This document contains a traffic control plan template and a related federal contract solicitation. The traffic control plan template provides guidance for contractors to request and obtain approval for road, sidewalk, parking lot and other closures or restrictions related to construction projects. It requires contractors to submit plans at least 6 weeks prior to closure and obtain approval from the Contracting Officer's Representative and Project Manager.

The related federal contract solicitation is for the installation of a dedicated fire suppression water distribution system and replacement of potable water lines for the North Campus at the VA Greater Los Angeles Healthcare System. Contractors are sought to provide all labor, materials, equipment and transportation to complete general construction, alterations, mechanical, electrical and utility work. Work will be performed at an active hospital and must comply with all applicable building codes and specifications. The response due date is not provided.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared By Approved By Basim M. Khoa Do

Project #1 Project Name1 Contractor1

Rev #1 Issue Date1 CO1 COR1

Lead2 Homa S. Approved2 Date2 Sheet 1/2 Yes/No1 Date/From1 Date/To1

Sidewalk Closure

This form to be filled and submitted by contractor after contract award but no later than 6 weeks before closure date , and to be approved by COR/PM. (VA/CFG)

Temporary Traffic Control Plan (TTCP) Procedure # CFG-VA-011

Road Closure Activities1 StreetName/Comments1,2

Notes

General Comments1,2

Lane Closure

For location, sizes, color of signage and other requirements, refer to VA standard specifications # CFG-VA-012

Parking Lot Access Restriction/Closure ADA Access Restriction/Closure

Detour Pedestrian Detour Bicycle Detour Building Access Restriction/Closure

Procedure

(1) To be filled by contractor

(2) To be filled by COR/PM

Prepared By Approved By Basim M. Khoa Do

Project #1 0 Project Name1 Contractor1

Rev #1 0 Issue Date1 0 CO1 1/0/1900 COR1 0 Lead2 Homa S. Approved2 0 Date2 Sheet 2/2

0 0

Temporary Traffic Control Plan (TTCP) Procedure # CFG-VA-011

Sample for the Master Traffic Control Map to be submitted with this plan

Upon receiving this plan, PM/COR shall review and provide approval PM/COR shall shall update the Master Map located on VA Share Point to reflect this project For more information, refer to CFG-VA-012 Temporary Traffic Control Standard

Contractor shall request a current version of map to be used and submitted with this form (TTCP) for approval checklist

File details come from the government source that posted it. Updated .