Copy of Price Breakdown 36C26126R0031 Modernize Generators.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Z2DZ--Modernize Generator Project
Solicitation number
36C26126R0031
Issued by

About this file

This is a Price Breakdown document for the Modernize Generators project (36C26126R0031) at Sparks M. Matsunaga VA Medical Center, organized by Construction Specifications Institute (CSI) divisions. The spreadsheet provides a detailed cost structure template with columns for Material, Equipment, Labor, and Total pricing across multiple construction and mechanical disciplines. Key cost categories include Division 01 (General Requirements with project management, mobilization, and quality control), Division 02 (Existing Conditions and demolition), Division 03 (Concrete work), Division 05 (Metals and fabrication), Division 07 (Thermal and moisture protection), Division 09 (Finishes), Division 21 (Fire Suppression systems), Division 22 (Plumbing), Division 23 (HVAC systems), Division 26 (Electrical systems including engine generators), Division 27 (Communications), Division 28 (Electronic Safety and Security), Division 31 (Earthwork), and Division 32 (Exterior Improvements). Additional line items include bonds, insurance, home office overhead, and profit calculations leading to a subtotal and grand total.

This price breakdown template is associated with a pre-solicitation announcement for a Department of Veterans Affairs construction project valued between $2,000,000 and $5,000,000. The full RFP will be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 236220 (Commercial and Institutional Building Construction). Potential offerors must be registered in the System for Award Management (SAM) and maintain current representations and certifications. The formal RFP with complete proposal instructions, scope of work, and specifications was expected to be available in early April 2026, with a site visit scheduled for March 25, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A - Price Breakdown 36C26126R0031 - Project # 459-24-001, Modernize Generators Attachment A - PRICE BREAKDOWN Description Material Equipment Labor Total

Project Manager/QC
Superintendent/Safety
Mobilization
Division 01 - General Requirements
General Requirements
Project Schedule
Shop Drawings
Safety Requirements
Quality Control
Testing Laboratory Services
Special Inspections
Temporary Environmental Controls
Construction Waste Management
Sustainable Construction Requirement
General Commisioning Requirements
Division 02 - Existing Conditions
Site Surveys
Demolition
Traditional Asbestos Abatement
Division 03- Concrete
(Short-Form) Cast-in-Place Concrete
Division 05- Metals
Metal Fabrication
Division 07- Thermal and Moisture Protection
Firestopping
Thermal Insulation
Joint Sealants
Division 08- Openings
Hollow Metal Doors
Door Hardware
Division 09- Finishes
Non-Structural Metal Framing
Gypsum Board
Resilient Base and Accessories
Painting
Division 10- Specialties
Wall and Door Protection
Fire Extinguisher Cabinets
FIRE EXTINGUISHERS
Division 13- Special Construction
Seismic Restraint Requirements for Non-Strutural Components

Division 14- Conveying Equipment

Division 21- Fire Supression
Wet-Pipe Sprinkler Systems

Division 22- Plumbing

Division 23- Heating, Ventilating, and Air Conditioning (HVAC)
Common Work Results for HVAC
General Motor Requirements for HVAC and Steam Generation Equipment
Noise and Vibration Control for HVAC Piping and Equipment
HVAC and Boiler Plant Insulation
Commissioning of HVAC Systems
Direct-Digital Control System for HVAC
Facility Fuel Systems
Division 26- Electrical
Requirements for Electrical Installations
Low-Voltage Electrical Power Conductors and Cables
Grounding and Bonding for Electrical Systems
Raceway and Boxes for Electrical Systems
Underground Electrical Construction
Overcurrent Protective Device Coordination Study
Commissioning of Electrical Systems
Wiring Devices
Motor Controllers
Engine Generators
Division 27- Communications
Grounding and Bonding for Communications Systems
Requirements for Communications Installations
Conduits and Backboxes for Communication System
Structure Cabling
Communications Optical Fiber Backbone Cabling
Commicationcopper Horizontal Cabling
Division 28- Electronic Safety and Security
Common Work Results for Electronic Safety and Security
Conductors and Cables for Electronic Safety and Security
Grounding and Bonding for Electronic Safety and Security
Conduits and Backboxes for Electronic Safety and Security
Fire Detection and Alarm
Division 31- Earthwork
Earthwork
Dewatering
Division 32- Exterior Improvements
Cement and Concrete for Exterior Improvements
Asphalt Paving
Chain Link Fences and Gates
Planting
Bonds
Insurance
Home Office Overhead
Profit

SUB-TOTAL

PROJECT GRAND TOTAL