a. Fire Alarm Outage Request Blank.docx
DOCX document 80 KB Posted
- Attached to
- J012--Fire Sprinkler Repairs Federal contract opportunity
- Solicitation number
- 36C26226Q0654_1
About this file
This is a Fire Alarm Outage Request Form template, version dated April 7, 2025, designed for use by contractors performing fire alarm or fire sprinkler system work at a VA facility on the La Jolla Campus. The form serves as an administrative and safety control document requiring completion and approval before any fire safety system maintenance, repairs, or testing can commence.
The form mandates a structured four-step process: contractors must save the blank template without editing it, complete all required sections with signatures from responsible organizations (contractor, subcontractor, VA Project Manager, VA Project Section Supervisor, and VA Authorizing Official—David Zajac, Eli Sisneros, or Jeff Salas), hand-deliver the approved form to Building 2 for queue placement per Central Plant Standard Operating Procedures, and coordinate with Central Plant duty personnel, contract leadership, and specified individuals on event day via text thread communication. The form requires submission 14 days prior to scheduled work (except emergency repairs authorized only by contracted company Everon) and includes pre-work and post-work safety checklists addressing isolation valve research, fire watch requirements for outages exceeding 8 hours (fire alarm) or 10 hours (sprinklers), San Diego Fire Department notification protocols, supplemental fire extinguishing equipment provision, and Central Plant notification procedures. Specific restrictions prohibit fire alarm testing between 7:30 AM and 8:00 AM due to patient care requirements. Post-work verification must confirm bypass removal, system restoration from test mode, completion of fire watch, notification closures, utility operator notification, and proper documentation in fire alarm outage and repair logbooks. An included FireWorks Cheat Sheet provides reference guidance on the fire alarm system's four building types, zone designations, and standard terminology for activating (removing from service) specific device types—smoke detectors, waterflows, pull stations, audio notifications, and visual notifications—across multiple floors and wings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 36C26226Q0654 0003 Amendment Fire Sprinkler Repairs.docx | DOCX document | |
| b. Utility(Inc Fire Spr) Outage Request Form.pdf | ||
| d. VHA PCRA 2024_1.1_Final.Template_Fillable.pdf | ||
| c. VHA ICRA-1.5 (July 2 2026) Fillble PDF.pdf | ||
| S06 36C26226Q0654 0002 Amendment Fire Sprinkler Repairs.docx | DOCX document | |
| S06 36C26226Q0654 0001 Amendment Fire Sprinkler Repairs.docx | DOCX document | |
| VA10091.pdf | ||
| S02 36C26226Q0654_1 Fire Sprinkler Repairs.docx | DOCX document | |
| W-9 Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE ALARM OUTAGE REQUEST FORM
Version dated 20250407
A. Step 1: Save this file in your desired location. Do not begin typing in the form, please, so others can use this form.
B. Step 2: Complete all sections below and obtain signatures from all responsible organizations to enable approval. Page 3 is the FireWorks/Panel cheat sheet to aid in completing system to be impacted. Then, print and hand deliver the approved form to Bldg 2 so it can be added and placed in the queue per Central Plant SOP for the outage/time/date.
C. Step 3. Event day, huddle in Central Plant. Create a text thread with central plant duty cell phone, onsite contract leadership(usually Supt, QC, USACE, CFM), Eli, and Myles.
D. Step 4. After work is completed. Postwork signatures are required to ensure the fire alarm system is not impaired by accidentally leaving a portion in bypass or the system in test.
FIRE ALARM OUTAGE REQUEST FORM
Version dated 20250407
PROJECT INFORMATION
PROJECT NUMBER Comment by Sisneros, Eli: Section-1234
PROJECT TITLE Comment by Sisneros, Eli: Related Project or Repair Name
DATE SUBMITTED
NATURE OF WORK
SYSTEM TO BE IMPACTED/ACTIVATED (Fire Alarm/Fire Sprinkler; Pulls, Smokes, Flows, Door Drop, Elevator Recall, and/or Place System in Test)
LOCATION
This permits applies only to areas specified; no system will be isolated or secured with approval. Use FireWorks Cheat sheet for building wings.
BUILDING NUMBER:
FLOOR:
WING:
ROOM NUMBER:
WHEN
No fire alarm tests between 7:30am and 8:00am due to patient care, clinical operation requirements.
| FREQUENCY: | Comment by Sisneros, Eli: Frequency: “One time” or “daily” ? |
| START DATE: | |
| END DATE: |
START TIME:
END TIME:
PRE-WORK SAFETY CHECKLIST (CONTRACTOR)
| Y/N/NA |
| ACTION |
Submit work request 14 prior to schedule work date. Required except for emergency repair.
Research area for isolation valves.
Fire Watch provided by contractor during a system shutdown longer than 10 hours (sprinklers) or 8 hours (fire alarm).
SDFD notified if duration of outage is longer than 10 hours (sprinklers) or 8 hours (fire alarm).
Provide supplemental fire extinguishing equipment on work site in case of fire.
Notify Central Plant, x3441, before and after work is completed.
PRE-WORK SAFETY CHECKLIST (VA PM)
Notify VA Police if work is in a secure space.
VA Project Manager on site for work duration.
Submit E-news announcement within 48 hours of start of work.
Personnel instructed in the fire alarm procedures (RACE).
