S06 Attachment 1 - Quality Assurance Surveillance Plan Boots on the Ground.docx
DOCX document 28 KB Posted
- Solicitation number
- 36C26126Q0975
About this file
This is a Quality Assurance Surveillance Plan (QASP) for the Boots on the Ground Services for Community Program Support contract with the Department of Veterans Affairs Veterans Health Administration. The QASP establishes systematic methods and procedures for monitoring contractor performance in delivering community outreach and health worker services across Hawaii, the continental U.S., and U.S.-Affiliated Pacific Islands. The document outlines roles and responsibilities for the Contracting Officer (CO), Contracting Officer's Representative (COR), and integrated project team in evaluating whether the contractor meets defined performance standards and acceptable quality levels (AQLs).
Key performance requirements include: identifying and deploying at least 5 community health workers (CHWs) per region at 2.0 FTE within three months; completing CHW training within three months with 100% AQL; achieving 80% attendance at monthly CPIVH meetings; monthly reporting of metrics including number of CHWs trained, veterans educated, referrals made, and outreach events conducted; and developing regional outreach workplans within three months with 75% of healthcare workers entering data into the database. Surveillance methods include random monitoring, periodic inspections, and customer feedback collection. Payment adjustments are performance-based, with reductions for failure to meet AQLs and incentives for exceeding standards. The COR completes monthly surveillance reports using provided monitoring forms, and corrective action plans may be required for marginal or unacceptable performance. The contract utilizes a results-focused performance management approach that emphasizes outcomes rather than process compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 Solicitation Questions and Answers.docx | DOCX document | |
| S06 36C26126Q0975 0001 Boots on the Ground CPIVH.pdf | ||
| S02 36C26126Q0975 Boots on the Ground CPIVH.pdf | ||
| S02 Attachment 2 - Small Business Participation Plan.docx | DOCX document | |
| S02 Attachment 1 - Quality Assurance Surveillance Plan Boots on the Ground.docx | DOCX document | |
| S02 Attachment 3 - Wage Determination Memo.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOOTS ON THE GROUND SERVICES FOR COMMUNITY PROGRAM SUPPORT
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Boots on the Ground Services for Community Program Support. This plan sets forth the procedures and guidelines Department of Veterans Affairs will use in ensuring the required performance standards or services levels are achieved by the contractor.
0. Purpose
0. The purpose of the QASP is to describe the systematic methods used to monitor performance and identify required documentation and resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and ensure the government pays only for the level of services received.
0. This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
0. Performance Management Approach
1. The PWS structures the acquisition around what service or quality level is required, as opposed to how the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by CPVIH to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1. Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, if the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract if the critical outcomes expected are being achieved and/or the desired performance levels are being met.
0. Performance Management Strategy
2. The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will also set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
2. The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determinations regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
1. ROLES AND RESPONSIBILITIES
1. The Contracting Officer (CO/KO) The CO is responsible for monitoring contract compliance, contract administration, and cost control, and resolving any differences between observations documented by the COR and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
1. The COR The COR is designated in writing by the CO to act as their authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or authorize any contractual changes on the government’s behalf. Any changes the contractor deems may affect contract price, terms, or conditions must be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
1. IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and Attachment 1, Performance Requirements Summary. If the contractor meets the required service or performance level, the monthly amount agreed on in the contract will be paid. If the contractor exceeds the service or performance level, it is eligible to receive favorable contracting review. Failure to meet the required service or performance level will result in a deduction from the monthly amount.
1. METHODOLOGIES TO MONITOR PERFORMANCE
0. Surveillance Techniques To minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
· Random monitoring, which shall be performed by the COR designated inspector
· Periodic inspection – the COR typically performs the periodic inspection
0. Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems, but the customer always has the option to communicate complaints to the CO or COR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
0. Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1 for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities, such as those involving identifying regional Community Health Workers (CHW) within three months; training of the CHWs within three months and completion of the course requirements. New training requirements beyond the initial course will happen on a normal basis and CHWs are expected to complete requirements within a month. CPIVH will conduct monthly meetings with CHWs and 80% attendance is required.
After course completion, the contractor is required to report to CPIVH the following metrics every month:
· Number of CHWs trained
· Number of Veterans educated on accessing VA care and benefits
· Number of Veterans assisted per CHW
· Number of Veterans newly registered for benefits per CHW
· Number of referrals made veteran health care and appts scheduled per CHW
· Number of veterans applied for assistance per CHW
· Financial
· Housing
· Education
· Number of outreach/outreach events held per CHW
· Quarterly updates to referral and POC directories
· Veteran experience using CPIVH survey
· Enter data in CPIVH data entry site
1. QUALITY ASSURANCE DOCUMENTATION
1. The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and assessed using the performance monitoring techniques shown in Attachment 1.
1. Monitoring Forms The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring form in Attachment 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure the required recruitment levels are being achieved.
1. The COR will retain a copy of all completed QA surveillance forms.
1. ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
2. Determining Performance
0. The government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in a deduction from the monthly payment, using the deduction percentages shown in Attachment 1. Likewise, if the contractor exceeds the performance standards, an incentive or award fee will be paid, in accordance with the incentive fee or award fee plan included in the contract.
2. Reporting
1. At the end of each month, the COR designated inspector will prepare a written report for the COR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
2. Reviews and Resolution
2. The COR may require the contractor’s project manager or designated alternate to meet with the CO and other government IPT personnel as deemed necessary to discuss the performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
· Recommendations for improved efficiency and/or effectiveness
· Issues arising from the performance monitoring processes 1.
1.
1.
1.
1.
1.
5.
5.
5.
2.
2. The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
2. The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the procuring CO (PCO) or ACO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Required Services (Tasks) Performance Standards Acceptable Quality Levels Methods of Surveillance Incentive (Positive and/or Negative) (Impact on Contractor Payments)
Identify regional Community Health Workers (CHW) within three months for the community contractor will provide at least 5 community health workers per region at 2.0 FTE (partial positions, work volume does not anticipate full-time positions). Over time the contractor and CPIVH will work to balance the positions according to workload.
| Completed and approved by CPIVH leadership |
| 100% |
| Periodic reviews and spot checks with reports of monthly hiring and appointment by the contract |
| Failure successfully deployed regional community health care workers capable of engaging local communities will result in 0% payment to contractors. Corrective actions may reestablish funding. |
| Training of the CHWs within 3 months and completion of the course requirements. |
| Completed and approved by CPIVH leadership and tracked by CPIVH Boots on the Ground PSA |
| 100% |
| Periodic reviews and spot checks |
| Payment is reduced by percentage based upon failure to meet acceptable quality levels. |
| New training requirements beyond the initial course will happen on a normal basis and CHWs are expected to complete requirements within a month. |
| Completed and approved by CPIVH leadership and tracked by CPIVH Boots on the Ground PSA |
| 100% |
| Periodic reviews and spot checks |
| Payment is reduced by percentage based upon failure to meet acceptable quality levels. |
Required Services (Tasks) Performance Standards Acceptable Quality Levels Methods of Surveillance Incentive (Positive and/or Negative) (Impact on Contractor Payments)
| CPIVH will conduct monthly meetings with CHWs and 80% attendance is required. |
| Completed and tracked by CPIVH Boots on the Ground PSA |
| 80% |
| Periodic reviews and spot checks |
| Payment will increase depending upon attendance above acceptable quality level. Payment will increase depending upon attendance below acceptable quality level. Measure is (percentage/5) increase/decrease. |
i.e. 40% attendance 80 (AQL)-40=40% 40/5=8% deduction
100% attendance
100-80(AQL)=20%
20/5=4% increase
| The contractor is required to report to CPIVH the metrics every month regarding pilot data collection and database entry |
| Completed and approved by CPIVH leadership and tracked by CPIVH Boots on the Ground PSA |
| 100% |
| Periodic reviews and spot checks failure to pilot data collection and entry will be noted by CP IVH staff |
| Payment is reduced by percentage based upon failure to meet acceptable quality levels. Corrective actions will reestablish fund |
| 3 months after the award of the contract the senior director will work with CPIVH staff to develop regional outreach workplans and begin collection of the regional veteran’s information |
| Completed and approved by CPIVH leadership and tracked by CPIVH Boots on the Ground PSA |
| 75% of healthcare workers will begin to collect and enter information in the database |
| Periodic reviews and spot checks by CPIVH staff and online discussions with contractors and community health care workers |
| Corrective actions will be taken with contractors to accomplish compliance |
| Within 1 month of contract award: senior director will work with CPIVH staff to develop educational course for training community health workers. |
| Completed and approved by CPIVH leadership |
| 100% |
| Periodic reviews and spot checks |
| Payment is reduced by percentage based upon failure to meet acceptable quality levels. |
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (check):
| Monthly | Quarterly | As needed | |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ______ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
| Service Provider’s Performance (check): | Meets Standards |
| Does Not Meet Standards |
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________