Logistics Mechanical Drawings-small.pdf
PDF 3 MB Posted
- Attached to
- R408--VASNHS-Las Vegas | Construction and Project Management Services 100% SDVOSB Set-Aside
- Solicitation number
- 36C26122Q0743
About this file
This solicitation is for construction and project management services at the Veterans Affairs Medical Center in Las Vegas, Nevada. The opportunity is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The work includes construction and renovation services at the Las Vegas VAMC. The period of performance is one base year with four one-year options. Proposals are due by June 26, 2022. The Veterans Health Administration and Veterans Integrated Service Network 21 are the agencies responsible for the contract. Pricing will be fixed price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 230800 CxHVAC Systems.docx | DOCX document | |
| 019100 Gen Cx Reqs .docx | DOCX document | |
| Assignment 2 - Logistics HVAC Commissioning.docx | DOCX document | |
| 36C26122Q0743 0002.docx | DOCX document | |
| 36C26122Q0743 0001.docx | DOCX document | |
| 36C26122Q0743.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
SD
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE CLEAN RETURN
(STEAM CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LPSC LOW PRESSURE CLEAN SUPPLY
(STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE
REQUIRED.
6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH
COR.
23. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
24. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS
ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
25. INSTALL PIPING FREE OF SAGS AND BENDS.
26. ALL INSTALLED SUPPLY AND RETURN DUCTWORK TO BE INSULATED.
27. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
28. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
29. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS
GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
30. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST.
31. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH GC AND EC TO ENSURE ALL OPENINGS ARE SEALED TO PREVENT ANY AIR LEAKAGE.
32. SITE ELEVATION IS 1900 FT ASL.
33. CONTRACTOR TO COORDINATE ANY WORK THAT REQUIRES A SHUTDOWN WITH THE VA AND GIVE MINIMUM 30 DAYS PRIOR NOTICE. SHUTDOWN IMPACTED WORK WILL HAVE
TO BE DONE AFTER HOURS.
MECHANICAL GENERAL NOTES
SEISMIC DESIGN CRITERIA
LAS VEGAS, NVLOCATION DSITE CLASSIFICATION
IVRISK CATEGORY DSEISMIC DESIGN CATEGORY
0.515
MAPPED SHORT PERIOD SPECTAL
RESPONSE (SS)
1.5SEISMIC IMPORTANCE FACTOR
0.169
MAPPED 1-SECOND SPECTRAL
RESPONSE (S1)
1.388SITE COEFFICIENT (Fa)
0.715
MAXIMUM SHORT PERIOD
SPECTRAL RESPONSE (SMS)
2.124SITE COEFFICIENT (Fv)
0.359
MAXIMUM 1-SECOND SPECTRAL
RESPONSE (SMS)
0.477
MAPPED SHORT PERIOD
SPECTRAL RESPONSE (S)
0.239
MAPPED 1-SECOND SPECTRAL
RESPONSE (SD1)
FOR FINAL VALUES REFER TO STRUCTURAL DRAWINGS.
PRESSURE SENSOR
THERMOSTAT
SUPPLY DIFFUSER
RETURN DIFFUSER/GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
EG-88 2000 DIFFUSER TAG | DIFFUSER CFM
LINEAR SLOT DIFFUSER
BALANCING DAMPER
(RECTANGULAR)
BALANCING DAMPER
(ROUND)
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
SIDE MOUNTED GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
MECHANICAL LEGEND
S-60
S-15
CR-15
CHWS
CHWR
HIGH PRESSURE STEAM (60
PSI AND ABOVE)
LOW PRESSURE STEAM (15 PSI
AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OUTLET
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MOTORIZED CONTROL VALVE
STEAM TRAP
COND CONDENSATE DRAIN LINE
CR-60 HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMITS OF DEMOLITION
INLINE CENTRIFUGAL PUMP
TANGENTIAL AIR SEPARATOR
EXPANSION TANK
WALL-MOUNTED INDOOR
SPLIT-SYSTEM
SPLIT-SYSTEM CONDENSING UNIT
UTILITY SET EXHAUST FAN
STEAM PRESSURE
REDUCING STATION
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
TERMINAL UNIT
CHECK VALVE
S-30
CR-30
MEDIUM PRESSURE STEAM (16
PSI THROUGH 59 PSI)
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
P
T
TERMINAL UNITSD
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:0
P M
M-001
MECHANICAL GENERAL INFORMATION
1 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
DocuSign Envelope ID: C8DBEC4A-B8ED-4DC5-B48D-F1193BC67E5F
4/3/2020
W11W10W9W8W7W6W5W4W3
N.8
WD
WD1
WC
WB
WA
N.2
N
SUPPLY SERVICE
WAREHOUSE
BG115
10106 SF
CORRIDOR
CB-8
993 SF
PIPING ROOM
CB-7
1163 SF
CORRIDOR
CB-9
2046 SF
GAS STORAGE
BG113
66 SF
GAS STORAGE
BG114
57 SF
STOREKEEPER
BG110
160 SF
UTILITY TRENCH ACCESS
ROOM
BE103
378 SF
REPRODUCTION CENTER
BG101
474 SF
BG102
336 SF
EQUIPMENT CHARGING
BG109
423 SF
GAS MANIFOLD ROOM
BG109A
198 SF
STAFF TOILET
BG108
66 SF
STAFF TOILET
BG107
58 SF
REF AND SECURE STORES
BG116
118 SF
1 11
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:2
P M
MD101
BASEMENT LEVEL MECHANICAL
DEMOLITION PLAN
2 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
0 4 8 16
NORTH
PLAN
1 DEMOLISH ALL SA DIFFUSERS AND RA
GRILLES IN THIS AREA. DEMOLISH ALL
DUCTWORK AND VAV TERMINAL UNITS
BACK TO LIMITS OF DEMOLITION AND CAP.
2 DEMOLISH EXHAUST DIFFUSER. DEMOLISH
EXHAUST DUCT BACK TO LIMITS OF
DEMOLITION AND CAP.
3 8" EXHAUST UP THROUGH ROOF EXISTING
TO REMAIN.
4 REBALANCE EXHAUST AIRFLOWS FOR THE
RESTROOMS. EXHAUST RATE IS TO BE 100
CFM IN EACH RESTROOM. FAN
BELTS/SHEAVES REPLACEMENT SHALL BE
INCLUDED IN THE SCOPE.
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
BASEMENT LEVEL MECHANICAL DEMOLITION PLAN
1. DEMOLITION WORK IN THE OFFICE AREA
SHALL BE PERFORMED DURING OFF
HOURS OR WEEKENDS AS DIRECTED BY
THE VA.
WD
WD1
WC
WB
WA
N.2
N
3/4" CR-15
1 1/4" S-15
2 1/2" CHWS
2 1/2" CHWR
1 1/2" HWS
1 1/2" HWR
3/4" CR-15
1" S-15
1 1/4" HWR
1 1/4" HWS
2" CHWR
2" CHWS
3/4" CR-15
1" S-15
2" CHWR
2" CHWS
1 1/2" HWR
1 1/2" HWS
1 1/4" HWR
1 1/4" HWS
2" CHWR
2" CHWS
1 1/4" HWS
1 1/4" HWR
1 1/2" HWR
1 1/2" HWS
2 1/2" CHWR
2 1/2" CHWS
1 1/4" S-15
3/4" CR-15
1 1/2" HWR
1 1/2" HWS
1" HWR
1" HWS
1" CHWR
1" CHWS
2" HWR
2" HWS
1" CR-15
2" S-15
3" CHWR
3" CHWS
1 1/2" S-15
1" CR-15
3" CHWR
3" CHWS
2" HWR
2" HWS
SUPPLY SERVICE
WAREHOUSE
BG115
10106 SF
CORRIDOR
CB-8
993 SF
PIPING ROOM
CB-7
1163 SF
CORRIDOR
CB-9
2046 SF
GAS STORAGE
BG113
66 SF
GAS STORAGE
BG114
57 SF
STOREKEEPER
BG110
160 SF
UTILITY TRENCH ACCESS
ROOM
BE103
378 SF
REPRODUCTION CENTER
BG101
474 SF
BG102
336 SF
EQUIPMENT CHARGING
BG109
423 SF
GAS MANIFOLD ROOM
BG109A
198 SF
STAFF TOILET
BG108
66 SF
STAFF TOILET
BG107
58 SF
REF AND SECURE STORES
BG116
118 SF
2" D co coco
2" D
2" D
2" D
2" D
2" D
2" D
2" D
2" D
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:3
P M
MD102
BASEMENT LEVEL MECHANICAL PIPING
DEMOLITION PLAN
3 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
BASEMENT LEVEL MECHANICAL PIPING DEMOLITION PLAN 0 4 8 16
NORTH
PLAN
1 EXISTING 1-1/4" HWS & HWR UP TO
RTU-WH-2 TO REMAIN. SEE MD103 FOR
CONTINUATION.
2 EXISTING 2" CHWS & CHWR UP TO
RTU-WH-2 TO REMAIN. SEE MD103 FOR
CONTINUATION.
3 DEMOLISH EXISTING HWS & HWR
BRANCHES BACK TO MAIN AND CAP.
4 DEMOLISH EXISTING 1" STEAM PIPING (S-15)
SUPPLY BACK TO MAIN AS INDICATED.
5 DEMOLISH EXISTING 3/4" STEAM
CONDENSATE RETURN (CR-15) SUPPLY
BACK TO MAIN AS INDICATED.
6 ALL EXISTING PIPING SERVING
WAREHOUSE EQUIPMENT & OTHER AREAS
SHALL REMAIN.
1. DEMOLITION WORK SHALL BE PERFORMED
DURING OFF HOURS OR WEEKENDS AS
DIRECTED BY THE VA.
2. ISOLATION VALVES SHALL BE PROVIDED
FOR ALL BRANCH PIPING NEAR THE MAINS.
WD
WD1
WC
WB
WA
N.2
N
RTU-WH-3 (EX.) RTU-WH-4 (EX.)
RTU-WH-2
RTU-WH-1 (EX.)
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:3
P M
MD103
ROOF MECHANICAL DEMOLITION PLAN
4 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
ROOF MECHANICAL DEMOLITION PLAN 0 4 8 16
NORTH
PLAN
1 DISCONNECT CHS/R, HWS/R, LPS SUPPLY &
CONDENSATE PIPING CONNECTED TO
EXISTING RTU.
2 DEMOLISH SUPPLY AND RETURN AIR
DUCTWORK CONNECTED TO RTU &
LOCATED BELOW CEILING WITHIN
WAREHOUSE AND DISPOSE.
3 DISCONNECT CONTROLS SERVING
RTU-WH-2, INCLUDING WIRING AND
CONDUITS.
4 REMOVE & DISPOSE OF THE EXISTING RTU.
5 DEMOLISH EXISTING STEAM PIPING (S-15)
SUPPLY & CONDENSATE PIPING BACK TO
MAIN. SEE SHEET MD102 FOR EXTENT OF
DEMOLITION.
6 DEMOLISH CONDENSATE DRAIN PIPING FOR
EXISTING RTU.
7 DEMOLISH EXISTING RTU ROOF CURB.
1. DEMOLITION WORK SHALL BE PERFORMED
DURING OFF HOURS OR WEEKENDS AS
DIRECTED BY THE VA.
2. REMOVAL OF DUCTWORK WITHIN
WAREHOUSE SHALL BE COORDINATED
WITH THE VA.
3. TEMPORARY PROTECTION OF OPENINGS
AFTER REMOVAL OF RTU IF REQUIRED
SHALL BE PROVIDED BY MECHANICAL
CONTRACTOR. PROTECTION SHALL
INCLUDE WATERPROOFING & SECURITY.
4. UTILITY SHUTDOWN, IF REQUIRED, SHALL
BE COORDINATED WITH VA.
Scale: No Scale
EXISTING RTU ON ROOF
Scale: No Scale
PIPING & DUCTWORK TO EXISTING RTU
WD
WD1
WC
WB
WA
N.2
N
SUPPLY SERVICE
WAREHOUSE
BG115
CLEAN STORAGE
BG105
DELIVERY PREP
BG104
PIPING ROOM
CB-7
CORRIDOR
CB-8
CORRIDOR
CB-9
M-301 x x x x
12x12
12x12
12ø8ø
10ø
12x12
RG-24 440
SD-13 330
SD-13 330
RG-24 440
SD-13 310
SD-13 310
SD-13 310SD-13 310 RG-24 435
RG-24 435
RG-24 435 SD-13 310SD-13 310
SD-13 310 SD-13 310
RG-24 435
SD-14 420 RG-24 530
SD-14 420 RG-24 530
10ø
10ø
12ø 12x10 x
10ø
BREAK OUT ROOM
BG106
16x1216x12
CORRIDOR
CB-9
GAS STORAGE
BG113
GAS STORAGE
BG114
STOREKEEPER
BG110
UTILITY TRENCH ACCESS
ROOM
BE103
REPRODUCTION CENTER
BG101
BG102
EQUIPMENT CHARGING
BG109
GAS MANIFOLD ROOM
BG109A
STAFF TOILET
BG108
STAFF TOILET
BG107
REF AND SECURE STORES
BG116
12ø
16x12
12ø
10ø
12x12
T T
T T
10ø
10ø
10ø
12x12
14ø
14ø
14ø
14ø 14ø
12ø
1-TU-4
1-EV-3
1-TU-3
1-EV-1
1-TU-1
1-EV-2
1-TU-2
1-EV-4
M-301
14ø
14ø
14ø
12ø
10ø
P
P
1-TU-4
1-TU-3
1-TU-2
1-TU-1
12x10
WALL BELOW GRADE
H
10ø
12x12
12x10
12ø 10ø
12ø5
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:2
P M
MH101
BASEMENT LEVEL HVAC PLAN
5 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
0 4 8 16
NORTH
PLAN
1 28" x 14" SA DUCT FROM RTU ON ROOF.
2 32" x 18" RA DUCT TO RTU ON ROOF.
3 SA DUCT DOWN FROM 19' TO APPROXIMATELY
15'.
4 RA DUCT UP FROM APPROXIMATELY 14' TO 19'.
5 DDC PANEL IN DELIVERY PREP ROOM.
6 28" x 14" SA DUCT TRANSITIONS FROM 46" x 11"
SUPPLY AIR OUTLET FROM RTU ON ROOF.
7 32" x 18" RA DUCT TRANSITIONS TO 46" x 11"
RETURN AIR INLET FROM RTU ON ROOF.
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
BASEMENT LEVEL HVAC PLAN
1. FOR DUCT SUPPORTS REFER TO
ARCHITECTURAL AND STRUCTURAL
DRAWINGS.
WD
WD1
WC
WB
WA
N.2
N
1 1
1 1
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:2
P M
MH102
BASEMENT LEVEL HVAC REFLECTED
CEILING PLAN
6 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
BASEMENT LEVEL MECHANICAL REFLECTED CEILING PLAN 0 4 8 16
NORTH
PLAN
1 DIFFUSERS NEAR COLUMNS OR WALL SHALL
BE 3-WAY OR 2-WAY TYPE.
WD
WD1
WC
WB
WA
N.2
N
RTU-WH-1 (EX.)
1-RTU-1
RTU-WH-3 (EX.) RTU-WH-4 (EX.)
M-301
M-301
O.A.
E.A.
INTAKE HOOD
EXHAUST HOOD
NEW ROOF CURB
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:4
P M
MH103
ROOF HVAC PLAN
7 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
0 4 8 16
NORTH
PLAN
1 INSTALL NEW RTU IN PLACE OF RTU-WH-2.
PROVIDE NEW 18" SEISMIC RATED ROOF
CURB FOR NEW RTU.
2 CONNECT NEW 1-1/4" S-15 & 1" CR-15 TO
STEAM DISPERSION SECTION IN NEW RTU.
PROVIDE STEAM TRAPS AT INLET AND OUTLET
OF HUMIDIFIER. SEE DETAIL 8/M-501 FOR
MORE INFORMATION.
3 CONNECT EXISTING CHWS/R & HWS/R TO
COOLING & HEATING COILS IN NEW RTU. SEE
DETAIL 4/M-501 FOR MORE INFORMATION
4 PROVIDE ALL NECESSARY OFFSETS AND
TRANSITIONS TO CONNECT EXISTING PIPING
TO NEW AHU. PROVIDE HEAT TRACING ON
HWS/R & CHS/R PIPING AND CONTROL VALVES
EXPOSED ON ROOF. HEAT TRACING SHALL BE
3 WATT PER LINEAR FOOT.
5 REUSE EXISTING ROOF PENETRATIONS FOR
NEW SUPPLY AND RETURN DUCT.
6 ROUTE 1-1/4" CONDENSATE DRAIN PIPING
FROM RTU COOLING SECTION TO EXISTING
CONDENSATE MAIN BELOW ROOF. SEE DETAIL
3/M-501 FOR MORE INFORMATION.
7 ROUTE 1" CONDENSATE DRAIN PIPING FROM
RTU HEAT EXCHANGER SECTION TO EXISTING
CONDENSATE MAIN BELOW ROOF. SEE DETAIL
3/M-501 FOR MORE INFORMATION.
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
ROOF HVAC PLAN
1. FOR RTU SUPPORTS, REFER TO STRUCTURAL
DRAWINGS.
2. REFER TO ARCHITECHTURAL DRAWINGS.
3. CHWS/R AND HWS/R PIPING SHALL BE HEAT
TRACED ON ROOF AND UPTO 3' INSIDE
WAREHOUSE. HEAT TRACE SHALL BE SW/LF.
4. REFER TO STRUCTURAL/ARCHITECTURAL
DRAWINGS FOR EQUIPMENT CURB
INSTALLATION. INSULATED ROOF CURB
PROVIDED BY CONTRACTOR SHALL BE PER
MANUFACTURER STANDARD. ROOF CURB TO BE
DESIGNED FOR LOCAL SITE CONDITIONS AND
STAMPED BY MANUFACTURER ENGINEER.
5. COOLING COIL AND HEAT EXCHANGER
CONDENSATE PIPING SHALL BE COPPER.
INSULATE WITH 1" THICK FG INSULATION.
WD
WD1
WC
WB
WA
N.2
N
1-CV-1
1-CV-2
1-CV-3
1-CV-4
1 1/4" S-15
SUPPLY SERVICE
WAREHOUSE
BG115
CLEAN STORAGE
BG105
DELIVERY PREP
BG104
PIPING ROOM
CB-7
CORRIDOR
CB-8
CORRIDOR
CB-9
BREAK OUT ROOM
BG106
CORRIDOR
CB-9
GAS STORAGE
BG113
GAS STORAGE
BG114
STOREKEEPER
BG110
UTILITY TRENCH ACCESS
ROOM
BE103
REPRODUCTION CENTER
BG101
BG102
EQUIPMENT CHARGING
BG109
GAS MANIFOLD ROOM
BG109A
STAFF TOILET
BG108
STAFF TOILET
BG107
REF AND SECURE STORES
BG116
1" CR-15
3/4" HWS
3/4" HWR
2" D
T T
P
1-TU-4
1-TU-3
1-TU-1
1-TU-2
1-TU-4
1-TU-3
1-TU-2
1-TU-1 T T
PH
CWS/R, HWS/R & S/CR-15
CONTROL VALVES ARE
LOCATED ON ROOF.
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:4
P M
MP101
BASEMENT LEVEL MECHANICAL PIPING
PLAN
8 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
0 4 8 16
NORTH
PLAN
1 ROUTE NEW 1 1/4" S-15 SERVICE UP TO NEW
RTU ON ROOF.
2 ROUTE 3/4" HWS/R TO EACH TERMINAL UNIT
AS INDICATED. SEE SHEET M-502 FOR MORE
INFORMATION.
3 ROUTE NEW 1" CR-15 UP TO NEW RTU ON
ROOF.
4 EXISTING 2" COIL CONDENSATE FROM RTU
ON ROOF.
5 DDC PANEL IN DELIVERY PREP ROOM.
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
BASEMENT LEVEL MECHANICAL PIPING PLAN
ROOF
0"
BASEMENT
-24' - 0"
ROOF
0' - 0"
BASEMENT
-24' - 0"
W10 W9 W8 W7 W6 W5 W4 W3
CEILING FRAMING
-12' - 0"
DELIVERY PREP
BG104
575 SF
CLEAN STORAGE
BG105
2396 SF
BREAK OUT ROOM
BG106
646 SF
28x1432x16
14ø 14ø
12ø 14ø
12x12
12x16
12x1212x12
ROOF
0"
BASEMENT
-24' - 0"
ROOF
0' - 0"
BASEMENT
-24' - 0"
WCWBWAN.2N
CEILING FRAMING
-12' - 0"
ROOF
0"
ROOF
0' - 0"
WB
2" D
2" CHWS
2" CHWR
1 1/4" HWS
1 1/4" HWR
2" D
1-RTU-1
14x28
16x32
22'-0"
1 1/4" S-15
1" CR-15
O.A. E.A.
ROOF
0"
ROOF
0' - 0"
W6
M-301
5'-2"
Engineers Architects
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:1
P M
M-301
MECHANICAL SECTIONS
9 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 3/16" = 1'-0"
Section A-A
Scale: 3/16" = 1'-0"
Section B-B Scale: 1/4" = 1'-0"
Section C-C
Scale: 1/4" = 1'-0"
Section D-D
0 42 8
0 42 8 0 2 4 8 0 2 4 8
1 NEW ROOF CURB SHALL SERVE AS PLENUM
FOR RETURN AIR TO RTU.
2 SEE KEYNOTES ON SHEET MH103 FOR PIPING
CONNECTIONS TO NEW RTU.
1. PROVIDE INSULATED ROOF CURB. SEE DETAIL.
2. FOR ROOF INSULATION AND FLASHING DETAIL
REFER TO ARCHITECHTURAL SHEETS.
NOM. SIZE (IN.)
PIPE (FT.)
TUBING (FT.)
5 FT
THRU 3/4
1 1 1/4
1 1/2
HANGER ROD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR
LOW TEMPERATURE
PIPE)
PROVIDE HIGH
COMPRESSIVE
STRENGHT
INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD AT
HANGER
WELD
SADDLE
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE
SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE
SPECIFICATIONS
1/2" DIA. HANGER RODS WITH 36"
MAX. SPACING ON EACH CHANNEL
BAND
1-5/8" 12 GAUGE CHANNEL
OR 2" x 2" x 1/4" ANGLE
NOTES:
SEE SPECIFICATIONS FOR
DETAILED HANGER
REQUIREMENTS. SIDE VIEW TRAPEZE HANGER
FOR UP TO 1000 LB. UNIFORM
LOAD
1" MAX.
PROVIDE INSULATION SHIELD &
INSERT FOR ALL PIPING (8" MIN.)
2 2 1/2 3 4 5 6 8 10 12
11 12 14 16 17 19 22 23
9 10 12 13 14 16 - -
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE
MAXIMUM PIPE/TUBING SUPPORT SPACING
PIPE AND INSULATION
INSULATION PROTECTION SHIELD
2" STEEL PIPE
2-1/2" STEEL PIPE
SEALANT
PROVIDE ALUMINUM JACKET
HIGH COMPRESSIVE
STRENGTH INSULATION
INSERT UNDER SHIELD
WELD PIPE SADDLE SUPPORT
TO PIPE. PROVIDE WATER
TIGHT CONNECTION
CLAMPING RING
PRE-MOULDED FLEXIBLE
PIPE COUNTER FLASHING
ROOF SYSTEM
INSULATION AND
MEMBRANE
ROOF SURFACE
CONCRETE ROOF SLAB
OR STEEL ROOF DECK
SECURE TO ROOF SLAB WITH
(4) 3/8" Ø EXPANSION BOLTS
OR WELD TO STEEL DECK
WELD PLATE TO PIPE
8" x 8" x 3/8" STEEL PLATE
M
IN
NOTES:
PROVIDE RESTRAINING CLAMPS 8'-0" O.C.
ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER
VERTICAL
2 1/2" [65mm] DIA.
ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER
HORIZONTAL
2 1/2" [65mm] DIA.
TYPICAL WATER
PIPING
REDUCER, IF REQUIRED
3/4" BALL
VALVE
ADAPTER TO 3/4" HOSE
THREAD. PROVIDE
HOSE CAP NUT
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS, LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
TYPICAL CHILLED WATER AND HOT WATER
PIPING DRAIN VALVE CONNECTIONS
ELEVATION:
THREADED PIPING
ELEVATION:
WELDED PIPING
1/4" COPPER TUBING
1/2" X 4" NIPPLE
AIR VENT
1/2" BALL VALVE
MV
OR
AV
CIRCULATING WATER
PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
TYPICAL MANUAL AIR VENT
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE
DRAIN PAN. PIPING SHALL BE RIGID
COPPER TYPE L OR TYPE M UNLESS
NOTE BELOW IS MET
PITCH DOWN TOWARD DRAIN
CLEANOUT
HUB DRAIN
DRAIN PAN
DIALECTRIC FITTING
NOTES:
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS INDOORS AND DOES
NOT PASS THROUHG RATED BARRIERS.
2. DIALECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE CONNECTED.
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAW THRU
BLOW THRU
2" PLUS X
1" MINIMUM
X
2X
B A
(SEE PLANS FOR LOCATION)
SEE DRAWINGS FOR PIPE SIZES
SCHEDULE 80
STEEL PIPE
BYPASS- INSTALL IN HORIZONTAL
PLANE LEVEL WITH TRAP OR IN
VERTICAL PLANE & BELOW TRAP
PIPE SIZE SHALL BE SAME SIZE
AS TRAP
PIPE SIZE SHALL BE SAME SIZE
AS TRAP
PIPE SIZE SHALL BE SAME SIZE
AS TRAP
TO RETURN MAIN
SCHEDULE 80 STEEL PIPE
1" GATE VALVE
INVERTED BUCKET
TRAP. SEE PLANS,
AND SCHEDULES
FLOW
DIELECTRIC FITTING
WHERE RETURN IS
COPPER PIPE
DRIP LEG OP EQUIPMENT
CONNECTION. MAKE THE
SAME SIZE AS THE SUPPLY
MAIN OR QUIPMENT
CONNECTION. SEE NOTE 1
" M
IN
. [3
0 m m
" M
IN
. [1 m m
M V
M V
M V
M V
MV
MV
M V
SINGLE COIL
DOUBLE COIL
WATER COIL
WATER COIL
WATER COIL
TI
FE
FE
TI
FLOW ELEMENT
TEMPERATURE
INDICATION TO ECC.
SEE CONTROL DIAGRAM
(TYP.)
DRAIN
AIR VENT WHEN COIL IS
NOT SELF-VENTING
(TYP.)
TEST PLUG (TYP.)
DRAIN WHEN COIL IS
NOT SELF-DRAINING
(TYP.)
DRAIN
PIPE HANGERS SHALL SUPPORT
PIPING INDEPENDENT OF COIL
(TYP.)
REDUCER, IF REQUIRED (TYP.)
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST
TWO HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE "H" 4" DIA.
PIPE & SMALLER. TYPE "H-P" FOR 5" DIA. PIPE & LARGER.
2. PIPING SHALL BE INSTALLED IN SUCH A MANNER THAT IT WILL NOT BLOCK THE
SWING OR USE OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE
SERVICING OF FILTERS, VALVES, OR EQUIPMENT.
3. THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED
MINIMUM UPSTEAM AND DOWNSTREAM DIMENSIONS CANNOT BE OBTAINED IN THE
RETURN PIPING.
BALANCING VALVE
BALANCING VALVE
COIL
REDUCER IF REQUIRED
SHUTOFF VALVE
WATER RETURN
WATER SUPPLY
MODULATION CONTROL VALVE
MANUAL AIR VENT
TEST PLUG (TYP.)
UNION CONNECTIONS (TYP.)
DRAIN WITH HOSE
CONNECTION
MV
BALANCING VALVE
SEE MANUFACTURER'S
PIPING RECOMMENDATIONS
FOR FINAL LAYOUT
AHU CROSS SECTION1/3 MODULATING CONTROL VALVE
STEAM SUPPLY
MANIFOLD PIPE ADAPTERS
TO HUMIDISTAT
HUMIDIFIER CONTROL VALVE
F & T TRAP ASSEMBLY
SCALE POCKET
TEMPERATURE SWITCH
STEAM
CONDENSATE
RETURN
A H
U H
E
IG
H T
H
/3
H
M
IN
2/3 MODULATING CONTROL VALVE
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:1
P M
M-501
MECHANICAL DETAILS
10 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
Scale: No Scale
PIPE HANGER
Scale: No Scale
DETAIL FOR SUPPORTING PIPING ON ROOF
Scale: No Scale
INSTALLATION OF THERMOMETER WELLS
Scale: No Scale
DRAIN VALVE AND AIR VENT CONNECTIONS (HYDRONIC
SYSTEMS)
Scale: No Scale
AIR HANDLING UNIT DRAIN TRAP DETAIL
Scale: No Scale
INVERTED BUCKET STEAM TRAP ASSEMBLY
Scale: N.T.S.
WATER COILS - PIPING CONNECTIONS
Scale: N.T.S.
TERMINAL UNIT WATER COILS - PIPING CONNECTIONS
Scale: N.T.S.
STEAM HUMIDIFIER - PIPING CONNECTIONS
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
TYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT PLAN OR SIDE
VIEW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEW
AIRFLOW
AIRFLOWAIRFLOW
E Q
U
IP
M E
N T
M A
X
M
AX.
M A X
M A
X
M
AX.
M A
X
MAIN SUPPLY
DUCT
PROVIDE VOLUME
DAMPER
PROVIDE
VOLUME
DAMPER
1/4 W OR
4" MIN.
SUPPLY REGISTER OR
BRANCH DUCT
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN
FOR SPLIT
DIMENSION
TURNING VANES
AIR FLOW
AIR FLOW
A
IR
F L O
W
AIR SPLIT DUCT TAKE-
OFF PLAN VIEW
BRANCH DUCT TAKE-OFF
PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
MAIN SUPPLY
DUCT
CONICAL TAP
TERMINAL UNIT DUCT TAKE-
OFF PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
SMACNA FIGURE 4-6 45°
LEED IN RIGID DUCT TO
AIR TERMINAL UNIT
MAIN SUPPLY
FLOW
F L O
W
PLAN VIEW
PROVIDE VOLUME
DAMPER AT EACH
BRANCH DUCT
1/4W OR 4" MIN.
BRANCH DUCT
MAIN EXHAUST OR RETURN
AIR FLOW
AIR FLOW
VD
W
PLAN VIEW
NOTES:
1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR
FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
SECTIONSIDE ELEVATION
1/2" ROUND ROD PIN
1/8" CLEARANCE
ALL AROUND
INSIDE END
BEARING
INSULATION
STAND-OFF
DAMPER BLADE
HANDLE
WITH
LOCKING
QUADRANT
STIFFEN BLADE
AS REQUIRED
INSULATION SEE
SPECIFICATION
DUCT
OUTSIDE END BEARING
LOAD RATED
FASTENERS
BAND OF SAME
SIZE AS HANGER
STRAP
50"Ø & UNDER
HANGER RODS
BAND
OVER 50"Ø
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NOT EXTERNAL LOAD
MAX
DUCT Ø
(IN.)
QUANTITY/SIZE (IN.) MAX LOAD
(LBS.)
MAX SPACING
(IN.)
ONE 1 x 22 GA STRAP
ONE 1 x 18 GA STRAP
ONE 1 x 16 GA STRAP
TWO 3/8 Ø RODS
TWO 1/2 Ø RODS
HANGER STRAPS OR RODS
NOTE:
1. NO FLEXIBLE DUCT FOR CLEAN STORAGE.
2. WHEN MOUNTED IN A GYPSUM BOARD CEILING PROVIDE, MANUFACTURERS SURFACE
MOUNT TRIM FRAME.
VOLUME DAMPER
W/LOCKING QUAD
SHEET
METAL
SADDLE
CEILING
TYPICAL DIFFUSER OR
REGISTER IN LAY-IN
CEILING
FLEXIBLE DUCT SIZE SAME
AS DIFFUSER INLET: 5'-0"
MAX. LENGHT
USE RIGID ELBOWS FOR
CHANGE OF DIRECTION
GREATER THAN 45°
SUPPORT SADDLE
FROM STRUCTURE
SEE SPECIFICATION
FOR CLAMPS AND
SEALANT (TYP.) THERMAL
INSULATION, SEE
SPECIFICATIONS
CONICAL OUTLET
BRANCH DUCT
12"
NOTES:
1. NO FLEXIBLE DUCT FOR CLEAN STORAGE.
2. RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A MINIMUM OF 3 TIMES THE DIAMETER OF
INLET.
3. A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT ALLOWED TO
ACCOMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0".
4. A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET, PROVIDED
THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10 FEET. FOR
LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO MAINTAIN THE
DUCT STATIC PRESSURE DROP AT OR BELOW 0.2"/100'.
5. FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0". USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER THAN 45°.
6. COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE INSULATION W/VAPOR BARRIER
FOR CONNECTING DUCT SECTIONS.
7. USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE DEDICATED AHU
SERVING THE SURGICAL SUITE.
AIR TERMINAL UNIT
(CV OR VAV)
SEE NOTE 5
SEE SPECIFICATIONS FOR
CLAMPS AND SEALANT (TYP.)
AIR DISTRIBUTION VARIES
WITH ROOM LAYOUT
FLEXIBLE AIR DUCT
CONNECTOR. SEE DETAIL
SOUND ATTENUATOR SEE
EQUIPMENT SCHEDULE
REHEAT COILSEE NOTE 1
SEE NOTE 2
SEE NOTE 3S
U
P P
L Y
A
IR
D U
C T
S E
E N
O T
E
NOTES:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE BETWEEN
VANES AND A 3/4" TRAILING EDGE.
4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.
W1
W
OA INTAKE
EXHAUST
AIR
NOTES:
1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
2. ALL STANDARD ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS.
ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED , SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/6 W
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/3 W
R
SHALL
EQUAL OR
BE
GREATER
THAN W
R
W
W
2/3W
R
/3
W
/3
W
1/2W
VAN
E
VAN
E R
W
1/6W
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:1
P M
M-502
MECHANICAL DETAILS
11 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
Scale: No Scale
DUCTWORK TRANSITIONS (WITH EQUIPMENT MOUNTED IN
DUCT)
Scale: No Scale
SUPPLY DUCT TAKE-OFFS
Scale: No Scale
SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS
Scale: No Scale
EXHAUST OR RETURN BRANCH DUCTWORK
Scale: No Scale
VOLUME DAMPER DETAIL
Scale: No Scale
ROUND DUCT HANGERS
Scale: No Scale
FLEXIBLE AIR DUCT CONNECTOR
Scale: No Scale
DUCT CONNECTIONS - AIR TERMINAL UNITS
Scale: N.T.S.
DUCTWORK SQUARE VANE ELBOWS
Scale: 12" = 1'-0"
AHU ELEVATION DETAIL
Scale: N.T.S.
DUCTWORK RADIUS ELBOW
RETURN OR
EXHAUST AIR
CLEAN
STEAM
SUPPLY
MODULATING 1/3
CONTROL VALVE
V-2/1
STEAM
CONDENSATE
RETURN
10'-0" MIN.
SUPPLY AIR
V-0
RAH
TSH
ZC
PC
AFS HHL
STEAM HUMIDIFIER:
RETURN (OR EXHAUST) AIR HUMIDITY SHALL BE MONITORED.
ON A CALL FOR HUMIDIFICATION, HUMIDIFIER VALVE V-2/1 SHALL OPEN AND MODULATE TO
MAINTAIN THE RETURN (OR EXHAUST) AIR HUMIDITY SET POINT TO 30% (ADJUSTABLE).
ON CALL FOR ADDITIONAL HUMIDITY VALVE V-2/2 SHALL OPEN AND MODULATE TO
MAINTAIN THE HUMIDITY.
PRIOR TO ACTIVATION OF V-2/1, THE ON/OFF CONTROL VALVE V-0 SHALL BE ENABLED
THROUGH ECC AND JACKET TEMPERATURE SENSED BY TSH SHALL BE WARM ENOUGH TO
PREVENT CONDENSATION.
THE AIRFLOW SWITCH SHALL PROVE AIRFLOW BEFORE HUMIDITY CONTROLS ARE
ACTIVATED.
MODULATING 2/3
CONTROL VALVE V-2/2
SEQUENCE OF OPERATION FOR RTU:
1. GENERAL:
1.1. THE UNIT SHALL OPERATE 24/7.
1.2. H-O-A SWITCH SHALL BE KEPT IN “AUTO” POSITION AND “OFF” POSITION SHALL BE USED ONLY FOR MAINTENANCE.
1.3. WHEN THE UNIT IS OFF DAMPERS D-1, AND D-2 SHALL CLOSE AND STATUS SHALL BE AVAILABLE ON THE BMS SYSTEM VIA ACTUATOR END SWITCHES.
1.4. WHEN UNIT IS COMMANDED ON, DAMPERS D-1, AND D-2 SHALL OPEN (STATUS INDICATED ON BMS VIA END SWITCHES). AFTER SAFETIES CHECK UNIT SHALL START.
2. TEMPERATURE CONTROL:
2.1. SUPPLY AIR TEMPERATURE AND HUMIDITY SETPOINT (AS SET BY BMS), SET BY SENSOR TT-8 AND HT-4, SHALL BE MAINTAINED BY SEQUENCING VALVES V-1, V-2, AND V-3. VALVES SHALL OPEN BASED ON SUPPLY AIR CONDITIONS AND SHALL NOT OPEN SIMULTENOUSLY.
3. AIRFLOW CONTROL:
3.1. THE SUPPLY AIR FLOW SHALL BE CONTROLLED BY THE BMS, MODULATING THE SUPPLY FAN VFD TO MAINTAIN SUPPLY STATIC PRESSURE SENSED BY SPS-1.
3.2. THE SPACES SERVED BY RTU SHALL BE MAINTAINED AT PRESSURE DIFFERENTIAL AS INDICATED ON THE DRAWINGS. CONTRACTOR SHALL PROVIDE TWO NEW
DIFFERENTIAL PRESSURE SENSORS TO MONITOR PRESSURE DIFFERENCE BETWEEN CLEAN STORAGE AND WAREHOUSE AND BREAK OUT ROOM.
3.3. THE EXHAUST VALVES SHALL TRACK SUPPLY VAVS AND SHALL MAINTAIN SPACE PRESSURES AS INDICATED ON THE DRAWINGS.
3.4. THE SUPPLY FAN AND RETURN AIR FAN TOTAL AIR FLOW SHALL BE TRACKED, AS SENSED BY AFT-3 AND AFT-4, TO MAINTAIN SPACE PRESSURIZATION.
3.5. THE HIGH-PRESSURE SENSOR PSH SHALL PREVENT SUPPLY AIR FAN DEVELOPING OVER 3” STATIC PRESSURE. THE SENSOR SHALL BE HARD WIRED TO SUPPLY FAN
MOTOR. IF HIGHER PRESSURE IS DEVELOPED, THE FAN SHALL SHUT OFF. UNIT SHALL BE MANUALLY RESTARTED.
3.6. THE LOW-PRESSURE SENSOR PSL SHALL PREVENT RETURN AIR FAN FROM DEVELOPING OVER 3” OF NEGATIVE STATIC PRESSURE. THE SENSOR SHALL BE HARD
WIRED TO RETURN FAN MOTOR. IF HIGHER NEGATIVE PRESSURE IS DEVELOPED, THE FAN SHALL SHUT OFF. UNIT SHALL BE MANUALLY RESTARTED.
4. HUMIDITY CONTROL:
4.1. THE SUPPLY AIR, RETURN AIR, AND OUTSIDE AIR RELATIVE HUMIDITY SHALL BE COMPARED AND ACCORDINGLY, HUMIDITY IN SUPPLY AIR SHALL BE ADDED.
4.2. ON CALL FOR HUMIDITY INCREASE THE CONTROL VALVE V-2 AT HUMIDIFIER SHALL OPEN AND STEAM SHALL BE DISPERSED INTO THE AIR STREAM IN THE HUMIDIFIER
SECTION.
4.3. WHEN RETURN AIR DEW POINT IS HIGHER THAN 45 DEGREES F. (ADJ), VALVE V-2 SHALL CLOSE AND NO STEAM INJECTION WILL BE DONE.
4.4. FOR DEHUMIDIFICATION, TERMINAL REHEAT COILS SHALL BE USED TO MAINTAIN THE SPACE CONDITIONS.
5. FREEZE PROTECTION:
5.1. IF THE AIR TEMPERATURE AS SENSED BY TT-5 FALLS BELOW 40 DEGREES F. (ADJ), AN ALARM WILL BE GENERATED AT THE BMS FRONT END.
5.2. THE FREEZESTAT SHALL BE SET AT 32 F (ADJ). IF THE AIR TEMPERATURE FALLS BELOW 32 F (ADJ) THE UNIT SUPPLY AND RETURN FANS SHALL BE DE-ENERGIZED.
UNIT WILL SHUT OFF AND DAMPERS D-1 AND D-2 SHALL CLOSE. UNIT SHALL BE MANUALLY RESTARTED.
5.3. DURING NO-FLOW CONDITIONS AS SENSED BY FLOW TRANSMITTER FT-1 AND WHEN AIR TEMPERATURE AS SENSED BY TT-5 IS BELOW 35 DEGREES F. (ADJ), THE UNIT
WILL SHUT OFF AS STATED ABOVE. UNIT SHALL BE MANUALLY RESTARTED.
5.4. IF NO WATER FLOW IS DETECTED ON CALL FOR HEATING AS SENSED BY FT-1, AN ALARM WILL BE GENERATED AND ABOVE FREEZE PROTECTION SEQUENCE SHALL BE
FOLLOWED.
6. LOSS OF COOLING PROTECTION:
6.1. IF THE SUPPLY AIR TEMPERATURE AS SENSED BY TT-8 IS ABOVE 65 DEGREES F. (ADJ), AN ALARM WILL BE GENERATED AT THE BMS FRONT END. IF THE TEMPERATURE
RISES TO 70 DEGREES F. (ADJ), THE UNIT WILL SHUT OFF AS STATED ABOVE.
6.2. IF ON CALL FOR COOLING NO WATER FLOW IS DETECTED AS SENSED BY FLOW TRANSMITTER FT-2, AN ALARM WILL BE GENERATED AT THE BMS FRONT END AND
ABOVE SEQUENCE SHALL BE FOLLOWED.
7. AUTOMATIC SMOKE SHUTDOWN/RESTART:
7.1. IF SMOKE IS DETECTED BY ANY SMOKE DETECTOR SMD-1, OR 2, THE SUPPLY AND RETURN AIR FANS SHALL BE DEENERGIZED AND UNIT SHALL SHUT DOWN AS STATED
ABOVE.
7.2. THE UNIT SHALL BE STARTED MANUALLY.
8. EMERGENCY CONSTANT SPEED OPERATION:
8.1. UPON FAILURE OF ANY ONE VFD, FOR BOTH SUPPLY AND RETURN FAN ARRAYS, AN ALARM WILL BE GENERATED AND THE REMANING FANS WILL RAMP UP THEIR
SPEED TO MAINTAIN REQUIRED CFM.
9. HYDRONIC CONTROL:
9.1. THE HOT WATER SUPPLY AND RETURN TEMPERATURE FOR PREHEAT COIL SHALL BE MONITORED AT BMS FRONT END VIA TT-A AND TT-B. THE FLOW (GPM) SHALL BE
MONITORED VIA FT-1.
9.2. IF THE HOT WATER SUPPLY TEMPERATURE IS ABOVE 190 DEGREES F. (ADJ), AN ALARM SHALL BE GENERATED AT BMS FRONT END.
9.3. IF THE HOT WATER SUPPLY TEMPERATURE IS BELOW 150 DEGREES F, (ADJ), AN ALARM SHALL BE GENERATED AT BMS FRONT END.
9.4. THE CHILLED WATER SUPPLY AND RETURN TEMPERATURES FOR COOLING COIL SHALL BE MONITORED AT BMS FRONT END VIA TT-C AND TT-D. THE FLOW SHALL BE M
ONITORED VIA FT-2.
9.5. IF THE CHILLED WATER SUPPLY TEMPERATURE IS ABOVE 48 DEGREES F. (ADJ), AN ALARM SHALL BE GENERATED AT THE BMS FRONT END.
10. AIRFLITER MONITORING:
10.1. THE PRESSURE DROP ACROSS PREFILTER-1, 2 AND 3 AND FINAL FILTERS SHALL BE MONITORED AT THE CENTRAL BMS.
10.2. IF THE PRESSURE DROP EXCEED THE SETPOINT (TBD IN CONJUNCTION WITH VA), ALARM WILL BE GENERATED AT THE BMS FRONT END.
11. ENERGY MONITORING:
11.1. THE BMS SYSTEM SHALL MONITOR BOTH AIR SIDE AND WATER SIDE BTUS AND DEVELOP A CHART TO SHOW WEEKLY/MONTHLY BTU USE.
RTU POINT LIST
POINT DESCRIPTION POINT ID
ANALOG INPUT
(AI)
BINARY INPUT
(BI)
ANALOG OUTPUT
(AO)
BINARY OUTPUT
(BO)
AV BV TREND
ALARM
POINT
OTHER NOTES
AIR FLOW MEASUREMENT AFT-2 1 X
RA TEMPERATURE TT-1 1 X
RA DAMPER D-1 1
AIR FLOW MEASUREMENT AFT-1 1 X
OA TEMPERATURE TT-2 1 X
OA HUMIDITY HT-1 1 1 X 1
OA DAMPER D-2 1
SMOKE DETECTOR SMD-1 1
LOW PRESSURE SENSOR PSL 1 1 X 1
EA TEMPERATURE TT-3 1 X
EA FAN AIRFLOW AFT-3 3 X
EA FAN START/STOP (X2) 4 4
EA FAN STATUS (X2) 4
EA FAN VFD STATUS (X2) 4 4
EXHAUST AIR DAMPER D-3 1
SUPPLY AIR TEMPERATURE TT-4 1 X
SUPPLY AIR HUMIDITY HT-2 1 X
PREFILTER-1 PRESSURE DROP DPS-1 1 1 X 1
PREFILTER-2 PRESSURE DROP DPS-2 1 1 X 1
INLET AIR TEMPERATURE TT-4 1 X
HEATING CONTROL VALVE V-1 1 X
HW FLOW FT-1 1 X
HWS TEMP TT-A 1 1 X 1
HWR TEMP TT-B 1 X
FREEZE STAT TSL-1 1 1 1
HW COIL OUT AIR TEMPERATURE TT-5 1 X
COOLING COIL CONTROL VALVE V-3 1 X
CHW FLOW FT-2 1 X
CWS TEMP TT-C 1 1 X 1
CWR TEMP TT-D 1 X
CC INLET AIR TEMPERATURE TT-6 1 X
CC OUTLET AIR TEMPERATURE TT-7 1 X
SA FAN AIRFLOW AFT-4 1 X
SA FAN START/STOP (X2) 4 4
SA FAN STATUS (X2) 4
SA FAN VFD STATUS (X2) 4 4
AIR TEMPERATURE TT-8 1 X
FINAL FILTER PRESSURE DROP PDS-4 1 1 X 1
STEAM CONTROL VALVE V-2 1
HUMIDIFIER STATUS CSG-1 1 1
HIGH PRESSURE SENSOR PSH-1 1 1 1
SA SMOKE DETECTOR SMD-2 1 1
SA HUMIDITY HT-4 1 X
SA STATIC PRESSURE SENSOR
RETURN AIR HUMIDITY HT-5 1 X
SUPPLIED BY MC INSTALLED BY FA CONTRACTOR
SUPPLIED BY MC INSTALLED BY FA CONTRACTOR
SYSTEM GRAPHICS 1 NEW GRAPHICS ON EXISITNG FRONT END BMS
SPS-1 1 X
A F
M D
M E
R V
DPS
M E
R V
DPS
1 2
TT
OA
AFT
D-2
HT
HX
M E
R V
H W
H E
A T
IN
G
C H
W C
O O
L
IN
G
H U
M
ID
IF
IE
R
M E
R V
A F
M D
AFT
TT
D-1
RA
DPS
TT
TT
TT
TT
TT
PSL
HT
TSL
HT
V-1
TT
EXHAUST FAN
VFDAFMD
SMD
AFT
D-3
EA
FT
TT
B
TT
A
V-2 (x2)
V-3
FT
TT
D
TT
C
SUPPLY FAN
(TWO FAN ARRAY)
AFMDVFD
AFT
DPS
SA
HT
PSH
SMD
SPS
(2/3 rd DOWNSTREAM)
HT
SUPPLIED BY MC INSTALLED
BY FA CONTRACTOR
SUPPLIED BY MC INSTALLED
BY FA CONTRACTOR
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
VA Southern Nevada Health
System (VASNHS)
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:1
:1
P M
M-503
MECHANICAL CONTROLS
12 15
Tikisha Slan
PA, NAS
Renovate Logistics Space Design
6900 N. Pecos Road North Las Vegas, NV 89086
04/03/2020
100% CONSTRUCTION DOCUMENTS
593-18-30218-352
RBK
Scale: No Scale
STEAM HUMIDIFICATION CONTROLS
Scale: No Scale
RTU SEQUENCE OF OPERATION
Scale: No Scale
RTU CONTROL POINTS LIST
Scale: No Scale
RTU CONTROL SCHEMATIC
SUPPLY SERVICE
WAREHOUSE
BG115
CLEAN STORAGE
BG105
DELIVERY PREP
BG104
PIPING ROOM
CB-7
CORRIDOR
CB-8
BREAK OUT ROOM
BG106
UTILITY TRENCH ACCESS
ROOM
BE103
BG102
STAFF TOILET
BG108
STAFF TOILET
BG107
SA: 2480 CFM
RA: 1740 CFM
SA: 840 CFM
RA: 1060 CFM
SA: 660 CFM
RA: 880 CFM370 CFM 370 CFM
150 CFM
150 CFM
DA
AO - REHEATING VALVE
HW
M
HWS HWR
T
AI - DISCHARGE AIR TEMP
AI - AIRFLOW
M
AO - ZONE DAMPER
SA
T AI - ZONE TEMP
AI - ZONE SETPOINT ADJUST
F
H AI - ZONE HUMIDITY
AI - ZONE HUMIDITY SETPOINT
ADJUST (FOR STORAGE ONLY)
ONLY FOR VAV
ONLY FOR VAV
BREAKOUT
CLEAN ROOM STORAGE
DELIVERY
PREP (DPS)
TO CONTROLLER
TO EF
AI - AIRFLOW
M
AO - ZONE DAMPER
EA
F
CONTROLLER
EV'S TO TRACK VAV'S TO
MAINTAIN PRESSURE
RELATIONSHIP.
VAV TERMINAL UNIT
VARIABLE AIR VOLUME - TERMINAL UNIT
RUN CONDITIONS - CONTINUOUS:
THE UNIT SHALL RUN CONTINUOUSLY TO MAINTAIN HEATING AND COOLING SET POINTS.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN THE COOLING SETPOINT BY A USER
DEFINABLE AMOUNT (ADJ.).
• LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS LESS THAN THE HEATING SETPOINT BY A USER
DEFINABLE AMOUNT (ADJ.).
ZONE SETPOINT ADJUST:
T…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .