Wage Determination HI20260001 Jan 16 2026.pdf
PDF 8 MB Posted
- Attached to
- Z2DZ--Modernize Generator Project Federal contract opportunity
- Solicitation number
- 36C26126R0031
About this file
This is a General Decision (Wage Determination) document for Hawaii construction projects, effective January 16, 2026, superseding the prior determination HI20250001. The determination establishes prevailing wage rates and fringe benefits for building construction, residential construction (single-family homes and apartments up to four stories), heavy construction, highway construction, and dredging projects across all Hawaii counties.
The wage determination includes detailed hourly rates and fringe benefit percentages for numerous construction trade classifications, including asbestos workers, boilermakers, bricklayers, tile and marble workers, carpenters, drywall workers, electricians, line construction workers, elevator mechanics, engineers with diving specialties, helicopter operators, power equipment operators (with extensive subclassifications for equipment types), dredging operators, ironworkers, laborers (with multiple subclassifications), painters, glaziers, plasterers, plumbers, pipefitters, roofers, sheet metal workers, and landscape/irrigation laborers. Rates range from approximately $9.33 to $81.72 per hour for base wages, with fringe benefits typically ranging from 1.20% to 43.46% depending on the classification. The determination also specifies hourly premiums for crane operators with booms and leads exceeding specified lengths. Two executive orders are referenced: EO 13706 regarding paid sick leave for federal contractors (requiring one hour per 30 hours worked, up to 56 hours annually) and EO 13658 establishing a minimum wage of $13.30 per hour for covered workers on Davis-Bacon Act contracts. The document provides guidance on wage determination appeals processes and rate identifier explanations for union, survey-based, state-adopted, and supplemental classifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Modernized Generator System SOW rev. 2.pdf | ||
| RFI Form - 36C26125R0031 Modernize Generators.docx | DOCX document | |
| Modernize Generator System Drawings.pdf | ||
| CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx | DOCX document | |
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONT.pdf | ||
| Copy of Price Breakdown 36C26126R0031 Modernize Generators.xlsx | XLSX spreadsheet | |
| 36C26126R0031_1.docx | DOCX document | |
| Modernize Generator System Final Specification.pdf | ||
| 36C26126R0031_2.docx | DOCX document | |
| 36C26126R0031.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .