About this file
This document contains a traffic control plan template and a related federal contract solicitation. The traffic control plan template provides guidance for contractors to request and obtain approval for road, sidewalk, parking lot and other closures or restrictions related to construction projects. It requires contractors to submit plans at least 6 weeks prior to closure and obtain approval from the Contracting Officer's Representative and Project Manager.
The related federal contract solicitation is for the installation of a dedicated fire suppression water distribution system and replacement of potable water lines for the North Campus at the VA Greater Los Angeles Healthcare System. Contractors are sought to provide all labor, materials, equipment and transportation to complete general construction, alterations, mechanical, electrical and utility work. Work will be performed at an active hospital and must comply with all applicable building codes and specifications. The response due date is not provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003 Solicitation 36C26222B0007.pdf | ||
| Amendment 0002 Solicitation 36C26222B0007.pdf | ||
| Amendment 0002 Attachment 1 RFI Log.pdf | ||
| Amendment 0001 Attachment 1 RFI Log.pdf | ||
| Amendment 0001 Attachment 3 Revised Plans.pdf | ||
| Amendment 0001 Solicitation 36C26222B0007.pdf | ||
| S02 Solicitation Attachment E GLA Specific Requirements.pdf | ||
| S02 Solicitation Attachment B Drawings.pdf | ||
| S02 Solicitation 36C26222B0007.pdf | ||
| S02 Solicitation Attachment C Wage Determination.pdf | ||
| S02 Solicitation Attachment D Temporary Traffic Control Standards.pdf | ||
| S02 Solicitation Attachment A Specifications.pdf | ||
| S02 Solicitation Attachment E GLA Specific Requirements.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared By Approved By Basim M. Khoa Do
Project #1 Project Name1 Contractor1
Rev #1 Issue Date1 CO1 COR1
Lead2 Homa S. Approved2 Date2 Sheet 1/2 Yes/No1 Date/From1 Date/To1
Sidewalk Closure
This form to be filled and submitted by contractor after contract award but no later than 6 weeks before closure date , and to be approved by COR/PM. (VA/CFG)
Temporary Traffic Control Plan (TTCP) Procedure # CFG-VA-011
Road Closure Activities1 StreetName/Comments1,2
Notes
General Comments1,2
Lane Closure
For location, sizes, color of signage and other requirements, refer to VA standard specifications # CFG-VA-012
Parking Lot Access Restriction/Closure ADA Access Restriction/Closure
Detour Pedestrian Detour Bicycle Detour Building Access Restriction/Closure
Procedure
(1) To be filled by contractor
(2) To be filled by COR/PM
Prepared By Approved By Basim M. Khoa Do
Project #1 0 Project Name1 Contractor1
Rev #1 0 Issue Date1 0 CO1 1/0/1900 COR1 0 Lead2 Homa S. Approved2 0 Date2 Sheet 2/2
0 0
Temporary Traffic Control Plan (TTCP) Procedure # CFG-VA-011
Sample for the Master Traffic Control Map to be submitted with this plan
Upon receiving this plan, PM/COR shall review and provide approval PM/COR shall shall update the Master Map located on VA Share Point to reflect this project For more information, refer to CFG-VA-012 Temporary Traffic Control Standard
Contractor shall request a current version of map to be used and submitted with this form (TTCP) for approval checklist