.docx DOCX document
VA10091.pdf PDF
S02 36C26226Q0654_1 Fire Sprinkler Repairs.docx DOCX document
W-9 Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA SAN DIEGO M&O Utility System Outage Request Form

Floor/Wing Outage Requestor:

Form Submission Date:

Assistance is required from:

PLUMBING SHOP

HVAC

STRUCTURAL

LOCK SHOP ELECTRICAL SHOP

• Was detailed plans submitted to Facilities Maintenance Manager or representative for approval?

YES NO

• Was the job site walked? Including Interstitial and was a visual verification of system valves, circuit breakers, or any items related to the outage identified by the requestor?

YES NO

• Does the requestor have at least 3 tentative scheduled days?

YES NO

• These Dates are:

• Will the outage affect any life safety systems? If yes please indicate and attach Fire Alarm+Sprinkler Request Form.

YES NO FIRE SPRINKLER FIRE ALARM

• Is all the required documentation approved? (i.e. ICRA, ILSM, SUPEXMAN)

YES NO N/A

• Does this outage merit a trial run? If yes please provide date(s):

YES NO N/A

• Was the trial run performed to verify that other systems were not affected?

YES N/A

• Name of the requestor or a representative (VA Employee) will be present during the outage.

• Requestor will be the only liaison between VA shops and contractor(s) during the outage.

DAY OF SHUT DOWN CONTACT INFORMATION / REQUIRED SIGNATURE

Revised: 8/2024

Outage Date(s):

Name Phone Signature

Time Frame:

Brief Description of Work:

FIRE SYSTEM OIT

N/A

Utility Operator (Bldg. 2)

NO

VHASDCROCHAE

Line

VHASDCROCHAE

Line

VA SAN DIEGO M&O Utility System Outage Request Form

Revised: 8/2024

Document Submittal Checklist

WORK PLAN

ILSM/ICRA

ACTIVITY HAZARD ANALYSIS (AHA)

CRANE LIFT PLAN

Phone

Phone

Phone

Phone

ADDITIONAL INFORMATION

VASDHS REQUIRED SIGNATURE

• Domestic hot water (Hand washing/ Showers)

• Temperature controls (Heating)

• Equipment (Sterilizers/Autoclaves)

• Trash compactor (Sanipak)

Untitled

Text1: CMI
Text2: Basement/ Tunnel/ 5th Center core
Check Box5: Off
Check Box6: Yes
Check Box7: Off
Check Box8: Off
Check Box9: Off
Text10: Installation of steam filter for SPS in B171B. Replacement of gate valve and steam trap in the tunnel. Replacement of main steam valve in the center core of 5th floor. Work required to be performed on a Sunday due to SPS work load.
Check Box11: Off
Check Box12: Yes
Check Box13: Yes
Check Box14: Off
Check Box15: Yes
Check Box16: Off
Date17_af_date: 7/26
Date18_af_date: 8/2
Date19_af_date: 8/9/26
Check Box20: Off
Check Box21: Off
Check Box22: Yes
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Yes
Check Box28: Off
Check Box29: Off
Text30: Bernard Johnson
Text47: Joe Notary
Text48: Mike Zinga
Text49: Joe Dobbins
Text50: Brandon Montoya
Text51: 858-426-7429
Text52: 858-210-2562
Text53: 619-922-1489
Text54: 858-758-0673
Text55: A full system steam outage is required to accomplish 3 scheduled activities. The three activities include a steam filter installation performed by CMI in room B171 SPS, Main steam valve replacement for the 5th floor performed by Centerline plumbing, and the gate valve with steam trap will be replaced by the plumbing shop.

Impacts include:

Text44:
Text45:
Text46:
Dropdown11: [ ]
Dropdown12: [ ]
Text3: 7/13/2026
Text4: 7/26/2026
Text5: Stephen Cooper
Text6: Micah Cottrell
Text7: Fernando Parra
Text8:
Text9:
Text12: 858-220-1851
Text13: 619-807-0925
Text14: 619-742-6931
Text15:
Text16:
Text11:
Text17: 0800-1630
Check Box1: Off
Check Box2: Off
Dropdown7: [N/A]
Dropdown42: [YES]
Dropdown8: [N/A]
Dropdown9: [N/A]
Dropdown10: [ ]
Check Box3: Yes
Check Box4: Off
Text18:
Text19:
Text20:
Text21:
Check Box30: Off
Text22: Chief M&O
Check Box31: Off
Check Box32: Yes
Text33: Maintenance Manager
Text34: Plumbing Lead
Text35: Chief of Engineering