Summary of Fire Sprinkler System Inspection and Testing Documentation

These documents are Form AES 2.2 inspection, testing, and maintenance reports for wet pipe fire sprinkler systems operating under California Code of Regulations Title 19 and NFPA 25 standards. The reports cover two properties: Building 90 located at 4951 Arroyo Rd., Livermore, CA 94550 (a 2-story concrete/wood construction with light/ordinary occupancy) and VA Livermore Building 62 at the same address (a 7-story Type I-A construction classified as institutional). Both inspections were performed annually as of July 30, 2025 for Building 90 and September 30, 2024 for Building 62.

Building 90 contains two system risers with main drain diameters of 2 inches each, achieving initial static pressures of 59-65 psi and final static pressures of 60-65 psi. The quarterly and annual inspections identified multiple deficiencies including out-of-date pressure gauges, painted sprinkler heads (155% QR chrome pendents) in various locations throughout the building, and one missing 401 2nd stage trim component. Building 62 contains four risers with main drain diameters ranging from 1-1/4 to 2 inches, with pressure readings of 57-65 psi initial and 50-65 psi residual. Deficiencies noted include gauges requiring replacement and missing outer trim components on multiple units. Both systems passed control valve operations, backflow preventer testing, and fire department connection inspections, with reports indicating the equipment is fully operable except for noted deficiencies requiring correction.

View the file

Other files

File Type Posted
Building Reports Attachment 3.pdf PDF
Building Reports Attachment 1.pdf PDF
Sprinkler Riser List Attachment 4.xlsx XLSX spreadsheet
36C26126Q0335 0001.docx DOCX document
36C26126Q0335.docx DOCX document
Attachment 3 WD 2015-5623.pdf PDF
Attachment 1 WD 2015-5637.pdf PDF
Attachment 2 WD 2015-5641.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form AES 2.2 Sept. 3, 2013

Inspection, Testing, and Maintenance Cover Sheet NFPA25 as amended by CCR, Title 19

Property Information:

Name:

Building 90

Occupancy/Use: Concrete/wood

Address:

4951 Arroyo Rd.

Construction Type: Light/ord.

City:

Livermore , CA.

No. Stories: 2

ZIP:

94550

Year Constructed: N/A

Contact:

Telephone:

Contractor Information: Number of System Risers 2

Copy sent to:

Name: Owner Date: 07-30-25

Address Fire AHJ Date:

City: Contractor Date:

State: NOTES:

1) For specific inspection, testing, and maintenance requirements and information, see NFPA 25, 2011 edition as amended by California Code of Regulations, Title 19, §901 to §906.

2) Inspection items may be performed by the owner in accordance with California Code of Regulations, Title 19, §904.1(a)

Telephone:

CA License#:

Job #:

Performed by:

Check box for each system inspected and enter the number of forms used for inspection. Check boxes (Fail or Pass) to indicate status of inspected system at end of inspection.

Forms Included with this Report NFPA 25 Chapter

Number of Forms N/A Fail* Pass

Automatic Sprinkler System 5 1

Standpipe and Hose System 6

Private Water Supply System 7

Fire Pump 8

Water Storage Tank 9

Water Spray System 10

Foam Water Sprinkler System 11

Water Mist System 12

Concerns that are Not Deficiencies (i.e. Non-Sprinklered Areas) Yes No

*See "Deficiencies and Comments" section at end of each respective form.

Wet Pipe Fire Sprinkler System

California Code of Regulations - Title 19 Inspection, Testing, and Maintenance

Annual Report

Property Information Contractor or Licensed Owner Information

Building Building 90

Address 4951 Arroyo Rd.

Livermore , CA.

City 94550 License #

Contact SFM Job #

Phone CSLB Misc.

Riser Information Main Drain Test (ANNUAL)

Riser No.

Location Riser

Diameter Main Drain Diameter

Initial Static Pressure

Residual Pressure

Final Static Pressure

P,F,N/A

1 Room A-108 - 1st floor EHS closet near dock 4 2 59 65 60 P

2 Room C-111 - 1st floor closet inside office space 2 2 65 60 65 P

Quarterly Inspections I = Inspection T = Test M = Maintenance P = Pass F = Fail N/A = Not Applicable

Item Description NFPA 25 CA ed.

