This document is a Standard Form 1442 Solicitation, Offer, and Award for a Microbiology Lab Renovation project at the VA Palo Alto Health Care System. The Department of Veterans Affairs is seeking proposals for a Firm-Fixed-Price construction contract to renovate the Microbiology Lab in Building 100, with a project value between $2,000,000 and $5,000,000. The solicitation is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 236220, with offers restricted to verified SDVOSB concerns.
Key details include a site visit scheduled for January 22, 2026, at 10:00 AM, with Request for Information (RFI) due by January 27, 2026, at 2:00 PM PST. The project involves general construction, interior finishes, mechanical, electrical, plumbing, and fire protection systems, with an anticipated 365-calendar day performance period. Wage determination CA20250018 applies, and payment and performance bonds are required. Proposals must be submitted electronically to the Contracting Officer, Jose Hernandez, with a comprehensive evaluation process considering technical approach, specialized experience, key personnel, and past performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 36C26126R0013 0002 Answers to RFI 57 and 59.docx | DOCX document | |
| Amendment 36C26126R0013 0002.docx | DOCX document | |
| 36C26126R0013 0001.docx | DOCX document | |
| S02 RFI FORM.docx | DOCX document | |
| Wage Determination CA20250018.txt | TXT text file | |
| DIVISIONAL COST BREAK-OUT.docx | DOCX document | |
| 640-23-102_SPECS v2_BID - 11-04-2025.pdf | ||
| 640-23-102_SPECS v1_BID - 11-04-2025.pdf | ||
| 640-23-102_VA2312_Bid Set Drawing_11-04-2025.pdf | ||
| 640-23-102_B100_Microbiology SOW R1 11-04-2025.pdf | ||
| SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE.docx | DOCX document | |
| VAAR 852.219-75.docx | DOCX document | |
| 36C26126R0013.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26126R0013
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time ____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C26126R0013
X 01-09-2026
TBD
640-23-102
612MCP
Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21 3237 Peacekeeper Way, Bldg 209 McClellan Park CA 95652 Jose Hernandez Contracting Officer jose.hernandez1@va.gov
Jose Hernandez 916-923-4519
Project # 640-23-102 - Microbiology Lab Renovation - VA Palo Alto Health Care System NAICS Code is 236220 – Commercial and Institutional Building Construction Small Business size standard is $45M Wage determination CA20250018 applies to this requirement
IAW VAAR 836.204: Disclosure of magnitude is Between $2,000,000 and $5,000,000
Payment and performance bonds are required
This requirement is 100% SDVOSB set aside
All documentation must be submitted electronically to jose.hernandez1@va.gov
A Site Visit is schedule for Thursday, January 22, 2026, at 10:00 AM Meeting Location: Building 100, 3801 Miranda Ave, Palo Alto, California 94304
RFIS are due on: January 27, 2026, at 2:00 PM PST
1 Electronic 10 Am
PST
02-09-2026
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
612MCP
Department of Veterans Affairs
Network Contracting Office (NCO) 21 3237 Peacekeeper Way, Bldg 209 McClellan CA 95652
Department of Veterans Affairs FMS VA-9(101) Financial Services Center
PO Box 149971 Austin TX 78714-9971
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 5 |
| 2.1 AVAILABILITY OF SOLICITATION DOCUMENTS: | 5 |
| 2.2 SDVOSB SET-ASIDE: | 5 |
| 2.3 TECHNICAL QUESTIONS: | 5 |
| 2.4 AMENDMENTS: | 5 |
| 2.5 PREPARATION OF PROPOSALS: | 5 |
| 2.6 SELECTION PROCEDURES: | 5 |
| 2.7 PROPOSAL REQUIREMENTS: | 6 |
| 2.8 SYSTEM FOR AWARD MANAGEMENT (SAM): | 13 |
| 2.9 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR | 13 |
| PERFORMANCE ASSESSMENT SYSTEM (CPARS): | 13 |
| 2.10 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS: | 14 |
| 2.11 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER: | 14 |
| 2.1 52.216-1 TYPE OF CONTRACT (DEVIATION) (NOV 2025) | 14 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (DEVIATION NOV 2025) | 14 |
| 2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 14 |
| 2.4 52.228-1 BID GUARANTEE (SEP 1996) | 16 |
| 2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 16 |
| 2.6 52.233-2 SERVICE OF PROTEST (DEVIATION NOV 2025) | 17 |
| 2.7 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 17 |
| 2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 21 |
| REPRESENTATIONS AND CERTIFICATIONS | 22 |
| 3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (NOV 2025) (DEVIATION) | 22 |
| 3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2025) (DEVIATION) | 23 |
| GENERAL CONDITIONS | 26 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 26 |
| 4.2 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (NOV 2025) (DEVIATION) | 26 |
| 4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025) (DEVIATION) | 27 |
| 4.4 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (NOV 2025) (DEVIATION) | 30 |
