02-01-15
SECTION 09 05 16
subsurface preparation for floor finishes Correct Building Deficiencies Project Number: 640-19-112M
PART 1 GENERAL
1.1 DESCRIPTION
This section specifies subsurface preparation requirements for areas to receive the installation of applied and resinous flooring. This section includes removal of existing floor coverings, testing concrete for moisture and pH, remedial floor coating for concrete floor slabs having unsatisfactory moisture or pH conditions, floor leveling and repair as required.
1.2 RELATED WORK
A. Section 07 92 00, JOINT SEALANTS.
B. Section 09 65 16, RESILIENT SHEET FLOORING Section 09 65 19, RESILIENT TILE FLOORING
| FLOORING Section 09 68 00, |
| CARPETING Section 09 68 21, |
1.3 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA and TEST DATA.
B. Written approval confirming product compatibility with subfloor material manufacturer and the flooring manufacturer
| C. | Product Data: |
| 1. | Moisture remediation system |
| 2. | Underlayment Primer |
| 3. | Cementitious Self-Leveling Underlayment |
| 4. | Cementitious Trowel-Applied Underlayment (Not suitable for resinous floor finishes) |
| D. | Test Data: |
| 1. | Moisture test and pH results performed by a qualified independent testing agency or warranty holding manufacturer’s technical representative. |
1.4 DELIVERY AND STORAGE
A. Deliver materials in containers with labels legible and intact and gradeseals unbroken.
B. Store material to prevent damage or contamination.
1.5 APPLICABLE PUBLICATIONS
| A. | Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only. |
| B. | American Society for Testing and Materials (ASTM): |
| D638-10 |
(2010) Test Method for Tensile Properties of Plastics
D4259-88 (2012) Standard Practice for Abrading Concrete to alter the surface profile of the concrete and to remove foreign materials and weak surface laitance.
C109/C109M-12 (2012) Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube Specimens) Modified Air Cure Only
D7234-12 (2012) Standard Test Method for Pull-Off Adhesion Strength of Coatings on Concrete Using Portable Pull-Off Adhesion Testers.
E96/E96M -12 (2012) Standard Test Methods for Water Vapor Transmission of Materials
F710-11 (2011) Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring
F1869-11 (2011) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
F2170-11 (2011) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes
C348-08 (2008) Standard Test Method for Flexural Strength of Hydraulic-Cement Mortars
C191-13 (2013) Standard Test Method for Time of Setting of Hydraulic Cement by Vicat Needle
PART 2 PRODUCTS
2.1 Moisture remediation coating
A. Dry Time: Underlayment shall receive the application of moisture insensitive tile in 6 hours, floor coverings in 16 hours, and resinous flooring in 3-7 days.
B. Primer: compatible and as recommended by manufacturer for use over intended substrate
PART 3 EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS
A. Maintain ambient temperature of work areas at not less than 16 degree C (60 degrees F), without interruption, for not less than 24 hours before testing and not less than three days after testing.
B. Maintain higher temperatures for a longer period of time where required by manufacturer's recommendation.
C. Do not install materials when the temperatures of the substrate or materials are not within 60-85 degrees F/ 16-30 degrees C.
3.2 SURFACE PREPARATION
| A. | Existing concrete slabs with existing floor coverings: |
| 1. | Conduct visual observation of existing floor covering for adhesion, water damage, alkaline deposits, and other defects. |
2. Remove existing floor covering and adhesives. Comply with local, state and federal regulations and the RFCI Recommended Work Practices for Removal of Resilient Floor Coverings, as applicable to the floor covering being removed.
B. Concrete shall meet the requirements of ASTM F710 and be sound, solid, clean, and free of all oil, grease, dirt, curing compounds, and any substance that might act as a bond-breaker before application. As required prepare slab by mechanical methods. No chemicals or solvents shall be used.
C. General: Prepare and clean substrates according to flooring manufacturer's written instructions for substrate indicated.
D. Repair damaged and deteriorated concrete according to flooring manufacturer's written recommendations.
E. Verify that concrete substrates are dry.
F. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with application only after substrates have maximum moisture-vapor-emission rate of per flooring manufactures formal and project specific written recommendation.
G. Perform in situ probe test, ASTM F2170. Proceed with application only after substrates do not exceed a maximum potential equilibrium relative humidity per flooring manufacture’s formal and project specific written recommendation.
H. Provide a written report showing test placement and results.
I. Prepare joints in accordance with Section 07 92 00, JOINT SEALANTS and material manufacturer’s instructions.
3.3 PROTECTION
A. Prior to the installation of the finish flooring, the surface of the underlayment should be protected from abuse by other trades by the use of plywood, tempered hardwood, or other suitable protection course
3.6 field quality control A. Where specified, field sampling of products shall be conducted by a qualified, independent testing facility.
E N D 09 05 16 - 1