APPROVAL AND CONTACT INFO
By signing below you are acknowledging that you understand all the provisions of this permit can be revoked at any time if I or my employees fail to follow the provisions above. Contractor and Subcontractor to contact VA Project Manager and Central Plant to request permission to start work prior to work commencing. No work will proceed without this from properly completed and approved (exception emergency repair which is only authorized by the contracted company Everon. Testing is not considered troubleshooting and is required to be planned in advance.)
| ORGANIZATION |
| RESPONSIBLE LEVELS |
| SIGNATURES |
| DATE SIGNED |
| Contact method onsite usually phone. |
| CONTRACTOR |
| Print: |
Signature:
Date:
Phone:
| SUBCONTRACTOR |
| Print: |
Signature:
Date:
Phone:
| VA PROJECT MANAGER |
| Print: |
Signature:
| Date: |
| Phone: |
| VA PROJECT SECTION SUPERVISOR |
| Print: |
Signature:
| Date: |
| Phone: |
VA AUTHORIZING OFFICIAL: DAVID ZAJAC, ELI SISNEROS, OR JEFF SALAS
| ☐ APPROVED |
| Date: |
Time:
☐ DISAPPROVED
| VA ENGINEERING AUTHORIZING OFFICIAL |
| Print: |
| Signature: |
| Date: |
POST WORK SAFETY CHECK
| Y/N/NA |
| ACTION |
Bypass removed.
System taken off test.
Notify VA Police that work was completed if work was in a secure space
Fire Watch ended
SDFD notified outage is completed if required.
On-duty Utility System Operator notified
Outage logged in Fire Alarm Outage Logbook
Repair/troubleshooting logged in Fire Alarm Repair/troubleshooting Logbook.
VA keys returned
POST WORK INSPECTION
| Organization |
| Sign |
| Date |
Contractor
VA PM
VA Project Supervisors
Fire Works Cheat Sheet
The Central Plant USS/USO(Utilities Systems Supervisor/Utilities Systems Operator can take out of service also known as Activate*, throughout the La Jolla Campus the fire alarm as follows:
A. Four types of initiating devices(smoke detectors, waterflows, tampers, and pull stations).
B. Two types of warnings notifications (audio which is overhead announcement/horns, and visual which is strobes lights).
C. Three types fire safety reactions(elevator recall, fire door drop, and air handler shutdown). These devices are smoke detectors, waterflows and pull stations.
D. Take out of Service the notification to the San Diego Fire Department by placing the system in “Test”. Placing the system in “Test” prevents the system from notifying the Fire Alarm’s emergency center from receiving a fire alarm and thereby preventing them from notifying the fire department in the event of a fire. This is not done via FireWorks so it is not called “activate” like the others.
*- Note that the Fireworks system uses the term “activate” to mean remove from service. This seems to be just backwards of what would be expected to take a device out of service and is a programming definition used by the FireWorks program. It is provided here in case you hear the term used as follows: “Roger, activating audio/visuals.” To which, you can clarify “did you mean that audio/visuals will be taken out of service?” for example. No such thing as a dumb question. In the end, it will ensure patient safety.
Other examples of standard terminology are:
“Activate Building 1, Smokes, 1st floor, Northwest” – This will take smoke detectors in the 1st floor Northwest zone out of service.
“Activate Building 1, Water flows, 3rd floor, East” – This will take waterflow alarms out of service in the 3rd floor East zone.
“Activate Building 1, Pulls, 6th floor, West” – This takes pull station alarms out of service in the 6th floor West zone.
“Troubles” – A notification on the fire alarm panel of a fault in the system which may be an impairment to a portion of the fire alarm system. Impairments require an Interim Life Safety Measure (ILSM), see Engr SOP: Life Safety Standad Operating Procedure(LSSOP) to ensure the applicable ILSM is completed correctly.
The table below identifies how each building’s fire alarm is zoned and provide are some examples of the terminology used to remove a particular type of signal for a zone.
Building 1
| Floor |
| Zones |
| Basement |
| West |
| East |
Door Drop/Elevator Smoke with recall
| 1st |
| Northwest |
| Northeast |
| Southwest |
| Southeast |
Elevator Smoke w recall
| 2nd |
| North |
| East |
| South |
| West |
| Core |
| Elevator Smoke w recall |
| 3rd |
| North |
| East |
| South |
| West |
| Core |
| Elevator Smoke w recall |
| 4th |
| North |
| East |
| South |
| West |
| Core |
| Elevator Smoke w recall |
| 5th |
| North |
| East |
| South |
| West |
| Core |
| Elevator Smoke w recall |
| 6th |
| North |
| East |
| South |
| West |
| Core |
| Elevator Smoke w recall |
| Penthouse Mezzanine |
| Penthouse |
Elevator Smoke w recall
Building 11
| Floor |
| Zones |
| Basement |
| West |
Elevator Smoke w recall
| 1st |
| West |
Elevator Smoke w recall
| 2nd |
| West |
Elevator Smoke w recall
Building 27
| Floor |
| Zones |
| 1st |
| 1st Floor |
Elevator Smoke w recall
| 2nd |
| 2nd Floor |
Elevator Smoke w recall
| 3rd |
| 3rd Floor |
Elevator Smoke w recall
Building 14, 16, 20, 23, 25 are one level.
Parking Garage( Buildings 28, 29, 30, 31) Numbered West to East, i.e. furthest west is Bldg 28. Each is zoned by floor level.
image1.jpg
File details come from the government source that posted it. Updated .