| 4.5 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (NOV 2025) (DEVIATION) | 31 |
| 4.6 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (NOV 2025) (DEVIATION) | 32 |
| 4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS | 37 |
| 4.8 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (NOV 2025) (DEVIATION) ALTERNATE II | 37 |
| 4.9 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION) | 39 |
| 4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 48 |
| 4.11 52.252-3 ALTERATIONS IN SOLICITATION (APR 1984) | 49 |
| 4.12 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) | 49 |
| 4.14 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 52 |
| 4.15 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 52 |
| 4.16 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 55 |
| 4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 57 |
| 4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 58 |
| 4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 59 |
| 4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019) | 59 |
| 4.21 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 60 |
| 4.22 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 61 |
| 4.23 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 62 |
| 4.24 IT CONTRACT SECURITY | 63 |
| Attachments | 74 |
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:
All solicitation related documents will be published to: SAM.gov.
2.2 SDVOSB SET-ASIDE:
This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Business concerns. Offers received from other than Service-Disabled Veteran-Owned Small Business concerns will not be considered. All Service-Disabled Veteran-Owned Small Businesses must be listed as “verified” by the VA’s Veteran Small Business Certification (VetCert) website https://search.certifications.sba.gov/. Offerors must be verified and visible in the Veteran Small Business Certification (VetCert) database at TIME OF SUBMISSION OF OFFERS AND AT TIME OF AWARD. Failure to be visible and verified in at submission of offers and at time of award will result in the offeror’s proposal being deemed unacceptable and ineligible for award.
2.3 TECHNICAL QUESTIONS:
Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Jose Hernandez. Questions shall be submitted only via e-mail to: Jose.hernandez1@va.gov The subject line must read: 640-23-102 Microbiology Lab Renovation Palo Alto Health Care System, Palo Alto, CA 94304 - Technical Questions. Oral questions of a technical nature are not acceptable.
2.4 AMENDMENTS:
Amendments to this solicitation will be posted at SAM .gov https://sam.gov/content/home Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your proposal being considered unacceptable.
2.5 PREPARATION OF PROPOSALS:
The Government will not pay for any costs incurred in preparation and submission of proposals.
2.6 SELECTION PROCEDURES:
This solicitation is issued as a Request for Proposal (RFP). The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value to the Government. It is the intent of the Government to award without discussions; however, the Government reserves the right to conduct discussions if necessary. If discussions are deemed necessary to maximize the Government’s ability to obtain the best value. A responsible determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.
Evaluations will be based on the following evaluation factors:
1- Volume 1: Technical Proposal Factor 1: Specialized Experience Factor 2: Technical Approach Factor 3: Key Personnel Factor 4: Past Performance
Volume 2: Price Proposal Volume 3: Administrative
2.7 PROPOSAL REQUIREMENTS:
A. GENERAL:
1. Proposals shall be based on solicitation document issued for RFP number 36C26126R0013. Proposals will be in the format stipulated in this document.
2. Proposals shall be received on or before the date and time specified in Block 13 of the SF 1442. There will be no public opening of the proposals.
3. Proposal Submission:
i. Submit proposals via e-mail to: jose.hernandez1@va.gov
ii. Emails are limited to five (5) MB.
iii. Only e-mail proposals will be accepted. Hard-copy proposals will not be accepted.
4. Bid Bond
i. The bid bond shall be submitted as part of the electronic proposal submission. An original hard copy of the bid bond may be requested by the VA, after the award selection.
ii. Failure to furnish the required bid guarantee on the proper SF 24 and for the proper amount, by the time specified in Block 13 of the SF 1442, shall result in rejection of the proposal. See FAR Provision 52.228-1, Bid Guarantee, contained in the solicitation.
5. Page size for all proposal documents will be 8.5 x 11 inches, with 1-inch margins around the page perimeter. Pages will be single spaced. Each page shall count as one (1) page. Proposals shall be submitted using Times New Roman, with font no smaller than 11 point with normal proportional spacing.
