Amendment 36C26126R0013 0002 Answers to RFI 57 and 59.docx

DOCX document 22 KB Posted

Attached to
Solicitation Z1DA--NRM - 640-23-102 | Microbiology Lab Renovation
Solicitation number
36C26126R0013
Issued by

About this file

This file is an amendment containing answers to two Requests for Information (RFI) submitted by potential contractors regarding the Microbiology Lab Renovation solicitation at VA Palo Alto. The amendment addresses technical clarifications needed for accurate proposal development and construction planning.

RFI 57 concerns Drawing S-100, which references five locations with enlarged plans on Sheet S-102 showing multiple W Shape structural members. The contractor requested clarification on which members are to be furnished and installed versus which are existing to remain. The government's response clarifies that all beams on Sheet S-102 are existing conditions and should remain in place. RFI 59 addresses a discrepancy between Drawing S900 and Statement of Work Section 3.10.b2 regarding the quantity and type of hoods in the microbiology lab—the drawing indicates 6 A2 hoods and 2 C1 hoods, while the SOW shows the reverse (6 C1 hoods and 2 A2 hoods). Rather than providing a definitive answer, the government directs contractors to follow the Construction Documents and verify the actual hood configuration during the pre-construction site walk, placing responsibility on the contractor to resolve the discrepancy through on-site inspection prior to finalizing their proposal.

View the file

Other files

File Type Posted
Amendment 36C26126R0013 0002.docx DOCX document
36C26126R0013 0001.docx DOCX document
S02 RFI FORM.docx DOCX document
Wage Determination CA20250018.txt TXT text file
DIVISIONAL COST BREAK-OUT.docx DOCX document
640-23-102_SPECS v2_BID - 11-04-2025.pdf PDF
640-23-102_SPECS v1_BID - 11-04-2025.pdf PDF
640-23-102_VA2312_Bid Set Drawing_11-04-2025.pdf PDF
36C26126R0013 Microbiology Lab Renovation.docx DOCX document
640-23-102_B100_Microbiology SOW R1 11-04-2025.pdf PDF
SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE.docx DOCX document
VAAR 852.219-75.docx DOCX document
36C26126R0013.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 36C26126R0013 0002

Drawing S-100 refers (5) locations to enlarged plans on Sheet S-102. Sheet S-102 shows multiple W Shape members in all (5) locations. Please confirm which members are to be furnished and installed (F&I) and which are existing to remain (ETR).
All beams on S102 are existing.
The Drawing S900 states there are 6 A2 hoods and 2 C1 hoods. However in the Statement of work , 3.10.b2 further below…. It is showing the hoods as 6 C1 hoods and 2 A2 hoods. Can you please clarify which is correct?
Contractor to follow Construction Documents and verify this on pre-construction site walk.

File details come from the government source that posted it. Updated .