Reference

Date Date Date Date

02-15-25 5-14-25 07-30-25

1.1 I Control Valves – Identification Sign 13.3.1 P P P

1.2 I Control Valves – Inspection 13.3.2 P P P

1.3 I Waterflow Alarm Devices 5.2.5 P P P

1.4 I Supervisory Devices 5.2.5 P P P

1.5 I Gauges (Wet Pipe Systems) 5.2.4.1 F F F

1.6 I Enter Water Supply Pressure Below Riser Check 5.2.4.1 65 65 psi 67 psi psi

1.7 I Enter Water Supply Pressure Above Riser Check 5.2.4.1 75 72 psi 72 psi psi

1.8 I Pressure Readings Acceptable 5.2.4.1 P P P

1.9 I Hydraulic Design Information Sign

(For Hydraulically Designed Systems)

5.2.6 P P P

1.10 I

General Information Sign (Not Required for System prior to 2007 Edition of NFPA 13)

5.2.8 P P P

1.11 I Heat Tape 5.2.7 N/A N/A N/A

1.12 I Spare Sprinklers 5.2.1.4 P P P

1.13 I Fire Department Connections 13.7 P P P

1.14 I Alarm Valves – Exterior Inspection 13.4.1 N/A N/A N/A

1.15 I Pressure Reducing Valves 13.5.1.1 N/A N/A N/A

1.16 I Backflow Preventers 13.6.1 P P P

1.17 I Small Hose Connections - Hose Valve* 5.1.6, 13.5.2

13.5.5.1 N/A N/A N/A

Fire Sprinkler System

California Code of Regulations - Title 19 Inspection, Testing, and Maintenance

Annual Report

Property Information Contractor or Licensed Owner Information

Building Building 90

Address 4951 Arroyo Rd.

Livermore , CA.

City 94550 License #

Contact SFM Job #

Phone CSLB Misc.

small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III standpipe systems.

Annual INSPECTION, TESTING, AND MAINTENANCE Includes ALL Quarterly and Annual Inspections, Tests, and Maintenance Items

I = Inspection T = Test M = Maintenance P = Pass F = Fail N/A = Not Applicable

Item Description

NFPA 25 CA ed.

Reference Date Comments Only P, F, N/A

1.1 I Control Valves – Identification Sign 13.3.1 07-30-25 P

1.2 I Control Valves – Inspection 13.3.2 07-30-25 P

1.3 I Waterflow Alarm Devices 5.2.5 07-30-25 P

1.4 I Supervisory Devices 5.2.5 07-30-25 P

1.5 I Gauges (Wet Pipe Systems) 5.2.4.1 07-30-25 P

1.6 I Hydraulic Design Information Sign (For

Hydraulically Designed Systems)

5.2.6 07-30-25 P

1.7 I Enter Water Supply Pressure Below Riser Check 5.2.4.1 07-30-25 P

1.8 I Enter Water Supply Pressure Above Riser Check 5.2.4.1 07-30-25 P

1.9 I Pressure Readings Acceptable 5.2.4.1 07-30-25 P

1.10 I General Information Sign

(Not Required for System Prior to 2007 Edition NFPA 13)

5.2.8 07-30-25 P

1.11 I Heat Tape 5.2.7 07-30-25 N/A

1.12 I Spare Sprinklers 5.2.1.4 07-30-25 P

1.13 I Fire Department Connections 13.7 07-30-25 P

1.14 I Alarm Valves – Exterior Inspection 13.4.1 07-30-25 N/A

1.15 I Pressure Reducing Valves 13.5.1.1 07-30-25 N/A

1.16 I Backflow Preventers 13.6.1 07-30-25 P

Fire Sprinkler System

California Code of Regulations - Title 19 Inspection, Testing, and Maintenance

Annual Report

Property Information Contractor or Licensed Owner Information

Building Building 90 Name

Address 4951 Arroyo Rd. Job #

City Livermore , CA. Misc.

ANNUAL INSPECTION, TESTING, AND MAINTENANCE

Include ALL Quarterly Inspections (See AES 2.1)

I = Inspection T = Test M = Maintenance P = Pass F = Fail N/A = Not Applicable

Item Description NFPA 25 CA ed.

Reference Date Comments Only P,F,N/A

1.17 I Small Hose Connections - Hose Valve* 5.1.6, 13.5.2

13.5.5.1

07-30-25 P

1.18 I PRV – Fire Sprinkler Systems 13.5.1.1 07-30-25 N/A

1.19 I Buildings (Freeze Protection) 4.1.1.1 07-30-25 Owner’s Responsibility N/A

1.20 I Sprinklers 5.2.1 07-30-25 F

1.21 I Sprinklers - Accessible Concealed Space 5.2.1.1.6 07-30-25 P

1.22 I Pipe and Fittings 5.2.2 07-30-25 P

1.23 I Pipe and Fittings - Accessible Concealed Space 5.2.2.3 07-30-25 P

1.24 I Hangers 5.2.3 07-30-25 P

1.25 I Hangers - Accessible Concealed Space 5.2.3.3 07-30-25 P

1.26 I Seismic Braces 5.2.3 07-30-25 P

1.27 I Seismic Braces - Accessible Concealed Space 5.2.3.3 07-30-25 P

1.28 I Unsprinklered Areas CFC 901.4 07-30-25 YES NO N/A

2.1 T Field Service Test Required Send

Report to Fire Code Official

5.3.1 07-30-25 If REQUIRED, Enter ‘F’ until results are returned from Lab N/A

2.2 T Recalled Sprinklers

If not present = Pass; If present = Fail

Title 19 904.1(c) 07-30-25 P

2.3 T Water Flow Alarm Devices 90

secs max. Enter time

5.3.3 13.2.6

07-30-25 90 sec. P

2.4 T Main Drain Test

(Enter data on Page 1 of this form)

13.2.5 13.3.3.4

07-30-25 P

2.5 T Control Valve - Position 13.3.3.2 07-30-25 P

2.6 T Control Valve – Operation 13.3.3.1 07-30-25 P

2.7 T Supervisory Devices 13.3.3.5 07-30-25 P

2.8 T Backflow Preventer Assemblies 13.6.2 07-30-25 P

2.9 T Small Hose Connections*

w/PRV Hose Valves – Partial Flow Test

13.5.2.3 13.5.3.3

07-30-25 N/A

2.10 T PRV – Fire Sprinkler Systems 13.5.1.3 07-30-25 N/A

2.11 T Pressure Gauges - Calibration 5.3.2 07-30-25 F

2.12 T

Small Hose Connections

* 13.5.6.2.2 07-30-25 N/A

* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III standpipe systems.

Fire Sprinkler System

California Code of Regulations - Title 19 Inspection, Testing, and Maintenance

Annual Report

Property Information Contractor or Licensed Owner Information

Building Building 90 Name

Address 4951 Arroyo Rd. Job #

City Livermore , CA. Misc.

ANNUAL INSPECTION, TESTING, AND MAINTENANCE

Include ALL Quarterly Inspections

I = Inspection T = Test M = Maintenance P = Pass F = Fail N/A = Not Applicable

Item Description NFPA 25 CA ed.

Reference Date Comments Only P,F,N/A

3.1 M Check Valves - Internal inspection 13.4.2 07-30-25 P

3.2 M Control Valves 13.3.4 07-30-25 P

3.3 M FDC - Backflush

14.3.2.3 14.3.2.4

07-30-25 P

3.4 M Internal Pipe Inspection - See Deficiencies and

Comments Section for Results.

14.2 07-30-25 Yes No N/A

3.5 M

Obstruction Investigation Required. If "Yes", See Deficiencies and Comments Section for Results 14.3 07-30-25 P

3.6 M System Returned to Service 4.5.3 07-30-25 Yes

No P

D = Deficiency C = Comment (Indicate type )

Item Date Riser D C Deficiencies and Comments Indicate all equipment, devices and parts that were repaired or replaced

*****Annual FIRE SPRINKLER INSPECTION*****

1.5 7-30-25 1 X Two out of date gauges on riser

1.20 7-30-25 1 X Two painted 155% QR crome pendents ½ in dinning hall

1.20 7-30-25 1 X 4 painted 155% QR crome pendents ½ in hall next to room A-128

1.20 7-30-25 1 X 3 painted 155% QR crome pendents ½ in room A-102

1.20 7-30-25 1 X 2 painted 155% QR crome pendents ½ in hall next to room A-100

1.20 7-30-25 1 X 1 painted in entrance of building and one standard response mixed with QR head. Need to change standard response head to a 155% QR crome ½ pendent.

1.20 7-30-25 1 X 1 painted 155% QR crome pendents ½ outside entrance next to room c-105

1.20 7-30-25 1 X 1 painted 155% QR crome pendents ½ in room C-104

1.20 7-30-25 1 X 1 Missing 401 2nd stage trim in room B-233 white

END OF REPORT

Check here if additional Deficiencies and Comments are listed on Form AES9.

See Correction Form AES 10 for corrected deficiencies.

Number attached

Number attached

I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable except as noted in the “Deficiencies and Comments” section of this form.

Print Name

Signature Date 07-30-25

Inspection, Testing, and Maintenance Cover Sheet NFPA25 as amended by CCR, Title 19

Property Information:

Name: Occupancy/Use:

Address: Construction Type:

City: No. Stories:

ZIP: Year Constructed:

Contact:

Telephone:

Contractor Information: Number of System Risers

Name: Copy sent to:

Address: Owner Date:

City: Fire AHJ Date:

State: Contractor Date:

Telephone:

NOTES:

1) For specific inspection, testing, and maintenance requirements and information, see NFPA 25, 2011 Edition as amended by California Code of Regulations, Title 19, §901 to §906.

2) Inspection items may be performed by the owner in accordance with California Code of Regulations, Title 19, §904.1(a)

CA License#:

Job #:

Performed by:

Check box for each system inspected and enter the number of forms used for inspection.

Check boxes (Fail or Pass) to indicate status of inspected system at end of inspection.

Forms Included with this Report NFPA 25 Chapter Number of Forms N/A Fail* Pass

Automatic Sprinkler System 5

Standpipe and Hose System 6

Private Water Supply System 7

Fire Pump 8

Water Storage Tank 9

Water Spray System 10

Foam Water Sprinkler System 11

Water Mist System 12

Concerns that are not deficiencies (i.e. Non-Sprinklered Areas) Yes No

*See "Deficiencies and Comments" section at end of each respective form.

AES 1 September 3, 2013

Fire Sprinkler System

California Code of Regulations - Title 19 Inspection, Testing, and Maintenance

Quarterly and Annual Report 1 of 3

Property Information Contractor or Licensed Owner Information

Building Name Name

Address Address

City St. Zip License # PhoneContact Person

SFM Job # CSLB Misc.

Main Drain Test (Annual) Riser No. Location Riser

Diameter Main Drain Diameter

Initial Static Pressure

Residual Pressure

Final Static Pressure P,F,N/A

This building has more than 5 risers. See additional AES 2.9 form attached Number of AES 2.9 forms attached

Quarterly Inspections I = Inspection T = Test M = Maintenance P = Pass F = Fail N/A = Not Applicable

Item Description NFPA 25 CA ed.

Reference

Date Date Date Date

1.1 I Control Valves – Identification Sign 13.3.1

1.2 I Control Valves – Inspection 13.3.2

1.3 I Waterflow Alarm Devices 5.2.5

1.4 I Supervisory Devices 5.2.5

1.5 I Gauges (Wet Pipe Systems) 5.2.4.1

1.6 I Enter Water Supply Pressure Below Riser Check 5.2.4.1 psi psi psi psi

1.7 I Enter Water Supply Pressure Above Riser Check 5.2.4.1 psi psi psi psi

1.8 I Pressure Readings Acceptable 5.2.4.1

1.9 I Hydraulic Design Information Sign

(for hydraulically designed systems) 5.2.6

1.10 I General Information Sign

(not required for system prior to 2007 edition of NFPA 13) 5.2.8

1.11 I Heat Tape 5.2.7

1.12 I Spare Sprinklers 5.2.1.4

1.13 I Fire Department Connections 13.7

1.14 I Alarm Valves – Exterior Inspection 13.4.1

1.15 I Pressure Reducing Valves 13.5.1.1

1.16 I Backflow Preventers 13.6.1

1.17 I Small Hose Connections - Hose Valve* 5.1.6, 13.5.2

13.5.5.1

1.18 I PRV – Fire Sprinkler Systems 13.5.1.1

* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III standpipe systems.

Form AES 2.1 Sept. 3, 2013

Email Address

City

Telephone

California Code of Regulations - Title 19 Inspection, Testing, and Maintenance

Quarterly and Annual Report 2 of 3

Property Information Contractor or Licensed Owner Information

Building Name Name

Address Job #

City

ANNUAL INSPECTION, TESTING, AND MAINTENANCE

Include ALL Quarterly Inspections

I = Inspection T = Test M = Maintenance P = Pass F = Fail N/A = Not Applicable

Item Description NFPA 25 CA ed.

Reference Date Comments Only P,F,N/A

1.19 I Sprinklers 5.2.1

1.20 I Buildings (Freeze Protection) 4.1.1.1 Owner’s Responsibility

1.21 I Pipe and Fittings 5.2.2

1.22 I Hangers 5.2.3

1.23 I Seismic Braces 5.2.3

2.1 T Field Service Test Required

(Send Report to Fire Code Official) 5.3.1 If REQUIRED, Enter 'F' until results are returned from Lab

2.2 T Recalled Sprinklers

If not present = Pass; If present = Fail

Title 19 904.1(c)

2.3 T Water Flow Alarm Devices

90 sec. maximum - (Enter Time )

5.3.3

13.2.6 sec.

2.4 T Main Drain Test

(Enter data on Page 1 of this form)

13.2.5 13.3.3.4

2.5 T Control Valve - Position 13.3.3.2

2.6 T Control Valve – Operation 13.3.3.1

2.7 T Supervisory Devices 13.3.3.5

2.8 T Backflow Preventer Assemblies 13.6.2

2.9 T Small Hose Connections*

w/PRV Hose Valves – Partial Flow Test

13.5.2.3 13.5.3.3

2.10 T PRV – Fire Sprinkler Systems 13.5.1.3

3.1 M Control Valves 13.3.4

3.2 M Small Hose Connections* 13.5.6.3

3.3 M

Obstruction Investigation required (If “Yes”, see Deficiencies and Comments Section for Results.)

14.3 Yes No

3.4 M System Returned to Service 4.5.3

Yes No

* Small hose connections are hose valves and optional hose supplied by the fire sprinkler system. They do not include Class I, II, or III standpipe systems.

D = Deficiency C = Comment (Indicate type )

Item Date Riser D C Deficiencies and Comments Indicate all equipment, devices and parts that were repaired or replaced

Form AES 2.1 Sept. 3, 2013

California Code of Regulations - Title 19 Inspection, Testing, and Maintenance

Quarterly and Annual Report 3 of 3

Property Information Contractor or Licensed Owner Information

Building Name Name Address Job #

City

D = Deficiency C = Comment (Indicate type )

Item Date Riser D C Deficiencies and Comments (cont.)

Indicate all equipment, devices and parts that were repaired or replaced

Check here if additional Deficiencies and Comments are listed on Form AES9

See Correction Form AES 10 for corrected deficiencies.

Number attached:

Number attached:

I hereby certify that the fire protection equipment listed above has been fully inspected, tested, and maintained on this date by the company indicated above, in accordance with CCR, Title 19, Sections 901 to 906 and that the equipment is fully operable except as noted in the “Deficiencies and Comments” section of this form.

Check box if Annual Inspection, Testing & Maintenance Items are Completed in the Indicated Quarter

Quarter 1st - Annual 2nd - Annual 3rd - Annual 4th - Annual

Date

Print Name

Signature

Form AES 2.1 Sept. 3, 2013

Livermore VA Building 90 Annual sprinkler Q3 inspection 7-30-25 Fail
VAL Bldg. 62 - 4951 Arroyo Rd. (Sprinkler) Annual Report - Sept, 2024
PropertyZIP: 94550
DDOccupancyUse: [I2]
DDConstructionType: [Type I-A]
NumberStories: 7
YrConstructed:
CALicense:
Inspector:
DDOwner: On
OwnerDate:
0: 9/30/24
Fire AHJ: Off
AHJDate:
Contractor: Off
ContractorDate:
AutoSprinkler: On
5: 1
Sprinkler NA:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
Sprinkler Fail:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
Sprinkler Pass:
0: Yes
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
Standpipe: Off
6: 0
PrivateWater: Off
7: 0
FirePump: Off
8: 0
WaterStorage: Off
9: 0
WaterSpray: Off
10: 0
Foam: Off
11: 0
WaterMist: Off
12: 0
Concerns: Off
Yes: Off
No: On
PropertyName: VA Livermore - Bldg 62
Address 1: 4951 Arroyo Rd.
PropertyCity: Livermore
Contact:
ContactTelephone:
License: 758796
SFMCheckBox: Off
SFM:
CSLBCheckBox: Yes
CSLB:
ContractorName:
ContractorAddress:
ContractorCity:
ContractorSTate:
ContractZIP: 94538
ContractorTelephone:
JobNumber:
Misc:
Riser NoRow1: 1
LocationRow1: Basement main supply
Riser DiameterRow1: 6"
Main Drain DiameterRow1: 2"
Initial Static PressureRow1: 65
Residual PressureRow1: 60
Final Static PressureRow1: 65
PFNARow1: P
Riser NoRow2: 2
LocationRow2: (East) Riser closet - 1st to 7th floor
Riser DiameterRow2: 3"
Main Drain DiameterRow2: 1-1/4"
Initial Static PressureRow2: 57
Residual PressureRow2: 50
Final Static PressureRow2: 57
PFNARow2: P
Riser NoRow3: 3
LocationRow3: (West) Riser closet - 1st to 7th floor
Riser DiameterRow3: 3"
Main Drain DiameterRow3: 1-1/4"
Initial Static PressureRow3: 60
Residual PressureRow3: 40
Final Static PressureRow3: 60
PFNARow3: P
Riser NoRow4: 4
LocationRow4: (Center) Riser closet - 1st to roof
Riser DiameterRow4: 4"
Main Drain DiameterRow4: 2"
Initial Static PressureRow4: 60
Residual PressureRow4: 50
Final Static PressureRow4: 60
PFNARow4: P
Riser NoRow5:
LocationRow5:
Riser DiameterRow5:
Main Drain DiameterRow5:
Initial Static PressureRow5:
Residual PressureRow5:
Final Static PressureRow5:
PFNARow5:
RiserCheckBox: Off
Number2:
9FormsAttached:
Date1331:
Date1332:
Date525:
Date525_5:
Date5241:
1:
61stQtr:
621stQtr:
62ndQtr:
622ndQtr:
63rdQtr: 64
623rdQtr: 64
64thQtr: 65
624thQtr: 65
psi5241:
psi137:
psi1341:
psi13511:
psi1361:
psi516 1352 13551:
psi13511_5:
Date1331_2:
Date1332_2:
Date525_2:
Date525_6:
Date5241_2:
psi5241_2:
psi526_2:
psi528_2:
psi527_2:
psi5214_2:
psi137_2:
psi1341_2:
psi13511_2:
psi1361_2:
psi516 1352 13551_2:
psi13511_6:
Date1331_3: P
Date1332_3: P
Date525_3: P
Date525_7: P
Date5241_3: P
psi5241_3: P
psi526_3: N/A
psi528_3: N/A
psi527_3: N/A
psi5214_3: P
psi137_3: P
psi1341_3: P
psi13511_3: N/A
psi1361_3: P
psi516 1352 13551_3: N/A
psi13511_7: N/A
psi526:
psi528:
psi527:
psi5214:
Date1331_4: F
Date1332_4: P
Date525_4: P
Date525_8: P
Date5241_4: F
psi5241_4: P
psi526_4: N/A
psi528_4: N/A
psi527_4: N/A
psi5214_4: P
psi137_4: P
psi1341_4: P
psi13511_4: N/A
psi1361_4: P
psi516 1352 13551_4: N/A
psi13511_8: N/A
EmailAddress:
Date521: 9/30/24
Comments Only521:
PFNA521: P
Date4111:
PFNAOwners Responsibility: N/A
Date522:
Owners Responsibility522:
PFNA522: P
Date523:
Owners Responsibility523:
PFNA523: P
Date523_2:
Owners Responsibility523_2:
PFNA523_2: P
Date531:
PFNAIf REQUIRED Enter F until results are returned from Lab: N/A
DateTitle 19 9041c:
If REQUIRED Enter F until results are returned from LabTitle 19 9041c:
PFNATitle 19 9041c: P
533 1326:
Text1: 50
sec: P
1325 13334:
Text2:
Text3: P
13332:
Text4:
Text5: P
13331:
Text6:
Text7: P
13335:
Text8:
Text9: P
1362:
Text10:
Text11: N/A
13523 13533:
Text12:
Text13: N/A
13513:
Text14:
Text15: N/A
1334:
Text16:
Text17: P
13563:
Text18:
Text19: N/A
143:
Group3:
3: Choice2
4: Choice1
Yes No: N/A
453:
Yes No_2: P
ItemRow1: 1.5
DateRow1: 9/30/24
RiserRow1: All
DefDC: Choice1
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow1: (21) Gauges out of date Replace
ItemRow2: 1.19
DateRow2: 9/30/24
RiserRow2: 5
DefDC2: Choice1
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow2: (1) Unit 537 Missing Outer off White 401 outer trim
ItemRow3: 1.19
DateRow3: 9/30/24
RiserRow3: 6
DefDC3: Choice1
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow3: (1) Unit 632 Missing Central Chrome Semi Rec outer trim
ItemRow4:
DateRow4:
RiserRow4:
DefDC4: Off
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow4: (1)8 unit 336 Missing Central Chrome 804a trim
ItemRow5:
DateRow5:
RiserRow5:
DefDC5: Off
Deficiencies and Comments Indicate all equipment devices and parts that were repaired or replacedRow5:
ItemRow1_2:
DateRow1_2:
RiserRow1_2:
DefDC6: Off
Deficiencies and Comments cont Indicate all equipment devices and parts that were repaired or replacedRow1:
ItemRow2_2:
DateRow2_2:
RiserRow2_2:
DefDC7: Off
Deficiencies and Comments cont Indicate all equipment devices and parts that were repaired or replacedRow2:
Text21:
Text22:
Text23:
DefDC8: Off
Text26:
Text27:
Text28:
Text29:
DefDC9: Off
Text32:
Text33:
Text34:
Text35:
DefDC10: Off
Text38:
Text39:
Text40:
Text41:
DefDC11: Off
Text44:
Text45:
Text46:
Text47:
DefDC12: Off
Text50:
Text51:
Text52:
Text53:
DefDC13: Off
Text56:
Text57:
Text58:
Text59:
DefDC14: Off
Text62:
Text63:
Text64:
Text65:
DefDC15: Off
Text68:
Text69:
Text70:
Text71:
DefDC16: Off
Text74:
Text75:
Text76:
Text77:
DefDC17: Off
Text80:
Text81:
Text82:
Text83:
DefDC18: Off
Text86:
Text87:
Text88:
Text89:
DefDC19: Off
Text92:
Text93:
Text94:
Text95:
DefDC20: Off
Text98:
Text20:
Text99:
Text100:
DefDC21: Off
Text103:
Text104:
Text105:
Text106:
DefDC22: Off
Text109:
Text110:
Text111:
Text112:
DefDC23: Off
Text115:
Text116:
Text117:
Text118:
DefDC24: Off
Text121:
Text122:
Text123:
Text124:
DefDC25: Off
Text127:
Text128:
Text129:
Text130:
DefDC26: Off
Text133:
Text134:
Text135:
Text136:
DefDC27: Off
Text139:
CheckboxDeficiencies: Off
DeficiencyNumberAttached:
CheckboxAES10: Off
AES10Number Attached:
CB1stAnnual: Off
CB2ndAnnual: Off
CB3rdAnnual: Off
CB4thAnnual: Yes
Date1stQtr:
Date2ndQtr:
Date3rdQtr: 8/22/23
Date4thQtr: 9/30/24
Print Name:
Text145:
Text148:
Text151:
Signature:
Text146:
Text149:
Text152:

File details come from the government source that posted it. Updated .