6. Page formatting restrictions do not apply to drawings, but each page does apply to the page count. Submission of the draft project schedule can be submitted utilizing larger paper of 11 x17 inches. Pages submitted in excess of the page count will not be evaluated.
PROPOSAL FORMAT AND EVALUATION:
1. Format: Proposals shall be based on solicitation documents and the instructions provided by the Contracting Officer. Technical (Non-Price) and Price sections of the Offerors proposals will be evaluated independently; therefore, the Offeror shall submit the proposal in three (3) Volumes (Volume I: Technical, Volume II: Price and Volume: III Administrative:). The contractor shall NOT include price information in Volume I, Technical. The three (3) volumes must be labeled with the Offeror's organization, business address, and VA Solicitation Number.
i. Volume I, including, all Non-Price factors (Specialized Experience, Technical Approach, Key Personnel and Past Performance) shall not exceed a total of fifteen (15) pages.
ii. Volume II including price only shall not exceed a total of Five (5) pages following the formatting requirements stated in general proposal requirements.
iii. Volume III Administrative: Offerors shall include the following in Volume III. All of the below information must be provided. An Offeror may be considered unacceptable if these items are not provided in the proposal.
a. Offeror shall acknowledge all amendments, by providing the number and date, in section 19 of the SF 1442 or by signing and returning each SF 30.
b. Bid Bond (see FAR Provision 52.228-1, Bid Guarantee, contained in the solicitation).
c. Offeror shall complete Clause 852.219-75 - VA Notice of Limitations on Subcontracting-Certificate of Compliance for Construction (JAN 2023) (DEVIATION) and return with their proposal submission. Completed form will become part of the official award documentation.
d. Offeror shall include the Safety or Environmental Violations and Experience Modification Rating Information, including filling out Attachment: SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE.
All Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the Offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, an Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
All Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
If the NCCI cannot issue an EMR because the Offeror lacks insurance history, Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned Offeror a Unity Rating of 1.0.
The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
*If the EMR rating for the subcontracting tiers cannot be provided at time of proposal submission, the prime contractor shall acknowledge this and provide as a submittal with the insurance and bonding requirements.
Failure to provide the RFP Attachment: SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE containing the above information, may result in a determination that an Offeror is not responsible and therefore ineligible for award.
iv. The Offeror shall submit Volumes I, II, and III in electronic format as searchable PDF documents. The proposal, in its entirety, shall not exceed three emails (one for each volume) of 5MB each. Include page numbers and the company name in the header or footer of each page.
2. Evaluation Factors: Proposals shall address the following evaluation factors, which are cited below.
Volume I: Technical FACTOR 1: Specialized Experience Submission Requirements: Offerors are required to submit a comprehensive and complete technical proposal that demonstrates their ability to perform the work described in this solicitation and demonstrate a minimum of 5 years’ experience doing work of similar scope and complexity. Offerors shall exhibit relevant past experience by reporting written narratives for a minimum of three (3) but no more than five (5) relevant Construction of medical facilities projects between $2,000,000 and $5,000,000 in project cost. The submitted narratives shall explain the work involved in sufficient detail for the Government to evaluate the depth and breadth of experience represented in that project, along with an assessment of the technical capabilities utilized to accomplish the work. All projects submitted for consideration must be at least 75% construction progress complete or completed within 7 years preceding the date proposals are due.
Experience will be evaluated based on the Offeror’s demonstration of similar, relevant, and recent projects within the broad scope of this solicitation for services as described in this solicitation.
The projects must be similar in size, scope and complexity of that described in this solicitation to be considered relevant. For the purposes of this factor, “Relevant” is defined as experience with managing renovation/expansion projects that are similar to those as described in the Scope of Work. “Recent” is defined as being completed within the past seven (7) years preceding the date proposals are due.
If the Offeror is a Joint Venture (JV), relevant experience should be submitted by that JV entity. If the JV does not have shared experience, projects shall be submitted for each JV partner relevant to their overall JV partnership. Offerors who fail to submit experience for all JV partners may be rated less favorably. The JV agreement shall be in this section.
If an Offeror is utilizing experience or past performance information from any entity that does not match the name, Unique Entity ID (UEI) of the Offeror exactly as stated on the SF 1442 (e.g. affiliates, subsidiaries, parent companies, sister companies, etc.) the proposal shall clearly demonstrate how that entity will have meaningful involvement in the performance of the contract and specifically address which resources are being committed to the contract. Failure to comply with this requirement or failure to adequately demonstrate meaningful involvement and commitment of resources on behalf of that entity may result in that experience information to be considered not relevant and may result in lower ratings.
Please note the Small Business Administration (SBA) definition of Joint Venture that must be met in order to submit as a JV entity: “A joint venture is formed for the sole purpose of pooling resources of separate businesses to successfully and cost-effectively support the mission of a government agency. It is considered a new legal entity that requires approval by the Small Business Administration (SBA), a separate federal identification number, and a new SAM user account.” (https://www.sba.gov/federal-contracting/contracting- uide/typescontracts#sectionheader-12 ).
FACTOR 2: Technical Approach Submission Requirements: Offerors shall submit a narrative not-to exceed five (5) pages addressing the Offeror’s approach to successful management of this contract, including a discussion on each of the following (the below items are not considered to be sub-factors):
(1) Demonstrate and clearly describe approach to subcontractor coordination, scheduling and oversight and approach to establishing and maintaining subcontractor and local community relationships.
(2) Submit a management plan and demonstrate the degree to which the management plan and team organization, including degree of prime participation, coordination, division of work, quality assurance, cost control, a preliminary schedule, sequence of work, estimated work crew size, and proposed equipment to meet the overall requirements of this contract.
FACTOR 3: Key Personnel Submission Requirements: Offerors are required to submit resumes that demonstrate their ability to perform the work described in this solicitation and demonstrate a minimum of five (5) years’ experience doing work of similar size, scope and complexity to that described in the solicitation to be considered relevant on projects that are at least 75% construction complete, for the following positions:
a. Project Manager
b. Superintendent
c. Safety Officer
* Offerors must submit proof of relevant certification (e.g., OSHA, Board of Certified Site Safety and Health Officers (BCSSHO), etc.) for the Safety Officer, OSHA 30-hour Construction Training Course is acceptable.
* Superintendent and Safety Officer may be dual-hatted, but experience shall be demonstrated separately for each position (i.e., if submitting the same person for both roles, that individual must have and demonstrate relevant experience on projects as both the Superintendent and Safety Officer separately). The superintended cannot be the QA/QC Officer.
FACTOR 4: Past Performance Submission Requirements: In accordance with FAR 42.1503(g), past performance will be evaluated using the Contractor Performance Assessment Reporting System (CPARS).
BEST VALUE DETERMINATION
This is a best value trade-off, competitive acquisition. Award will be made to the Offerors whose offers conform to the solicitation requirements, who are determined responsible in accordance with FAR Subpart 9.1 by possessing the financial and other capabilities to fulfill the requirements of the contract; and whose proposals are judged, by an integrated assessment of price and non-price evaluation factors, to be the most advantageous to the Government. The Government will use the best value tradeoff process in determining which Offerors represent best value in accordance with FAR 15.101-1.
EVALUATION CRITERIA
The evaluation criteria include following factors:
Volume 1: Technical Proposal Factor 1: Specialized Experience Factor 2: Technical Approach Factor 3: Key Personnel Factor 4: Past Performance
Volume 2: Price Proposal Volume 3: Administrative
RELATIVE IMPORTANCE OF EVALUATION FACTORS
It is in the best interests of the Government to consider tradeoffs between price and non-price related factors. The relative importance of all evaluation factors is that non-price Factors 1-4 are approximately equal to each other. When the proposal is evaluated as a whole, the non-price factors are more important than price.
The importance of price will increase if the Offerors’ technical proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of the technical proposal’s superiority to the Government. Proposals will be evaluated on the basis of the established criteria and award will be made to the responsible Offerors whose offer conforms to the solicitation and represents the best value to the Government in accordance with FAR 15.101-1, price and non-price factors considered.
BASIS OF EVALUATION
VOLUME I: TECHNICAL PROPOSAL
Factor 1 - Specialized Experience The basis of evaluation will focus on the Offeror’s demonstrated experience and depth of experience in performing relevant construction of medical facilities projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review a maximum of five (5) submitted projects under this Factor as stated in this section. Any projects submitted in excess of five (5) will not be considered.
The Government will evaluate the Offer’s Experience for strengths, weaknesses, and deficiencies. The standard for this factor is met when the Offeror:
(1) Submits minimum of three (3) but no more than five (5) relevant construction of medical facilities projects between $2,000,000 and $5,000,000 in project cost that collectively, meet the requirements outlined in the Statement of Work and this solicitation. All projects submitted for consideration must be at least 75% construction progress complete or completed within 7 years preceding the date proposals are due.
Offers that demonstrate a greater depth and breadth of recent and more relevant construction of medical facilities experience shall be rated more favorably.
FACTOR 2 – Technical Approach The basis of evaluation will be a subjective assessment of the Offeror’s approach to effectively managing this contract for the submission requirements under this Factor stated in Section 2.7.
The Government will evaluate the Offeror’s Technical Approach for strengths, weaknesses, and deficiencies. The standard for this factor is met when the offeror’s narrative adequately addresses each of the submission requirements.
More favorable ratings will be given to Offerors who demonstrate a sound management approach, ability to account for unique challenges associated with this contract, and identifies quantitative or qualitative benefits to the Government within their technical narrative.
Failure to address any one of the submission requirements may result in lower ratings.
Proposals providing only a generic acknowledgement of the requirements of this factor may also be given lower ratings.
Any narrative that exceeds the page limitation will be evaluated up to the first five (5) single-sided pages only; any information beyond this limit will not be evaluated and may be considered a failure to address requirements.
FACTOR 3 – Key Personnel The basis of evaluation will be an assessment of the offeror’s key personnel project experience.
In order to meet the requirements of this factor, all three (3) key personnel must demonstrate a minimum of five (5) years’ experience doing work of similar size, scope and complexity for the requirement on projects that are at least 75% construction complete. As a minimum, the Safety Officer must submit proof of relevant certification.
FACTOR 4 - Past Performance The basis of evaluation will be the degree to which past performance evaluations (to include PPQs if applicable) and all other past performance information reviewed by the government (i.e., CPARS, FAPIIS, eSRS, performance recognition documents, etc.) reflect a trend of satisfactory performance. Evaluation of this factor will be an assessment of the overall past performance record.
Offerors need not submit for this factor; but if they choose to, offerors shall submit past performance information on relevant projects that are at least 75% construction progress complete or completed within seven (7) years preceding the date proposals are due on projects submitted under Factor 1, Specialized Experience. The Government may seek all relevant performance information on all Offerors in the competitive range through sources such as CPARS or other government databases and other sources that are available. The Government shall not be limited in its search for performance data.
In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have neutral past performance.
Volume II: Price Factor 1: Price Proposal Requirements (Volume II):
Submission Criteria: Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the Price Schedule when submitting price offers. Submit a bid guarantee as stipulated in the solicitation. Please note commercial bid bonds are not acceptable.
In addition to the pricing schedule, Offerors shall submit a complete Breakdown of the Division Pricing for all Line Items. The prices shall be Firm Fixed Price. The Offeror shall take care not to include remarks that take exception to the Government’s solicitation and attachments or pricing requirements or otherwise preclude the Government from evaluating the offer or render the offer as nonconforming or unacceptable.
If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices not provided for in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from discussions.
Evaluation Methodology: Price (Volume II - Price) the total evaluated price will be determined by the Offeror’s price of all items included in the attached Scope of Work.
B. FINAL PROPOSAL REVISIONS (section only applies if discussions are conducted):
1. If determined to be necessary, proposal revisions will be requested from the Offerors determined by the CO to be in the competitive range based on the selection criteria. Discussions may be conducted with those Offerors falling within the competitive range, after which proposal revisions will be requested. Proposal revisions will be submitted as per Section 2.7(A), above, except as noted below and will be due at a time and place to be determined.
Offerors submitting proposal revisions will not be requested to re-submit any documents which are unchanged from their initial proposals. Offerors will provide necessary changes to individual paragraphs, as briefly as possible, and include a table of contents, which indicates where within the initial proposal the additional information or changed documents would be placed. Proposal revisions shall include a completed SF 1442 that acknowledges receiving all amendments, by number and date, in section 19 of the SF 1442 or by signing and returning each SF 30. A new bid bond shall be submitted only if the final proposal revisions Offeror’s price proposal is greater than its initial price proposal.
2.8 SYSTEM FOR AWARD MANAGEMENT (SAM):
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Offerors are required to be registered in SAM at the time an offer is submitted in order to comply with the annual representations and certifications requirements. The Offeror shall be registered at time of submission.
2.9 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR
PERFORMANCE ASSESSMENT SYSTEM (CPARS):
As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $750,000, and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS has connectivity with the Past Performance Information Retrieval System (PPIRS) database, which is available to all Federal agencies. PPIRS is the system used to collect and retrieve performance assessment reports used in source selection determinations and completed CPARS report cards transferred to PPIRS. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.
Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438-1690. Registration should occur no later than thirty days after contract award, and must be kept current should there be any change to the contractor’s registered representative.
For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.
Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.
2.10 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation commensurate with the level of access needed to perform the statement of work is: Low Risk. This requirement is applicable to all subcontractor personnel requiring the same access. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements.
2.11 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER:
Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).
2.1 52.216-1 TYPE OF CONTRACT (DEVIATION) (NOV 2025)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (DEVIATION NOV 2025) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.4 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
(End of Provision)
2.6 52.233-2 SERVICE OF PROTEST (DEVIATION NOV 2025)
Protests, (as defined in FAR 33.102), that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), must be served on the Contracting Officer identified in the solicitation by obtaining written and dated acknowledgment of receipt from them, Jose Hernandez jose.hernandez1@va.gov Hand-Carried Address:
Department of Veterans Affairs Acquisition Operations Service (049A3)
810 Vermont Avenue, NW Washington DC 20420 Mailing Address:
Department of Veterans Affairs Acquisition Operations Services (049A3)
810 Vermont Ave, NW Washington DC 20420
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.7 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)
(a) Definitions. As used in this provision— Backhaul, covered article, covered telecommunications equipment or services, critical technology, FASCSA order, Intelligence community, interconnection arrangements, national security system, roaming, sensitive compartmented information, sensitive compartmented information system, source, and substantial or essential component have the meanings provided in the clause 52.240-91, Security Prohibitions and Exclusions.
Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.
Marginalized populations of Sudan means—
(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note); and
(2) Marginalized areas in Northern Sudan described in section 4(9) of such Act.
Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted under specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;
(3) Consist of providing goods or services to marginalized populations of Sudan;
(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;
(5) Consist of providing goods or services that are used only to promote health or education; or
(6) Have been voluntarily suspended.
Sensitive technology—
(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically—
(i) To restrict the free flow of unbiased information in Iran; or
(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and
(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).
(b) Procedures.
(1) Covered telecommunications and video surveillance. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”
(2) FASCSA Orders.
(i) The Offeror shall search in SAM for the phrase “FASCSA order” for any covered article, or any products or services produced or provided by a source, if there is an applicable FASCSA order described in paragraph (e) of FAR 52.240-91, Security Prohibitions and Exclusions.
(ii) The Offeror shall review the solicitation for any FASCSA orders that are not in SAM but are effective and apply to the solicitation and resultant contract (see FAR 40.204-1(c)(2)).
(iii) FASCSA orders issued after the date of solicitation do not apply unless added by an amendment to the solicitation.
(c) Covered telecommunications equipment or services representations. By submission of its offer, the Offeror represents that, after conducting a reasonable inquiry (that looks at any information in the Offeror’s possession but does not need to include an internal or third-party audit)—
(1) It will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation, except as waived by the solicitation, or as disclosed in paragraph (g); and
(2) It does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services, except as waived by the solicitation, or as disclosed in paragraph (g).
(d) FASCSA Representation. By submission of this offer, the offeror represents that it has conducted a reasonable inquiry, and that the offeror does not propose to provide or use in response to this solicitation any covered article, or any products or services produced or provided by a source, if the covered article or the source is prohibited by an applicable FASCSA order in effect on the date the solicitation was issued, except as waived by the solicitation, or as disclosed in paragraph (g). A reasonable inquiry will look at any information in the offeror’s possession but does not need to include an internal or third-party audit.
(e) Sudan certification. By submission of its offer, the offeror certifies, after conducting a reasonable inquiry (that looks at any information in the offeror’s possession but does not need to include an internal or third-party audit), that the offeror does not conduct any restricted business operations in Sudan.
(f) Iran Representation and Certifications.
(1) Except as provided in paragraph (f)(2) of this provision or if a waiver has been granted in accordance with FAR 40.203-3, the offeror, after conducting a reasonable inquiry (that looks at any information in the offeror’s possession but does not need to include an internal or third-party audit), by submission of its offer—
(i) Represents, to the best of its knowledge and belief, that the offeror does not export any sensitive technology to the government of Iran or any entities or individuals owned or controlled by, or acting on behalf or at the direction of, the government of Iran;
(ii) Certifies that the offeror, or any person (as defined at section 15 of the Iran Sanctions Act of 1996, Pub. L. 104-172, 50 U.S.C.