This is a Price Breakdown document for the Modernize Generators project (36C26126R0031) at Sparks M. Matsunaga VA Medical Center, organized by Construction Specifications Institute (CSI) divisions. The spreadsheet provides a detailed cost structure template with columns for Material, Equipment, Labor, and Total pricing across multiple construction and mechanical disciplines. Key cost categories include Division 01 (General Requirements with project management, mobilization, and quality control), Division 02 (Existing Conditions and demolition), Division 03 (Concrete work), Division 05 (Metals and fabrication), Division 07 (Thermal and moisture protection), Division 09 (Finishes), Division 21 (Fire Suppression systems), Division 22 (Plumbing), Division 23 (HVAC systems), Division 26 (Electrical systems including engine generators), Division 27 (Communications), Division 28 (Electronic Safety and Security), Division 31 (Earthwork), and Division 32 (Exterior Improvements). Additional line items include bonds, insurance, home office overhead, and profit calculations leading to a subtotal and grand total.
This price breakdown template is associated with a pre-solicitation announcement for a Department of Veterans Affairs construction project valued between $2,000,000 and $5,000,000. The full RFP will be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 236220 (Commercial and Institutional Building Construction). Potential offerors must be registered in the System for Award Management (SAM) and maintain current representations and certifications. The formal RFP with complete proposal instructions, scope of work, and specifications was expected to be available in early April 2026, with a site visit scheduled for March 25, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx | DOCX document | |
| Wage Determination HI20260001 Jan 16 2026.pdf | ||
| Modernize Generator System Final Specification.pdf | ||
| Modernized Generator System SOW rev. 2.pdf | ||
| 36C26126R0031_1.docx | DOCX document | |
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONT.pdf | ||
| Modernize Generator System Drawings.pdf | ||
| RFI Form - 36C26125R0031 Modernize Generators.docx | DOCX document | |
| 36C26126R0031_2.docx | DOCX document | |
| 36C26126R0031.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A - Price Breakdown 36C26126R0031 - Project # 459-24-001, Modernize Generators Attachment A - PRICE BREAKDOWN Description Material Equipment Labor Total
| Project Manager/QC |
| Superintendent/Safety |
| Mobilization |
| Division 01 - General Requirements |
| General Requirements |
| Project Schedule |
| Shop Drawings |
| Safety Requirements |
| Quality Control |
| Testing Laboratory Services |
| Special Inspections |
| Temporary Environmental Controls |
| Construction Waste Management |
| Sustainable Construction Requirement |
| General Commisioning Requirements |
| Division 02 - Existing Conditions |
| Site Surveys |
| Demolition |
| Traditional Asbestos Abatement |
| Division 03- Concrete |
| (Short-Form) Cast-in-Place Concrete |
| Division 05- Metals |
| Metal Fabrication |
| Division 07- Thermal and Moisture Protection |
| Firestopping |
| Thermal Insulation |
| Joint Sealants |
| Division 08- Openings |
| Hollow Metal Doors |
| Door Hardware |
| Division 09- Finishes |
| Non-Structural Metal Framing |
| Gypsum Board |
| Resilient Base and Accessories |
| Painting |
| Division 10- Specialties |
| Wall and Door Protection |
| Fire Extinguisher Cabinets |
| FIRE EXTINGUISHERS |
| Division 13- Special Construction |
| Seismic Restraint Requirements for Non-Strutural Components |
Division 14- Conveying Equipment
| Division 21- Fire Supression |
| Wet-Pipe Sprinkler Systems |
Division 22- Plumbing
| Division 23- Heating, Ventilating, and Air Conditioning (HVAC) |
| Common Work Results for HVAC |
| General Motor Requirements for HVAC and Steam Generation Equipment |
| Noise and Vibration Control for HVAC Piping and Equipment |
| HVAC and Boiler Plant Insulation |
| Commissioning of HVAC Systems |
| Direct-Digital Control System for HVAC |
| Facility Fuel Systems |
| Division 26- Electrical |
| Requirements for Electrical Installations |
| Low-Voltage Electrical Power Conductors and Cables |
| Grounding and Bonding for Electrical Systems |
| Raceway and Boxes for Electrical Systems |
| Underground Electrical Construction |
| Overcurrent Protective Device Coordination Study |
| Commissioning of Electrical Systems |
| Wiring Devices |
| Motor Controllers |
| Engine Generators |
| Division 27- Communications |
| Grounding and Bonding for Communications Systems |
| Requirements for Communications Installations |
| Conduits and Backboxes for Communication System |
| Structure Cabling |
| Communications Optical Fiber Backbone Cabling |
| Commicationcopper Horizontal Cabling |
| Division 28- Electronic Safety and Security |
| Common Work Results for Electronic Safety and Security |
| Conductors and Cables for Electronic Safety and Security |
| Grounding and Bonding for Electronic Safety and Security |
| Conduits and Backboxes for Electronic Safety and Security |
| Fire Detection and Alarm |
| Division 31- Earthwork |
| Earthwork |
| Dewatering |
| Division 32- Exterior Improvements |
| Cement and Concrete for Exterior Improvements |
| Asphalt Paving |
| Chain Link Fences and Gates |
| Planting |
| Bonds |
| Insurance |
| Home Office Overhead |
| Profit |
SUB-TOTAL
PROJECT GRAND TOTAL